Sunrise Heights
SURYA DEVELOPERS AND CONTRACTORS · Khammam · RERA P00800001934
SUNRISE HEIGHTS is a residential apartment project in Khanapuram Haveli, Khammam (Urban) Mandal, Khammam district, developed by registered promoter SURYA DEVELOPERS AND CONTRACTORS. The project covers 740.03 m² and comprises one residential building with 1 Stilt + 5 upper floors and 15 apartments: 10 2BHK and 5 3BHK. It is registered under TG-RERA number P00800001934, with the registration certificate stating validity through 08/03/2024; no proposed completion date is stated in the supplied record.
More from Surya Developers And Contractors · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SUNRISE HEIGHTS RERA record |
| Project type | Residential apartment project RERA record |
| Registered portion / phase | Not separately identified in the supplied record. The registration is for the project under one registration number; the sanctioned building permit describes one residential building. RERA record |
| TG-RERA registration | P00800001934; registration certificate issued 06/07/2020, stated valid from 06/07/2020 to 08/03/2024. No extension is recorded in the supplied certificate. |
| Registered promoter | SURYA DEVELOPERS AND CONTRACTORS RERA record |
| RERA status | The supplied certificate records the registration period above; current registration status is not established by the supplied record. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Khanapuram Haveli RERA record Land records |
| Revenue village | Khanapuram Haveli RERA record Land records |
| Mandal | Khammam (Urban) Mandal, as stated in the TG-RERA registration certificate |
| District / PIN | Khammam / 507002 RERA record |
| Project survey number(s) | Survey No. 88; the building-permit description also identifies Plot No. 6&6/A. The title documents refer to portions of Survey No. 88, including “88part 6 part, 6A 7part”; see Land & Title for the deed-level chain. RERA record Land records |
| Registered site extent | 740.03 m²; total area and net area are both recorded as 740.03 m², with road-affected area 0 m². Land records |
| Boundaries recorded in RERA filing | North: ROAD WIDTH 9; South: EXISTING BUILDING; East: EXISTING BUILDING; West: PLOT NO 00. Land records |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Khammam Municipal Corporation Approvals record |
| Principal approval | Building Permit Order 3018/W22/2018/6479, approved 08 March, 2019 Approvals record |
| Approved built-up area | 2,240.99 m² in the RERA project information; the permit extraction separately records residential upper-floor area 1,839.90 m² and stilt parking area 378.22 m². These are separately reported figures from the supplied records. RERA filing |
| Building count and configuration | One residential building; permit describes 1 Stilt + 5 upper floors and records residential upper floors as 6. The supplied record does not explain this floor-count wording further. RERA filing |
| Height / parking | Permit records building height 14.75 m and 1 stilt for parking. No parking-space count is supplied. |
| Unit counts | Sanctioned plan: 1 total building unit; RERA unit schedule: 15 apartments (10 2BHK and 5 3BHK). RERA filing RERA unit table |
Offering and status
| Item | Record |
|---|---|
| Configurations | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable areas | 2BHK: 119.32 m²; 3BHK: 128.4 m² RERA unit table |
| Booked / available | 2BHK: 0 booked / 10 available; 3BHK: 0 booked / 5 available. The portal-derived booking counts have no recorded as-of date and are indicative. RERA unit table |
| Construction stage | Not established by the supplied evidence. The record provides a building permit and registration certificate, but no independently verified construction-progress evidence. |
| Completion dates | RERA registration certificate validity ends 08/03/2024; this is not itself a construction-completion or possession date. No project completion certificate or revised completion date is supplied. |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied documents. The building permit states that an occupancy certificate is required before occupation. |
2. The project story
SUNRISE HEIGHTS is registered as a residential apartment project in Khanapuram Haveli, Khammam district, on Survey No. 88. The supplied building permit describes a single residential building with a stilt and upper floors, while the RERA unit schedule lists 15 apartments across 2BHK and 3BHK configurations. RERA record Land records RERA unit table
The record establishes the approved building-permit details and the RERA registration period, but does not establish the present physical construction stage, completed facilities, or possession readiness. The registration certificate’s end date of 08/03/2024 should be read separately from construction completion; no occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
The project site is recorded as 740.03 m², with net area also 740.03 m² and road-affected area 0 m². The RERA project information records approved built-up area as 2,240.99 m². The building-permit extraction separately lists 1,839.90 m² for residential upper floors and 378.22 m² for stilt parking. Land records RERA filing RERA filing
The permit describes one residential building, 1 Stilt + 5 upper floors, with height 14.75 m. It also states that the stilt and any cellar approved for parking are to be used exclusively for vehicle parking; the supplied permit data identifies one stilt, but does not establish a cellar or parking-space count.
