Pratham Arcade
RAJASHREE DEVELOPERS · Rangareddy · RERA P02400004732
PRATHAM ARCADE is a residential apartment project in Mansoorabad / Shiva Ganga Colony, Saroornagar, Ranga Reddy district, developed by registered promoter RAJASHREE DEVELOPERS, a partnership. The project has a registered site area of 483.12 sq. m. and one building, BLDG-1, with 1 Stilt + 5 upper floors; the TG-RERA filing records 10 3BHK units, each with a saleable area of 120.83 sq. m. Its TG-RERA registration number is P02400004732, and the project header records proposed completion as 25/06/2028.
More from Rajashree Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | PRATHAM ARCADE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration and building permit relate to the project at Plot Nos. 20 & 21 RERA filing |
| TG-RERA registration | P02400004732 RERA record |
| Registration validity | Issued 19/07/2022; stated valid through 25/02/2028. Registration validity is distinct from the project completion date. Approvals record |
| Registered promoter | RAJASHREE DEVELOPERS, a partnership Parties record RERA filing |
| RERA status | Registered; status recorded as “New Project.” RERA record RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Mansoorabad / Shiva Ganga Colony, Saroornagar RERA record RERA filing |
| Revenue village | Mansoorabad RERA record RERA filing |
| Mandal | Saroornagar RERA record RERA filing |
| District | Ranga Reddy RERA record RERA filing |
| PIN | 500074 RERA record |
| Survey number(s) | 66/9; building permit specifies 66/9 PART. RERA filing |
| Plot numbers | 20 & 21 RERA filing |
| Registered site area | 483.12 sq. m.; net area 483.12 sq. m. and road-/nala-affected areas recorded as 0 sq. m. RERA filing |
| Boundaries | North: ROAD WIDTH - 9; south, east and west: EXISTING BUILDING RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2/C5/00208/2022, approved 25 February, 2022 Approvals record |
| Related GHMC file number | 2/C5/06151/2020 |
| Approved built-up area | The extracted permit records residential upper-floors area 1,387.10 m² and stilt parking area 263.03 m². |
| Building count and configuration | 1 building, BLDG-1; sanctioned as 1 Stilt + 5 upper floors. RERA filing |
| Height | 15 m |
| Parking levels | Stilt parking is shown in the permit; the permit states that stilt parking is to be used exclusively for vehicle parking. |
| Unit count | 10 units recorded in the TG-RERA unit filing; the permit extract does not provide a separate unit count. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 120.83 sq. m. RERA unit table RERA unit details |
| Booking / availability | 0 booked; 10 available in the portal record, which has no stated as-of date; treat as indicative. RERA unit table |
| Construction stage | No site-progress stage or independently verified construction status is supplied. The project is described as under construction only in vendor-supplied material. Promoter website |
| Completion date | Promoter’s Form-B declaration undertakes completion by 25/02/2028. A separate header field records proposed completion as 25/06/2028; no revised-completion order or explanation is supplied. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied in the project records reviewed. The building permit requires an occupancy certificate before occupation. Document index |
2. The project story
PRATHAM ARCADE is registered as a residential apartment project on Plot Nos. 20 & 21 in Survey No. 66/9 (the building permit specifies 66/9 PART) in Mansoorabad village, Saroornagar mandal, Ranga Reddy district. The registered site area is 483.12 sq. m. RERA record RERA filing
The building permit records one residential building, BLDG-1, with 1 stilt + 5 upper floors. The TG-RERA unit data records ten 3BHK units, with all ten shown as available and none booked in the portal extract; that extract does not state when the booking information was captured. RERA unit table
No independently verified site progress is provided. The promoter’s Form-B declaration states a completion undertaking of 25/02/2028; the separate project header records a proposed completion date of 25/06/2028. No supplied record establishes an occupancy certificate or completion of any building portion. RERA record Document index
3. Master plan, architecture & building design
The GHMC building permit identifies one building, BLDG-1, on a site of 483.12 m², with 1 stilt + 5 upper floors and a stated height of 15 m. It records 1,387.10 m² as residential upper-floors area and 263.03 m² as stilt parking area. The permit extract does not establish a separate FSI-counted area, gross built-up area, building footprint, or floor-by-floor unit arrangement.
