NOVA SUNRISE is a residential apartment project in UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, Medchal-Malkajgiri. It is being developed by registered promoter DPR INFRA PROJECTS PRIVATE LIMITED. The project occupies 363.66 sq. m and comprises one building sanctioned as 1 Stilt + 5 upper floors, with 10 2BHK apartments of 111.48 sq. m each. It is registered under TG-RERA P02200004616, with a proposed completion date of 06/05/2025.

More from Dpr Infra Projects Pvt Ltd · 6 projects →

01What we found

Period endedTG-RERA registration ran to 6 May 2025 - check its extension on TG-RERA
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameNOVA SUNRISE RERA record
Project type / phaseResidential apartment project; registered phase or separately identified phase name is not disclosed. RERA record
TG-RERA registrationP02200004616; registered from 13/06/2022 through 06/05/2025. The certificate records a two-year validity period and says extension is subject to Authority approval under the Act and Rules. RERA record
Registered promoterDPR INFRA PROJECTS PRIVATE LIMITED; company. RERA record Corporate record
RERA status in supplied recordThe recorded registration period ended on 06/05/2025. The supplied certificate says it was not extended; no later extension is established in the supplied evidence. RERA record

Land and geographic identity

ItemRecord
LocalityUPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL; the registration certificate describes the site as Shanthinagar, Uppal. RERA record RERA filing
Revenue villageShanthinagar in the project identity/RERA filing. The building-permit and OC extracts identify UPPAL BHAGAT; the supplied records do not resolve the revenue-village identity. RERA record RERA filing
Mandal / district / PINUppal / Medchal-Malkajgiri / 500038 in the project identity and registration certificate. The GHMC extracts state mandal UPPAL and district MEDCHAL. RERA record
Survey numbers110 TO 114, 116 AND 117. The filed plot identity is PLOT NOs 46PART, 47 AND 48PART. RERA record RERA filing
Site area363.66 sq. m total and net area in the RERA filing; the building permit also records plot area and net plot area as 363.66 Sq. Mtrs. RERA filing
BoundariesEast: 40 FEET WIDE ROAD; west: PLOT NOs 49 AND 50; north: PLOT NO 48 PART; south: PLOT NO 46 PART. RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approval2467/GHMC/LBN/2022-BP, approved 06 May, 2022. The building-permit extract also records file no. 003125/GHMC/1797/LBN2/2021-BP. Approvals record
Approved building area1,063.15 Sq.Mt. in the building-permit extract; the OC extract records floor area 1063.15 m2.
Building count and configurationOne building; sanctioned as 1 Stilt + 5 upper floors. The OC extract also lists a cellar and ground level in its floor description. RERA filing
Height14.50 m in the building-permit and OC extracts.
ParkingThe permit records Total Parking Area 197.4; the OC extract records Parking Area 197.4 m2. A vehicle-space count is not supplied.
Unit count10 apartments in the TG-RERA unit record; the supplied sanction extract does not state an approved apartment count. RERA unit table

Offering and status

ItemRecord
Unit type and RERA saleable area2BHK; 111.48 sq. m per unit in the RERA unit record. RERA unit table
Booked / available10 booked; 0 available, as last read from the TG-RERA portal. The portal record has no as-of date, so these counts are indicative. RERA unit table
Construction / completion deadlineThe RERA filing and Form B declaration state a proposed completion date of 06/05/2025; the building permit also sets completion before 06 May, 2025. RERA record
Occupancy certificateGHMC OC 2987/GHMC/LBN/2023-OC, dated 18 August, 2023, is supplied for the building on the stated survey numbers. It certifies the building fit for occupation; its scope is the building identified in the OC extract, not a separately described multi-phase development. Approvals record

2. The project story

  • NOVA SUNRISE is recorded with TG-RERA as a residential apartment project on a 363.66 sq. m site in the Uppal/ Shanthinagar area, associated in the filing with survey numbers 110 TO 114, 116 AND 117 and plot portions 46PART, 47 AND 48PART. The approved building is a single residential building, with the permit describing 1 Stilt + 5 upper floors. RERA record RERA filing
  • The RERA unit record lists ten 2BHK apartments, all shown as booked and none available in the portal snapshot; that snapshot is undated. The supplied GHMC occupancy certificate identifies a completed residential building and states it is fit for occupation. It records completion notice submission on 20 July, 2023 and issue of the OC on 18 August, 2023. This is documentary evidence of certification for the building identified in that certificate, not an independent site inspection for this report. RERA unit table
  • The project’s proposed completion date and the registration’s recorded validity end date are both 06/05/2025. Registration validity, the declared completion deadline and the supplied building-level OC are separate records; the evidence does not show a TG-RERA extension. RERA record

