Nova Sunrise
DPR INFRA PROJECTS PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200004616
NOVA SUNRISE is a residential apartment project in UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, Medchal-Malkajgiri. It is being developed by registered promoter DPR INFRA PROJECTS PRIVATE LIMITED. The project occupies 363.66 sq. m and comprises one building sanctioned as 1 Stilt + 5 upper floors, with 10 2BHK apartments of 111.48 sq. m each. It is registered under TG-RERA P02200004616, with a proposed completion date of 06/05/2025.
More from Dpr Infra Projects Pvt Ltd · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | NOVA SUNRISE RERA record |
| Project type / phase | Residential apartment project; registered phase or separately identified phase name is not disclosed. RERA record |
| TG-RERA registration | P02200004616; registered from 13/06/2022 through 06/05/2025. The certificate records a two-year validity period and says extension is subject to Authority approval under the Act and Rules. RERA record |
| Registered promoter | DPR INFRA PROJECTS PRIVATE LIMITED; company. RERA record Corporate record |
| RERA status in supplied record | The recorded registration period ended on 06/05/2025. The supplied certificate says it was not extended; no later extension is established in the supplied evidence. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL; the registration certificate describes the site as Shanthinagar, Uppal. RERA record RERA filing |
| Revenue village | Shanthinagar in the project identity/RERA filing. The building-permit and OC extracts identify UPPAL BHAGAT; the supplied records do not resolve the revenue-village identity. RERA record RERA filing |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500038 in the project identity and registration certificate. The GHMC extracts state mandal UPPAL and district MEDCHAL. RERA record |
| Survey numbers | 110 TO 114, 116 AND 117. The filed plot identity is PLOT NOs 46PART, 47 AND 48PART. RERA record RERA filing |
| Site area | 363.66 sq. m total and net area in the RERA filing; the building permit also records plot area and net plot area as 363.66 Sq. Mtrs. RERA filing |
| Boundaries | East: 40 FEET WIDE ROAD; west: PLOT NOs 49 AND 50; north: PLOT NO 48 PART; south: PLOT NO 46 PART. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | 2467/GHMC/LBN/2022-BP, approved 06 May, 2022. The building-permit extract also records file no. 003125/GHMC/1797/LBN2/2021-BP. Approvals record |
| Approved building area | 1,063.15 Sq.Mt. in the building-permit extract; the OC extract records floor area 1063.15 m2. |
| Building count and configuration | One building; sanctioned as 1 Stilt + 5 upper floors. The OC extract also lists a cellar and ground level in its floor description. RERA filing |
| Height | 14.50 m in the building-permit and OC extracts. |
| Parking | The permit records Total Parking Area 197.4; the OC extract records Parking Area 197.4 m2. A vehicle-space count is not supplied. |
| Unit count | 10 apartments in the TG-RERA unit record; the supplied sanction extract does not state an approved apartment count. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Unit type and RERA saleable area | 2BHK; 111.48 sq. m per unit in the RERA unit record. RERA unit table |
| Booked / available | 10 booked; 0 available, as last read from the TG-RERA portal. The portal record has no as-of date, so these counts are indicative. RERA unit table |
| Construction / completion deadline | The RERA filing and Form B declaration state a proposed completion date of 06/05/2025; the building permit also sets completion before 06 May, 2025. RERA record |
| Occupancy certificate | GHMC OC 2987/GHMC/LBN/2023-OC, dated 18 August, 2023, is supplied for the building on the stated survey numbers. It certifies the building fit for occupation; its scope is the building identified in the OC extract, not a separately described multi-phase development. Approvals record |
2. The project story
- NOVA SUNRISE is recorded with TG-RERA as a residential apartment project on a 363.66 sq. m site in the Uppal/ Shanthinagar area, associated in the filing with survey numbers 110 TO 114, 116 AND 117 and plot portions 46PART, 47 AND 48PART. The approved building is a single residential building, with the permit describing 1 Stilt + 5 upper floors. RERA record RERA filing
- The RERA unit record lists ten 2BHK apartments, all shown as booked and none available in the portal snapshot; that snapshot is undated. The supplied GHMC occupancy certificate identifies a completed residential building and states it is fit for occupation. It records completion notice submission on 20 July, 2023 and issue of the OC on 18 August, 2023. This is documentary evidence of certification for the building identified in that certificate, not an independent site inspection for this report. RERA unit table
- The project’s proposed completion date and the registration’s recorded validity end date are both 06/05/2025. Registration validity, the declared completion deadline and the supplied building-level OC are separate records; the evidence does not show a TG-RERA extension. RERA record
3. Master plan, architecture & building design
- The GHMC building-permit extract identifies a residential building on 363.66 Sq. Mtrs of plot area, with 1,063.15 Sq.Mt. stated as the residential upper-floor area and a building height of 14.50 m. It describes 1 Stilt + 5 upper floors. The OC extract separately describes Cellar + Stilt; Ground + Upper Floors; 5 Upper Floor and records a floor area of 1063.15 m2.