The site boundaries recorded in the RERA filing are an existing building to the east, south and west, and a road identified as ROAD WIDTH - 9 to the north. The permit requires specified setbacks of 2.5 m Side I, 2.5 m Side II, 2.5 m Front and 3 m Rear. RERA filing
The permit extract does not provide details of lifts, staircases, flat count per floor, entry/exit arrangements, internal circulation, or phase-wise organization. It records Tot-lot (m²) 0 and 20 Trees; it does not provide a measured landscaped or recreational-open-space area.
The separate GHMC proceedings concerning Plot Nos. 20 and 21 include layout-regularization information for Sy. No. 66/9. These proceedings record plot areas of 289.00 SQ YDS, [OR] 241.93 SQ MTRS and identify road-width references; they are distinct from the building-permit description of the apartment building.
4. Homes, configurations & floor plans
The TG-RERA filing records ten 3BHK units, each with a filed saleable area of 120.83 sq. m. The portal shows zero booked and ten available, without an as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 120.83 sq. m. | Software-measured from drawings: median 117.8 sq. m.; range 114.3–118.3 sq. m. | Not supplied |
The carpet-area figures are software measurements from the supplied floor-plan drawings, not RERA-filed measurements; the measurement record says they require review. Saleable area is the RERA-filed figure and is not interchangeable with carpet area; the supplied drawing-analysis caveat notes that saleable area also counts the home’s share of common areas. No loading figure is supplied. Floor plans RERA unit details
The measured drawing set covers 4 flat designs. A supplied second-floor plan measurement for one flat identifies living/dining, kitchen, three bedrooms, three toilets, a dressroom, puja space and wash area; the room dimensions are drawing-derived software measurements, not RERA disclosures. RERA unit details
5. Parking & vehicle circulation
The building permit records 263.03 m² of stilt parking area and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extract does not state a number of car or two-wheeler spaces, visitor or accessible provision, parking allocation by unit, or ramp and driveway arrangements.
The unit record marks the 3BHK configuration as mortgaged, but the supplied material does not identify a unit-specific parking allocation or establish exclusive ownership of any parking bay. RERA unit table
6. Amenities, recreation & open spaces
The following are recorded in the project permit or TG-RERA amenity filing. The progress percentages shown in the amenity record are 0; no independent completion verification is supplied. RERA amenities
| Description / size | Recorded as available “YES”; permit extract records Tot-lot (m²) 0. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record and GHMC permit |
| Declared progress / verified status | Amenity progress 0; not independently verified complete. |
| Description / size | TG-RERA amenity record says available “YES”; permit requires a rainwater-harvesting percolation pit and records No. of RWHPs 4. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record and GHMC permit |
| Declared progress / verified status | Amenity progress 0; no completion verification supplied. |
| Description / size | 20 Trees recorded in the building-permit extract. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | No completion or planting-status evidence supplied. |
| Description / size | Listed in the TG-RERA amenity record; no size or quantity supplied. RERA amenities |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | Progress 0; no independent status supplied. |
No project-specific evidence in the supplied RERA amenity or permit records establishes a clubhouse, swimming pool, gym, or children’s play facility.
