Sai Srinivasa Luxuria
Uppala · Medchal-Malkajgiri · RERA P02200001914
Sai Srinivasa Luxuria is a residential apartment project in Mamatha Nagar, Uppal mandal, Medchal-Malkajgiri district, developed by registered promoter Uppala Srinivas. The registered site extent is 501 sq. m., and the project comprises one proposed residential building with a stilt and five floors. The TG-RERA filing lists 10 3BHK apartments, each with a saleable area of 136.1 sq. m. The project is registered under TG-RERA P02200001914, with proposed completion by 28 November 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | Sai Srinivasa Luxuria RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. TG-RERA’s certificate identifies the registered project; the GHMC permit describes one proposed residential building. |
| TG-RERA registration | P02200001914 RERA record |
| Registration validity | 06/07/2020 to 28/11/2024; the certificate says four years and records no extension. This is registration validity, not an occupancy certificate or evidence of project completion. |
| Registered promoter | Uppala Srinivas in the registration certificate and Form B; the project identity record gives the promoter as “Uppala.” RERA record |
| RERA status | Recorded as “On-Going Project”; the supplied registration record shows the registration period ending 28/11/2024. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Mamatha Nagar RERA record |
| Revenue village | Nagole RERA record RERA filing |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500068 RERA record |
| Project survey identity | Survey No. 63 (Sub Division 63/AA); the permit writes this as “63 (SUB DIVISION NO. 63/AA).” RERA record |
| Plot numbers | 20, 21 & 22 RERA filing |
| Registered site extent | 501 sq. m. RERA filing |
| Total / net area | Total area 501 sq. m.; net area 501.00 sq. m. The filed road-affected area is 0 sq. m. RERA filing |
| Boundaries as filed | East: Plot Nos. 13, 14 & 15; west: road; north: Plot No. 23; south: Plot No. 19. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2/C3/18487/2018, dated 28 November 2018 Approvals record |
| Related file number | 2/C3/18222/2018 Approvals record |
| Approved building count and use | One proposed residential building |
| Sanctioned floor configuration | Stilt + 5 floors |
| Approved built-up area | 1,132.70 sq. m. RERA filing |
| Building height | 15 m, as shown in the permit’s sanctioned parameters |
| Parking levels / provision | The permit states that cellar and stilts approved for parking must be used exclusively for vehicle parking. The supplied extraction does not establish a parking-space count or specify a cellar level in the floor configuration. |
| Approved and RERA-filed units | The filed project record reports 10 units; the GHMC permit says sanctioned unit numbers must not be increased without prior approval, but the supplied permit extraction does not state the unit count. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK apartments RERA unit table |
| RERA-filed saleable area | 136.1 sq. m. per unit RERA unit table |
| Booked / available | 4 booked and 6 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table |
| Construction stage | TG-RERA records the project as ongoing. The supplied amenity-progress record lists sewerage at 50% and most other listed infrastructure items at 0%; these are reported progress fields, not an independent site inspection. RERA filing RERA amenities |
| Completion dates | Promoter’s Form B undertaking and the RERA certificate state completion by 28 November 2024. The project identity record gives the same original and revised proposed completion date. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied project documents. The GHMC permit says an occupancy certificate is required before occupation. Document index |
2. The project story
Sai Srinivasa Luxuria is a residential apartment project registered with TG-RERA under P02200001914, on Plot Nos. 20, 21 & 22 in Survey No. 63 (Sub Division 63/AA), Nagole village, Uppal mandal, Medchal-Malkajgiri district. Its locality is recorded as Mamatha Nagar. The filed site extent is 501 sq. m. RERA record RERA filing
The GHMC Building Permit Order describes one proposed residential building with a stilt and five floors, and an approved built-up area of 1,132.70 sq. m. The RERA unit record lists 10 3BHK apartments; it reports 4 booked and 6 available, with no portal as-of date supplied for those counts. RERA unit table
The project is recorded as ongoing, and its disclosed completion date is 28 November 2024. The supplied material does not establish independently verified construction progress or include an occupancy/completion certificate. Reported infrastructure progress is limited in the available RERA amenity record; see the facilities and services sections below. RERA filing RERA record RERA amenities Document index
3. Master plan, architecture & building design
The approved project site area is 501 sq. m., with a stated net area of 501 sq. m. and road-affected area of 0 sq. m. The GHMC permit records one residential building, 15 m in height, with a stilt and five floors, and approved built-up area of 1,132.70 sq. m. These are permit figures; the supplied evidence does not separately identify FSI-counted area or gross built-up area. RERA filing RERA filing
The permit includes conditions for tree planting around the site, a fenced and maintained tot-lot, a rainwater-harvesting structure, transformer space and an on-site garbage house. Its extracted parameters list two rainwater-harvesting pits and 25 trees. The same permit requires the cellar and stilt areas approved for parking to be used exclusively for vehicle parking. These are permit conditions and provisions; the supplied material does not confirm that they have been completed.