- The permit records 197.4 as total parking area and six rainwater-harvesting pits. The OC extract records parking area of 197.4 m2, tot-lot area of 197.4 m2, and rainwater harvesting. These are document-recorded provisions; detailed drawings establishing internal circulation, open-space layout, floor-by-floor apartment arrangement, lifts, stairs, or building footprint are not supplied here.
- The RERA filing and GHMC records identify one building; no separate phase-wise building organization is evidenced. Approved built-up/floor area, saleable area and drawing-measured carpet area are distinct figures reported separately below. RERA filing RERA unit table
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 10 | 0 | 111.48 sq. m | 75.0–81.9 sq. m; median 79.5 sq. m | 29% |
RERA unit counts, booking status and saleable area are from the TG-RERA unit record; the booking snapshot has no stated as-of date. Carpet-area measurements are software-measured from approved floor-plan drawing geometry, not RERA-filed measurements; the supplied analysis covers six flat designs and says the result needs review. RERA unit table Floor plans RERA unit details
The supplied measured drawing example identifies a third-floor flat labelled 02 and shows a master bedroom, second bedroom, living/dining room, kitchen, two toilets and a sitout. The example’s listed room dimensions and areas are drawing-derived measurements; they are not a statement of RERA-filed room dimensions. RERA unit details
Saleable area and carpet area should not be treated as interchangeable: the drawing analysis describes its carpet measurement as software-measured and notes that saleable area also includes the home’s share of common areas. No separately measured balcony or utility area, or unit-specific loading schedule, is provided. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records a total parking area of 197.4; the OC extract states Parking Area 197.4 m2. The permit’s conditions say cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted or partitioned for other use.
The supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible-space provision, ramp or driveway arrangements, EV charging, or a unit-by-unit parking allocation. A parking area stated in an approval does not by itself establish exclusive allocation or ownership for a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | Permit conditions call for a fenced tot-lot maintained as greenery; the OC extract records Tot -lot area 197.4 m2. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | The RERA amenities record shows 100%; the OC records the area. No independent site verification is supplied. |
| Description / size | Six pits are stated in the building permit; the OC extract records rainwater harvesting. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Permit provision and OC record; no independent operational verification supplied. |
| Description / size | RERA amenities record: YES, 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-declared status; no independent service verification supplied. |
| Description / size | RERA amenities record for “Sewerage (Chamber, Lines, Septic Tank, STP)”: YES, 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-declared status; the supplied data does not identify which listed sewerage components are installed or independently verify operation. |
| Description / size | RERA amenities record: YES, 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-declared status; no independent verification supplied. |
The amenity register lists other categories—including internal roads and footpaths, storm-water drains, street lighting, community buildings, sewage treatment/disposal, solid-waste management, energy management, fire protection and recreational open space—with 0% recorded. This is the supplied RERA amenities data, not an independent inspection or a finding about present site conditions. RERA amenities
7. Utilities, building services & safety
The RERA amenities record declares water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station at 100%. The GHMC permit specifies six rainwater-harvesting pits and requires space for a transformer and a garbage house; the OC extract notes rainwater harvesting. The evidence does not provide water source or storage capacity, treatment or reuse details, storm-water system design, electrical backup capacity, or waste-management arrangements. RERA amenities
The building-permit conditions require services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. The permit also refers to fire-fighting installations and an occupancy Fire NOC before issue of the OC. The supplied record does not include lift count or capacity, fire-system specifications, or a separate Fire NOC document; no service or statutory-compliance conclusion is drawn from those conditions alone.
