Shwasa Residency - Alpha Towers
SHWASA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200003553
SHWASA RESIDENCY - ALPHA TOWERS is a residential apartment project in Rampally Village, Keesara Mandal, Medchal-Malkajgiri District, developed by SHWASA CONSTRUCTIONS, a Proprietorship. The registered site extent is 6,688.40 sq. m., and the development comprises three blocks: Block A has 2Cellar + 1Ground + 5 floors, while Blocks B and C each have 1Ground + 5 floors. The RERA filing records 78 apartments in a 3BHK configuration, with a saleable area of 231.23 sq. m per 3BHK. Its TG-RERA registration number is P02200003553, and Form B states completion on or before 20/08/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SHWASA RESIDENCY - ALPHA TOWERS RERA record |
| Project type / registered portion | Residential apartment project; registered portion is identified as ALPHA TOWERS. The RERA filing describes three buildings/blocks. RERA record RERA filing |
| TG-RERA registration | P02200003553 RERA record |
| Registration validity | 20/11/2021 to 20/08/2026, according to the registration certificate; no extension is recorded in the supplied certificate extract. This is the registration period, not a statement that construction is complete. |
| Registered promoter / entity type | SHWASA CONSTRUCTIONS; Proprietorship in the RERA filing. RERA record RERA filing |
| RERA status in supplied record | Registered under section 5; registration certificate is Form C. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Rampally Village (also recorded as Rampalle Village in the HMDA technical approval) RERA record |
| Mandal / district / PIN | Keesara / Medchal-Malkajgiri / 501301 RERA record |
| Project survey numbers | 58, 59, 60, 61, 62, 63 and 65 RERA record |
| Plots | Plot Nos. 400/A, 400/B, 400/C, 400/D and 400/E RERA filing |
| Registered site extent | 6,688.40 sq. m. in the HMDA technical approval; the Form B declaration states 8000.00 Sq.yards or 6688.00 Sq.Mtrs. |
| RERA-filed total / net area | Total area 6688.40 sq. m; net area 6688.40 sq. m; reported area affected by road widening/FTL/Nala widening: 0. RERA filing |
| Boundaries | East: Plot No. 399; west: others land; north: 40 feet wide road; south: 100 feet wide road internal. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority / principal approval | Hyderabad Metropolitan Development Authority (HMDA), Technical Approval No. 033172/GHT/R1/U6/HMDA/23012020, dated 20/08/2020. The technical approval directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s approval and identifies Nagaram Municipality as the delegated local authority. |
| Approved built-up area | 15902.28 (the approval extract labels this “Total Built up Area”; units are not stated in that extracted field). |
| Approved buildings and floors | Block A: 2Cellar + 1Ground + 5; Blocks B and C: 1Ground + 5 each. |
| Parking levels | The technical approval says cellar/stilt areas are to be used exclusively for vehicle parking; Block A is shown with two cellars. A project-wide parking-space count is not available in the supplied records. |
| Units | Approved plan: 3 building units; RERA filing: 3 proposed building units and 78 total apartments. RERA filing RERA unit table |
| Approved area by block | Block A 7210.8; Block B 7210.8; Block C 1480.68. These are extracted approval figures; the supplied extract does not state their units in the block-by-block fields. |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK; 78 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 231.23 sq. m per 3BHK, as supplied in the RERA unit data. RERA unit table RERA unit details |
| Booked / available | Portal-derived count: 0 booked / 78 available, but the record gives no “as of” date; treat as indicative, not a current inventory confirmation. RERA unit table |
| Completion commitment | Form B states completion “on or before 20/08/2026.” |
| Other proposed completion date in project header | 20/12/2026; its status and basis are not explained in the supplied material. RERA record |
| Construction stage | No construction-progress percentage or independently verified site-stage evidence is supplied. The technical approval and RERA filing identify a proposed development. RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied records. The approval requires an occupancy certificate before occupation. |
2. The project story
The RERA record describes a residential group-housing project on Plots 400/A–400/E at Rampally Village, Keesara, across Survey Nos. 58, 59, 60, 61, 62, 63 and 65. Its approved organization comprises three residential blocks, with 78 apartments recorded in the RERA unit data and a single 3BHK configuration. RERA record RERA filing RERA unit table
The HMDA technical approval describes the blocks as proposed and records the floor arrangements: Block A has two cellars, a ground floor and five upper floors; Blocks B and C each have a ground floor and five upper floors. This is evidence of the approved building configuration, not evidence that the blocks have been built or are occupied. No construction progress, tower-wise completion, or OC is established in the supplied documents.
