Janani Pride

JANANI INFRA · Rangareddy · RERA P02400001522

JANANI PRIDE is a residential apartment project in Mansoorabad, Saroornagar Mandal, Ranga Reddy District, developed by registered promoter JANANI INFRA. The project occupies 669.05 m² and comprises one residential building, Building-A, with 1 Stilt + 5 upper floors and 20 homes: 10 1BHK units of 42.03 sq. m each and 10 2BHK units of 58.25 sq. m each. It is registered with TG-RERA under P02400001522, and the promoter’s Form B states completion by 13 - 12-2024.

01What we found

Period endedTG-RERA registration ran to 13 Dec 2024 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameJANANI PRIDE
Project typeResidential apartment project RERA record
Phase / registered portionA single registered project is evidenced; phase designation is not disclosed. The filed building approval identifies Building-A.
TG-RERA registrationP02400001522, granted under section 5; certificate issued 27/12/2019.
Registration validity27/12/2019 to 13/12/2024 (certificate states four years); no extension is recorded in the supplied registration data. This is registration validity, not a current occupancy certificate.
Registered promoterJANANI INFRA; organization type recorded as Partnership. RERA record RERA filing
RERA status in supplied recordRegistration certificate is present; the supplied record gives the validity end date as 13/12/2024 and does not record an extension.

Land and geographic identity

ItemProject record
Locality / revenue villageMansoorabad; the building permit and title records describe Mansoorabad Village. RERA record Land records
Mandal / district / PINSaroornagar / Ranga Reddy / 500068. RERA record
Project survey number(s)Survey No. 32; no subdivision is specified in the supplied project identity or registration certificate. Land records
Plot numbers190, 191 and 192. RERA filing
Registered site extentThe filed building permit states site area 669.05 m² and net area 669.05 m². The RERA land record likewise gives total area and net area as 669.05 sq. m. Land records
Boundaries recorded in RERA land detailsEast: PLOT NO 146 147 148; West: ROAD WIDTH 9; North: PLOT NO 193; South: PLOT NO 189. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC).
Principal building approvalBuilding Permit Order 2/C3/18870/2018, approved 13 December, 2018; related file number 2/C3/21515/2018. Approvals record
Approved built-up areaRERA project information records approved built-up area as 1938.80 sq. m. The permit extraction separately lists 1,590.05 for residential upper floors and 336.35 for the stilt; those extracted component figures are shown as recorded, without treating them as a substitute for the RERA approved built-up-area field. RERA filing
Building count and sanctioned configuration1 building, Building-A (residential), with 1 Stilt + 5 upper floors. The permit extraction records height as 15 m.
Parking configurationStilt is approved for parking under the permit conditions; a sanctioned parking-space count and any unit-wise allocation are not supplied.
Unit count20 units in the RERA unit record: 10 1BHK and 10 2BHK. RERA unit table

Offering and status

ItemProject record
Unit types and RERA saleable area1BHK: 10 units, 42.03 sq. m each; 2BHK: 10 units, 58.25 sq. m each. These are RERA-filed saleable areas. RERA unit table RERA unit details
Booked / availableThe portal-read record shows 0 booked and 10 available for each configuration (20 available in total). The record has no as-of date, so these counts are indicative rather than a current inventory confirmation. RERA unit table
Construction stageNo independently verified site-progress measurement is supplied. The TG-RERA amenity progress fields show 0% for each listed item; this is a filed progress record, not an independent site inspection. RERA amenities
Completion dateThe promoter’s Form B undertaking states completion by 13 - 12-2024. No revised completion date is supplied.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project evidence. The building permit says an occupancy certificate is compulsory before occupation.

