Sign in

Nirvana

MEGHAA CONSTRUCTIONS · Hanamkonda · RERA P00300004783

NIRVANA is a residential apartment project in BHEEMARAM _W55, Hasanparthy mandal, Warangal Urban district. It is being developed by Meghaa Constructions, a partnership, on a site recorded as 1083.77 m². The project comprises one building with 1 Stilt + 5 upper floors and 25 apartments: 20 2BHK and five 3BHK, with RERA-filed saleable areas of 54.36 m² and 142.88 m², respectively. Its TG-RERA registration is P00300004783, and the proposed completion date recorded in the project information is 23/03/2028.

01What we found

RegisteredTG-RERA - valid till 23 Nov 2027
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameNIRVANA RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo separate phase name is disclosed. The registration and building-permit record identify one proposed residential apartment building. RERA record
TG-RERA registrationP00300004783; registration granted under section 5.
Registration validity01/08/2022–23/11/2027; certificate states five years, unless extended by the Authority. The record says it has not been extended. Registration validity is distinct from the completion undertaking and occupancy status.
Registered promoterMeghaa Constructions, a partnership. RERA record RERA filing Corporate record
RERA statusThe supplied certificate records registration. The project is described in the filing as “New Project.” RERA filing

Land and geographic identity

FieldProject record
LocalityBHEEMARAM _W55 RERA record RERA filing
Revenue villageBheemaram Revenue Village; the building-permit record also identifies Bheemaram, Ward 55. Land records
Mandal / district / PINHasanparthy / Warangal Urban / 506015 RERA record
Survey number(s)Survey No. 140; no subdivision is specified in the supplied project identity or building-permit record. RERA record Land records
Plot / premises identifiers45/A,46/A TO 52,55-4-1187 as recorded on the TG-RERA certificate.
Registered site extent1,293 Sq.yards in the development agreement/title-report record.
Site area / net areaBuilding-permit record: 1083.77 m² site area and 1081.31 m² net area. RERA land details record 1083.77 m² total and net area. These are reported as recorded, without reconciling the differing net-area entries here. Land records
Boundaries in RERA filingEast: PLOT NO - 66 TO 72; West: ROAD WIDTH - 9; North: EXISTING BUILDING -; South: ROAD WIDTH -9. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Warangal Municipal Corporation; the RERA filing also lists DTCP as the authority for plan approval. Approvals record
Principal approvalBuilding Permit Order 3006/33364/W55/2021, approved 23 November, 2021.
Approved built-up area3023.29 m² in the RERA filing. RERA filing
Building countOne building is recorded in the RERA land details; the permit describes one proposed residential apartment building. RERA filing
Sanctioned floors / height1 Stilt + 5 upper floors; sanctioned height 14.84 m.
Parking levelThe permit identifies the stilt for parking. It also states that approved stilt/cellar parking is to be used exclusively for vehicle parking; the supplied extracted sanctioned configuration specifies a stilt, not a cellar.
Unit count25 in the RERA record; the permit extract does not supply a sanctioned unit total. RERA unit table RERA filing

Offering and status

FieldProject record
Unit types2BHK and 3BHK apartments RERA unit table
RERA-filed saleable area2BHK: 54.36 m²; 3BHK: 142.88 m² RERA unit table
Booked / available2BHK: 0 booked / 20 available; 3BHK: 0 booked / 5 available. These portal counts have no as-of date in the supplied record and are indicative. RERA unit table
Construction stageNo current construction-progress percentage or independently verified site status is supplied. The permit is for a proposed building. RERA amenities
Completion datePromoter’s Form B undertaking: 23/11/2027. Separately, the project information records a proposed completion date of 23/03/2028; the supplied material does not explain the difference. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The building permit requires a completion notice and occupancy certificate before occupation.

2. The project story

NIRVANA is registered as a residential apartment project on Survey No. 140 in Bheemaram Revenue Village, Hasanparthy mandal, Warangal Urban district. The registered offering is for one apartment building, with 25 homes across 2BHK and 3BHK configurations. RERA record Land records RERA unit table

The building permit describes a proposed building of one stilt and five upper floors. The RERA portal indicates 20 two-bedroom and five three-bedroom apartments, all shown as available when the record was captured; because the portal counts have no stated as-of date, they should not be treated as a current sales statement. RERA unit table

The supplied evidence establishes the approved proposal and the promoter’s declared completion undertaking, but not the building’s present physical progress or independent completion status. No occupancy or completion certificate is included. The promoter’s Form B states a completion date of 23/11/2027; the project-information filing separately gives 23/03/2028 as the proposed completion date. RERA filing Document index

