Sign in

Aarav Enclave

AARAV CONSTRUCTIONS · Hanamkonda · RERA P00300000875

AARAV ENCLAVE is a residential apartment project in BHEEMARAM, Hasanparthy mandal, Warangal Urban district, developed by registered promoter AARAV CONSTRUCTIONS. It covers 487.31 sq. m and comprises one Stilt + 4 residential apartment building with 12 homes: eight 2BHK units and four 3BHK units. The project is registered under TG-RERA No. P00300000875, with an original and revised proposed completion date of 05/07/2024.

01What we found

Period endedTG-RERA registration ran to 5 Jul 2024 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from quikr.com

1. Project at a glance

Project identity

ItemRecord
Registered project nameAARAV ENCLAVE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration covers the project identified at Survey Nos. 242 and 242/A
TG-RERA registrationP00300000875; granted 12/06/2019; certificate states validity from 12/06/2019 through 05/07/2024 and no extension is recorded in the supplied certificate
Registered promoterAARAV CONSTRUCTIONS; entity type recorded as proprietorship RERA filing Corporate record
RERA statusThe project record describes it as “On-Going Project.” The registration’s stated validity ended on 05/07/2024; the supplied materials do not establish a later extension or current registration status RERA filing

Land and geographic identity

ItemRecord
LocalityBHEEMARAM RERA record RERA filing
Revenue villageBheemaram RERA record Land records
MandalHasanparthy RERA record Land records
DistrictWarangal Urban RERA record Land records
PIN506001 RERA record
Project survey numbers and subdivisionsSurvey Nos. 242 and 242/A Land records
Registered site extent487.31 sq. m; RERA land record shows total area 487.31 sq. m and net area 487.31 sq. m, with affected area 0 sq. m Land records
Boundaries in RERA land recordNorth: 9M WIDE ROAD; East: 9M WIDE ROAD; South: EXISTING BUILDING OF OTHERS; West: OPEN PLOT OF OTHERS Land records

Development identity

ItemRecord
Sanctioning authorityGreater Warangal Municipal Corporation (GWMC) Approvals record
Principal building permitNo. 3006/12792/W55/2018, dated 05 July, 2018 Approvals record
Sanctioned buildingOne Stilt + 4 residential apartment building; sanctioned height recorded as 12 m
Approved built-up area1,024.04 sq. m, as recorded in the RERA project fields RERA filing
Sanctioned floor configurationStilt + 4; no basement or podium is identified in the supplied building-permit extraction
Parking levelPermit conditions state that the approved cellar and stilt areas are to be used exclusively for vehicle parking; the extracted floor configuration identifies stilt, but does not specify a cellar level
Unit count12 units across 2BHK and 3BHK configurations in the RERA unit record; the supplied approval extract does not state an approved total unit count RERA unit table RERA unit details

Offering and status

ItemRecord
RERA-filed configurations2BHK: 8 units; 3BHK: 4 units RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 48.75 sq. m; 3BHK: 125.0 sq. m RERA unit table RERA unit details
Booked / availableRERA portal figures last read show 0 booked and 8 available 2BHK units, and 0 booked and 4 available 3BHK units. The portal record supplied has no as-of date; treat counts as indicative RERA unit table RERA unit details
Construction-stage recordAn architect’s Form–1A certificate states that the project was completed in all aspects and identifies an occupancy certificate for the complete building dated 22/10/2020
Completion dates in RERA recordOriginal and revised proposed completion dates: 05/07/2024 RERA record RERA filing
Occupancy certificateThe Form–1A identifies OC No. 3006/26053/w55/2020, issued by GWMC on 22/10/2020 for the complete building; the underlying OC document itself is not separately included in the supplied materials

2. The project story

AARAV ENCLAVE is recorded with TG-RERA as a residential apartment project on 487.31 sq. m in Bheemaram village, Hasanparthy mandal, Warangal Urban district, covering Survey Nos. 242 and 242/A. Its building permit describes one Stilt + 4 apartment building, and the RERA unit record lists 12 homes: eight 2BHK and four 3BHK. RERA record Land records RERA unit table

The RERA-filed architect’s Form–1A reports completion of the project in all aspects and identifies an occupancy certificate for the complete building dated 22/10/2020. This is a filed certification; an underlying occupancy-certificate copy is not among the supplied documents. The RERA record separately lists 05/07/2024 as both the original and revised proposed completion date, and the registration certificate’s validity ended on that date. RERA record

The supplied material does not include independently verified site-inspection findings. Accordingly, the certificate’s completion statement should not be read as an independent physical inspection by this report.

3. Master plan, architecture & building design

The sanctioned scheme evidenced in the building-permit extraction is a single residential apartment building with a Stilt + 4 configuration and a recorded height of 12 m. The permit records a site area and net area of 487.31 sq. m, road-affected area of 0 sq. m, residential area of 1,024.04 sq. m and stilt area of 264.06 sq. m. The RERA project fields also report approved built-up area of 1,024.04 sq. m. These are the areas as recorded in the respective project/permit data; no FSI-counted area, carpet area, building footprint or floor-by-floor area schedule is supplied. RERA filing

No supplied drawing-derived record establishes flats per floor, lift or stair arrangements, entrances/exits, internal circulation, landscaping dimensions, or a residential/common-area breakdown. The RERA amenity record reports internal roads and footpaths, a green strip/tot-lot/park and aggregate recreational open space as available at 100%, but supplies no areas for these items. Floor plans RERA amenities

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK80848.75 sq. mNot availableNot supplied
3BHK404125.0 sq. mNot availableNot supplied

Unit counts, bookings and saleable areas above are from the TG-RERA unit record; booking counts have no supplied as-of date and are indicative. The floor-plan dataset contains two drawings, but records no measured plans and no flats in the drawings; it therefore provides no software-measured carpet areas or room dimensions for this report. RERA unit table RERA unit details Floor plans

Saleable area is the RERA-filed area measure. It should not be treated as carpet area: the supplied measurement guidance notes that saleable area also counts the home’s share of common areas. No balcony, utility-area or loading figures are supplied. RERA unit table Floor plans

5. Parking & vehicle circulation

The building-permit conditions state that the approved cellar and stilt areas are to be used exclusively for vehicle parking and not partitioned or converted to another use. The permit extraction identifies Stilt + 4 floors but does not establish the number of parking spaces, a cellar level, visitor or accessible parking, ramps, driveways, pedestrian separation, or EV charging.