8. Location, access & connectivity
The project is recorded in the locality UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, district Medchal-Malkajgiri, PIN 500038; the certificate describes the site as Shanthinagar, Uppal. The supplied project-location data also identifies an approximate nearest sampled Outer Ring Road interchange distance of 11.1 km. RERA record Location record
The RERA land record gives the eastern boundary as a 40 FEET WIDE ROAD. The supplied evidence does not specify public-transport services, local landmark distances, approach-road route, or travel times. RERA filing
9. Developer & development status
The registered legal promoter is DPR INFRA PROJECTS PRIVATE LIMITED, a company, with GSTIN 36AAICD4960B1ZT. The promoter address recorded in the project data is SHIV RESIDENCY, ROAD NO 1, SAI NAGAR COLONY, BLOCK NO 3, SHANTHI NAGAR, UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, Uppal, Medchal-Malkajgiri, 500038. A separate official company registration identifier and promoter contact details are not supplied. Corporate record Parties record
The RERA filing identifies NAYINI DHARMAPAL REDDY as an authorized signatory and NAYINI SAI CHARAN REDDY as a director; it also lists NAYINI DHARMAPAL REDDY as a landowner under an AreaShare arrangement. Parties record
The promoter’s Form B declaration dated 13th day of May, 2022 states that the project would be completed by 06' May. 2025 and includes the promoter’s declarations concerning title, encumbrances and project funds. These are promoter declarations. The supplied GHMC OC separately records the building as fit for occupation.
10. Approvals, official records & documents
| Identifier / date | P02200004616; issued 13/06/2022; valid through 06/05/2025 |
|---|---|
| What the supplied record establishes | Form C registration for NOVA SUNRISE, naming Dpr Infra Projects Private Limited as promoter. |
| Identifier / date | 2467/GHMC/LBN/2022-BP; 06 May, 2022; file no. 003125/GHMC/1797/LBN2/2021-BP |
|---|---|
| What the supplied record establishes | Residential building permit extract for the site and building configuration described above. |
| Identifier / date | 2987/GHMC/LBN/2023-OC; 18 August, 2023; application 008436/GHMC/4174/LBN2/2023-OC |
|---|---|
| What the supplied record establishes | OC extract for the residential building on the stated site, certifying it fit for occupation. |
| Identifier / date | Dated 13th day of May, 2022 |
|---|---|
| What the supplied record establishes | Promoter affidavit-cum-declaration concerning the project and proposed completion by 06' May. 2025. |
| Identifier / date | LRS/1561/7421/CR-2/EASTZONE/GHMC/20008ONE/ |
|---|---|
| What the supplied record establishes | Number appears in the building-permit extract; a separate approved layout drawing or independently accessible layout record is not supplied. |
| Identifier / date | Documents 236039–236048, 236156–236162 |
|---|---|
| What the supplied record establishes | Filed materials include title-report/deed and development-agreement documents, agreement and allotment templates, and a floor-plan/layout document. The templates shown in the supplied extracts do not establish a completed unit-specific sale. Document index |
The supplied evidence does not include a separate completed-project certificate beyond the GHMC occupancy-certificate record, or a separate Fire NOC. The principal approval conditions and the full title and legal-document analysis are addressed in the relevant due-diligence sections. Document index
1. Project at a glance
Project identity
Registered project name: NOVA SUNRISE
Project type / phase: Residential apartment project; registered phase or separately identified phase name is not disclosed.
