M.R Fortune Heights
M/S. M.R CONSTRUCTIONS ( MADHAVA RAO CONSTRUCTIONS) · Rangareddy · RERA P02400001386
M.R FORTUNE HEIGHTS is a residential apartment project in GREEN HILLS COLONY, Saroornagar, Ranga Reddy, on a site of 501.21 m². The registered promoter is M/S. M.R CONSTRUCTIONS ( MADHAVA RAO CONSTRUCTIONS). The project comprises one building with 1 Stilt + 5 upper floors and 10 3-bedroom apartments, each with a filed saleable area of 130.0 sq. m. It is registered under TG-RERA number P02400001386, with proposed completion 20/06/2021.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | M.R FORTUNE HEIGHTS RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | A single building is identified in the supplied sanction and project record. A phase designation is not disclosed. RERA record |
| TG-RERA registration | P02400001386, issued 13/11/2019; registration certificate states validity through 20/06/2021. Registration validity is distinct from the completion deadline and does not establish an extension. |
| Registered promoter | M/S. M.R CONSTRUCTIONS ( MADHAVA RAO CONSTRUCTIONS); the promoter is recorded as a partnership. RERA record Corporate record |
| RERA status | The project record identifies it as “New Project.” The supplied certificate records the registration period above; a current registration status is not established by the supplied material. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | GREEN HILLS COLONY RERA record |
| Revenue village | Not disclosed in the project land record; the title report refers to Saroornagar Village. The two descriptions are preserved here rather than treated as equivalent. Land records |
| Mandal / district / PIN | Saroornagar / Ranga Reddy / 500035 RERA record |
| Project survey number(s) and subdivision(s) | Survey No. 7; no subdivision is disclosed. Land records |
| Plot identifier | 41-B/11-13-1010 RERA record |
| Registered site extent | 501.21 m²; the sanction records total and net area as 501.21 m² and road-affected area as 0 m². |
| Boundaries | North: PLOT NO 40-A; South: PLOT NO 41-A; East: PLOT NO 41-C; West: 30 FEET WIDE ROAD. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | Building Permit Order 2/C5/09483/2019, approved 19 June, 2019. The order also lists file no. 2/C5/05355/2019. |
| Approved built-up area | RERA project fields record approved built-up area of 1445.10 sq. m. The supplied sanction extraction separately gives residential upper-floor area 1,204.25 m², stilt area 223.67 m², and second-floor area 125.15 m²; these are not interchangeable area measures. RERA filing |
| Building / block count | One building is identified in the supplied building-permit extraction. |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors; the order records a height of 14.75 m. No basement or podium is identified in the supplied extraction. |
| Parking levels | The sanction lists stilt and cellar for parking in a condition, but the supplied extraction does not establish a cellar level or provide a parking-space count. |
| Unit count | 10 units in the RERA filing; the sanction extraction does not give a total approved apartment count. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Unit type | 3-bedroom apartments RERA unit table |
| Filed saleable area | 130.0 sq. m per unit RERA unit table |
| Booked / available | 0 booked / 10 available, as recorded in the portal data supplied; no as-of date is provided, so these counts are indicative rather than a current inventory confirmation. RERA unit table |
| Construction stage | Not established by the supplied project record as a verified site condition. The vendor’s “completed” description is a vendor claim, not independent completion evidence. Promoter website |
| Completion deadline | The RERA record states proposed completion 20/06/2021. The supplied registration certificate records no extension. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. Its status is therefore not established for the building. Document index |
2. The project story
M.R FORTUNE HEIGHTS is registered as a residential apartment project at Green Hills Colony, on the land recorded as Survey No. 7 and plot identifier 41-B/11-13-1010. The RERA record gives a site area of 501.21 m² and identifies ten 3-bedroom apartments. RERA record Land records RERA unit table
The GHMC building-permit extraction describes one residential building with stilt and five upper floors. It records a proposed completion date in the RERA data of 20/06/2021, but the supplied material does not establish construction progress through a dated site inspection or provide an occupancy/completion certificate. Accordingly, neither the vendor’s “completed” description nor the elapsed deadline alone establishes the building’s actual completion or occupation status. RERA record Promoter website Document index
3. Master plan, architecture & building design
The supplied GHMC Building Permit Order identifies a residential building on a 501.21 m² site, with 1 Stilt + 5 upper floors and a recorded height of 14.75 m. It lists a residential upper-floor area of 1,204.25 m², stilt area of 223.67 m², and a second-floor area of 125.15 m². The RERA fields separately state approved built-up area of 1445.10 sq. m; the supplied material does not define these figures as the same measurement. RERA filing
The order lists 25 Trees, 5 rainwater-harvesting structures, 3.5 m setbacks, and a 30 FEET WIDE ROAD on the west boundary; it also references an 18 mt. road width in its conditions. The extraction does not provide a readable complete drawing set from which to verify building footprint, apartment arrangement by floor, circulation, lifts, stairs, or landscaped/open-space dimensions. Land records
The sanction includes conditions concerning tot-lot greenery, a transformer space, a garbage house, rainwater harvesting, parking use of approved cellar/stilt areas, and adherence to the sanctioned plan. These are approval conditions; the supplied record does not verify their implementation or completion.
