TANUSH BUILDERS AND DEVELOPERS is a residential apartment project in HASTINAPURAM, Saroornagar mandal, Ranga Reddy district, being developed by the registered promoter TANUSH BUILDERS AND DEVELOPERS. The site covers 908.96 m² and has one building, Building A, configured as Cellar + Stilt + 5 upper floors. The TG-RERA schedule lists 15 3BHK apartments. The project is registered under TG-RERA number P02400001049, with a proposed completion date of 29/10/2024.

More from Tanush Builders And Developers · 2 projects →

01What we found

Period endedTG-RERA registration ran to 29 Oct 2024 - check its extension on TG-RERA
9documents on file - each fact links to its page
32court cases on this project's land (survey 59, Haripuri)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameTANUSH BUILDERS AND DEVELOPERS RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNot identified as a named phase; the registration covers the project recorded at Survey No. 59 PART, Plot Nos. 7 and 8 RERA record Land records
TG-RERA registration numberP02400001049 RERA record
Registration validity20/07/2019 to 29/10/2024, as stated in the registration certificate; the certificate records a five-year validity period
Registered promoterTANUSH BUILDERS AND DEVELOPERS RERA record Corporate record
TG-RERA statusOn-Going Project in the supplied project record RERA record

Land and geographic identity

FieldProject record
LocalityHASTINAPURAM; the registration certificate identifies Haripuri, Saroornagar RERA record
Revenue villageHaripuri in the project record; the filed title report and permit refer to Karmanghat village RERA record Land records
Mandal / districtSaroornagar mandal, Ranga Reddy district RERA record Land records
PIN500070 in the project header and registration certificate RERA record
Project survey identifierSurvey No. 59 PART; the title records also use “Sy. No.59/part” and “59 Part” RERA record Land records
Plot numbers7 and 8 Land records
Registered site extent908.96 m² RERA record Land records
Total / net land areaTotal 908.96 m²; net 908.96 m²; recorded affected area 0 m² Land records
Boundaries as filedEast: 30 FT WIDE ROAD; West: PLOT NOS 23 24 25 AND 26; North: 30 FT ROAD; South: PLOT NO 6 Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approvalApproval No. 2/C4/16991/2018, dated 29 October 2018; File No. 2/C4/15537/2018 Approvals record
Approved built-up area2,116.57 m² in the RERA project fields; the permit extraction states residential area of 2,116.55 m² RERA record
BuildingsOne building: Building A (TANUSH BUILDERS) RERA record
Sanctioned configurationCellar + Stilt + 5 upper floors; the permit records 0 ground floors and 1 parking floor
Parking levelCellar and stilt are identified in the permit as approved for parking; a car-space count is not provided
Approved versus RERA-declared unitsThe project fields record 1 total building unit and 1 proposed building unit; the RERA unit schedule records 15 apartments RERA record RERA unit table

Offering and status

FieldProject record
RERA-filed configuration3BHK; 15 units RERA unit table
RERA-filed saleable area150.19 m² per unit RERA unit table
Booking / availability0 booked and 15 available in the portal-derived unit record; no as-of date is supplied, so these counts are indicative RERA unit table
Completion datesOriginal and revised proposed completion dates: 29/10/2024 RERA record
Construction stageThe project is recorded as On-Going; no independently verified site-progress measurement is supplied RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied records; the permit requires an occupancy certificate before occupation RERA record

2. The project story

This is a residential apartment development registered under TG-RERA as TANUSH BUILDERS AND DEVELOPERS, on the site identified as Survey No. 59 PART, Plot Nos. 7 and 8, in the Haripuri/Saroornagar project record. The GHMC permit describes the site as Sri Srinivasapuram and authorizes one residential building, Building A, with a cellar, stilt and five upper floors. RERA record Land records

The RERA unit schedule lists fifteen 3BHK apartments. The project record labels the development On-Going and gives a proposed completion date of 29 October 2024. Those are record disclosures, not a site inspection or independent confirmation of construction progress. The supplied material does not establish a current percentage of completion or an issued occupancy certificate. RERA record RERA unit table

The registration certificate is valid through 29 October 2024 as stated in that certificate. Registration validity, the declared completion deadline and whether an occupancy certificate has been issued are separate matters; the supplied records do not show an extension or an occupancy certificate. RERA record

3. Master plan, architecture & building design

The GHMC building-permit order identifies one residential building and gives its configuration as Cellar + Stilt + 5. It records a residential area of 2,116.55 m², a cellar area of 456.73 m² and a stilt area of 326.63 m². The RERA project fields separately record approved built-up area of 2,116.57 m². These are figures as stated in their respective project records; the supplied material does not define them as interchangeable area measures. RERA record

The permit records 46.68 m² for a tot-lot, 10 rainwater-harvesting pits, 45 trees, transformer space and a garbage house. It also requires a peripheral greenery strip. These are permit-recorded provisions or conditions; the supplied evidence does not establish their present construction or maintenance status.