The promoter’s Form B undertaking gives 20/08/2026 as the completion date, while the project header separately records 20/12/2026 as the proposed completion date. The basis for the latter date is not identified here; the two dates are reported as supplied, without inferring an extension or completion status. RERA record
3. Master plan, architecture & building design
The approved site is stated as 6,688.40 sq. m in HMDA’s technical approval, with three proposed residential blocks on Plots 400/A–400/E. The RERA land record reports total and net area as 6688.40 sq. m. HMDA’s extracted approval records a total built-up area of 15902.28, but its extracted field does not state the unit; the block-specific figures are also reported without units in the extracted fields. RERA filing
| Block | Floor configuration in HMDA technical approval | Extracted block built-up area |
|---|---|---|
| A | 2Cellar + 1Ground + 5 | 7210.8 |
| B | 1Ground + 5 | 7210.8 |
| C | 1Ground + 5 | 1480.68 |
The technical approval says cellars/stilt are to be used exclusively for vehicle parking, prohibits parking or construction in setback areas, and requires prior approval for construction modifications. It also requires a tot-lot/open-space/buffer area to remain greenery and not be used for another purpose. The available extract does not provide block footprints, floor-by-floor apartment layouts, flats per floor, lift/stair counts, circulation drawings, or quantified open-space area.
The approved floor-plan file is identified in the supplied unit measurement record as document 192768; a software measurement was made for one 3BHK design. This measurement is drawing-derived, not a RERA area disclosure, and the measurement record says it needs review. Floor plans RERA unit details
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 78 | 0 | 78 | 231.23 sq. m | 108.1 sq. m (software-measured from one drawing design) | 53% (as supplied with the drawing measurement) |
RERA unit details RERA unit table Floor plans
The 108.1 sq. m carpet-area figure is measured by software from the ground-floor plan in document 192768, not filed as a RERA carpet-area disclosure; the source advises checking the measurement against the drawing. The RERA-filed figure is saleable area, which the supplied drawing record explains includes the home’s share of common areas and is not the same measure as carpet area. The drawing record labels balcony and utility areas as excluded from its carpet-area calculation. RERA unit details Floor plans
The measured design records three bedrooms, living and dining areas, a kitchen, sit-out, balconies, utility, and two toilets. One balcony is labelled “1.52M Wide Balcony” and the other “1.20M WIDE BALCONY”; room dimensions and areas are drawing-derived and relate to the single measured flat design, not necessarily every apartment. RERA unit details
5. Parking & vehicle circulation
HMDA’s technical approval requires cellar/stilt areas to be used exclusively for vehicle parking without partition walls or rolling shutters. Block A’s approved floor configuration includes two cellars; the available extract does not identify a cellar in Blocks B or C. The RERA registration filing lists a mortgage area of 1602.19 sq. m, but the supplied records do not establish a project-wide count of parking spaces, visitor or accessible bays, or unit-specific parking allocations. RERA filing
No parking-space count, ramp or driveway design, EV charging provision, or legally documented exclusive parking allocation is supplied. A parking area shown or reserved in the approval does not by itself establish ownership or allocation to a particular apartment. RERA filing
6. Amenities, recreation & open spaces
The RERA amenities record identifies facilities and services below. Its progress fields are recorded as 0 where shown; this does not establish completed delivery. The HMDA approval also includes site requirements for some facilities. No independent completion verification is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | No size supplied; HMDA requires the tot-lot/open space/buffer to be maintained as greenery. | RERA amenities; HMDA technical approval | RERA record says available “YES” and progress 0; not independently verified. |
| Community buildings | No further description or size supplied. | RERA amenities | Progress 0; completion not established. |
| Water conservation / rainwater harvesting | No capacity or system details supplied. | RERA amenities; HMDA technical approval | RERA record says available “YES” and progress 0; not independently verified. |
| Internal roads and footpaths | No dimensions or layout details supplied. | RERA amenities | Progress 0; completion not established. |
| Street lighting | No further description supplied. | RERA amenities | Progress 0; completion not established. |
| Storm-water drains | No further description supplied. | RERA amenities | Progress 0; completion not established. |
| Solid-waste management and disposal | No system details supplied. | RERA amenities; HMDA technical approval | Progress 0; completion not established. |
The third-party vendor list mentions a gymnasium, swimming pool, children’s play area and clubhouse, among other advertised facilities; the supplied RERA and approval extracts do not establish their approval, size, or delivery status. They are therefore not presented here as confirmed project facilities. Promoter website RERA amenities
7. Utilities, building services & safety
| Evidence in the supplied project record | RERA amenities record “Water Supply” as available “YES”; the technical approval requires the local authority to ensure water-supply arrangements. No source, storage capacity or treatment details are supplied. |
|---|---|
| Status / limitation | Recorded as available in the RERA amenities data; actual operation and capacity are not verified. RERA amenities |
| Evidence in the supplied project record | RERA amenities record sewerage as available “YES”; HMDA requires a septic tank and an STP at the site. ETP is also listed among the technical approval’s amenities/utilities. |