4. Homes, configurations & floor plans
The RERA filing lists ten 3 BEDROOM units, each with a filed saleable area of 130.0 sq. m. The portal counts show zero booked and ten available, but are undated and should be treated as indicative. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK (filed as 3 BEDROOM) | 10 | 0 | 10 | 130.0 sq. m | 88.4–94.8 sq. m; median 91.6 sq. m (software-measured) | 30% (software-measured) |
The carpet-area range and loading are software measurements from the supplied approved-floor-plan drawing record, not RERA-filed figures; the record says four flat designs were measured and flags one measurement for review. The drawing extraction shows three bedrooms, living/dining, kitchen, two toilets and two balconies for one typical-plan flat; the balconies are excluded from the measured carpet area. Dimensions shown for the extracted flat include living/dining 6.62 × 8.02 m, kitchen 2.63 × 2.98 m, and bedrooms 3.05 × 3.49 m, 3.05 × 3.49 m, and 3.05 × 4.09 m. RERA unit details Floor plans
Carpet area is the measured usable internal area in the drawing geometry; balconies are separately identified, and the supplied drawing-measurement notes explain that RERA saleable area also accounts for a share of common areas. The software-measured values require review against the drawing and do not replace the RERA-filed saleable area. Floor plans
5. Parking & vehicle circulation
The GHMC order states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted or partitioned for other use. The supplied extraction does not provide a sanctioned number of car or two-wheeler spaces, identify visitor or accessible spaces, or establish unit-wise parking allocations. A parking bay shown in a plan would not by itself establish exclusive ownership.
The order refers to a transformer space and conditions for maintaining access and not obstructing the road or footpath; the supplied record does not describe the vehicle entry, ramps, internal driveway arrangement, pedestrian separation, or EV charging provision.
6. Amenities, recreation & open spaces
The RERA amenities record includes the following entries. Its progress percentages are recorded as 0; these entries do not establish delivery or independently verified completion. The GHMC order separately specifies certain site conditions, which are identified below as approval requirements rather than completed facilities. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | RERA amenities record | 0%; completion not verified RERA amenities |
| Water Supply | Listed as “YES”; source and capacity not stated | RERA amenities record | 0%; completion not verified RERA amenities |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Type/capacity not specified | RERA amenities record | 0%; completion not verified RERA amenities |
| Storm Water Drains | Listed as “YES” | RERA amenities record | 0%; completion not verified RERA amenities |
| Green Strip/TOT LOT/Park | Listed as “YES”; area not stated | RERA amenities record; GHMC order includes tot-lot and greenery conditions | 0%; completion not verified RERA amenities |
| Street Lighting | Details not stated | RERA amenities record | 0%; completion not verified RERA amenities |
| Community Buildings | Details not stated | RERA amenities record | 0%; completion not verified RERA amenities |
| Treatment and disposal of sewage and sullage water | Details not stated | RERA amenities record | 0%; completion not verified RERA amenities |
| Solid-waste management and disposal | Details not stated | RERA amenities record; GHMC order requires a garbage house | 0%; completion not verified RERA amenities |
| Water conservation / rainwater harvesting | RERA record lists “YES”; GHMC order specifies rainwater-harvesting structures, with 5 recorded | RERA amenities record; GHMC order | 0% in RERA record; installation not verified RERA amenities |
| Energy management | Details not stated | RERA amenities record | 0%; completion not verified RERA amenities |
| Fire protection and fire-safety requirements | Systems/details not stated | RERA amenities record; GHMC order includes fire-safety conditions | 0%; completion not verified RERA amenities |
| Electrical meter room, sub-station, receiving station | Listed as “YES”; capacity not stated; GHMC order requires transformer space | RERA amenities record; GHMC order | 0%; completion not verified RERA amenities |
| Aggregate recreational open space | Area not stated | RERA amenities record | 0%; completion not verified RERA amenities |
7. Utilities, building services & safety
The RERA amenities record lists water supply, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” but gives no capacities or completion verification. It does not specify the water source, storage, treatment, sewage-treatment plant, reuse arrangements, electrical backup, lifts or lift capacities. RERA amenities
The GHMC order requires rainwater harvesting, transformer space, a garbage house and fire-fighting installations, and states that sanitation, plumbing, fire-safety, lifts and electrical installations are to be executed under qualified technical supervision. These are stated conditions, not evidence that the systems have been installed, tested or certified. The supplied record does not establish accessibility features or completed fire/life-safety clearances.