No approved drawing extraction is available to describe floor-by-floor apartment arrangement, building footprint, lift or stair count, internal circulation, or common-area distribution. The layout-plan document entry is present but not extracted, so site layout and detailed drawing features cannot be characterized from the supplied evidence. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 119.32 m² | Not measured from drawings | Not supplied |
| 3BHK | 5 | 0 | 5 | 128.4 m² | Not measured from drawings | Not supplied |
RERA-filed saleable areas and unit counts are drawn from the project unit schedule. Booking figures are portal-derived, have no recorded as-of date, and should be treated as indicative. RERA unit table RERA unit details RERA unit table
Two floor-plan drawings are recorded, but neither has been measured: both remain pending scan review. Accordingly, no software-measured carpet areas, room dimensions, balcony or utility measurements, or typical-floor arrangement can be reported. Saleable area and carpet area are different measures; the supplied record does not provide a verified carpet-area figure for either configuration. Floor plans
5. Parking & vehicle circulation
The building permit records one stilt for parking and states that stilt—and any approved cellar—parking is to be used exclusively for vehicles without partition walls or rolling shutters. It also records a stilt parking area of 378.22 m². No sanctioned parking-space count, visitor or accessible allocation, mechanical parking, ramp arrangement, EV charging provision, or unit-specific parking allocation is established in the supplied evidence.
6. Amenities, recreation & open spaces
| Description / size | Permit records Tot-lot area as NA; conditions require a fenced tot-lot maintained as greenery before occupancy certificate. |
|---|---|
| Declared progress / verified status | Permit condition; completion not verified. |
| Description / size | Permit specifies rainwater-harvesting structures (percolation pits); No. of RWHs: 6. |
|---|---|
| Declared progress / verified status | Required by permit; installation not verified. |
| Description / size | Permit requires greenery along the site periphery; RERA amenity record lists “Green Strip/TOT LOT/Park.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Recorded as an amenity/permit condition; completion not verified. |
| Description / size | Listed as available in the RERA amenity record; no description or size supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0% in the supplied record; completion not verified. |
| Description / size | RERA amenity record lists aggregate recreational open space but supplies no area. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress shown as 0%; completion not verified. |
The RERA amenity schedule also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, and an electrical meter room/sub-station/receiving station. The supplied schedule reports 0% progress for its listed entries; it does not independently verify whether any work has since been completed. RERA amenities
7. Utilities, building services & safety
The building permit requires a rainwater-harvesting structure, space for a transformer, and a garbage house. It also states that public water and electricity connections are to be provided only on production of an occupancy certificate, and that sanitation, plumbing, fire-safety requirements, lifts, and electrical installations are to be carried out under qualified technical supervision. These are permit requirements, not evidence that the services are installed or operational.
The RERA amenity record lists water supply, sewerage, storm-water drainage, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, and an electrical meter room/sub-station/receiving station; each has 0% recorded progress in the supplied data. No capacity, source, treatment method, backup supply, lift count or capacity, CCTV/security detail, or accessibility arrangements are established. RERA amenities
8. Location, access & connectivity
The registered project location is Khanapuram Haveli, Khammam district, Telangana, 507002, in Khammam (Urban) Mandal as stated on the TG-RERA certificate. The permit identifies the street as KHANAPURAM HAVELI, KHAMMAM, Ward 22, and records a north boundary of ROAD WIDTH 9. RERA record
The supplied location evidence does not establish public-transport routes, measured distances to local facilities, or verified travel times. No connectivity claims are made here.
9. Developer & development status
The registered promoter is SURYA DEVELOPERS AND CONTRACTORS, identified in the project record as a partnership. The supplied record names VASI REDDY SURYA PRAKASH as authorized signatory and VASI REDDY SRIDEVI as partner. A masked identifier appears in the RERA filing as xxxxxx505H; no unmasked corporate identifier or official contact details are supplied. RERA record Corporate record Parties record
The record describes one building and a 15-apartment RERA unit schedule. It does not establish construction progress, a revised completion deadline, or an issued occupancy certificate. The project’s RERA registration certificate records validity through 08/03/2024; the supplied evidence does not record an extension. RERA unit table
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for SUNRISE HEIGHTS, registration P00800001934, issued 06/07/2020, valid through 08/03/2024 as stated in the certificate. |
| Building permit | Khammam Municipal Corporation Building Permit Order 3018/W22/2018/6479, approved 08 March, 2019; the extraction records the residential building, site area, floor configuration and permit conditions. |
| Layout plan | A layout-plan document entry is present, but the supplied document is not extracted; its drawing details are therefore not described here. |
| Occupancy / completion certificate | Not supplied. The building permit states that an occupancy certificate is compulsory before occupation. |
| Project unit and amenity records | RERA unit schedule records 10 2BHK and 5 3BHK apartments; the RERA amenity record lists project infrastructure and amenities, with progress recorded as 0%. RERA unit table RERA amenities |
1. Project at a glance
Project identity
Registered project name: SUNRISE HEIGHTS
Project type: Residential apartment project
Registered portion / phase: Not separately identified in the supplied record. The registration is for the project under one registration number; the sanctioned building permit describes one residential building.
