Dnr Residency

SR CONSTRUCTIONS · Karimnagar · RERA P02700003602

DNR RESIDENCY is a residential apartment project in Rampur locality, Karimnagar -I, Karimnagar. The registered promoter is SR CONSTRUCTIONS. The project covers 709.18 m² and comprises one building with 1 Stilt + 5 upper floors and 20 2BHK units. It is registered under TG-RERA number P02700003602, with proposed completion 07/12/2027.

More from Sr Constructions · 4 projects →

01What we found

RegisteredTG-RERA - valid till 7 Aug 2027
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FactProject record
Registered project nameDNR RESIDENCY
Project typeResidential apartment project RERA record
Phase / registered portionPhase is not separately identified in the supplied record. The registration and filed building plan concern one building. RERA record
TG-RERA registrationP02700003602
Registration validity20/11/2021 to 07/08/2027; the certificate states five years and records no extension. This is the registration period, not the construction completion date.
Registered promoterSR CONSTRUCTIONS (the registration certificate names “Sr Constructions”)
RERA statusRegistered under section 5; listed as a “New Project.” RERA record

Land and geographic identity

FactProject record
LocalityRampur / Rampur locality RERA record
Revenue villageRampur is the village name in the project identity and filed plan; the registration certificate’s location field says Karimnagar -I. RERA record
Mandal / district / PINKarimnagar -I / Karimnagar / 505001 RERA record
Project survey number(s) and subdivisionsSurvey No. 961; no subdivision is stated in the supplied project identity or registration certificate. RERA record
Registered site extent709.18 m²
Plan-record land areaPlot area and net plot area are each 709.18 m². The plan also labels 369.77 m² as vacant plot area and 339.41 m² as proposed coverage area (47.86 %).
Boundaries (RERA filing)East: existing building; west: vacant land; north: road width “9 14”; south: existing building. RERA filing

Development identity

FactProject record
Sanctioning authority / principal approvalBuilding-permit order 3145/Karimnagar Muni/2021/0511, approved 07 August, 2021; the extracted order identifies Satavahana Urban Development Authority (Karimnagar) as authority.
Filed plan reference3145/Karimnagar Muni/2021/0511; the plan extraction identifies Karimnagar Municipal Corporation.
Approved built-up areaThe plan records 1,708.62 m² as built up area and 2,033.32 m² as total built-up area; it separately labels 1,694.10 m² as net residential BUA. These are distinct plan labels.
Building count and configurationOne residential apartment building: 1 Stilt + 5 upper floors. The permit records building height 14.97 m.
Parking levels / approved parkingStilt is shown in the building configuration. The plan extraction records “PROPOSED NUMBER OF PARKINGS 0”; a parking-space count is not otherwise established by the supplied records.
Approved versus RERA-filed unit countThe plan extraction lists 20 units; the RERA unit record lists 20 units. RERA unit table

Offering and status

FactProject record
RERA-filed configuration2BHK; 20 units RERA unit table
RERA-filed saleable area108.23 m² per unit RERA unit table
Booked / available0 booked / 20 available, as last read from TG-RERA; the portal record has no as-of date, so counts are indicative. RERA unit table
Construction stageNo independently verified or dated construction-progress information is supplied. The RERA amenity entries report 0% progress for listed items. RERA amenities
Completion dates in recordsThe building-permit order states 07 August, 2027; the project header gives proposed completion 07/12/2027. The Form B declaration states an undertaking to complete by 12-08-2026. These are recorded claims with different scopes/contexts, and the evidence supplied does not establish a revised completion date. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building-permit order says an occupancy certificate is compulsory before occupation.

2. The project story

DNR RESIDENCY is registered as a residential apartment project on Survey No. 961 in the Rampur locality, Karimnagar. The filed plan describes one stilt-plus-five-upper-floor building, with a site extent of 709.18 m² and a residential use. The RERA unit record describes a single 2BHK configuration comprising 20 units. RERA record RERA unit table

The supplied permit and plan establish the approved building form, but the evidence does not establish the current physical construction stage through an independent site inspection or dated progress certificate. The amenity register shows listed progress as 0%; that is a portal-recorded progress field, not independent verification of site conditions. No occupancy certificate is supplied, and the building permit requires one before occupation. RERA amenities

3. Master plan, architecture & building design

The filed plan describes one residential building with 1 Stilt + 5 upper floors and a height of 14.97 m. It records a 709.18 m² plot and net plot area, 339.41 m² proposed coverage (47.86 %), 369.77 m² vacant plot area, 1,694.10 m² net residential BUA, 1,708.62 m² built-up area, and 2,033.32 m² total built-up area. The plan’s labels are reported separately; the supplied evidence does not identify them as carpet area, saleable area, or FSI-counted area.