8. Location, access & connectivity
The registered location is Green Hills Colony, Saroornagar Mandal, Ranga Reddy District, PIN 500035; the project record gives Survey No. 7 and plot identifier 41-B/11-13-1010. The revenue village is not disclosed in the RERA land record. The title report refers to Saroornagar Village. RERA record Land records
The RERA land boundaries identify a 30 FEET WIDE ROAD on the west. The supplied location dataset gives these mapped distances from the cadastral parcel centroid; it does not identify a route or travel time. Land records Location record
| Mapped place | Category | Distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 1.2 km |
| IndusInd Bank | Bank | 0.4 km |
| Unnamed bus station | Bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | College | 1.6 km |
| Sankaraya Eye Hospital | Hospital | 1.6 km |
| ADP | IT office | 0.0 km |
| South india shopping mall | Mall | 2.6 km |
| Unnamed park | Park | 1.2 km |
| Nanakramguda Govt primary school | School | 0.5 km |
9. Developer & development status
The registered promoter is M/S. M.R CONSTRUCTIONS ( MADHAVA RAO CONSTRUCTIONS), recorded as a partnership. The RERA party information lists Gattamaneni Thirumala as authorized signatory and Gattamaneni Narasimham as partner. The supplied record does not establish a company registration identifier, official website or contact details. Corporate record Parties record
The registration certificate records a promoter office at Village: Meerpet, Mandal: Balapur, District: Ranga Reddy, PIN 500097. This is the certificate’s promoter-office address, not the project location.
The promoter’s RERA filing states proposed completion by 20/06/2021; the supplied certificate says the registration was not extended. No current construction-progress report or occupancy/completion certificate is supplied, so present construction and handover status remain unverified. RERA record Document index
10. Approvals, official records & documents
| Reference and scope | P02400001386, issued 13/11/2019; |
|---|---|
| What the supplied record establishes | Form C registration for M.R FORTUNE HEIGHTS, with validity stated through 20/06/2021 and a separate-account condition. |
| Reference and scope | Building Permit Order 2/C5/09483/2019, approved 19 June, 2019; file no. 2/C5/05355/2019; |
|---|---|
| What the supplied record establishes | Building permission extraction for a residential building at Green Hills Colony, on 501.21 m², described as 1 Stilt + 5 upper floors. |
| Reference and scope | G2/BP/662/2001, listed in the GHMC permit extraction; |
|---|---|
| What the supplied record establishes | Reference is recorded; a separate approved-layout plan is not established by the supplied documents. |
| What the supplied record establishes | Promoter-side affidavit declaring legal title, no encumbrances and project-fund, audit and approval undertakings. |
|---|
| What the supplied record establishes | Supplied drawing record used for software measurement of the 3BHK configuration; measurements are not RERA disclosures. |
|---|
| What the supplied record establishes | Advocate’s title opinion concerning the project land; detailed title matters are addressed in the Land & Title section. |
|---|
| Reference and scope | Not supplied |
|---|---|
| What the supplied record establishes | The supplied material does not establish issuance or current status. |
The GHMC order lists a contractor’s all-risk policy number 433702/44/2020/97 and notarised affidavit number 2471/2019 among its references.
