SHIVA JYOTHI NIVAS is a residential apartment project in Kothapet, Saroornagar mandal, Ranga Reddy district, developed by registered promoter GOWTHAMI CONSTRUCTIONS. The project has a site area of 418 sq. m and one building with 1 Stilt + 5 upper floors, comprising 10 2BHK apartments. It is registered with TG-RERA under P02400002645, with a proposed completion date of 17/12/2026.

01What we found

RegisteredTG-RERA - valid till 17 Dec 2026
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered nameSHIVA JYOTHI NIVAS RERA record
Project type / phaseResidential apartment project; phase or separately named registered portion is not disclosed. RERA record RERA filing
TG-RERA registrationP02400002645, valid from 03/03/2021 to 17/12/2026; the certificate states a five-year registration period, subject to extension under the applicable process. RERA record
Registered promoterGOWTHAMI CONSTRUCTIONS; entity type recorded as Partnership. RERA record RERA filing Parties record
RERA project statusOn-Going Project in the supplied project record. RERA filing

Land and geographic identity

FieldProject record
Locality / PINKothapet; 500035. The permit identifies East Maruthi Nagar (Kothapet-3C). RERA record RERA filing
Revenue villageKothapet. RERA record RERA filing
Mandal / districtSaroornagar / Ranga Reddy. RERA record RERA filing
Survey numbers / subdivisionsSurvey Nos. 96/2 and 152; no further subdivision identifiers are disclosed in the project registration materials cited here. RERA record Land records
Registered site area418 sq. m site area; 418.00 sq. m net area in the RERA land details. RERA filing
BoundariesEast: Plot No. 14; west: Plot No. 12; north: 40-foot-wide road; south: Survey No. 153. RERA filing
Site-area qualificationThe permit records road-affected area 0 sq. m and nala-affected area 0 sq. m.

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approval2/C5/12411/2020, approved 17 December, 2020. The permit also records file no. 2/C5/13080/2020. Approvals record
Approved built-up area1,037.50 m² residential upper-floor area; the project form also records approved built-up area as 1,037.50 sq. m. RERA filing
Building / floorsOne building, identified in the permit as Building A-1; 1 Stilt + 5 upper floors. Permit height: 15 m. RERA filing
Parking provision in permit1 stilt parking level, area 205.46 m². The supplied record does not state a sanctioned number of parking bays.
UnitsRERA land details record 1 total building unit; the RERA unit schedule records 10 2BHK apartments. The supplied materials do not explain the “building units” field’s relationship to the apartment count. RERA filing RERA unit table RERA unit details
Site provision recorded in permitSeven rainwater-harvesting pits and 20 trees; the permit also identifies space for a transformer, a garbage house and an ETP.

Offering and status

FieldProject record
RERA-filed configuration2BHK, 10 units; saleable area 112.88 m² per unit in the supplied unit schedule. RERA unit table RERA unit details
Booked / available10 booked / 0 available, as last read from the TG-RERA portal; the record provides no as-of date, so counts are indicative. RERA unit table RERA unit details
Construction stageProject status is recorded as On-Going Project. No independently verified present-day site-progress measurement is supplied. RERA filing
Completion datesOriginal proposed completion: 17/12/2026; revised proposed completion: 17/12/2026. RERA filing
Occupancy-certificate recordA GHMC occupancy certificate, 3796/GHMC/LBN/ 2 022-OC, dated 27/10/2022, is recorded in an architect’s completion certificate for the project. Approvals record

2. The project story

SHIVA JYOTHI NIVAS is registered as a residential apartment project in Kothapet village, Saroornagar mandal, Ranga Reddy district. Its RERA-filed land identity is Survey Nos. 96/2 and 152, Plot No. 13, with a registered site area of 418 sq. m. The GHMC permit describes one residential building, Building A-1, with one stilt level and five upper floors. RERA record Land records

The RERA unit schedule describes ten 2BHK apartments. The portal-derived booking figures show all ten booked and none available, but carry no as-of date. Although the project record labels the development “On-Going Project,” an architect’s certificate dated 31/12/2022 certifies completion and records the GHMC occupancy certificate dated 27/10/2022. Those are distinct records; the supplied materials do not independently verify current site conditions. RERA filing RERA unit table RERA unit details

3. Master plan, architecture & building design

The GHMC building permit identifies a single residential building on a 418 m² site: Building A-1, with 1 Stilt + 5 upper floors, a stated height of 15 m, and 1,037.50 m² of residential upper-floor area. The stilt parking area is recorded as 205.46 m². These are permit figures; no separate FSI-counted area, gross built-up-area calculation, building-footprint measurement or floor-by-floor apartment schedule is supplied.

