Sign in

Ratna Enclave

SRI SRI BHAVANI CONSTRUCTIONS · Rangareddy · RERA P02400010327

RATNA ENCLAVE is a residential apartment project in Hariuri Colony, Saroornagar Mandal, Ranga Reddy District, being developed by registered promoter SRI SRI BHAVANI CONSTRUCTIONS. The project records one building on 451.20 sq. m of land, with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a RERA-filed saleable area of 151.44 sq. m. Its TG-RERA registration number is P02400010327, and its proposed completion is 21/02/2028.

01What we found

RegisteredTG-RERA - valid till 21 Oct 2027
15documents on file - each fact links to its page
22court cases on this project's land (survey 9, Haripuri)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Haripuri, Saroornagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameRATNA ENCLAVE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionA single building is recorded; no separate phase name is disclosed. RERA filing
TG-RERA registrationP02400010327 RERA record
Registration validity21 October 2024 to 21 October 2027, unless extended by the Authority. This is the registration period, not the project completion deadline. Approvals record
Registered promoterSRI SRI BHAVANI CONSTRUCTIONS RERA record
RERA statusNew Project; registration is recorded as valid through 21 October 2027. RERA record Approvals record

Land and geographic identity

FieldRecord
LocalityHariuri Colony / Haripuri Colony RERA record RERA filing
Revenue villageHaripuri, as recorded in the RERA registration; the building permit describes Saroornagar Village. RERA record
MandalSaroornagar RERA record RERA filing
DistrictRanga Reddy RERA record
PIN500035 RERA record
Project survey number / subdivision9/1/H; the sanctioned-plan extract also writes this as 9/1H. RERA record Land records
Site extentRERA land details record total and net area of 451.20 sq. m. The building-permit extract separately records Plot Area 451.2 sq. m and Net Plot Area 448.96 sq. m. RERA filing
Plot references81 PART and 82, 83 RERA filing
Boundaries in RERA land detailsEast: 30 Wide Road; West: Plot No 81 Part; North: 30 Wide Road; South: Open Space. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approval3184/GHMC/LBN/2024-BP, approved 21 October 2024 Approvals record
Approved built-up area1,193.70 sq. m excluding parking; 1,432.44 sq. m including parking, as stated in the building-plan extract.
Building countOne building is recorded in the RERA project information. RERA filing
Sanctioned configuration1 Stilt + 5 upper floors; the plan extract states six floors and building height 15.00 MT.
Parking238.7 sq. m parking area is recorded in the plan extract; the permit also gives a total parking area of 238.7. The supplied record does not state a vehicle-space count.
Unit counts10 dwelling units in the plan extract; the RERA filing records 10 total units. RERA unit table

Offering and status

FieldRecord
Filed configuration3BHK RERA unit table
RERA-filed saleable area151.44 sq. m per unit RERA unit table
Booked / available0 booked; 10 available, as last read from the TG-RERA portal. The record has no as-of date, so counts are indicative. RERA unit table
Construction stageThe project is registered as a new project and its building permit is for proposed construction. No independently verified site-progress figure is supplied. RERA record
Completion datesBuilding permit: construction to be completed before 21 October 2027. RERA registration declaration: completion before 21 October 2027. The project header separately records proposed completion as 21/02/2028. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project documents; the permit requires an occupancy certificate before occupation.

2. The project story

RATNA ENCLAVE is registered as a residential apartment project on survey 9/1/H in Haripuri, Saroornagar Mandal, Ranga Reddy District, at Hariuri/Haripuri Colony. The RERA record describes one building, while the GHMC permit and filed plan describe a proposed residential building with stilt parking and five upper floors. RERA record Land records

The offering is recorded as ten 3BHK apartments. The TG-RERA portal data last read lists all ten as available, but it has no as-of date. The supplied materials do not establish the current physical construction stage or independently verify progress at the site. The permit and promoter’s Form B declaration state a completion deadline of 21 October 2027; the registration remains valid to that date unless extended. No occupancy certificate is included. RERA unit table

3. Master plan, architecture & building design

The sanctioned building-permit record describes one residential building on a plot recorded as 451.2 sq. m, with 448.96 sq. m net plot area in the plan extract. It specifies 1 Stilt + 5 upper floors, six floors in total, and a building height of 15.00 MT. The plan extract gives proposed built-up area as 1,193.70 sq. m excluding parking and 1,432.44 sq. m including parking. These are approved-plan figures, not carpet or saleable area.

The supplied drawing-derived record covers two plan sheets and four measured 3BHK designs. It does not provide a complete architectural description of building footprint, flat arrangement by floor, lifts, stairs, entries, exits, or internal circulation. The plan extract lists road widths of 9.00MT, 9.14MT (30'-0"), and 4.64M; these are drawing-recorded dimensions, not a separate confirmation of the built access arrangement. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010151.44 sq. m101.5–101.6 sq. m, software-measured from drawings33%

The RERA filing provides the unit count and saleable area. The carpet-area range and loading are software measurements from the approved floor-plan drawings, not RERA disclosures; the drawing measurements are flagged as requiring review. The supplied data describes carpet area as smaller than saleable area, which includes the home’s share of common areas. Balcony, utility, and other separately measured areas are not specified in the supplied unit details. RERA unit table Floor plans RERA unit details

The measured room schedule for one drawn flat identifies a living/drawing room (4.64 × 5.62 m), dining/kitchen (5.64 × 6.26 m), master bedroom (3.49 × 4.0 m), two children’s bedrooms (3.49 × 2.99 m and 3.0 × 2.99 m) and three toilets, plus a wash area. These are drawing-based measurements, not separate RERA area disclosures. RERA unit details

5. Parking & vehicle circulation

The building-plan extract records 238.7 sq. m of parking area, and the permit states that the stilt approved for parking is to be used exclusively for vehicle parking. The records do not provide the number of car or two-wheeler spaces, visitor or accessible parking counts, a parking allocation for individual apartments, or an independently verified arrangement of ramps, driveways, or pedestrian routes. A parking-area figure alone does not establish an exclusive parking entitlement for a particular unit.