1. Project at a glance
Project identity
Registered name: M.R FORTUNE HEIGHTS
Project type: Residential apartment project
Phase / registered portion: A single building is identified in the supplied sanction and project record. A phase designation is not disclosed.
TG-RERA registration: P02400001386, issued 13/11/2019; registration certificate states validity through 20/06/2021. Registration validity is distinct from the completion deadline and does not establish an extension.
Registered promoter: M/S. M.R CONSTRUCTIONS ( MADHAVA RAO CONSTRUCTIONS); the promoter is recorded as a partnership.
RERA status: The project record identifies it as “New Project.” The supplied certificate records the registration period above; a current registration status is not established by the supplied material.
Land and geographic identity
Locality: GREEN HILLS COLONY
Revenue village: Not disclosed in the project land record; the title report refers to Saroornagar Village. The two descriptions are preserved here rather than treated as equivalent.
Mandal / district / PIN: Saroornagar / Ranga Reddy / 500035
Project survey number(s) and subdivision(s): Survey No. 7; no subdivision is disclosed.
Plot identifier: 41-B/11-13-1010
Registered site extent: 501.21 m²; the sanction records total and net area as 501.21 m² and road-affected area as 0 m².
Boundaries: North: PLOT NO 40-A; South: PLOT NO 41-A; East: PLOT NO 41-C; West: 30 FEET WIDE ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C5/09483/2019, approved 19 June, 2019. The order also lists file no. 2/C5/05355/2019.
Approved built-up area: RERA project fields record approved built-up area of 1445.10 sq. m. The supplied sanction extraction separately gives residential upper-floor area 1,204.25 m², stilt area 223.67 m², and second-floor area 125.15 m²; these are not interchangeable area measures.
Building / block count: One building is identified in the supplied building-permit extraction.
Sanctioned floor configuration: 1 Stilt + 5 upper floors; the order records a height of 14.75 m. No basement or podium is identified in the supplied extraction.
Parking levels: The sanction lists stilt and cellar for parking in a condition, but the supplied extraction does not establish a cellar level or provide a parking-space count.
Unit count: 10 units in the RERA filing; the sanction extraction does not give a total approved apartment count.
Offering and status
Unit type: 3-bedroom apartments
Filed saleable area: 130.0 sq. m per unit
Booked / available: 0 booked / 10 available, as recorded in the portal data supplied; no as-of date is provided, so these counts are indicative rather than a current inventory confirmation.
Construction stage: Not established by the supplied project record as a verified site condition. The vendor’s “completed” description is a vendor claim, not independent completion evidence.
Completion deadline: The RERA record states proposed completion 20/06/2021. The supplied registration certificate records no extension.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. Its status is therefore not established for the building.
2. The project story
M.R FORTUNE HEIGHTS is registered as a residential apartment project at Green Hills Colony, on the land recorded as Survey No. 7 and plot identifier 41-B/11-13-1010. The RERA record gives a site area of 501.21 m² and identifies ten 3-bedroom apartments.
The GHMC building-permit extraction describes one residential building with stilt and five upper floors. It records a proposed completion date in the RERA data of 20/06/2021, but the supplied material does not establish construction progress through a dated site inspection or provide an occupancy/completion certificate. Accordingly, neither the vendor’s “completed” description nor the elapsed deadline alone establishes the building’s actual completion or occupation status.
3. Master plan, architecture & building design
The supplied GHMC Building Permit Order identifies a residential building on a 501.21 m² site, with 1 Stilt + 5 upper floors and a recorded height of 14.75 m. It lists a residential upper-floor area of 1,204.25 m², stilt area of 223.67 m², and a second-floor area of 125.15 m². The RERA fields separately state approved built-up area of 1445.10 sq. m; the supplied material does not define these figures as the same measurement.
The order lists 25 Trees, 5 rainwater-harvesting structures, 3.5 m setbacks, and a 30 FEET WIDE ROAD on the west boundary; it also references an 18 mt. road width in its conditions. The extraction does not provide a readable complete drawing set from which to verify building footprint, apartment arrangement by floor, circulation, lifts, stairs, or landscaped/open-space dimensions.