7. Utilities, building services & safety
The TG-RERA amenity record marks water supply, sewerage and electrical meter room/sub-station/receiving station as available “YES”; it does not provide capacities, system specifications or completion evidence. The GHMC permit extract requires space for a transformer, a garbage house within the premises, and an ETP. It also records four rainwater-harvesting pits and requires a rainwater-harvesting percolation pit. RERA amenities
| Service | Evidence in supplied records |
|---|---|
| Water | RERA amenity record: water supply available “YES.” No source, storage or treatment capacity is stated in that record. RERA amenities |
| Sewerage / treatment | RERA amenity record lists sewerage and treatment/disposal of sewage and sullage water; the permit requires an ETP. No capacities or installed/completed status are supplied. RERA amenities |
| Storm-water drainage | Listed in the RERA amenity record; progress shown as 0. RERA amenities |
| Electrical | RERA amenity record marks electrical meter room/sub-station/receiving station available “YES”; the permit requires space for a transformer. No supply or backup capacity is supplied in the project-specific permit extract. RERA amenities |
| Fire and life safety | The permit states that an occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate. No Fire NOC or completed fire-system evidence is supplied. |
| Waste | The permit requires a garbage house within the premises; no completion status is supplied. |
| Lifts, accessibility and security | No project-specific lift, accessible-circulation, CCTV or access-control details are established by the supplied RERA permit and amenity records. RERA amenities |
8. Location, access & connectivity
The registered project location is Mansoorabad, Saroornagar, in Mansoorabad revenue village, Saroornagar mandal, Ranga Reddy district, PIN 500074. The RERA-filed boundaries identify a road to the north as ROAD WIDTH - 9, with existing buildings to the other three sides. RERA record RERA filing RERA filing
The supplied location record gives the Outer Ring Road nearest sampled interchange at 7.0 km. This is a recorded approximate distance, not a travel-time estimate. No project-specific public-transport routes, approach-road measurements, or additional verified landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is RAJASHREE DEVELOPERS, identified in the RERA filing as a partnership. The supplied promoter identifier includes GSTIN 36AAVFR9448N1ZY. The RERA record lists AKINAPALLY RAJ KUMAR as authorized signatory and AKINAPALLY LATHA as partner. A registered-office address or official promoter website/contact details are not established in the supplied project record. Parties record RERA filing Corporate record
The promoter’s Form-B affidavit, signed by AKINAPALLY RAJKUMAR as authorized signatory, declares title to the land, states that the land is free from encumbrances, and undertakes project completion by 25/02/2028. These are promoter declarations in the registration material.
No project-specific construction-progress percentage or independently verified site-progress report is supplied. The registered project record identifies one building and ten RERA-filed units; no phase-wise development schedule is provided. RERA filing RERA unit table RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02400004732; issued 19/07/2022 |
|---|---|
| What the supplied record establishes | FORM ‘C’ registration for PRATHAM ARCADE, stated valid through 25/02/2028, subject to its listed conditions. |
| Identifier / date | 2/C5/00208/2022; 25 February, 2022 |
|---|---|
| What the supplied record establishes | Building permission for BLDG-1 on Plot Nos. 20 & 21, Survey No. 66/9 PART, with 1 Stilt + 5 upper floors. |
| Identifier / date | 2/C5/06151/2020 |
|---|---|
| What the supplied record establishes | File number associated with the building-permit record. |
| Identifier / date | LRS29052018035701 and LRS29052018035739; proceedings record dated 29/05/2018 |
|---|---|
| What the supplied record establishes | Proceedings concerning regularization of Plot Nos. 20 and 21 in Sy. No. 66/9. The supplied extraction also references application numbers 3000058678 and 3000058681. |
| Identifier / date | Filed for PRATHAM ARCADE |
|---|---|
| What the supplied record establishes | Promoter declarations on title, encumbrances, completion undertaking and project obligations. |
| Identifier / date | 242795 |
|---|---|
| What the supplied record establishes | Drawing material used for software measurement; the supplied review notes measured carpet area requires review. |
| Identifier / date | 242795 Document index |
|---|---|
| What the supplied record establishes | The supplied record identifies a layout-plan submission, but no extracted layout-plan content is available here. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No such certificate is established in the reviewed project documents. |
The building permit states that the permission does not confer ownership rights, requires adherence to the sanctioned plan, and requires an occupancy certificate before occupation. It also specifies that an occupancy Fire NOC is to be obtained before issue of the occupancy certificate.