The supplied data does not provide a verified building footprint, flat count per floor, lift or stair details, internal circulation plan, or a phase-wise building arrangement. The RERA filing includes a layout-plan document entry, but the supplied document record does not contain an extracted layout plan. Document index

4. Homes, configurations & floor plans

The TG-RERA schedule records fifteen 3BHK apartments, with 0 booked and 15 available in the portal-derived unit record. The counts have no supplied as-of date and should be treated as indicative. The RERA-filed saleable area is 150.19 m² per unit. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK15015150.19 m²Software-measured range: 110.5–130.7 m²; median 119.4 m²20%

The carpet figures were software-measured from the supplied floor-plan drawing data, not filed as RERA carpet-area disclosures; the drawing-based measurements are flagged as requiring review. The data reports six measured flat designs. The median measured carpet area is also supplied as 1,285 sq. ft.; the measured range is 1,190–1,407 sq. ft. Floor plans RERA unit details

Carpet area, as defined in the supplied Act text, excludes external walls, service shafts, exclusive balcony/verandah area and exclusive open terrace area, while including internal partition walls. Saleable area in the supplied Telangana Rules includes carpet area, exclusive balcony/verandah/terrace area and a proportionate share of common areas under the agreement. Accordingly, the measured carpet figures and the RERA-filed saleable area describe different area concepts. [PROJECT-CITED PROVISIONS: Act s.2(k)] [PROJECT-CITED PROVISIONS: Rules r.2(1)(g)] Floor plans RERA unit table

One drawing-derived example for flat 02 on the second-floor plan labels a dining/kitchen, hall, three bedrooms, three toilets and a wash area. The supplied room dimensions are drawing measurements, not RERA-filed unit specifications. RERA unit details

5. Parking & vehicle circulation

The GHMC permit identifies the cellar and stilt as approved for parking and states that those areas are to be used exclusively for vehicle parking without partition walls or rolling shutters. It records one parking floor, while the building configuration separately includes a cellar and stilt. The supplied data does not give a sanctioned number of car or two-wheeler spaces, visitor or accessible-space provision, or a unit-wise parking allocation.

The building permit also records adjoining road boundaries and refers to an 18 mt. road width in its conditions. The supplied material does not describe a parking ramp, internal driveway, separate pedestrian circulation, mechanical parking or EV-charging provision. A parking-space count or exclusive allocation cannot be established from the available record. Land records

6. Amenities, recreation & open spaces

The permit records several site provisions, while the RERA amenities schedule includes a broader set of infrastructure categories. The schedule reports category availability but does not provide verified completion evidence; its progress values are recorded as 0. RERA amenities

Tot-lot / green strip
Description / sizePermit records a 46.68 m² tot-lot and requires it to be fenced and maintained as greenery; it also requires a peripheral greenery strip
Declared progress / verified statusPermit provision/condition; completion not verified
Trees
Description / size45 trees recorded in the permit
Declared progress / verified statusPermit-recorded provision; completion not verified
Internal roads and footpaths
Description / sizeListed as available in the RERA amenities schedule; no dimensions supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule availability; progress shown as 0
Street lighting
Description / sizeListed as available in the RERA amenities schedule
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule availability; progress shown as 0
Water conservation / rainwater harvesting
Description / sizeRERA schedule lists water conservation and rainwater harvesting; permit records 10 rainwater-harvesting pits and requires a rainwater-harvesting structure
Evidence sourceRERA amenities
Declared progress / verified statusDeclared/permit-recorded provision; completion not verified
Water supply
Description / sizeListed as available in the RERA amenities schedule
Evidence sourceRERA amenities
Declared progress / verified statusRERA schedule availability; progress shown as 0
Sewerage and sewage treatment/disposal
Description / sizeSewerage and treatment/disposal of sewage and sullage water appear in the RERA amenities schedule; no system capacity or treatment details supplied
Evidence sourceRERA amenities
Declared progress / verified statusSchedule records treatment/disposal as available; progress shown as 0; completion not verified
Storm-water drains
Description / sizeListed in the RERA amenities schedule; no design or capacity supplied
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0
Solid-waste management and disposal
Description / sizeListed in the RERA amenities schedule; permit also records a garbage house
Evidence sourceRERA amenities
Declared progress / verified statusCompletion not verified; RERA progress shown as 0
Electrical meter room / sub-station / receiving station
Description / sizeListed as available in the RERA amenities schedule; permit records transformer space
Evidence sourceRERA amenities
Declared progress / verified statusProvision recorded; completion not verified
Community buildings and aggregate recreational open space
Description / sizeCategories appear in the RERA schedule, without a stated facility description or area
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0; no completed facility established

7. Utilities, building services & safety

The RERA amenities schedule lists water supply, sewerage, sewage and sullage treatment/disposal, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. The supplied record does not provide capacities, system specifications or evidence of completed installation. RERA amenities

The GHMC permit requires a rainwater-harvesting structure, transformer space, and a garbage house. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical personnel’s supervision. The permit makes structural and fire-safety responsibility a condition of development; the supplied records do not establish the installed systems, completion clearances or statutory compliance.