The sanction includes conditions concerning tot-lot greenery, a transformer space, a garbage house, rainwater harvesting, parking use of approved cellar/stilt areas, and adherence to the sanctioned plan. These are approval conditions; the supplied record does not verify their implementation or completion.
4. Homes, configurations & floor plans
The RERA filing lists ten 3 BEDROOM units, each with a filed saleable area of 130.0 sq. m. The portal counts show zero booked and ten available, but are undated and should be treated as indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK (filed as 3 BEDROOM) | 10 | 0 | 10 | 130.0 sq. m | 88.4–94.8 sq. m; median 91.6 sq. m (software-measured) | 30% (software-measured) |
The carpet-area range and loading are software measurements from the supplied approved-floor-plan drawing record, not RERA-filed figures; the record says four flat designs were measured and flags one measurement for review. The drawing extraction shows three bedrooms, living/dining, kitchen, two toilets and two balconies for one typical-plan flat; the balconies are excluded from the measured carpet area. Dimensions shown for the extracted flat include living/dining 6.62 × 8.02 m, kitchen 2.63 × 2.98 m, and bedrooms 3.05 × 3.49 m, 3.05 × 3.49 m, and 3.05 × 4.09 m.
Carpet area is the measured usable internal area in the drawing geometry; balconies are separately identified, and the supplied drawing-measurement notes explain that RERA saleable area also accounts for a share of common areas. The software-measured values require review against the drawing and do not replace the RERA-filed saleable area.
5. Parking & vehicle circulation
The GHMC order states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted or partitioned for other use. The supplied extraction does not provide a sanctioned number of car or two-wheeler spaces, identify visitor or accessible spaces, or establish unit-wise parking allocations. A parking bay shown in a plan would not by itself establish exclusive ownership.
The order refers to a transformer space and conditions for maintaining access and not obstructing the road or footpath; the supplied record does not describe the vehicle entry, ramps, internal driveway arrangement, pedestrian separation, or EV charging provision.
6. Amenities, recreation & open spaces
The RERA amenities record includes the following entries. Its progress percentages are recorded as 0; these entries do not establish delivery or independently verified completion. The GHMC order separately specifies certain site conditions, which are identified below as approval requirements rather than completed facilities.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | Size not stated | RERA amenities record | 0%; completion not verified |
| Water Supply | Listed as “YES”; source and capacity not stated | RERA amenities record | 0%; completion not verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Type/capacity not specified | RERA amenities record | 0%; completion not verified |
| Storm Water Drains | Listed as “YES” | RERA amenities record | 0%; completion not verified |
| Green Strip/TOT LOT/Park | Listed as “YES”; area not stated | RERA amenities record; GHMC order includes tot-lot and greenery conditions | 0%; completion not verified |
| Street Lighting | Details not stated | RERA amenities record | 0%; completion not verified |
| Community Buildings | Details not stated | RERA amenities record | 0%; completion not verified |
| Treatment and disposal of sewage and sullage water | Details not stated | RERA amenities record | 0%; completion not verified |
| Solid-waste management and disposal | Details not stated | RERA amenities record; GHMC order requires a garbage house | 0%; completion not verified |
| Water conservation / rainwater harvesting | RERA record lists “YES”; GHMC order specifies rainwater-harvesting structures, with 5 recorded | RERA amenities record; GHMC order | 0% in RERA record; installation not verified |
| Energy management | Details not stated | RERA amenities record | 0%; completion not verified |
| Fire protection and fire-safety requirements | Systems/details not stated | RERA amenities record; GHMC order includes fire-safety conditions | 0%; completion not verified |
| Electrical meter room, sub-station, receiving station | Listed as “YES”; capacity not stated; GHMC order requires transformer space | RERA amenities record; GHMC order | 0%; completion not verified |
| Aggregate recreational open space | Area not stated | RERA amenities record | 0%; completion not verified |
7. Utilities, building services & safety
The RERA amenities record lists water supply, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as “YES,” but gives no capacities or completion verification. It does not specify the water source, storage, treatment, sewage-treatment plant, reuse arrangements, electrical backup, lifts or lift capacities.