1. Project at a glance
Project identity
Registered project name: PRATHAM ARCADE
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration and building permit relate to the project at Plot Nos. 20 & 21
TG-RERA registration: P02400004732
Registration validity: Issued 19/07/2022; stated valid through 25/02/2028. Registration validity is distinct from the project completion date.
Registered promoter: RAJASHREE DEVELOPERS, a partnership
RERA status: Registered; status recorded as “New Project.”
Land and geographic identity
Locality: Mansoorabad / Shiva Ganga Colony, Saroornagar
Revenue village: Mansoorabad
Mandal: Saroornagar
District: Ranga Reddy
PIN: 500074
Survey number(s): 66/9; building permit specifies 66/9 PART.
Plot numbers: 20 & 21
Registered site area: 483.12 sq. m.; net area 483.12 sq. m. and road-/nala-affected areas recorded as 0 sq. m.
Boundaries: North: ROAD WIDTH - 9; south, east and west: EXISTING BUILDING
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C5/00208/2022, approved 25 February, 2022
Related GHMC file number: 2/C5/06151/2020
Approved built-up area: The extracted permit records residential upper-floors area 1,387.10 m² and stilt parking area 263.03 m².
Building count and configuration: 1 building, BLDG-1; sanctioned as 1 Stilt + 5 upper floors.
Height: 15 m
Parking levels: Stilt parking is shown in the permit; the permit states that stilt parking is to be used exclusively for vehicle parking.
Unit count: 10 units recorded in the TG-RERA unit filing; the permit extract does not provide a separate unit count.
Offering and status
RERA-filed configuration: 3BHK
RERA-filed saleable area: 120.83 sq. m.
Booking / availability: 0 booked; 10 available in the portal record, which has no stated as-of date; treat as indicative.
Construction stage: No site-progress stage or independently verified construction status is supplied. The project is described as under construction only in vendor-supplied material.
Completion date: Promoter’s Form-B declaration undertakes completion by 25/02/2028. A separate header field records proposed completion as 25/06/2028; no revised-completion order or explanation is supplied.
Occupancy / completion certificate: No occupancy or completion certificate is supplied in the project records reviewed. The building permit requires an occupancy certificate before occupation.
2. The project story
PRATHAM ARCADE is registered as a residential apartment project on Plot Nos. 20 & 21 in Survey No. 66/9 (the building permit specifies 66/9 PART) in Mansoorabad village, Saroornagar mandal, Ranga Reddy district. The registered site area is 483.12 sq. m.
The building permit records one residential building, BLDG-1, with 1 stilt + 5 upper floors. The TG-RERA unit data records ten 3BHK units, with all ten shown as available and none booked in the portal extract; that extract does not state when the booking information was captured.
No independently verified site progress is provided. The promoter’s Form-B declaration states a completion undertaking of 25/02/2028; the separate project header records a proposed completion date of 25/06/2028. No supplied record establishes an occupancy certificate or completion of any building portion.
3. Master plan, architecture & building design
The GHMC building permit identifies one building, BLDG-1, on a site of 483.12 m², with 1 stilt + 5 upper floors and a stated height of 15 m. It records 1,387.10 m² as residential upper-floors area and 263.03 m² as stilt parking area. The permit extract does not establish a separate FSI-counted area, gross built-up area, building footprint, or floor-by-floor unit arrangement.
The site boundaries recorded in the RERA filing are an existing building to the east, south and west, and a road identified as ROAD WIDTH - 9 to the north. The permit requires specified setbacks of 2.5 m Side I, 2.5 m Side II, 2.5 m Front and 3 m Rear.
The permit extract does not provide details of lifts, staircases, flat count per floor, entry/exit arrangements, internal circulation, or phase-wise organization. It records Tot-lot (m²) 0 and 20 Trees; it does not provide a measured landscaped or recreational-open-space area.