The permit also records a 0 m² road-affected area and 0 m² nala-affected area, a compound wall length of 80.46 RM, seven rainwater-harvesting pits and 20 trees. It specifies a 2.5 m setback in the extracted permit details. The supplied drawing file is identified as a layout plan, but its extraction is unavailable; detailed plans for internal circulation, entrances, stairs, lifts, open-space arrangement and apartment distribution cannot therefore be described from the available drawing record. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10100112.88 m²72.1–84.4 m²; median 77.6 m²31%

The RERA filing gives the unit count, booking figures and saleable area. The carpet-area figures are software-measured from approved floor-plan drawing geometry, not RERA-filed; the measurement record says six flat designs were measured and flags all six for review. The measurement system describes carpet area as smaller than saleable area, which includes a share of common areas. The supplied data does not provide a separately measured balcony or utility-area figure. RERA unit details Floor plans

A second-floor-plan room record for one flat labels a kitchen, living/dining area, two bedrooms and two toilets. Its listed dimensions include a kitchen of 2.89 m × 3.13 m, a master bedroom of 5.34 m × 3.13 m, a bedroom of 3.13 m × 4.26 m, and toilets each measuring 1.52 m × 2.0 m. The room measurements are drawing-derived and should be checked against the drawing; they are not RERA disclosures. RERA unit details

5. Parking & vehicle circulation

The GHMC permit identifies one stilt parking level with an area of 205.46 m² and states that approved stilt parking is to be used exclusively for vehicle parking. The supplied permit extraction does not establish the number of car or two-wheeler bays, visitor or accessible spaces, a parking allocation for individual apartments, or the arrangement of vehicle entry, ramps and internal driveways. No separate unit-allocation document is supplied; a drawn or sanctioned parking provision does not by itself establish an exclusive allotment.

6. Amenities, recreation & open spaces

The following status figures are recorded in the supplied RERA amenities schedule. A stated availability or percentage is a filed status, not independent verification of present delivery.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplySize or capacity not suppliedRERA amenities scheduleMarked available; 100% declared. RERA amenities
Storm-water drainsSize or capacity not suppliedRERA amenities scheduleMarked available; 100% declared. RERA amenities
Solid-waste management and disposalDetails not suppliedRERA amenities scheduleMarked available; 100% declared. RERA amenities
Water conservation / rainwater harvestingPermit specifies 7 rainwater-harvesting pits; amenities schedule records the facilityRERA amenities schedule; GHMC permitMarked available; 100% declared in the schedule. RERA amenities
Energy managementDetails not suppliedRERA amenities scheduleMarked available; 100% declared. RERA amenities
Electrical meter room / substation / receiving stationPermit specifies space for a transformer; schedule lists electrical service provisionRERA amenities schedule; GHMC permitMarked available; 100% declared in the schedule. RERA amenities
Green strip / tot-lot / parkPermit requires a tot-lot to be fenced and maintained as greenery; extracted permit lists tot-lot area as 0 m²GHMC permit; RERA amenities scheduleSchedule records 0%; completion is not independently verified. RERA amenities
Internal roads and footpathsDetails not suppliedRERA amenities schedule0% declared. RERA amenities
Street lightingDetails not suppliedRERA amenities schedule0% declared. RERA amenities
Community buildingsDetails not suppliedRERA amenities schedule0% declared. RERA amenities
Sewage and sullage treatment/disposalPermit identifies an ETP; no capacity or system details suppliedGHMC permit; RERA amenities scheduleTreatment/disposal schedule records 0%; completion is not independently verified. RERA amenities
Aggregate recreational open spaceArea not suppliedRERA amenities schedule0% declared. RERA amenities