No project-specific unit allocation document establishing an exclusive parking space for any apartment is supplied. The RERA amenity record does not state parking counts or allocations. RERA amenities Document index

6. Amenities, recreation & open spaces

The project’s RERA amenity record marks the following items “YES” at 100%, and three other listed items at 0%. These percentages are filing-recorded status, not independent verification of delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not suppliedRERA amenity record RERA amenities100% recorded; not independently verified
Green strip / tot-lot / parkSize not suppliedRERA amenity record RERA amenities100% recorded; not independently verified
Aggregate recreational open spaceArea not suppliedRERA amenity record RERA amenities100% recorded; not independently verified
Community buildingsNo description or size suppliedRERA amenity record RERA amenities0% recorded
Water conservation / rainwater harvestingSize/capacity not suppliedRERA amenity record RERA amenities; building permit100% recorded in RERA amenity record; permit requires a rainwater-harvesting structure (percolation pit); completion not independently verified

No RERA-filed evidence in the supplied materials establishes a clubhouse, indoor recreation facility, sports facility, or convenience/community facility with a project-specific description or size. RERA amenities Document index

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drains, street lighting, rainwater harvesting and an electrical meter room/sub-station/receiving station as available at 100%. It gives no capacities, technical specifications or independent verification. The same record shows treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%. RERA amenities

The building permit requires a rainwater-harvesting structure, transformer space and a garbage house. It also requires an occupancy certificate before occupation and states that public water and electricity connections will be provided only on production of that certificate. Permit conditions place structural and fire-safety responsibilities on the owner, builder/developer, architect and site engineer; the supplied record does not establish installed fire systems, lift provision, backup power, water storage or treatment capacities, CCTV, access controls, waste-segregation arrangements, or accessibility features.

8. Location, access & connectivity

The registered location is BHEEMARAM, Bheemaram village, Hasanparthy mandal, Warangal Urban district, PIN 506001. The building-permit extraction identifies the site as BHEEMARAM [V], HASANPARTHY [M], WARANGAL. RERA record Land records

The RERA land record gives 9M WIDE ROAD boundaries to the north and east; the building-permit extraction also contains a separate road-width entry of “18M road width.” These are reproduced as supplied, without an independent road survey. Land records

No project-specific public-transport details, landmarks, or verified travel distances are supplied. Location record

9. Developer & development status

The registered promoter is AARAV CONSTRUCTIONS, recorded as a proprietorship. The RERA project record names Chokkarapu Narsaiah as authorized signatory; the Form B declaration is made by CHOKKARAPU NARASAIAH as promoter. The supplied record does not provide a verified company-registration identifier, official website, or official contact details. Corporate record Parties record

The promoter’s Form B affidavit, dated 28 April 2019, declares a completion undertaking of 05/07/2024 and includes declarations concerning approvals, project funds, audits and allottee treatment. These are promoter declarations. Separately, the architect’s Form–1A reports completion in all aspects and identifies an OC for the complete building dated 22/10/2020.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300000875; issued 12/06/2019; stated validity through 05/07/2024
Scope and evidenceForm “C” registration for AARAV ENCLAVE, promoter Aarav Constructions; identifies Survey Nos. 242 and 242/A and plots 6 & 7
Building permit order
Identifier / dateGWMC No. 3006/12792/W55/2018; 05 July, 2018
Scope and evidencePermit extraction for one Stilt + 4 residential apartment building at Bheemaram; records site area 487.31 sq. m
Architect’s completion certificate (Form–1A)
Identifier / dateOC No. 3006/26053/w55/2020; 22/10/2020
Scope and evidenceReports completion in all aspects and identifies the OC as covering the complete building; the underlying OC copy is not separately supplied
Promoter declaration (Form B)
Identifier / dateDated 28 April 2019
Scope and evidencePromoter-filed title, encumbrance, funds, audit, approvals and completion declarations
Title report and link documents
Identifier / dateTitle investigation report dated 02-01-2019; associated title documents
Scope and evidenceSupplied title materials address plots 6 and 7 and the project land in Survey Nos. 242 and 242/A
HMDA approved-layout lookup
Identifier / dateNot available in the supplied record
Scope and evidenceThe public DPMS lookup was reported as inaccessible; no approved-layout record is established here HMDA

The supplied evidence does not include a separate underlying occupancy-certificate copy, a complete set of sanctioned drawings, or an approved-layout lookup result. The building-permit extraction records that permit KUDAL001550/2015-17 as the Layout / Sub Divn. No.

Frequently asked questions

Is AARAV ENCLAVE registered with Telangana RERA?

Yes. AARAV ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P00300000875; the registration status is On-Going Project.

Who is the developer of AARAV ENCLAVE?

The promoter named in the RERA registration is AARAV CONSTRUCTIONS.

Where is AARAV ENCLAVE located?

AARAV ENCLAVE is in BHEEMARAM, Hasanparthy, Hanamkonda, Telangana (506001).

When will AARAV ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 05/07/2024. This is the promoter's declaration, not a guarantee.

More projects in Bheemaram