Sign in

Ananya Pride

ANANYA CONSTRUCTIONS · Karimnagar · RERA P02700003772

ANANYA PRIDE is a residential apartment project in Indraprastha Colony (Alkapuri Colony), Karimnagar -I, Karimnagar district. The registered promoter is ANANYA CONSTRUCTIONS. The project covers 627.82 m2 and comprises one residential building, Building - A (B), with 1 Stilt + 5 upper floors and 15 apartments: 10 2BHK and 5 3BHK. It is registered under TG-RERA P02700003772, and the RERA header records proposed completion on 24/11/2027.

More from Ananya Constructions · 2 projects →

01What we found

RegisteredTG-RERA - valid till 24 Jul 2027
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameANANYA PRIDE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionRERA record identifies one building and 15 units; a separate phase name is not disclosed. RERA filing RERA unit table
TG-RERA registrationP02700003772, granted under section 5; registration certificate dated 20/12/2021. RERA record
Registration validityCertificate states 20/12/2021 to 24/07/2027; the record shows no extension. This is registration validity, not the building-completion deadline. RERA record
Registered promoterANANYA CONSTRUCTIONS; partnership. RERA filing Corporate record
RERA statusRegistered; the supplied record does not state that an occupancy or completion certificate has been issued.

Land and geographic identity

ItemProject record
LocalityIndraprastha Colony (Alkapuri Colony) appears in the building-permit records; the RERA locality field records Karimnagar-I, Karimnagar.
Revenue villageNot consistently established in the supplied project records: the permit extractions identify INDRAPRASTHA COLONY (ALKAPURI COLONY) and Karimnagar, while the title documents refer to Rampur.
Mandal / district / PINKarimnagar -I is recorded in the project fields; the RERA certificate gives Karimnagar urban; district Karimnagar; PIN 505001. RERA filing
Survey and plot identifiersSurvey No. 849. The project fields record Plot Nos. 120, 121, 124(PART); the RERA certificate records 125,129,124(PART). RERA filing
Registered site extent627.82 m2 total area and 627.82 m2 net area in the project filing and permit extractions. RERA filing
Boundaries in RERA filingEast: Plot No. 119 and 122 and 123 of others; west: 30 FT ROAD; north: Plot No. 119; south: part of Plot No. 124. RERA filing
Road-affected areaThe permit extraction records 183.51 m2 as a road-affected portion surrendered to the local authority; it separately lists the site and net area as 627.82 m2.

Development identity

ItemProject record
Sanctioning authoritySatavahana Urban Development Authority (Karimnagar). Approvals record
Building permit orders3145/Karimnagar Muni/2020/0079, dated 20 June, 2021; and 3145/Karimnagar Muni/2020/0080, dated 24 July, 2021. Approvals record
Building count / configurationOne residential building, identified as Building - A (B), with 1 Stilt + 5 upper floors. The permit extractions state heights of 14.95 m and 14.9 m, respectively. RERA filing
Approved area figuresThe permit records 1,581.05 m2 as residential upper-floor area / ground residential area, and 305.59 m2 as stilt / parking-floor area. The project filing records approved built-up area of 1,581.05 m2. RERA filing
Parking provisionStilt is approved for parking; the permit records parking-floor area of 305.59 m2. A number of parking spaces is not provided in the supplied record.
UnitsProject filing records 15 total building units: 10 2BHK and 5 3BHK. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed configurations and saleable areas2BHK: 10 units, 62.15 sqm each as filed; 3BHK: 5 units, 157.93 sqm each as filed. RERA unit table RERA unit table
Booked / availablePortal-derived counts show 0 booked / 10 available 2BHK and 0 booked / 5 available 3BHK. The portal record has no as-of date, so these counts are indicative. RERA unit table
Completion datesThe Form B declaration undertakes completion by 20/06/2027; the RERA header records proposed completion 24/11/2027. These are recorded as separate completion-date fields. RERA record
Permit completion datesPermit 0079 states construction to be completed before 20 June, 2027; permit 0080 states before 24 July, 2027.
Construction stageNo independently verified site-progress figure is supplied. The amenity record lists 0% for each of its 14 items; those entries are recorded progress fields, not independent site verification. RERA amenities
Occupancy / completion certificatePermit records state that an occupancy certificate is required before occupation; the supplied permit extractions state completion is not certified.