2. The project story

JANANI PRIDE is registered as a residential apartment project on Survey No. 32, at Plot Nos. 190, 191 and 192 in Mansoorabad, Saroornagar Mandal, Ranga Reddy District. The TG-RERA-filed project record describes one residential building, Building-A, and lists 20 homes: ten 1BHK and ten 2BHK units. RERA record Land records RERA unit table

GHMC’s filed building permit, dated 13 December, 2018, sanctions a building configuration of one stilt level and five upper floors. The promoter’s Form B declares a completion date of 13 December 2024. The supplied record does not establish actual construction progress through an independent inspection, or document that an occupancy/completion certificate has been issued. The permit requires an occupancy certificate before occupation. RERA amenities

3. Master plan, architecture & building design

The RERA-filed land record and GHMC building permit identify a 669.05 m² site in Survey No. 32. The permit identifies a single residential building, Building-A, with 1 Stilt + 5 upper floors and a recorded height of 15 m. No tower grouping or separate phases are identified in the supplied evidence. Land records

The RERA project-information field reports 1938.80 sq. m as approved built-up area. The permit extraction separately lists 1,590.05 for residential upper floors and 336.35 for the stilt. These are distinct recorded figures; the supplied material does not define them as carpet area, saleable area or FSI-counted area. RERA filing

The permit records 0 road-affected area and 0 tot-lot area, and lists a 3.5 setback figure. It also requires peripheral greenery and tree planting, a fenced tot-lot maintained as greenery, a rainwater-harvesting structure, transformer space and a garbage house. These are approval conditions; the evidence does not establish their completion.

Two floor-plan drawings are noted, but neither has a software measurement available; no flat-level room dimensions or measured carpet areas can therefore be reported from the supplied drawing record. Floor plans

4. Homes, configurations & floor plans

The RERA-filed unit schedule lists 20 apartments across two configurations. The floor-plan drawings have not been software-measured, so there is no drawing-derived carpet-area or room-measurement figure to report. Saleable area and carpet area are different measures: the supplied floor-plan note says saleable area includes a home’s share of common areas and that software-measured carpet area, where available, would be a drawing measurement rather than a RERA disclosure. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK1001042.03 sq. mNot measuredNot supplied
2BHK1001058.25 sq. mNot measuredNot supplied

The booking and availability figures are from the TG-RERA portal read and carry no as-of date; confirm current inventory directly before relying on them. RERA unit table

5. Parking & vehicle circulation

The GHMC permit conditions state that the stilt approved for parking must be used exclusively for vehicle parking and not converted or misused for another purpose. The permit also specifies one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m.

A parking-space count, visitor or accessible-space provision, two-wheeler count, ramp arrangement, and unit-specific parking allocation are not available in the supplied evidence. The approval of stilt parking does not by itself establish an exclusive parking entitlement for a particular apartment.

6. Amenities, recreation & open spaces

The TG-RERA amenity record lists the following project items. Its progress fields show 0% for each; this is the status in that record, not an independent verification of site conditions. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not suppliedTG-RERA amenity record0%; not independently verified
Water supplyMarked “YES”; capacity/source not suppliedTG-RERA amenity record0%; not independently verified
SewerageChambers, lines, septic tank/STP listed; size or capacity not suppliedTG-RERA amenity record0%; not independently verified
Storm-water drainsSize or layout not suppliedTG-RERA amenity record0%; not independently verified
Green strip / tot-lot / parkSize not supplied; permit requires greenery and a fenced tot-lotTG-RERA amenity record; GHMC permit0%; not independently verified
Street lightingDetails not suppliedTG-RERA amenity record0%; not independently verified
Community buildingsType or size not suppliedTG-RERA amenity record0%; not independently verified
Sewage and sullage treatment/disposalSystem details and capacity not suppliedTG-RERA amenity record0%; not independently verified
Solid-waste management and disposalDetails not supplied; permit also requires a garbage houseTG-RERA amenity record; GHMC permit0%; not independently verified
Water conservation / rainwater harvestingDetails not supplied; permit requires a rainwater-harvesting structure and records No. of RWHPs 4TG-RERA amenity record; GHMC permit0%; not independently verified
Energy managementDetails not suppliedTG-RERA amenity record0%; not independently verified
Fire protection and safetySystem details not supplied; see utility and safety sectionTG-RERA amenity record; GHMC permit0%; not independently verified
Electrical meter room / sub-station / receiving stationDetails not supplied; permit requires transformer spaceTG-RERA amenity record; GHMC permit0%; not independently verified
Recreational open spaceAggregate area not supplied; permit records tot-lot area as 0TG-RERA amenity record; GHMC permit0%; not independently verified

A third-party listing mentions a clubhouse, swimming pool, gym and children’s play area, but these are not established as sanctioned or delivered project facilities in the supplied TG-RERA project record and are not treated as confirmed amenities here. Promoter website