3. Master plan, architecture & building design

  • The GHMC building-permit extract identifies a residential building on 363.66 Sq. Mtrs of plot area, with 1,063.15 Sq.Mt. stated as the residential upper-floor area and a building height of 14.50 m. It describes 1 Stilt + 5 upper floors. The OC extract separately describes Cellar + Stilt; Ground + Upper Floors; 5 Upper Floor and records a floor area of 1063.15 m2.
  • The permit records 197.4 as total parking area and six rainwater-harvesting pits. The OC extract records parking area of 197.4 m2, tot-lot area of 197.4 m2, and rainwater harvesting. These are document-recorded provisions; detailed drawings establishing internal circulation, open-space layout, floor-by-floor apartment arrangement, lifts, stairs, or building footprint are not supplied here.
  • The RERA filing and GHMC records identify one building; no separate phase-wise building organization is evidenced. Approved built-up/floor area, saleable area and drawing-measured carpet area are distinct figures reported separately below. RERA filing RERA unit table

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10100111.48 sq. m75.0–81.9 sq. m; median 79.5 sq. m29%

RERA unit counts, booking status and saleable area are from the TG-RERA unit record; the booking snapshot has no stated as-of date. Carpet-area measurements are software-measured from approved floor-plan drawing geometry, not RERA-filed measurements; the supplied analysis covers six flat designs and says the result needs review. RERA unit table Floor plans RERA unit details

The supplied measured drawing example identifies a third-floor flat labelled 02 and shows a master bedroom, second bedroom, living/dining room, kitchen, two toilets and a sitout. The example’s listed room dimensions and areas are drawing-derived measurements; they are not a statement of RERA-filed room dimensions. RERA unit details

Saleable area and carpet area should not be treated as interchangeable: the drawing analysis describes its carpet measurement as software-measured and notes that saleable area also includes the home’s share of common areas. No separately measured balcony or utility area, or unit-specific loading schedule, is provided. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit records a total parking area of 197.4; the OC extract states Parking Area 197.4 m2. The permit’s conditions say cellar and stilt areas approved for parking are to be used exclusively for vehicle parking and not converted or partitioned for other use.

The supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible-space provision, ramp or driveway arrangements, EV charging, or a unit-by-unit parking allocation. A parking area stated in an approval does not by itself establish exclusive allocation or ownership for a particular apartment.

6. Amenities, recreation & open spaces

Green strip / tot lot
Description / sizePermit conditions call for a fenced tot-lot maintained as greenery; the OC extract records Tot -lot area 197.4 m2.
Evidence sourceRERA amenities
Declared progress / verified statusThe RERA amenities record shows 100%; the OC records the area. No independent site verification is supplied.
Rainwater harvesting
Description / sizeSix pits are stated in the building permit; the OC extract records rainwater harvesting.
Evidence sourceRERA amenities
Declared progress / verified statusPermit provision and OC record; no independent operational verification supplied.
Water supply
Description / sizeRERA amenities record: YES, 100%.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared status; no independent service verification supplied.
Sewerage
Description / sizeRERA amenities record for “Sewerage (Chamber, Lines, Septic Tank, STP)”: YES, 100%.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared status; the supplied data does not identify which listed sewerage components are installed or independently verify operation.
Electrical meter room / sub-station / receiving station
Description / sizeRERA amenities record: YES, 100%.
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared status; no independent verification supplied.

The amenity register lists other categories—including internal roads and footpaths, storm-water drains, street lighting, community buildings, sewage treatment/disposal, solid-waste management, energy management, fire protection and recreational open space—with 0% recorded. This is the supplied RERA amenities data, not an independent inspection or a finding about present site conditions. RERA amenities

7. Utilities, building services & safety

The RERA amenities record declares water supply, sewerage, rainwater harvesting and an electrical meter room/sub-station/receiving station at 100%. The GHMC permit specifies six rainwater-harvesting pits and requires space for a transformer and a garbage house; the OC extract notes rainwater harvesting. The evidence does not provide water source or storage capacity, treatment or reuse details, storm-water system design, electrical backup capacity, or waste-management arrangements. RERA amenities

The building-permit conditions require services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. The permit also refers to fire-fighting installations and an occupancy Fire NOC before issue of the OC. The supplied record does not include lift count or capacity, fire-system specifications, or a separate Fire NOC document; no service or statutory-compliance conclusion is drawn from those conditions alone.