TG-RERA registration: P02200004616; registered from 13/06/2022 through 06/05/2025. The certificate records a two-year validity period and says extension is subject to Authority approval under the Act and Rules.
Registered promoter: DPR INFRA PROJECTS PRIVATE LIMITED; company.
RERA status in supplied record: The recorded registration period ended on 06/05/2025. The supplied certificate says it was not extended; no later extension is established in the supplied evidence.
Land and geographic identity
Locality: UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL; the registration certificate describes the site as Shanthinagar, Uppal.
Revenue village: Shanthinagar in the project identity/RERA filing. The building-permit and OC extracts identify UPPAL BHAGAT; the supplied records do not resolve the revenue-village identity.
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500038 in the project identity and registration certificate. The GHMC extracts state mandal UPPAL and district MEDCHAL.
Survey numbers: 110 TO 114, 116 AND 117. The filed plot identity is PLOT NOs 46PART, 47 AND 48PART.
Site area: 363.66 sq. m total and net area in the RERA filing; the building permit also records plot area and net plot area as 363.66 Sq. Mtrs.
Boundaries: East: 40 FEET WIDE ROAD; west: PLOT NOs 49 AND 50; north: PLOT NO 48 PART; south: PLOT NO 46 PART.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: 2467/GHMC/LBN/2022-BP, approved 06 May, 2022. The building-permit extract also records file no. 003125/GHMC/1797/LBN2/2021-BP.
Approved building area: 1,063.15 Sq.Mt. in the building-permit extract; the OC extract records floor area 1063.15 m2.
Building count and configuration: One building; sanctioned as 1 Stilt + 5 upper floors. The OC extract also lists a cellar and ground level in its floor description.
Height: 14.50 m in the building-permit and OC extracts.
Parking: The permit records Total Parking Area 197.4; the OC extract records Parking Area 197.4 m2. A vehicle-space count is not supplied.
Unit count: 10 apartments in the TG-RERA unit record; the supplied sanction extract does not state an approved apartment count.
Offering and status
Unit type and RERA saleable area: 2BHK; 111.48 sq. m per unit in the RERA unit record.
Booked / available: 10 booked; 0 available, as last read from the TG-RERA portal. The portal record has no as-of date, so these counts are indicative.
Construction / completion deadline: The RERA filing and Form B declaration state a proposed completion date of 06/05/2025; the building permit also sets completion before 06 May, 2025.
Occupancy certificate: GHMC OC 2987/GHMC/LBN/2023-OC, dated 18 August, 2023, is supplied for the building on the stated survey numbers. It certifies the building fit for occupation; its scope is the building identified in the OC extract, not a separately described multi-phase development.
2. The project story
- NOVA SUNRISE is recorded with TG-RERA as a residential apartment project on a 363.66 sq. m site in the Uppal/ Shanthinagar area, associated in the filing with survey numbers 110 TO 114, 116 AND 117 and plot portions 46PART, 47 AND 48PART. The approved building is a single residential building, with the permit describing 1 Stilt + 5 upper floors.
- The RERA unit record lists ten 2BHK apartments, all shown as booked and none available in the portal snapshot; that snapshot is undated. The supplied GHMC occupancy certificate identifies a completed residential building and states it is fit for occupation. It records completion notice submission on 20 July, 2023 and issue of the OC on 18 August, 2023. This is documentary evidence of certification for the building identified in that certificate, not an independent site inspection for this report.
- The project’s proposed completion date and the registration’s recorded validity end date are both 06/05/2025. Registration validity, the declared completion deadline and the supplied building-level OC are separate records; the evidence does not show a TG-RERA extension.