7. Utilities, building services & safety

The building permit requires a rainwater-harvesting structure and records No. of RWHPs 4. It also requires space for a transformer, a garbage house, and an ETP as per standard specification. The RERA amenity record marks water supply “YES” but provides no source, storage or treatment capacity; the listed sewerage, storm-water, waste and energy items have no technical capacities in the supplied data. RERA amenities

For fire and life safety, the permit conditions specify a separate underground static water-storage tank of 25,000 litres and a separate terrace tank of 25,000 litres for residential buildings. They also call for fire extinguishers, a manually operated alarm system, hose reel and down-comer, emergency lighting in corridors/common passages and staircases, a generator as an alternate electricity source, and a fire-resistant swing door for collapsible lifts. Automatic sprinklers are specified if basement area exceeds 200 sq. m. These are permit conditions; the supplied evidence does not confirm installation or completion.

The permit refers to lifts and requires services including sanitation, plumbing, fire safety and electrical installations to be executed under qualified technical supervision. Lift count, capacity, accessibility features, power-backup capacity, CCTV, access-control systems and EV charging provision are not established in the supplied project documents.

8. Location, access & connectivity

The official project location is Mansoorabad Village, Saroornagar Mandal, Ranga Reddy District, PIN 500068, on Survey No. 32 and Plot Nos. 190, 191 and 192. The building permit describes the site as Mansoorabad; the TG-RERA certificate records locality as Saroornagar. RERA record Land records

The location dataset supplies these nearby mapped points and distances: Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; an unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; ADP, 0.0 km; South India Shopping Mall, 2.6 km; an unnamed park, 1.2 km; and Nanakramguda Government Primary School, 0.5 km. These are supplied mapped distances; no travel times or route conditions are provided. Location record

9. Developer & development status

The registered promoter is JANANI INFRA, recorded as a partnership. The RERA record names VATTE NAVEEN KUMAR REDDY as authorized signatory and lists five other partners: BOBBALA MAHENDAR REDDY, SEENA REDDY, VODAPALLI SUDARSHAN, VATTI ANANTALAKSHMI and PASHAM LINGA REDDY. RERA filing Parties record

The promoter’s Form B, dated 09/04/2019, declares legal title to the project land, states that the land is free from encumbrances, and undertakes completion by 13 - 12-2024. These are promoter declarations in the filed form.

The project record includes an ICICI Bank account entry for the promoter’s designated account, with account number masked as 1741, branch MANSOORABAD, IFSC ICIC0001314**. No verified construction-progress percentage or occupancy/completion certificate is supplied. Parties record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for JANANI PRIDE, registration P02400001522, issued 27/12/2019, valid through 13/12/2024.
GHMC building permitBuilding Permit Order 2/C3/18870/2018, dated 13 December, 2018, for Building-A at Plot Nos. 190, 191 and 192, Survey No. 32, Mansoorabad; related file 2/C3/21515/2018.
Plan/layout recordsA layout-plan document is listed in the RERA filing, but it is not extracted in the supplied evidence. No independent layout-portal verification is available here. Document index HMDA
Promoter declarationForm B affidavit-cum-declaration dated 09/04/2019, including the promoter’s title, encumbrance and completion declarations.
Occupancy / completion certificateNo such certificate is included in the supplied evidence. The GHMC permit requires an occupancy certificate before occupation.

The supplied overview evidence does not include a site inspection, measured construction-progress report, or current occupancy/completion certificate. No detailed conclusion about the current physical completion status can be drawn from the filed approval and promoter declaration alone.

Frequently asked questions

Is JANANI PRIDE registered with Telangana RERA?

Yes. JANANI PRIDE is registered with the Telangana Real Estate Regulatory Authority as P02400001522; the registration status is New Project.

Who is the developer of JANANI PRIDE?

The promoter named in the RERA registration is JANANI INFRA.

Where is JANANI PRIDE located?

JANANI PRIDE is in MANSOORABAD, Saroornagar, Rangareddy, Telangana (500068).

When will JANANI PRIDE be completed?

The promoter's proposed date of completion filed with RERA is 13/12/2024. This is the promoter's declaration, not a guarantee.