The separate GHMC proceedings concerning Plot Nos. 20 and 21 include layout-regularization information for Sy. No. 66/9. These proceedings record plot areas of 289.00 SQ YDS, [OR] 241.93 SQ MTRS and identify road-width references; they are distinct from the building-permit description of the apartment building.
4. Homes, configurations & floor plans
The TG-RERA filing records ten 3BHK units, each with a filed saleable area of 120.83 sq. m. The portal shows zero booked and ten available, without an as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 120.83 sq. m. | Software-measured from drawings: median 117.8 sq. m.; range 114.3–118.3 sq. m. | Not supplied |
The carpet-area figures are software measurements from the supplied floor-plan drawings, not RERA-filed measurements; the measurement record says they require review. Saleable area is the RERA-filed figure and is not interchangeable with carpet area; the supplied drawing-analysis caveat notes that saleable area also counts the home’s share of common areas. No loading figure is supplied.
The measured drawing set covers 4 flat designs. A supplied second-floor plan measurement for one flat identifies living/dining, kitchen, three bedrooms, three toilets, a dressroom, puja space and wash area; the room dimensions are drawing-derived software measurements, not RERA disclosures.
5. Parking & vehicle circulation
The building permit records 263.03 m² of stilt parking area and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied permit extract does not state a number of car or two-wheeler spaces, visitor or accessible provision, parking allocation by unit, or ramp and driveway arrangements.
The unit record marks the 3BHK configuration as mortgaged, but the supplied material does not identify a unit-specific parking allocation or establish exclusive ownership of any parking bay.
6. Amenities, recreation & open spaces
The following are recorded in the project permit or TG-RERA amenity filing. The progress percentages shown in the amenity record are 0; no independent completion verification is supplied.
| Description / size | Recorded as available “YES”; permit extract records Tot-lot (m²) 0. |
|---|---|
| Evidence source | TG-RERA amenity record and GHMC permit |
| Declared progress / verified status | Amenity progress 0; not independently verified complete. |
| Description / size | TG-RERA amenity record says available “YES”; permit requires a rainwater-harvesting percolation pit and records No. of RWHPs 4. |
|---|---|
| Evidence source | TG-RERA amenity record and GHMC permit |
| Declared progress / verified status | Amenity progress 0; no completion verification supplied. |
| Description / size | 20 Trees recorded in the building-permit extract. |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | No completion or planting-status evidence supplied. |
| Description / size | Listed in the TG-RERA amenity record; no size or quantity supplied. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | Progress 0; no independent status supplied. |
No project-specific evidence in the supplied RERA amenity or permit records establishes a clubhouse, swimming pool, gym, or children’s play facility.
7. Utilities, building services & safety
The TG-RERA amenity record marks water supply, sewerage and electrical meter room/sub-station/receiving station as available “YES”; it does not provide capacities, system specifications or completion evidence. The GHMC permit extract requires space for a transformer, a garbage house within the premises, and an ETP. It also records four rainwater-harvesting pits and requires a rainwater-harvesting percolation pit.
Water: RERA amenity record: water supply available “YES.” No source, storage or treatment capacity is stated in that record.
Sewerage / treatment: RERA amenity record lists sewerage and treatment/disposal of sewage and sullage water; the permit requires an ETP. No capacities or installed/completed status are supplied.
Storm-water drainage: Listed in the RERA amenity record; progress shown as 0.
Electrical: RERA amenity record marks electrical meter room/sub-station/receiving station available “YES”; the permit requires space for a transformer. No supply or backup capacity is supplied in the project-specific permit extract.
Fire and life safety: The permit states that an occupancy Fire NOC is to be obtained from the Director (EV&DM) before issue of an occupancy certificate. No Fire NOC or completed fire-system evidence is supplied.
Waste: The permit requires a garbage house within the premises; no completion status is supplied.