The available building-plan extraction does not provide a verified account of floor-by-floor unit arrangement, lifts, stairs, entries, internal circulation, landscape area or the distribution of common areas. The separate floor-plan drawing is used for the software-measured unit information described below. Floor plans
4. Homes, configurations & floor plans
The TG-RERA filing lists 10 3BHK units, each with a saleable area of 136.1 sq. m. The portal-derived booking record shows 4 booked and 6 available, but supplies no as-of date. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 4 | 6 | 136.1 sq. m. | 87.9 sq. m. (software-measured) | 35% (software-derived from drawing data) |
The carpet-area figure is software-measured from the typical floor-plan drawing for one measured 3BHK design, not a TG-RERA carpet-area disclosure; the measurement is flagged as needing review. The RERA saleable area and drawing-measured carpet area are different area measures: carpet area is the usable interior floor area measured from the drawing, while saleable area is the filed saleable figure and may include the home’s share of common areas. The supplied record does not provide a separate balcony area or a RERA-filed carpet area. Floor plans RERA unit details
The measured drawing labels a living/dining room, kitchen, three bedrooms, three toilets, a balcony and a utility area. The recorded dimensions are: living/dining 5.97 × 8.16 m; kitchen 2.2 × 3.5 m; bedrooms 3.0 × 3.7 m, 3.0 × 3.6 m and 3.5 × 3.6 m; toilets 1.63 × 1.74 m, 1.3 × 2.22 m and 1.63 × 1.75 m; utility 1.51 × 2.44 m. No balcony dimensions are supplied. These are drawing-based measurements, not RERA-filed room-area disclosures. RERA unit details
5. Parking & vehicle circulation
The GHMC permit says the cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. It does not provide a parking-space count in the supplied extraction. No separate figures are supplied for visitor, accessible or two-wheeler parking, and the available records do not establish unit-specific parking allocation. Document index
The vendor information lists covered car parking, but this is a vendor-supplied claim rather than a verified count or an allocation record. The available evidence does not describe parking ramps, vehicle entries and exits, internal driveways, pedestrian separation or EV charging. Promoter website
6. Amenities, recreation & open spaces
The GHMC permit specifies certain site provisions, while the TG-RERA amenity record supplies reported availability and progress fields. Percentages below are the figures in that record, not independent verification of completed facilities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot | Permit extraction lists tot-lot area as 0 sq. m.; requires fencing and maintenance as greenery and identifies 25 trees. | RERA record: available “YES,” 0%; not independently verified complete. RERA amenities | |
| Community buildings | No size or facility description supplied. | RERA amenities | RERA record: 0%; no independent verification supplied. |
| Aggregate recreational open space | No area supplied. | RERA amenities | RERA record: 0%; no independent verification supplied. |
Clubhouse/indoor, sports/recreation and convenience/community: The supplied RERA amenity record does not specify clubhouse, indoor recreation or sports facilities. Vendor-listed facilities such as a fitness centre, swimming pool and indoor play areas are not established as sanctioned or delivered by the project documents reviewed here. RERA amenities Promoter website
7. Utilities, building services & safety
The permit requires construction of a rainwater-harvesting structure and lists two rainwater-harvesting pits. It also requires transformer space and a garbage house. The RERA infrastructure record marks water supply as available, but reports 0% progress; sewerage is marked available and 50% progress. These are recorded declarations/progress figures and do not independently confirm operating services. RERA amenities
| Service | Evidence in the supplied record |
|---|---|
| Water | RERA amenity record: “YES” available; progress 0%. The permit requires rainwater harvesting. No water-source, storage, treatment or capacity details are supplied. RERA amenities |