The GHMC order requires rainwater harvesting, transformer space, a garbage house and fire-fighting installations, and states that sanitation, plumbing, fire-safety, lifts and electrical installations are to be executed under qualified technical supervision. These are stated conditions, not evidence that the systems have been installed, tested or certified. The supplied record does not establish accessibility features or completed fire/life-safety clearances.
8. Location, access & connectivity
The registered location is Green Hills Colony, Saroornagar Mandal, Ranga Reddy District, PIN 500035; the project record gives Survey No. 7 and plot identifier 41-B/11-13-1010. The revenue village is not disclosed in the RERA land record. The title report refers to Saroornagar Village.
The RERA land boundaries identify a 30 FEET WIDE ROAD on the west. The supplied location dataset gives these mapped distances from the cadastral parcel centroid; it does not identify a route or travel time.
| Mapped place | Category | Distance |
|---|---|---|
| Financial District (Nanakramguda) | Anchor | 1.2 km |
| IndusInd Bank | Bank | 0.4 km |
| Unnamed bus station | Bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | College | 1.6 km |
| Sankaraya Eye Hospital | Hospital | 1.6 km |
| ADP | IT office | 0.0 km |
| South india shopping mall | Mall | 2.6 km |
| Unnamed park | Park | 1.2 km |
| Nanakramguda Govt primary school | School | 0.5 km |
9. Developer & development status
The registered promoter is M/S. M.R CONSTRUCTIONS ( MADHAVA RAO CONSTRUCTIONS), recorded as a partnership. The RERA party information lists Gattamaneni Thirumala as authorized signatory and Gattamaneni Narasimham as partner. The supplied record does not establish a company registration identifier, official website or contact details.
The registration certificate records a promoter office at Village: Meerpet, Mandal: Balapur, District: Ranga Reddy, PIN 500097. This is the certificate’s promoter-office address, not the project location.
The promoter’s RERA filing states proposed completion by 20/06/2021; the supplied certificate says the registration was not extended. No current construction-progress report or occupancy/completion certificate is supplied, so present construction and handover status remain unverified.
10. Approvals, official records & documents
| Reference and scope | P02400001386, issued 13/11/2019; |
|---|---|
| What the supplied record establishes | Form C registration for M.R FORTUNE HEIGHTS, with validity stated through 20/06/2021 and a separate-account condition. |
| Reference and scope | Building Permit Order 2/C5/09483/2019, approved 19 June, 2019; file no. 2/C5/05355/2019; |
|---|---|
| What the supplied record establishes | Building permission extraction for a residential building at Green Hills Colony, on 501.21 m², described as 1 Stilt + 5 upper floors. |
| Reference and scope | G2/BP/662/2001, listed in the GHMC permit extraction; |
|---|---|
| What the supplied record establishes | Reference is recorded; a separate approved-layout plan is not established by the supplied documents. |
| What the supplied record establishes | Promoter-side affidavit declaring legal title, no encumbrances and project-fund, audit and approval undertakings. |
|---|
| What the supplied record establishes | Supplied drawing record used for software measurement of the 3BHK configuration; measurements are not RERA disclosures. |
|---|
| What the supplied record establishes | Advocate’s title opinion concerning the project land; detailed title matters are addressed in the Land & Title section. |
|---|
| Reference and scope | Not supplied |
|---|---|
| What the supplied record establishes | The supplied material does not establish issuance or current status. |
The GHMC order lists a contractor’s all-risk policy number 433702/44/2020/97 and notarised affidavit number 2471/2019 among its references.
Frequently asked questions
Is M.R FORTUNE HEIGHTS registered with Telangana RERA?
Yes. M.R FORTUNE HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P02400001386; the registration status is New Project.
Who is the developer of M.R FORTUNE HEIGHTS?
The promoter named in the RERA registration is M/S. M.R CONSTRUCTIONS ( MADHAVA RAO CONSTRUCTIONS).
Where is M.R FORTUNE HEIGHTS located?
M.R FORTUNE HEIGHTS is in GREEN HILLS COLONY, Saroornagar, Rangareddy, Telangana (500035).
When will M.R FORTUNE HEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 20/06/2021. This is the promoter's declaration, not a guarantee.