3. Master plan, architecture & building design
- The GHMC building-permit extract identifies a residential building on 363.66 Sq. Mtrs of plot area, with 1,063.15 Sq.Mt. stated as the residential upper-floor area and a building height of 14.50 m. It describes 1 Stilt + 5 upper floors. The OC extract separately describes Cellar + Stilt; Ground + Upper Floors; 5 Upper Floor and records a floor area of 1063.15 m2.
- The permit records 197.4 as total parking area and six rainwater-harvesting pits. The OC extract records parking area of 197.4 m2, tot-lot area of 197.4 m2, and rainwater harvesting. These are document-recorded provisions; detailed drawings establishing internal circulation, open-space layout, floor-by-floor apartment arrangement, lifts, stairs, or building footprint are not supplied here.
- The RERA filing and GHMC records identify one building; no separate phase-wise building organization is evidenced. Approved built-up/floor area, saleable area and drawing-measured carpet area are distinct figures reported separately below.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 10 | 0 | 111.48 sq. m | 75.0–81.9 sq. m; median 79.5 sq. m | 29% |
RERA unit counts, booking status and saleable area are from the TG-RERA unit record; the booking snapshot has no stated as-of date. Carpet-area measurements are software-measured from approved floor-plan drawing geometry, not RERA-filed measurements; the supplied analysis covers six flat designs and says the result needs review.
The supplied measured drawing example identifies a third-floor flat labelled 02 and shows a master bedroom, second bedroom, living/dining room, kitchen, two toilets and a sitout. The example’s listed room dimensions and areas are drawing-derived measurements; they are not a statement of RERA-filed room dimensions.
Saleable area and carpet area should not be treated as interchangeable: the drawing analysis describes its carpet measurement as software-measured and notes that saleable area also includes the home’s share of common areas. No separately measured balcony or utility area, or unit-specific loading schedule, is provided.
5. Parking & vehicle circulation
The GHMC permit records a total parking area of 197.4; the OC extract states Parking Area 197.4 m2. The permit’s conditions say cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted or partitioned for other use.
The supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible-space provision, ramp or driveway arrangements, EV charging, or a unit-by-unit parking allocation. A parking area stated in an approval does not by itself establish exclusive allocation or ownership for a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | Permit conditions call for a fenced tot-lot maintained as greenery; the OC extract records Tot -lot area 197.4 m2. |
|---|---|
| Declared progress / verified status | The RERA amenities record shows 100%; the OC records the area. No independent site verification is supplied. |
| Description / size | Six pits are stated in the building permit; the OC extract records rainwater harvesting. |
|---|---|
| Declared progress / verified status | Permit provision and OC record; no independent operational verification supplied. |
| Description / size | RERA amenities record: YES, 100%. |
|---|---|
| Declared progress / verified status | RERA-declared status; no independent service verification supplied. |
| Description / size | RERA amenities record for “Sewerage (Chamber, Lines, Septic Tank, STP)”: YES, 100%. |
|---|---|
| Declared progress / verified status | RERA-declared status; the supplied data does not identify which listed sewerage components are installed or independently verify operation. |
| Description / size | RERA amenities record: YES, 100%. |
|---|---|
| Declared progress / verified status | RERA-declared status; no independent verification supplied. |
The amenity register lists other categories—including internal roads and footpaths, storm-water drains, street lighting, community buildings, sewage treatment/disposal, solid-waste management, energy management, fire protection and recreational open space—with 0% recorded. This is the supplied RERA amenities data, not an independent inspection or a finding about present site conditions.
7. Utilities, building services & safety
The RERA amenities record declares water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station at 100%. The GHMC permit specifies six rainwater-harvesting pits and requires space for a transformer and a garbage house; the OC extract notes rainwater harvesting. The evidence does not provide water source or storage capacity, treatment or reuse details, storm-water system design, electrical backup capacity, or waste-management arrangements.
The building-permit conditions require services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. The permit also refers to fire-fighting installations and an occupancy Fire NOC before issue of the OC. The supplied record does not include lift count or capacity, fire-system specifications, or a separate Fire NOC document; no service or statutory-compliance conclusion is drawn from those conditions alone.