| Sewerage and drainage | RERA record identifies sewerage (chamber, lines, septic tank, STP) as available, at 50%. Storm-water drains and sewage/sullage treatment and disposal are each recorded at 0%. No system capacity or completion evidence is supplied. RERA amenities |
| Electrical | The permit requires transformer space. The RERA record lists the electrical meter room/sub-station/receiving station as available, with 0% progress. No capacity or backup-power details are established by the project-specific approval documents. RERA amenities |
| Vertical transportation | The vendor specification lists a lift; the supplied permit extraction does not provide lift count, capacity or commissioning status. Promoter website |
| Fire and life safety | The RERA record reports fire-protection and fire-safety progress at 0%. The permit states that fire-safety requirements and related services are to be executed under qualified technical supervision. No fire-clearance certificate is supplied. RERA amenities |
| Waste | The permit requires a garbage house; the RERA record reports solid-waste management and disposal at 0%. RERA amenities |
| Accessibility | No project-specific accessibility features or accessible-circulation details are supplied. Document index |
8. Location, access & connectivity
The registered revenue location is Nagole village, Uppal mandal, Medchal-Malkajgiri district, PIN 500068; the project locality is recorded as Mamatha Nagar. The registered plots are 20, 21 & 22 in Survey No. 63 (Sub Division 63/AA). RERA record RERA filing RERA filing
The location record provides a cadastral parcel centroid of 17.38153, 78.56754 and identifies the nearest sampled Outer Ring Road interchange at approximately 8.8 km. This is a location-data estimate, not a stated project travel time. Location record
The supplied vendor material lists nearby landmarks and distances, but these are vendor claims rather than verified project-record connectivity measurements. No project-specific public-transport route or approach-road details are established in the supplied official records. Promoter website Location record
9. Developer & development status
The TG-RERA registration certificate names Uppala Srinivas as promoter; the project identity record shortens this to “Uppala.” The supplied evidence does not establish the promoter’s legal entity type, corporate registration number, registered office, official project contacts or official website. RERA record Corporate record
In Form B, Uppala Srinivas declares legal title to the project land, states that it is free from encumbrances, and undertakes completion by 28 November 2024. These are promoter declarations in the filed affidavit.
The project is recorded as ongoing, with no extension shown in the supplied TG-RERA registration certificate. The RERA amenity record reports 50% progress for sewerage and 0% for most other listed infrastructure items. These entries are reported records, not independently inspected construction progress; no occupancy/completion certificate is supplied. RERA filing RERA amenities Document index
10. Approvals, official records & documents
| Record | Details | Evidence |
|---|---|---|
| TG-RERA registration | Form C certificate for Sai Srinivasa Luxuria, P02200001914, issued 06/07/2020; stated validity through 28/11/2024. The supplied certificate records no extension. | |
| GHMC building permission | Building Permit Order 2/C3/18487/2018, dated 28 November 2018; one proposed residential building, Stilt + 5, approved built-up area 1,132.70 sq. m. | |
| Related GHMC file number | 2/C3/18222/2018 | |
| Layout / subdivision reference in permit | LRS/65/CR-3/EASTZONE/GHMC/2011 | |
| Notarised affidavit number in permit | 20023/2018 | |
| Promoter declaration | Form B affidavit by Uppala Srinivas, dated 09 August 2019. | |
| Floor-plan drawing | Project drawing record used for software measurement of the 3BHK configuration; not a RERA area disclosure. | |
| Occupancy/completion certificate | Not included in the supplied documents. | Document index |
1. Project at a glance
Project identity
Registered project name: Sai Srinivasa Luxuria
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed. TG-RERA’s certificate identifies the registered project; the GHMC permit describes one proposed residential building.