TG-RERA registration: P00800001934; registration certificate issued 06/07/2020, stated valid from 06/07/2020 to 08/03/2024. No extension is recorded in the supplied certificate.
Registered promoter: SURYA DEVELOPERS AND CONTRACTORS
RERA status: The supplied certificate records the registration period above; current registration status is not established by the supplied record.
Land and geographic identity
Locality: Khanapuram Haveli
Revenue village: Khanapuram Haveli
Mandal: Khammam (Urban) Mandal, as stated in the TG-RERA registration certificate
District / PIN: Khammam / 507002
Project survey number(s): Survey No. 88; the building-permit description also identifies Plot No. 6&6/A. The title documents refer to portions of Survey No. 88, including “88part 6 part, 6A 7part”; see Land & Title for the deed-level chain.
Registered site extent: 740.03 m²; total area and net area are both recorded as 740.03 m², with road-affected area 0 m².
Boundaries recorded in RERA filing: North: ROAD WIDTH 9; South: EXISTING BUILDING; East: EXISTING BUILDING; West: PLOT NO 00.
Development identity
Sanctioning authority: Khammam Municipal Corporation
Principal approval: Building Permit Order 3018/W22/2018/6479, approved 08 March, 2019
Approved built-up area: 2,240.99 m² in the RERA project information; the permit extraction separately records residential upper-floor area 1,839.90 m² and stilt parking area 378.22 m². These are separately reported figures from the supplied records.
Building count and configuration: One residential building; permit describes 1 Stilt + 5 upper floors and records residential upper floors as 6. The supplied record does not explain this floor-count wording further.
Height / parking: Permit records building height 14.75 m and 1 stilt for parking. No parking-space count is supplied.
Unit counts: Sanctioned plan: 1 total building unit; RERA unit schedule: 15 apartments (10 2BHK and 5 3BHK).
Offering and status
Configurations: 2BHK and 3BHK
RERA-filed saleable areas: 2BHK: 119.32 m²; 3BHK: 128.4 m²
Booked / available: 2BHK: 0 booked / 10 available; 3BHK: 0 booked / 5 available. The portal-derived booking counts have no recorded as-of date and are indicative.
Construction stage: Not established by the supplied evidence. The record provides a building permit and registration certificate, but no independently verified construction-progress evidence.
Completion dates: RERA registration certificate validity ends 08/03/2024; this is not itself a construction-completion or possession date. No project completion certificate or revised completion date is supplied.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied documents. The building permit states that an occupancy certificate is required before occupation.
2. The project story
SUNRISE HEIGHTS is registered as a residential apartment project in Khanapuram Haveli, Khammam district, on Survey No. 88. The supplied building permit describes a single residential building with a stilt and upper floors, while the RERA unit schedule lists 15 apartments across 2BHK and 3BHK configurations.
The record establishes the approved building-permit details and the RERA registration period, but does not establish the present physical construction stage, completed facilities, or possession readiness. The registration certificate’s end date of 08/03/2024 should be read separately from construction completion; no occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
The project site is recorded as 740.03 m², with net area also 740.03 m² and road-affected area 0 m². The RERA project information records approved built-up area as 2,240.99 m². The building-permit extraction separately lists 1,839.90 m² for residential upper floors and 378.22 m² for stilt parking.
The permit describes one residential building, 1 Stilt + 5 upper floors, with height 14.75 m. It also states that the stilt and any cellar approved for parking are to be used exclusively for vehicle parking; the supplied permit data identifies one stilt, but does not establish a cellar or parking-space count.
No approved drawing extraction is available to describe floor-by-floor apartment arrangement, building footprint, lift or stair count, internal circulation, or common-area distribution. The layout-plan document entry is present but not extracted, so site layout and detailed drawing features cannot be characterized from the supplied evidence.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 119.32 m² | Not measured from drawings | Not supplied |
| 3BHK | 5 | 0 | 5 | 128.4 m² | Not measured from drawings | Not supplied |
RERA-filed saleable areas and unit counts are drawn from the project unit schedule. Booking figures are portal-derived, have no recorded as-of date, and should be treated as indicative.
Two floor-plan drawings are recorded, but neither has been measured: both remain pending scan review. Accordingly, no software-measured carpet areas, room dimensions, balcony or utility measurements, or typical-floor arrangement can be reported. Saleable area and carpet area are different measures; the supplied record does not provide a verified carpet-area figure for either configuration.