The building-permit order records one building and the same stilt-plus-five-floor configuration. It also lists 14% open space and five rainwater-harvesting structures. The plan extraction lists a lift, septic tank, rainwater harvesting, distribution transformer and greenery; it does not provide lift capacity, detailed floor-by-floor arrangements, or a verified layout of common areas.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020108.23 m²Software-measured range: 58.7–89.1 m²; median 65.7 m²39%

The RERA filing provides the unit count, booking figures and saleable area; the booking record has no as-of date and should be treated as indicative. The carpet-area range, median and loading are software measurements from the approved floor-plan drawings, not RERA-filed carpet-area disclosures; the measurements are marked as needing review. The supplied drawing-based example labels two bedrooms, kitchen, living/dining, toilets and balconies. One balcony is measured at 3.9 m²; the other has no supplied measurement. The drawing measurement is not a substitute for verifying the unit dimensions against the plan. RERA unit table Floor plans RERA unit details

5. Parking & vehicle circulation

The building includes a stilt level, and the permit says approved stilt/cellar parking, where shown, must be used exclusively for parking and not partitioned or converted. However, the plan extraction records “PROPOSED NUMBER OF PARKINGS 0” and supplies no count of car, two-wheeler, visitor or accessible spaces. No unit-specific parking allocation, visitor parking, ramp or driveway arrangement, pedestrian separation, or EV charging provision is established by the supplied evidence.

6. Amenities, recreation & open spaces

Green strip / TOT LOT / park
Description / sizePermit records 14% open space; the filed plan also refers to a fenced and maintained TOT LOT and peripheral greenery. No facility size is supplied.
Declared progress / verified statusAmenity register: 0%; no independent completion verification supplied. RERA amenities
Community buildings
Description / sizeListed in the RERA amenity register; no size or description supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; no independent completion verification supplied.
Recreational open space
Description / sizeListed in the RERA amenity register; no size supplied.
Evidence sourceRERA amenities
Declared progress / verified status0%; no independent completion verification supplied.

The supplied evidence does not identify a clubhouse or indoor recreation facilities, or specific sports facilities. RERA amenities

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterWater supply is marked “YES” in the RERA amenity record, with 0% progress recorded. No source, storage capacity or treatment details are supplied. RERA amenities
Sewerage and drainageThe amenity record marks sewerage as “YES” and records 0% progress; the plan lists a septic tank and rainwater harvesting. No STP capacity, reuse scheme or detailed storm-water design is supplied. RERA amenities
ElectricalElectrical meter room/sub-station/receiving station is marked “YES” with 0% progress in the amenity record. The plan lists a distribution transformer and transformer space. No backup-power capacity is supplied. RERA amenities
Vertical transportationA lift is listed in the plan record; no capacity or service-lift information is supplied.
Fire and life safetyFire protection and fire-safety requirements are marked “YES” with 0% progress in the amenity record. No system specifications or completion verification are supplied. RERA amenities
Waste and energySolid-waste management/disposal and energy management are listed in the amenity register; energy management is marked “YES.” Progress is recorded as 0% for both entries. RERA amenities
Safety / accessibilityThe permit requires construction-worker safety and specifies a minimum separation from high- and low-tension electrical lines. The supplied record does not establish accessible circulation, ramps, CCTV, or access-control facilities.

These are filed plan or RERA amenity-record entries, not evidence that the services have been completed or independently tested.

8. Location, access & connectivity

The registered project location is Rampur, Karimnagar -I mandal, Karimnagar district, PIN 505001, on Survey No. 961. The project boundary record identifies existing buildings to the east and south, vacant land to the west, and a road to the north. The filed plan records a 9.14 MT road width; the building-permit extraction separately refers to an 18M road. The supplied location record lists Financial District (Nanakramguda) at 1.2 km. No public-transport details or other verified access routes are supplied. RERA record RERA filing Location record

9. Developer & development status

The registered promoter is SR CONSTRUCTIONS, identified in the project filing as a partnership. The supplied promoter record lists GSTIN 36ADAFS0446B1ZL and an office address at Ramnagar, Ramachendrapur, Rampur, Karimnagar -I, Karimnagar, 505001. The registration certificate lists the promoter office location as Karimnagar -I, Karimnagar, PIN 505001. The filing identifies Duvvuri Sanjeev Reddy as an authorized signatory and Dasari Sripal Reddy as a partner. Corporate record Parties record

The completion-date records are set out above. No independently verified construction progress or occupancy certificate is supplied.

10. Approvals, official records & documents

RecordDetails
TG-RERA registration certificateForm C; P02700003602; registered 20/11/2021, valid through 07/08/2027; project DNR RESIDENCY; Survey No. 961.
Building-permit orderProceeding/approval 3145/Karimnagar Muni/2021/0511, approved 07 August, 2021; one stilt-plus-five-upper-floor residential building.
Filed building planProposed residential apartment building on Survey No. 961, Rampur; one stilt plus five upper floors; plan identifies Karimnagar Municipal Corporation and the same proceeding reference.
Additional plan recordProposed residential apartment building plan, Survey No. 961, Rampur locality; proceeding reference 3145/Karimnagar Muni/2021/0511.
Form B declarationPromoter declaration concerning project funds, accounts, approvals and allottee treatment; completion undertaking 12-08-2026. The extracted text does not state the project registration number or land-title basis.
Occupancy / completion certificateNot included in the supplied documents. The permit states that an occupancy certificate is compulsory before occupation.

Frequently asked questions

Is DNR RESIDENCY registered with Telangana RERA?

Yes. DNR RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02700003602; the registration status is New Project.

Who is the developer of DNR RESIDENCY?

The promoter named in the RERA registration is SR CONSTRUCTIONS.

Where is DNR RESIDENCY located?

DNR RESIDENCY is in RAMPUR, Karimnagar -I, Karimnagar, Telangana (505001).

When will DNR RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 07/12/2027. This is the promoter's declaration, not a guarantee.