3. Master plan, architecture & building design

The building-permit record identifies one proposed residential apartment building on a site recorded as 1083.77 m², with a 1081.31 m² net area in that permit extraction. It sanctions 1 Stilt + 5 upper floors and records a building height of 14.84 m. The RERA filing reports 3023.29 m² of approved built-up area. These figures describe different filed or permit-record fields and are not interchangeable. RERA filing

The permit extract identifies a 14% open-space figure and a 54.4 m² tot-lot. It also lists six rain-water-harvesting structures and space for a transformer. The supplied material does not establish the building footprint, flats per floor, lift or stair arrangement, apartment entrances, detailed circulation, or a full site-plan breakdown.

The approved-drawing document is filed as 230134, but the supplied overview evidence does not include a complete drawing-derived description of the building layout or common-area arrangement. Document index

4. Homes, configurations & floor plans

The RERA filing records 25 apartments: 20 2BHK and five 3BHK. Its saleable areas are 54.36 m² for 2BHK and 142.88 m² for 3BHK. The supplied unit record shows 0 booked and all 25 available, but provides no as-of date for those counts. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002054.36 m²Not measured in the supplied drawing analysisNot supplied
3BHK505142.88 m²93.4–93.6 m²; median 93.5 m² (software-measured)35%

The 3BHK carpet figures are software measurements from three flat designs in the filed floor-plan drawing, not RERA-filed carpet-area disclosures, and are flagged by the source as requiring drawing review. The RERA saleable area is a separate filed measure; the supplied drawing-analysis note says it includes the home’s share of common areas, so it should not be read as carpet area. RERA unit details Floor plans

The measured sample drawing identifies bedrooms, living/dining, kitchen, attached and common toilets, and a 1.00 m-wide balcony. These details are drawing-based; the supplied evidence does not establish that every 3BHK has an identical arrangement.

5. Parking & vehicle circulation

The approved configuration includes a stilt, and the building permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking. The extracted permit details specify a stilt area of 500.65 m²; no parking-space count, visitor or accessible-space provision, or unit-by-unit parking allocation is supplied.

The RERA filing records 284.11 m² as mortgage area, but the supplied information does not identify this as a count or allocation of parking spaces. A drawn or stated parking area does not establish exclusive parking ownership for a particular apartment. RERA filing Land records

6. Amenities, recreation & open spaces

The permit identifies a 54.4 m² tot-lot, requires tree planting and perimeter greenery, and records a 14% open-space figure. It also lists rain-water harvesting, transformer space and a garbage house. The RERA amenity record lists proposed or recorded infrastructure items, but shows 0% progress for its entries; this is not independent evidence of completion. RERA amenities

Tot-lot
Description / size54.4 m²
Evidence sourceBuilding permit
Declared progress / verified statusRequired/listed in permit; no completion verification supplied
Perimeter greenery / tree planting
Description / sizeStrip of greenery around the site and tree planting required by the permit
Evidence sourceBuilding permit
Declared progress / verified statusRequired/listed; no completion verification supplied
Water supply
Description / sizeRERA amenity record says “YES”
Evidence sourceTG-RERA amenity record
Declared progress / verified status0% progress recorded; source and operating status not established RERA amenities
Sewerage
Description / sizeRERA amenity record says “YES” for sewerage infrastructure
Evidence sourceTG-RERA amenity record
Declared progress / verified status0% progress recorded; system type and operating status not established RERA amenities
Solid-waste management and disposal
Description / sizeRERA amenity record says “YES”; permit also lists a garbage house
Evidence sourceTG-RERA amenity record; building permit
Declared progress / verified status0% progress recorded for the amenity entry; no completion verification supplied RERA amenities
Rain-water harvesting
Description / sizePermit lists six rain-water-harvesting structures; RERA amenity record says “YES” for water conservation/rain-water harvesting
Evidence sourceBuilding permit; TG-RERA amenity record
Declared progress / verified statusRequired/listed; no completion verification supplied RERA amenities
Transformer space / electrical room
Description / sizePermit requires space for a transformer; RERA amenity record says “YES” for electrical meter room/sub-station/receiving station
Evidence sourceBuilding permit; TG-RERA amenity record
Declared progress / verified statusListed; no completion verification supplied RERA amenities
Other listed site items
Description / sizeInternal roads and footpaths, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, energy management, fire protection, and recreational open space
Evidence sourceTG-RERA amenity record
Declared progress / verified statusEach is shown at 0% progress; the supplied record does not establish completed provision RERA amenities