8. Location, access & connectivity

The project is recorded in the locality UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, district Medchal-Malkajgiri, PIN 500038; the certificate describes the site as Shanthinagar, Uppal. The supplied project-location data also identifies an approximate nearest sampled Outer Ring Road interchange distance of 11.1 km. RERA record Location record

The RERA land record gives the eastern boundary as a 40 FEET WIDE ROAD. The supplied evidence does not specify public-transport services, local landmark distances, approach-road route, or travel times. RERA filing

9. Developer & development status

The registered legal promoter is DPR INFRA PROJECTS PRIVATE LIMITED, a company, with GSTIN 36AAICD4960B1ZT. The promoter address recorded in the project data is SHIV RESIDENCY, ROAD NO 1, SAI NAGAR COLONY, BLOCK NO 3, SHANTHI NAGAR, UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, Uppal, Medchal-Malkajgiri, 500038. A separate official company registration identifier and promoter contact details are not supplied. Corporate record Parties record

The RERA filing identifies NAYINI DHARMAPAL REDDY as an authorized signatory and NAYINI SAI CHARAN REDDY as a director; it also lists NAYINI DHARMAPAL REDDY as a landowner under an AreaShare arrangement. Parties record

The promoter’s Form B declaration dated 13th day of May, 2022 states that the project would be completed by 06' May. 2025 and includes the promoter’s declarations concerning title, encumbrances and project funds. These are promoter declarations. The supplied GHMC OC separately records the building as fit for occupation.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200004616; issued 13/06/2022; valid through 06/05/2025
What the supplied record establishesForm C registration for NOVA SUNRISE, naming Dpr Infra Projects Private Limited as promoter.
GHMC building permit
Identifier / date2467/GHMC/LBN/2022-BP; 06 May, 2022; file no. 003125/GHMC/1797/LBN2/2021-BP
What the supplied record establishesResidential building permit extract for the site and building configuration described above.
GHMC occupancy certificate
Identifier / date2987/GHMC/LBN/2023-OC; 18 August, 2023; application 008436/GHMC/4174/LBN2/2023-OC
What the supplied record establishesOC extract for the residential building on the stated site, certifying it fit for occupation.
Form B promoter declaration
Identifier / dateDated 13th day of May, 2022
What the supplied record establishesPromoter affidavit-cum-declaration concerning the project and proposed completion by 06' May. 2025.
Layout approval record
Identifier / dateLRS/1561/7421/CR-2/EASTZONE/GHMC/20008ONE/
What the supplied record establishesNumber appears in the building-permit extract; a separate approved layout drawing or independently accessible layout record is not supplied.
Project agreements / title materials
Identifier / dateDocuments 236039–236048, 236156–236162
What the supplied record establishesFiled materials include title-report/deed and development-agreement documents, agreement and allotment templates, and a floor-plan/layout document. The templates shown in the supplied extracts do not establish a completed unit-specific sale. Document index

The supplied evidence does not include a separate completed-project certificate beyond the GHMC occupancy-certificate record, or a separate Fire NOC. The principal approval conditions and the full title and legal-document analysis are addressed in the relevant due-diligence sections. Document index

Frequently asked questions

Is NOVA SUNRISE registered with Telangana RERA?

Yes. NOVA SUNRISE is registered with the Telangana Real Estate Regulatory Authority as P02200004616; the registration status is New Project.

Who is the developer of NOVA SUNRISE?

The promoter named in the RERA registration is DPR INFRA PROJECTS PRIVATE LIMITED.

Where is NOVA SUNRISE located?

NOVA SUNRISE is in UPPAL KALAN, UNDER GHMC UPPAL CIRCLE, UPPAL MANDAL, Shanthinagar, Uppal, Medchal-Malkajgiri, Telangana (500038).

When will NOVA SUNRISE be completed?

The promoter's proposed date of completion filed with RERA is 06/05/2025. This is the promoter's declaration, not a guarantee.