TG-RERA registration: P02200001914
Registration validity: 06/07/2020 to 28/11/2024; the certificate says four years and records no extension. This is registration validity, not an occupancy certificate or evidence of project completion.
Registered promoter: Uppala Srinivas in the registration certificate and Form B; the project identity record gives the promoter as “Uppala.”
RERA status: Recorded as “On-Going Project”; the supplied registration record shows the registration period ending 28/11/2024.
Land and geographic identity
Locality: Mamatha Nagar
Revenue village: Nagole
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500068
Project survey identity: Survey No. 63 (Sub Division 63/AA); the permit writes this as “63 (SUB DIVISION NO. 63/AA).”
Plot numbers: 20, 21 & 22
Registered site extent: 501 sq. m.
Total / net area: Total area 501 sq. m.; net area 501.00 sq. m. The filed road-affected area is 0 sq. m.
Boundaries as filed: East: Plot Nos. 13, 14 & 15; west: road; north: Plot No. 23; south: Plot No. 19.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C3/18487/2018, dated 28 November 2018
Related file number: 2/C3/18222/2018
Approved building count and use: One proposed residential building
Sanctioned floor configuration: Stilt + 5 floors
Approved built-up area: 1,132.70 sq. m.
Building height: 15 m, as shown in the permit’s sanctioned parameters
Parking levels / provision: The permit states that cellar and stilts approved for parking must be used exclusively for vehicle parking. The supplied extraction does not establish a parking-space count or specify a cellar level in the floor configuration.
Approved and RERA-filed units: The filed project record reports 10 units; the GHMC permit says sanctioned unit numbers must not be increased without prior approval, but the supplied permit extraction does not state the unit count.
Offering and status
RERA-filed configuration: 3BHK apartments
RERA-filed saleable area: 136.1 sq. m. per unit
Booked / available: 4 booked and 6 available, as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative.
Construction stage: TG-RERA records the project as ongoing. The supplied amenity-progress record lists sewerage at 50% and most other listed infrastructure items at 0%; these are reported progress fields, not an independent site inspection.
Completion dates: Promoter’s Form B undertaking and the RERA certificate state completion by 28 November 2024. The project identity record gives the same original and revised proposed completion date.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied project documents. The GHMC permit says an occupancy certificate is required before occupation.
2. The project story
Sai Srinivasa Luxuria is a residential apartment project registered with TG-RERA under P02200001914, on Plot Nos. 20, 21 & 22 in Survey No. 63 (Sub Division 63/AA), Nagole village, Uppal mandal, Medchal-Malkajgiri district. Its locality is recorded as Mamatha Nagar. The filed site extent is 501 sq. m.
The GHMC Building Permit Order describes one proposed residential building with a stilt and five floors, and an approved built-up area of 1,132.70 sq. m. The RERA unit record lists 10 3BHK apartments; it reports 4 booked and 6 available, with no portal as-of date supplied for those counts.
The project is recorded as ongoing, and its disclosed completion date is 28 November 2024. The supplied material does not establish independently verified construction progress or include an occupancy/completion certificate. Reported infrastructure progress is limited in the available RERA amenity record; see the facilities and services sections below.
3. Master plan, architecture & building design
The approved project site area is 501 sq. m., with a stated net area of 501 sq. m. and road-affected area of 0 sq. m. The GHMC permit records one residential building, 15 m in height, with a stilt and five floors, and approved built-up area of 1,132.70 sq. m. These are permit figures; the supplied evidence does not separately identify FSI-counted area or gross built-up area.