2. The project story

ANANYA PRIDE is registered as a residential apartment project on Survey No. 849 in the Indraprastha Colony / Alkapuri Colony area of Karimnagar. The filed land area is 627.82 m2. The sanctioned building form is a single residential building, Building - A (B), with one stilt level and five upper floors. RERA record RERA filing

The RERA filing lists 15 apartments: ten 2BHK and five 3BHK, with all 15 shown as available and none booked in the portal-derived inventory record; the portal data has no recorded as-of date. No drawing-based unit measurements are available in the supplied materials. RERA unit table Floor plans

The project is registered, but registration validity, completion deadlines and occupancy certification are distinct matters. The certificate is valid through 24/07/2027; completion dates are recorded separately in the RERA header, promoter declaration and building permits. The supplied permit extractions state that completion is not certified and that an occupancy certificate is required before occupation. No independently verified construction-progress assessment or issued occupancy certificate is included. RERA record

3. Master plan, architecture & building design

The building-permit records describe one residential building, Building - A (B), with 1 Stilt + 5 upper floors. Heights recorded in the two permit extractions are 14.9 m and 14.95 m. The RERA filing and permit records give the site area as 627.82 m2 and the residential area as 1,581.05 m2; the permit records a stilt / parking-floor area of 305.59 m2. These are the figures as labelled in the supplied records; no separate FSI-counted, gross built-up, carpet or common-area area is provided. RERA filing

The permit conditions identify a tot-lot, a transformer space, a garbage house and a rainwater-harvesting percolation pit. They also require the sanctioned plan to be followed, require prior approval for modifications, and specify one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts. The supplied records do not describe flat distribution by floor, lifts, stairs, internal circulation, landscaping dimensions or residential/common-area allocation.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001062.15 sqmNot measured in supplied drawingsNot supplied
3BHK505157.93 sqmNot measured in supplied drawingsNot supplied

RERA saleable areas and unit counts are from the project filing; booking and availability figures are portal-derived and have no as-of date. The two supplied floor-plan records are scans pending measurement, so no software-measured carpet area or room dimensions can be reported. Saleable area and carpet area are different measures; no balcony, utility or loading breakdown is provided here. RERA unit table RERA unit table Floor plans

5. Parking & vehicle circulation

The sanctioned building configuration includes one stilt level, and the permit records 305.59 m2 as parking-floor area. The permit condition states that approved stilt parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. No parking-space count, resident or visitor allocation, accessible bays, two-wheeler provision, EV charging, ramp details or unit-specific parking allocation is supplied. A drawn or sanctioned parking area does not by itself establish an exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 project items, with 0% progress recorded for each. The permit conditions also describe selected site facilities. No supplied evidence independently verifies that any facility is complete or operational. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsListed; no size or building details supplied.RERA amenities0% recorded; completion not independently verified.
Green Strip / Tot Lot / ParkPermit condition refers to a fenced tot-lot maintained as greenery and a peripheral greenery strip; no area supplied.RERA amenities0% recorded for Green Strip/TOT LOT/Park; completion not independently verified.
Aggregate recreational open spaceListed; no area supplied.RERA amenities0% recorded; completion not independently verified.
Internal roads & footpathsListed; no dimensions supplied.RERA amenities0% recorded; completion not independently verified.
Street lightingListed; no specification supplied.RERA amenities0% recorded; completion not independently verified.
Water supplyListed; no source or capacity details in this amenity record.RERA amenities0% recorded; completion not independently verified.
Sewerage and sewage/sullage treatment and disposalListed; no system capacity or treatment details supplied.RERA amenities0% recorded; completion not independently verified.
Storm-water drainsListed; no design or capacity details supplied.RERA amenities0% recorded; completion not independently verified.
Solid-waste management and disposalListed; no operating details supplied.RERA amenities0% recorded; completion not independently verified.
Water conservation / rainwater harvestingListed as available “YES”; permit condition specifies a rainwater-harvesting percolation pit and records 19 RWHPs in one permit extraction and 9 in the other.RERA amenities0% recorded in the RERA amenity list; completion not independently verified.
Energy managementListed; no system details supplied.RERA amenities0% recorded; completion not independently verified.
Fire protection and fire safetyListed; no equipment or system details supplied in the amenity record.RERA amenities0% recorded; completion not independently verified.
Electrical meter room / substation / receiving stationListed; permit conditions require space for a transformer.RERA amenities0% recorded; completion not independently verified.

7. Utilities, building services & safety

The permit conditions specify a separate underground static water-storage tank of 25, 000L and a separate residential terrace tank of 25,000lits. The record does not identify the water source or describe treatment arrangements. It requires a rainwater-harvesting percolation pit; the two permit extractions record different counts for RWHPs (19 and 9), without further explanation in the supplied material.