7. Utilities, building services & safety

The project records list water supply, sewerage, solid-waste management, rain-water harvesting and electrical-service infrastructure in the TG-RERA amenity schedule. The building permit requires six rain-water-harvesting structures, transformer space and a garbage house. The supplied evidence does not specify water source or storage capacity, an STP design or capacity, treated-water reuse, storm-water design, electrical backup, lift number or capacity, or waste-collection arrangements. RERA amenities

The permit assigns responsibility for sanitation, plumbing, fire-safety requirements, lifts and electrical installations to qualified technical supervision, and states that structural and fire-safety requirements are the responsibility of the owner, builder/developer, architect and site engineer. It also requires an occupancy certificate before occupation. These are permit conditions; the supplied record does not establish that the systems have been installed, tested or independently verified.

The supplied material does not detail escape stairs, fire-system equipment, emergency access, accessible circulation, CCTV, access control or EV charging. Document index RERA amenities

8. Location, access & connectivity

The registered project location is BHEEMARAM _W55, Bheemaram Revenue Village, Hasanparthy mandal, Warangal Urban district, PIN 506015. The building permit identifies the site at Bheemaram, Ward 55, Survey No. 140. RERA record Land records

The RERA filing records road-width boundaries of 9 on the west and south. The building permit extract also refers to an 18M road width in a condition concerning a site abutting such a road; it does not establish here which project frontage that condition applies to. RERA filing

The supplied connectivity record gives the nearest sampled Outer Ring Road interchange as approximately 111.8 km. No public-transport information or other verified landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is MEGHAA CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ABSFM8928Q1ZZ. Its listed address is B, Raghavendra Nagar, Bheemaram, BHEEMARAM _W55, Hasanparthy, Warangal Urban, 506015. The supplied records identify Polampally Shobhan Babu as authorized signatory and Boyenapally Anil Rao, Katla Gayathri and Kondaveeti Lalitha Bhavani as partners. RERA filing Corporate record Parties record

The RERA record identifies two landowners under an area-share arrangement: MARAPELLI NAGESH REDDY and MARAPALLY GEETHA DEVI. The development agreement filed with the title materials records a 38% land-owner and 62% developer built-up-area allocation. Parties record

The promoter’s Form B declares completion by 23/11/2027. The project-information record gives 23/03/2028 as the proposed completion date; the supplied evidence does not explain the difference. No current construction-progress measurement or occupancy certificate is supplied. RERA filing Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence records
TG-RERA certificate P00300004783Form C registration for NIRVANA under section 5, issued 01/08/2022, valid through 23/11/2027; Survey No. 140 and the recorded plot/premises identifiers are included.
Building Permit Order 3006/33364/W55/2021Greater Warangal Municipal Corporation permit dated 23 November, 2021, for a proposed residential apartment building of 1 Stilt + 5 upper floors at Bheemaram, Survey No. 140.
Approved plan / drawingFiled as document 230134; the drawing source is used for the software-measured 3BHK floor-plan analysis. A full drawing-based building description is not available in the supplied material.
Form B declarationPromoter’s affidavit-cum-declaration, including the land-ownership and encumbrance statements and completion undertaking of 23/11/2027.
Title and development documentsTitle-report and development-agreement materials are listed in the shared evidence; the development agreement is recorded as document 205/2022 and is described in document 230110.
Occupancy / completion certificateNot supplied in the reviewed project documents. The building permit requires completion notice and an occupancy certificate before occupation.

The supplied records do not include an issued occupancy or completion certificate, a current construction-status report, or a detailed account of the building’s installed services. The overview therefore describes the registered and permitted proposal and the promoter’s stated completion undertaking, not independently verified delivery. Document index

Frequently asked questions

Is NIRVANA registered with Telangana RERA?

Yes. NIRVANA is registered with the Telangana Real Estate Regulatory Authority as P00300004783; the registration status is New Project.

Who is the developer of NIRVANA?

The promoter named in the RERA registration is MEGHAA CONSTRUCTIONS.

Where is NIRVANA located?

NIRVANA is in BHEEMARAM _W55, Bheemaram, Hasanparthy, Hanamkonda, Telangana (506015).

When will NIRVANA be completed?

The promoter's proposed date of completion filed with RERA is 23/03/2028. This is the promoter's declaration, not a guarantee.

More projects in Bheemaram