The permit includes conditions for tree planting around the site, a fenced and maintained tot-lot, a rainwater-harvesting structure, transformer space and an on-site garbage house. Its extracted parameters list two rainwater-harvesting pits and 25 trees. The same permit requires the cellar and stilt areas approved for parking to be used exclusively for vehicle parking. These are permit conditions and provisions; the supplied material does not confirm that they have been completed.
The available building-plan extraction does not provide a verified account of floor-by-floor unit arrangement, lifts, stairs, entries, internal circulation, landscape area or the distribution of common areas. The separate floor-plan drawing is used for the software-measured unit information described below.
4. Homes, configurations & floor plans
The TG-RERA filing lists 10 3BHK units, each with a saleable area of 136.1 sq. m. The portal-derived booking record shows 4 booked and 6 available, but supplies no as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 4 | 6 | 136.1 sq. m. | 87.9 sq. m. (software-measured) | 35% (software-derived from drawing data) |
The carpet-area figure is software-measured from the typical floor-plan drawing for one measured 3BHK design, not a TG-RERA carpet-area disclosure; the measurement is flagged as needing review. The RERA saleable area and drawing-measured carpet area are different area measures: carpet area is the usable interior floor area measured from the drawing, while saleable area is the filed saleable figure and may include the home’s share of common areas. The supplied record does not provide a separate balcony area or a RERA-filed carpet area.
The measured drawing labels a living/dining room, kitchen, three bedrooms, three toilets, a balcony and a utility area. The recorded dimensions are: living/dining 5.97 × 8.16 m; kitchen 2.2 × 3.5 m; bedrooms 3.0 × 3.7 m, 3.0 × 3.6 m and 3.5 × 3.6 m; toilets 1.63 × 1.74 m, 1.3 × 2.22 m and 1.63 × 1.75 m; utility 1.51 × 2.44 m. No balcony dimensions are supplied. These are drawing-based measurements, not RERA-filed room-area disclosures.
5. Parking & vehicle circulation
The GHMC permit says the cellar and stilt areas approved for parking are to be used exclusively for vehicle parking. It does not provide a parking-space count in the supplied extraction. No separate figures are supplied for visitor, accessible or two-wheeler parking, and the available records do not establish unit-specific parking allocation.
The vendor information lists covered car parking, but this is a vendor-supplied claim rather than a verified count or an allocation record. The available evidence does not describe parking ramps, vehicle entries and exits, internal driveways, pedestrian separation or EV charging.
6. Amenities, recreation & open spaces
The GHMC permit specifies certain site provisions, while the TG-RERA amenity record supplies reported availability and progress fields. Percentages below are the figures in that record, not independent verification of completed facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot | Permit extraction lists tot-lot area as 0 sq. m.; requires fencing and maintenance as greenery and identifies 25 trees. | RERA record: available “YES,” 0%; not independently verified complete. | |
| Community buildings | No size or facility description supplied. | RERA record: 0%; no independent verification supplied. | |
| Aggregate recreational open space | No area supplied. | RERA record: 0%; no independent verification supplied. |
Clubhouse/indoor, sports/recreation and convenience/community: The supplied RERA amenity record does not specify clubhouse, indoor recreation or sports facilities. Vendor-listed facilities such as a fitness centre, swimming pool and indoor play areas are not established as sanctioned or delivered by the project documents reviewed here.
7. Utilities, building services & safety
The permit requires construction of a rainwater-harvesting structure and lists two rainwater-harvesting pits. It also requires transformer space and a garbage house. The RERA infrastructure record marks water supply as available, but reports 0% progress; sewerage is marked available and 50% progress. These are recorded declarations/progress figures and do not independently confirm operating services.
Water: RERA amenity record: “YES” available; progress 0%. The permit requires rainwater harvesting. No water-source, storage, treatment or capacity details are supplied.