6. Amenities, recreation & open spaces

Tot-lot / greenery
Description / sizePermit condition requires a fenced tot-lot maintained as greenery; the permit parameter also records “Tot Lot NA.” No area or capacity is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRequired by permit condition; no completion evidence supplied.
Rainwater harvesting
Description / sizeTwo rainwater-harvesting pits are stated in the permit; the building-plan extract also lists rainwater harvesting.
Declared progress / verified statusPlanned/required; no completion evidence supplied.
Internal roads and footpaths
Description / sizeListed in the RERA amenities record; no size or progress detail is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified.
Green strip / park
Description / sizeListed in the RERA amenities record; no size or progress detail is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified.
Community buildings
Description / sizeListed in the RERA amenities record; no description or size is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0%; not independently verified.

No evidenced clubhouse or indoor recreation facility is described in the supplied project documents. The vendor record lists a kids’ play area, but this is a third-party listing rather than a supplied sanction or delivery record. Promoter website

7. Utilities, building services & safety

The RERA amenities record marks water supply, sewerage and rainwater harvesting as available, but records progress as 0% for the listed infrastructure; it does not provide capacities or independent completion verification. The building-plan extract lists a storage-purpose water sump and septic tank. The permit requires a rainwater-harvesting structure, space for a transformer, and a garbage house within the premises. RERA amenities

The permit requires sanitation, plumbing, fire-safety systems, lifts and electrical installations to be executed under qualified technical supervision, and states that an occupancy certificate is compulsory before occupation. It also requires fire-fighting installations and an Occupancy Fire NOC before issue of the occupancy certificate. These are permit conditions, not evidence that the systems are installed, commissioned, or certified. No lift count or capacity, power-backup capacity, water-storage capacity, STP specification, CCTV system, accessibility arrangement, or completed safety inspection is established by the supplied project-specific records.

8. Location, access & connectivity

The registered location is Haripuri, Saroornagar, Ranga Reddy District, PIN 500035, with the project identified in the RERA record as Hariuri Colony. The RERA land record gives 30 Wide Road on the east and north boundaries, Plot No 81 Part on the west, and Open Space on the south. RERA record RERA filing

The location data records the nearest sampled Outer Ring Road interchange at approximately 8.6 km. No public-transport service, route, or project-specific travel-time measurement is supplied in the official project-location data. Location record

9. Developer & development status

The registered promoter is SRI SRI BHAVANI CONSTRUCTIONS, recorded as a partnership. The supplied corporate identifier is GSTIN 36AFMFS1451C1Z4. Gunti Bhaskar is identified as an authorized signatory; Goguri Sridhar Reddy is identified in the RERA record as a landowner under a revenue-share arrangement. The promoter’s registered address is Road No 5, Padmalaya Nagar Colony, Ward No 11, Block No 14, Hariuri Colony, Saroornagar, Ranga Reddy, PIN 500035. The supplied record does not provide a verified official website or contact number. Corporate record Parties record RERA record

The promoter’s Form B declaration states that the firm will complete the project before 21 October 2027. This is a promoter declaration; the permit also sets that completion date, while no construction-progress certification or occupancy certificate is supplied here.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400010327; valid 21 October 2024–21 October 2027 unless extended
What the supplied record establishesForm C certificate for RATNA ENCLAVE and SRI SRI BHAVANI CONSTRUCTIONS.
GHMC building permit order
Identifier / date3184/GHMC/LBN/2024-BP; 21 October 2024
What the supplied record establishesConditional sanction for a residential building with 1 stilt and 5 upper floors.
GHMC building-plan extract
Identifier / dateApplication TS/048805/2024; file 171/ENG/TP10/GHMC/2020-25
What the supplied record establishesPlan extract showing proposed stilt plus five upper floors and ten dwelling units.
Promoter Form B declaration
Identifier / dateDeclaration dated “— - day of July, 2025”
What the supplied record establishesPromoter’s stated development/title and encumbrance declarations and completion undertaking.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe permit requires an occupancy certificate before occupation; no certificate is included in the supplied project documents.
Layout-permission record
Identifier / dateFinal layout permission extract, 4441/HUDA/P2/89
What the supplied record establishesIncluded in the title-report materials; the supplied extract describes a layout permission for land in Survey Nos. 9/1-Ii and 11, Saroornagar.

Frequently asked questions

Is RATNA ENCLAVE registered with Telangana RERA?

Yes. RATNA ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02400010327; the registration status is New Project.

Who is the developer of RATNA ENCLAVE?

The promoter named in the RERA registration is SRI SRI BHAVANI CONSTRUCTIONS.

Where is RATNA ENCLAVE located?

RATNA ENCLAVE is in Hariuri Colony, Haripuri, Saroornagar, Rangareddy, Telangana (500035).

When will RATNA ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 21/02/2028. This is the promoter's declaration, not a guarantee.

More projects in Haripuri