8. Location, access & connectivity
The project is recorded in the locality UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, district Medchal-Malkajgiri, PIN 500038; the certificate describes the site as Shanthinagar, Uppal. The supplied project-location data also identifies an approximate nearest sampled Outer Ring Road interchange distance of 11.1 km.
The RERA land record gives the eastern boundary as a 40 FEET WIDE ROAD. The supplied evidence does not specify public-transport services, local landmark distances, approach-road route, or travel times.
9. Developer & development status
The registered legal promoter is DPR INFRA PROJECTS PRIVATE LIMITED, a company, with GSTIN 36AAICD4960B1ZT. The promoter address recorded in the project data is SHIV RESIDENCY, ROAD NO 1, SAI NAGAR COLONY, BLOCK NO 3, SHANTHI NAGAR, UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, Uppal, Medchal-Malkajgiri, 500038. A separate official company registration identifier and promoter contact details are not supplied.
The RERA filing identifies NAYINI DHARMAPAL REDDY as an authorized signatory and NAYINI SAI CHARAN REDDY as a director; it also lists NAYINI DHARMAPAL REDDY as a landowner under an AreaShare arrangement.
The promoter’s Form B declaration dated 13th day of May, 2022 states that the project would be completed by 06' May. 2025 and includes the promoter’s declarations concerning title, encumbrances and project funds. These are promoter declarations. The supplied GHMC OC separately records the building as fit for occupation.
10. Approvals, official records & documents
| Identifier / date | P02200004616; issued 13/06/2022; valid through 06/05/2025 |
|---|---|
| What the supplied record establishes | Form C registration for NOVA SUNRISE, naming Dpr Infra Projects Private Limited as promoter. |
| Identifier / date | 2467/GHMC/LBN/2022-BP; 06 May, 2022; file no. 003125/GHMC/1797/LBN2/2021-BP |
|---|---|
| What the supplied record establishes | Residential building permit extract for the site and building configuration described above. |
| Identifier / date | 2987/GHMC/LBN/2023-OC; 18 August, 2023; application 008436/GHMC/4174/LBN2/2023-OC |
|---|---|
| What the supplied record establishes | OC extract for the residential building on the stated site, certifying it fit for occupation. |
| Identifier / date | Dated 13th day of May, 2022 |
|---|---|
| What the supplied record establishes | Promoter affidavit-cum-declaration concerning the project and proposed completion by 06' May. 2025. |
| Identifier / date | LRS/1561/7421/CR-2/EASTZONE/GHMC/20008ONE/ |
|---|---|
| What the supplied record establishes | Number appears in the building-permit extract; a separate approved layout drawing or independently accessible layout record is not supplied. |
| Identifier / date | Documents 236039–236048, 236156–236162 |
|---|---|
| What the supplied record establishes | Filed materials include title-report/deed and development-agreement documents, agreement and allotment templates, and a floor-plan/layout document. The templates shown in the supplied extracts do not establish a completed unit-specific sale. |
The supplied evidence does not include a separate completed-project certificate beyond the GHMC occupancy-certificate record, or a separate Fire NOC. The principal approval conditions and the full title and legal-document analysis are addressed in the relevant due-diligence sections.
Frequently asked questions
Is NOVA SUNRISE registered with Telangana RERA?
Yes. NOVA SUNRISE is registered with the Telangana Real Estate Regulatory Authority as P02200004616; the registration status is New Project.
Who is the developer of NOVA SUNRISE?
The promoter named in the RERA registration is DPR INFRA PROJECTS PRIVATE LIMITED.
Where is NOVA SUNRISE located?
NOVA SUNRISE is in UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, Shanthinagar, Uppal, Medchal-Malkajgiri, Telangana (500038).
When will NOVA SUNRISE be completed?
The promoter's proposed date of completion filed with RERA is 06/05/2025. This is the promoter's declaration, not a guarantee.