Sewerage and drainage: RERA record identifies sewerage (chamber, lines, septic tank, STP) as available, at 50%. Storm-water drains and sewage/sullage treatment and disposal are each recorded at 0%. No system capacity or completion evidence is supplied.
Electrical: The permit requires transformer space. The RERA record lists the electrical meter room/sub-station/receiving station as available, with 0% progress. No capacity or backup-power details are established by the project-specific approval documents.
Vertical transportation: The vendor specification lists a lift; the supplied permit extraction does not provide lift count, capacity or commissioning status.
Fire and life safety: The RERA record reports fire-protection and fire-safety progress at 0%. The permit states that fire-safety requirements and related services are to be executed under qualified technical supervision. No fire-clearance certificate is supplied.
Waste: The permit requires a garbage house; the RERA record reports solid-waste management and disposal at 0%.
Accessibility: No project-specific accessibility features or accessible-circulation details are supplied.
8. Location, access & connectivity
The registered revenue location is Nagole village, Uppal mandal, Medchal-Malkajgiri district, PIN 500068; the project locality is recorded as Mamatha Nagar. The registered plots are 20, 21 & 22 in Survey No. 63 (Sub Division 63/AA).
The location record provides a cadastral parcel centroid of 17.38153, 78.56754 and identifies the nearest sampled Outer Ring Road interchange at approximately 8.8 km. This is a location-data estimate, not a stated project travel time.
The supplied vendor material lists nearby landmarks and distances, but these are vendor claims rather than verified project-record connectivity measurements. No project-specific public-transport route or approach-road details are established in the supplied official records.
9. Developer & development status
The TG-RERA registration certificate names Uppala Srinivas as promoter; the project identity record shortens this to “Uppala.” The supplied evidence does not establish the promoter’s legal entity type, corporate registration number, registered office, official project contacts or official website.
In Form B, Uppala Srinivas declares legal title to the project land, states that it is free from encumbrances, and undertakes completion by 28 November 2024. These are promoter declarations in the filed affidavit.
The project is recorded as ongoing, with no extension shown in the supplied TG-RERA registration certificate. The RERA amenity record reports 50% progress for sewerage and 0% for most other listed infrastructure items. These entries are reported records, not independently inspected construction progress; no occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Record | Details | Evidence |
|---|---|---|
| TG-RERA registration | Form C certificate for Sai Srinivasa Luxuria, P02200001914, issued 06/07/2020; stated validity through 28/11/2024. The supplied certificate records no extension. | |
| GHMC building permission | Building Permit Order 2/C3/18487/2018, dated 28 November 2018; one proposed residential building, Stilt + 5, approved built-up area 1,132.70 sq. m. | |
| Related GHMC file number | 2/C3/18222/2018 | |
| Layout / subdivision reference in permit | LRS/65/CR-3/EASTZONE/GHMC/2011 | |
| Notarised affidavit number in permit | 20023/2018 | |
| Promoter declaration | Form B affidavit by Uppala Srinivas, dated 09 August 2019. | |
| Floor-plan drawing | Project drawing record used for software measurement of the 3BHK configuration; not a RERA area disclosure. | |
| Occupancy/completion certificate | Not included in the supplied documents. |
Frequently asked questions
Is Sai Srinivasa Luxuria registered with Telangana RERA?
Yes. Sai Srinivasa Luxuria is registered with the Telangana Real Estate Regulatory Authority as P02200001914; the registration status is On-Going Project.
Who is the developer of Sai Srinivasa Luxuria?
The promoter named in the RERA registration is Uppala.
Where is Sai Srinivasa Luxuria located?
Sai Srinivasa Luxuria is in Mamatha Nagar, Nagole, Uppal, Medchal-Malkajgiri, Telangana (500068).
When will Sai Srinivasa Luxuria be completed?
The promoter's proposed date of completion filed with RERA is 28/11/2024. This is the promoter's declaration, not a guarantee.
More projects in Nagole