5. Parking & vehicle circulation
The building permit records one stilt for parking and states that stilt—and any approved cellar—parking is to be used exclusively for vehicles without partition walls or rolling shutters. It also records a stilt parking area of 378.22 m². No sanctioned parking-space count, visitor or accessible allocation, mechanical parking, ramp arrangement, EV charging provision, or unit-specific parking allocation is established in the supplied evidence.
6. Amenities, recreation & open spaces
| Description / size | Permit records Tot-lot area as NA; conditions require a fenced tot-lot maintained as greenery before occupancy certificate. |
|---|---|
| Declared progress / verified status | Permit condition; completion not verified. |
| Description / size | Permit specifies rainwater-harvesting structures (percolation pits); No. of RWHs: 6. |
|---|---|
| Declared progress / verified status | Required by permit; installation not verified. |
| Description / size | Permit requires greenery along the site periphery; RERA amenity record lists “Green Strip/TOT LOT/Park.” |
|---|---|
| Declared progress / verified status | Recorded as an amenity/permit condition; completion not verified. |
| Description / size | Listed as available in the RERA amenity record; no description or size supplied. |
|---|---|
| Declared progress / verified status | Progress shown as 0% in the supplied record; completion not verified. |
| Description / size | RERA amenity record lists aggregate recreational open space but supplies no area. |
|---|---|
| Declared progress / verified status | Progress shown as 0%; completion not verified. |
The RERA amenity schedule also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, and an electrical meter room/sub-station/receiving station. The supplied schedule reports 0% progress for its listed entries; it does not independently verify whether any work has since been completed.
7. Utilities, building services & safety
The building permit requires a rainwater-harvesting structure, space for a transformer, and a garbage house. It also states that public water and electricity connections are to be provided only on production of an occupancy certificate, and that sanitation, plumbing, fire-safety requirements, lifts, and electrical installations are to be carried out under qualified technical supervision. These are permit requirements, not evidence that the services are installed or operational.
The RERA amenity record lists water supply, sewerage, storm-water drainage, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, and an electrical meter room/sub-station/receiving station; each has 0% recorded progress in the supplied data. No capacity, source, treatment method, backup supply, lift count or capacity, CCTV/security detail, or accessibility arrangements are established.
8. Location, access & connectivity
The registered project location is Khanapuram Haveli, Khammam district, Telangana, 507002, in Khammam (Urban) Mandal as stated on the TG-RERA certificate. The permit identifies the street as KHANAPURAM HAVELI, KHAMMAM, Ward 22, and records a north boundary of ROAD WIDTH 9.
The supplied location evidence does not establish public-transport routes, measured distances to local facilities, or verified travel times. No connectivity claims are made here.
9. Developer & development status
The registered promoter is SURYA DEVELOPERS AND CONTRACTORS, identified in the project record as a partnership. The supplied record names VASI REDDY SURYA PRAKASH as authorized signatory and VASI REDDY SRIDEVI as partner. A masked identifier appears in the RERA filing as xxxxxx505H; no unmasked corporate identifier or official contact details are supplied.
The record describes one building and a 15-apartment RERA unit schedule. It does not establish construction progress, a revised completion deadline, or an issued occupancy certificate. The project’s RERA registration certificate records validity through 08/03/2024; the supplied evidence does not record an extension.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SUNRISE HEIGHTS, registration P00800001934, issued 06/07/2020, valid through 08/03/2024 as stated in the certificate.
Building permit: Khammam Municipal Corporation Building Permit Order 3018/W22/2018/6479, approved 08 March, 2019; the extraction records the residential building, site area, floor configuration and permit conditions.
Layout plan: A layout-plan document entry is present, but the supplied document is not extracted; its drawing details are therefore not described here.
Occupancy / completion certificate: Not supplied. The building permit states that an occupancy certificate is compulsory before occupation.
Project unit and amenity records: RERA unit schedule records 10 2BHK and 5 3BHK apartments; the RERA amenity record lists project infrastructure and amenities, with progress recorded as 0%.
Frequently asked questions
Is SUNRISE HEIGHTS registered with Telangana RERA?
Yes. SUNRISE HEIGHTS is registered with the Telangana Real Estate Regulatory Authority as P00800001934; the registration status is New Project.
Who is the developer of SUNRISE HEIGHTS?
The promoter named in the RERA registration is SURYA DEVELOPERS AND CONTRACTORS.
Where is SUNRISE HEIGHTS located?
SUNRISE HEIGHTS is in KHANAPURAM HAVELI, Khammam, Telangana (507002).
When will SUNRISE HEIGHTS be completed?
The promoter's proposed date of completion filed with RERA is 08/03/2024. This is the promoter's declaration, not a guarantee.