No lift count or capacity, backup-power arrangement, water-storage or treatment capacity, STP capacity, fire-system specification, CCTV/access-control provision, accessible routes or accessibility features are supplied. RERA amenities Document index

8. Location, access & connectivity

The registered project record identifies HASTINAPURAM, Haripuri, Saroornagar mandal, Ranga Reddy district, PIN 500070, and Survey No. 59 PART. The GHMC permit describes the site as Sri Srinivasapuram; the title report refers to Karmanghat village. RERA record Land records

The filed site boundaries identify 30 FT roads to the east and north. The location record gives the nearest sampled Outer Ring Road interchange as approximately 7.1 km away; this is a supplied approximate distance, not a travel-time estimate. Land records Location record

The supplied evidence does not establish public-transport routes, measured distances to metro stations, or distances to schools, hospitals or shopping facilities. Location record

9. Developer & development status

The registered promoter is TANUSH BUILDERS AND DEVELOPERS, recorded as a partnership. The project record identifies VANGA SRIKANTH REDDY as authorized signatory and VANGA MANOHAR REDDY as partner. A promoter office address is recorded as Beside Var Gardens, Srinivasapuram Colony, HASTINAPURAM, Saroornagar, Ranga Reddy, PIN 500070. A corporate registration identifier or official contact details are not supplied. Corporate record Parties record RERA record

A Form B affidavit filed for the project contains the promoter’s declaration of a completion target of 29 October 2024 and statements concerning title basis, encumbrances, project funds, audits and pending approvals. These are promoter declarations in the filed form, not independent verification of the matters declared.

The project record states On-Going and gives the same original and revised proposed completion date, 29 October 2024. No current independently verified construction-progress figure, extension order or occupancy certificate is supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for TANUSH BUILDERS AND DEVELOPERS, Registration No. P02400001049, issued 20/07/2019; valid through 29/10/2024 as stated in the certificate
GHMC building permitBuilding Permit Order, Approval No. 2/C4/16991/2018, File No. 2/C4/15537/2018, approved 29 October 2018; Building A described as Cellar + Stilt + 5 floors
Layout / subdivision referenceLRS29122017022809, recorded in the building-permit extraction
Title reportAdvocate K. Rama Devi title report dated 19-01-2019, concerning Plot Nos. 7 and 8 in Sy. No. 59/part, Karmanghat; document record states it traces title and refers to the development agreement and GHMC mortgage
Development agreementRegistered Development Agreement-cum-GPA dated October 2018 between the landowners and Tanush Builders & Developers, concerning two plots totaling 1088 Sq. yards; the supplied extraction describes development rights and an area-share arrangement
Building-plan/layout document entryRERA filing includes a layout-plan document entry, but the supplied document record has no extracted layout-plan content
Sale agreement templatePartially filled Telangana RERA-form Agreement for Sale template; the supplied extraction does not establish a completed agreement for a particular allottee or unit
Occupancy / completion certificateNo such certificate is identified in the supplied project documents; the GHMC permit states an occupancy certificate is compulsory before occupation

The supplied records establish the identifiers and document descriptions above. They do not provide a current site inspection, an issued occupancy certificate, or a complete extracted approved layout drawing. Document index

Frequently asked questions

Is TANUSH BUILDERS AND DEVELOPERS registered with Telangana RERA?

Yes. TANUSH BUILDERS AND DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P02400001049; the registration status is On-Going Project.

Who is the developer of TANUSH BUILDERS AND DEVELOPERS?

The promoter named in the RERA registration is TANUSH BUILDERS AND DEVELOPERS.

Where is TANUSH BUILDERS AND DEVELOPERS located?

TANUSH BUILDERS AND DEVELOPERS is in HASTINAPURAM, Haripuri, Saroornagar, Rangareddy, Telangana (500070).

When will TANUSH BUILDERS AND DEVELOPERS be completed?

The promoter's proposed date of completion filed with RERA is 29/10/2024. This is the promoter's declaration, not a guarantee.

More projects in Haripuri