The RERA amenity list includes water supply, sewerage and sewage/sullage treatment, storm-water drainage, electrical infrastructure, fire protection and energy management, but does not supply technical specifications or capacities for these systems. The permit requires transformer space, a garbage house, specified entry/exit dimensions, and qualified technical supervision of services including sanitation, plumbing, fire safety, lifts and electrical installations. It also states that structural and fire safety are the responsibility of the owner, builder/developer, architect and site engineer. These are permit requirements, not evidence that the systems have been installed, inspected or certified. RERA amenities

No lift count or capacity, backup-power provision, sewage-treatment capacity, waste-segregation procedure, CCTV/security system, accessibility plan or fire-clearance certificate is supplied. The permit includes a sprinkler condition where basement area exceeds 200 Sq.mts.; the supplied information does not establish that this threshold applies to the building.

8. Location, access & connectivity

The project record identifies the location as Indraprastha Colony / Alkapuri Colony, Karimnagar, District Karimnagar, PIN 505001. The revenue-village identity is not consistently established in the supplied records: permit extractions identify Indraprastha Colony (Alkapuri Colony) and Karimnagar, while the title report refers to Rampur. RERA record

The filed site boundaries include a 30 FT ROAD on the west, and the permit records an 18M road width. A supplied connectivity record lists Financial District (Nanakramguda) at 1.2 km from the stated cadastral parcel centroid; it does not provide route, travel time or public-transport information. RERA filing Location record

9. Developer & development status

The registered promoter is ANANYA CONSTRUCTIONS, recorded as a partnership. The project filing gives GSTIN 36ABTFA9495R1Z0 and lists its office in Mukarampura / Indraprastha Colony, Karimnagar, PIN 505001. The partnership deed identifies Dasari Sridevi and Peddireddy Sampath Kumar as partners; the building permits identify them as the firm’s partners. RERA filing Corporate record

The RERA record identifies G Ravinder and G Kamala as landowners under area-share agreements. The Form B affidavit, signed by the promoter’s authorized signatory, declares a title basis for the project land, states that the land is free from encumbrances and undertakes completion by 20/06/2027. Parties record

No project-specific, independently verified construction-progress percentage is supplied. The RERA amenity progress entries are all 0%; the permit extractions state that completion is not certified. The project’s registration validity through 24/07/2027 is not itself a statement that construction is complete or that an occupancy certificate has been issued. RERA amenities

10. Approvals, official records & documents

RecordWhat the supplied material establishes
TG-RERA registration certificate, P02700003772Form C records registration of ANANYA PRIDE to ANANYA CONSTRUCTIONS under section 5, issued 20/12/2021, valid through 24/07/2027.
Building permit 3145/Karimnagar Muni/2020/0079Satavahana Urban Development Authority (Karimnagar) permit dated 20 June, 2021 for the residential building; its extraction gives validity through 20 June, 2027 and lists permit conditions.
Building permit 3145/Karimnagar Muni/2020/0080Satavahana Urban Development Authority (Karimnagar) permit dated 24 July, 2021 for the residential building; its extraction lists building parameters and permit conditions.
Layout / subdivision referencesPermit records cite 1351/26/2012/KNR, G2/732/26/2015/KNR, and 1265/26/2012/KNR; the supplied material does not include an extracted approved-layout drawing.
Form B promoter declarationDeclaration dated 26-11-2021 by SAMPATH KUMAR PEDIREDDY for ANANYA CONSTRUCTIONS, including a completion undertaking and statutory-account declarations.
Filed title materialAdvocate title report dated 14-08-2021, recorded sale-deed and development-agreement/GPA materials, and the RERA-filed encumbrance statement.
Occupancy / completion certificateNo issued certificate is supplied; permit records state an occupancy certificate is required before occupation and mark completion as not certified.

Frequently asked questions

Is ANANYA PRIDE registered with Telangana RERA?

Yes. ANANYA PRIDE is registered with the Telangana Real Estate Regulatory Authority as P02700003772; the registration status is New Project.

Who is the developer of ANANYA PRIDE?

The promoter named in the RERA registration is ANANYA CONSTRUCTIONS.

Where is ANANYA PRIDE located?

ANANYA PRIDE is in Karimnagar -I, Karimnagar, Telangana (505001).

When will ANANYA PRIDE be completed?

The promoter's proposed date of completion filed with RERA is 24/11/2027. This is the promoter's declaration, not a guarantee.

More projects in Karimnagar I