7. Utilities, building services & safety

The permit lists rainwater harvesting, transformer space, a garbage house and an ETP among site provisions, and requires water-supply and electricity connections to be provided on production of an occupancy certificate. The RERA amenities schedule marks water supply, storm-water drains, solid-waste management, water conservation/rainwater harvesting, energy management and the electrical meter-room/substation/receiving-station item as available at 100%. These are recorded declarations; no capacities, technical specifications or independent verification are supplied. RERA amenities

The permit requires services such as sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. It also requires fire-safety and means-of-escape provisions, and states that an occupancy fire NOC is to be obtained before issue of the occupancy certificate. The supplied records do not provide lift count or capacity, fire-system specifications, accessible circulation details, backup-power capacity, CCTV or security arrangements.

8. Location, access & connectivity

The registered location is Kothapet village, Saroornagar mandal, Ranga Reddy district, PIN 500035. The permit places the site in East Maruthi Nagar (Kothapet-3C); the registered land boundaries identify a 40-foot-wide road to the north, Plot No. 14 to the east, Plot No. 12 to the west and Survey No. 153 to the south. RERA record RERA filing RERA filing

The supplied location dataset lists Financial District (Nanakramguda), 1.2 km, as an anchor. No route, measurement method, public-transport information or travel time is supplied, so the figure should be treated as the dataset’s stated distance rather than a verified journey distance. Location record

9. Developer & development status

The registered promoter is GOWTHAMI CONSTRUCTIONS, recorded as a partnership. The RERA record names ROHITH HARI KISHORE SOMURI as a partner and VENKATA KRISHNA PRASAD SOMURI as authorized signatory. A project registration certificate lists the promoter office as Village: Dhurganagar, Mandal: Saroornagar, District: Ranga Reddy, PIN 500036; the project address fields separately identify Durga Nagar / East Maruthi Nagar, Kothapet, PIN 500035. Parties record RERA filing

The promoter’s Form B declaration undertakes completion by 17th December, 2026. The RERA record gives the same date as both original and revised proposed completion. Separately, an architect’s certificate records project completion and an occupancy certificate dated 27/10/2022. The supplied materials provide no independently measured present-day construction progress. RERA filing

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400002645; issued 03/03/2021; valid through 17/12/2026
Scope and evidenceForm ‘C’ registration for SHIVA JYOTHI NIVAS; identifies Survey Nos. 96/2 and 152.
GHMC building permit
Identifier / dateApproval no. 2/C5/12411/2020; approved 17 December, 2020
Scope and evidencePermit for the residential building at Plot No. 13, Kothapet, Survey Nos. 96/2 and 152; file no. 2/C5/13080/2020.
GHMC occupancy certificate
Identifier / date3796/GHMC/LBN/ 2 022-OC; dated 27/10/2022
Scope and evidenceRecorded in the architect’s project-completion certificate dated 31/12/2022.
Approved drawing / layout-plan file
Identifier / dateDocument 148170
Scope and evidenceSupplied as the project’s layout-plan document, but extraction is unavailable; detailed drawing review is not possible from the supplied record. Document index
Promoter declaration, Form B
Identifier / dateDeclaration date is partially rendered as “25'' day of January, 202”
Scope and evidencePromoter declaration includes the completion undertaking and project-funds declarations.

The permit sets out building and site conditions, including display of the sanctioned plan, commencement and completion notices, use of the stilt for parking, and obtaining an occupancy certificate before occupation. Its detailed conditions are documented in the building-permit record.

Frequently asked questions

Is SHIVA JYOTHI NIVAS registered with Telangana RERA?

Yes. SHIVA JYOTHI NIVAS is registered with the Telangana Real Estate Regulatory Authority as P02400002645; the registration status is On-Going Project.

Who is the developer of SHIVA JYOTHI NIVAS?

The promoter named in the RERA registration is GOWTHAMI CONSTRUCTIONS.

Where is SHIVA JYOTHI NIVAS located?

SHIVA JYOTHI NIVAS is in Kothapet, Saroornagar, Rangareddy, Telangana (500035).

When will SHIVA JYOTHI NIVAS be completed?

The promoter's proposed date of completion filed with RERA is 17/12/2026. This is the promoter's declaration, not a guarantee.