Lifts, accessibility and security: No project-specific lift, accessible-circulation, CCTV or access-control details are established by the supplied RERA permit and amenity records.
8. Location, access & connectivity
The registered project location is Mansoorabad, Saroornagar, in Mansoorabad revenue village, Saroornagar mandal, Ranga Reddy district, PIN 500074. The RERA-filed boundaries identify a road to the north as ROAD WIDTH - 9, with existing buildings to the other three sides.
The supplied location record gives the Outer Ring Road nearest sampled interchange at 7.0 km. This is a recorded approximate distance, not a travel-time estimate. No project-specific public-transport routes, approach-road measurements, or additional verified landmark distances are supplied.
9. Developer & development status
The registered promoter is RAJASHREE DEVELOPERS, identified in the RERA filing as a partnership. The supplied promoter identifier includes GSTIN 36AAVFR9448N1ZY. The RERA record lists AKINAPALLY RAJ KUMAR as authorized signatory and AKINAPALLY LATHA as partner. A registered-office address or official promoter website/contact details are not established in the supplied project record.
The promoter’s Form-B affidavit, signed by AKINAPALLY RAJKUMAR as authorized signatory, declares title to the land, states that the land is free from encumbrances, and undertakes project completion by 25/02/2028. These are promoter declarations in the registration material.
No project-specific construction-progress percentage or independently verified site-progress report is supplied. The registered project record identifies one building and ten RERA-filed units; no phase-wise development schedule is provided.
10. Approvals, official records & documents
| Identifier / date | P02400004732; issued 19/07/2022 |
|---|---|
| What the supplied record establishes | FORM ‘C’ registration for PRATHAM ARCADE, stated valid through 25/02/2028, subject to its listed conditions. |
| Identifier / date | 2/C5/00208/2022; 25 February, 2022 |
|---|---|
| What the supplied record establishes | Building permission for BLDG-1 on Plot Nos. 20 & 21, Survey No. 66/9 PART, with 1 Stilt + 5 upper floors. |
| Identifier / date | 2/C5/06151/2020 |
|---|---|
| What the supplied record establishes | File number associated with the building-permit record. |
| Identifier / date | LRS29052018035701 and LRS29052018035739; proceedings record dated 29/05/2018 |
|---|---|
| What the supplied record establishes | Proceedings concerning regularization of Plot Nos. 20 and 21 in Sy. No. 66/9. The supplied extraction also references application numbers 3000058678 and 3000058681. |
| Identifier / date | Filed for PRATHAM ARCADE |
|---|---|
| What the supplied record establishes | Promoter declarations on title, encumbrances, completion undertaking and project obligations. |
| Identifier / date | 242795 |
|---|---|
| What the supplied record establishes | Drawing material used for software measurement; the supplied review notes measured carpet area requires review. |
| Identifier / date | 242795 |
|---|---|
| What the supplied record establishes | The supplied record identifies a layout-plan submission, but no extracted layout-plan content is available here. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No such certificate is established in the reviewed project documents. |
The building permit states that the permission does not confer ownership rights, requires adherence to the sanctioned plan, and requires an occupancy certificate before occupation. It also specifies that an occupancy Fire NOC is to be obtained before issue of the occupancy certificate.
Frequently asked questions
Is PRATHAM ARCADE registered with Telangana RERA?
Yes. PRATHAM ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02400004732; the registration status is New Project.
Who is the developer of PRATHAM ARCADE?
The promoter named in the RERA registration is RAJASHREE DEVELOPERS.
Where is PRATHAM ARCADE located?
PRATHAM ARCADE is in MANSOORABAD, SAROORNAGAR, Mansoorabad, Saroornagar, Rangareddy, Telangana (500074).
When will PRATHAM ARCADE be completed?
The promoter's proposed date of completion filed with RERA is 25/06/2028. This is the promoter's declaration, not a guarantee.
More projects in Mansoorabad