|---|---|
| Status / limitation | Proposed/required in the approval; no capacity, commissioning record or verified operating status is supplied. RERA amenities |
| Evidence in the supplied project record | Storm-water drains appear in the RERA amenities list; HMDA requires rainwater-harvesting structures. |
|---|---|
| Status / limitation | No design, capacity or completion evidence supplied. RERA amenities |
| Evidence in the supplied project record | RERA amenities record an electrical meter room/sub-station/receiving station as available “YES”; HMDA requires provision for a transformer. |
|---|---|
| Status / limitation | No capacity, permanent connection evidence or commissioning status supplied. RERA amenities |
| Evidence in the supplied project record | RERA amenities record fire protection and fire-safety requirements as available “YES”. |
|---|---|
| Status / limitation | The supplied records do not include a fire-clearance certificate or evidence of installed systems; an amenities entry alone does not establish statutory compliance. RERA amenities |
| Evidence in the supplied project record | No project-specific lift count or capacity, accessible-circulation details, generator capacity, CCTV/access-control specification, or security-system installation evidence is supplied. |
|---|---|
| Status / limitation | Not established by the supplied RERA/approval extracts. RERA amenities Document index |
8. Location, access & connectivity
The registered project location is Rampally Village, Keesara Mandal, Medchal-Malkajgiri District, Telangana, PIN 501301, on Plot Nos. 400/A–400/E and Survey Nos. 58, 59, 60, 61, 62, 63 and 65. The RERA land record gives a 40 feet wide road on the north and a 100 feet wide internal road on the south. RERA record RERA filing
The supplied location data identifies the Financial District (Nanakramguda) at 1.2 km, labelled as an anchor. No source context or route measurement method is supplied, so this is reported as the recorded distance only; no travel time is available. Location record
9. Developer & development status
The registered promoter is SHWASA CONSTRUCTIONS, identified in the RERA filing as a proprietorship. The named proprietor and authorised signatory is AKULA KRANTHI KUMAR. The RERA registration certificate gives the promoter’s office as Rampally Village, Keesara Mandal, Medchal-Malkajgiri District, PIN 501301. No corporate registration identifier, official website, or contact details are supplied in the project record. RERA filing Parties record
The RERA unit data records 78 3BHK apartments, with booking counts last read from the portal but no as-of date. No progress certificate or independently verified construction update is supplied. Form B records the promoter’s undertaking to complete on or before 20/08/2026; the header separately lists 20/12/2026 as the proposed completion date. No occupancy or completion certificate is supplied. RERA unit table RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for SHWASA RESIDENCY - ALPHA TOWERS, registration P02200003553, valid 20/11/2021–20/08/2026. |
| Principal technical approval | HMDA Technical Approval No. 033172/GHT/R1/U6/HMDA/23012020, dated 20/08/2020; approval extract identifies the plots, survey numbers, three blocks and floor configurations. |
| Form B promoter declaration | Form B affidavit-cum-declaration dated 25-10-2021, including the promoter’s title, encumbrance and completion declarations. |
| Approved floor-plan material | Document 192768 is referenced by the supplied drawing-measurement record; one 3BHK design was software-measured. Floor plans RERA unit details |
| Agreement / allotment material | A partially filled agreement for sale and a blank allotment-letter form are identified in the filed-document record; they do not establish a particular buyer’s completed sale. |
| Occupancy / completion certificate | Not included in the supplied documents. Document index |
| Layout approval record | The filing includes a layout-plan document entry, but the supplied document extraction does not establish a separate approved-layout certificate. Document index |
The HMDA technical approval includes conditions concerning parking, rainwater harvesting, transformer and garbage-house provision, septic tank, STP, tot-lot/open space and occupancy certification. This overview indexes the available approval evidence; it does not establish that those conditions have been completed or cleared.
1. Project at a glance
Project identity
Registered project name: SHWASA RESIDENCY - ALPHA TOWERS
Project type / registered portion: Residential apartment project; registered portion is identified as ALPHA TOWERS. The RERA filing describes three buildings/blocks.
TG-RERA registration: P02200003553
Registration validity: 20/11/2021 to 20/08/2026, according to the registration certificate; no extension is recorded in the supplied certificate extract. This is the registration period, not a statement that construction is complete.
Registered promoter / entity type: SHWASA CONSTRUCTIONS; Proprietorship in the RERA filing.
RERA status in supplied record: Registered under section 5; registration certificate is Form C.
Land and geographic identity
Locality / revenue village: Rampally Village (also recorded as Rampalle Village in the HMDA technical approval)
Mandal / district / PIN: Keesara / Medchal-Malkajgiri / 501301
Project survey numbers: 58, 59, 60, 61, 62, 63 and 65
Plots: Plot Nos. 400/A, 400/B, 400/C, 400/D and 400/E
Registered site extent: 6,688.40 sq. m. in the HMDA technical approval; the Form B declaration states 8000.00 Sq.yards or 6688.00 Sq.Mtrs.
RERA-filed total / net area: Total area 6688.40 sq. m; net area 6688.40 sq. m; reported area affected by road widening/FTL/Nala widening: 0.
Boundaries: East: Plot No. 399; west: others land; north: 40 feet wide road; south: 100 feet wide road internal.
Development identity
Sanctioning authority / principal approval: Hyderabad Metropolitan Development Authority (HMDA), Technical Approval No. 033172/GHT/R1/U6/HMDA/23012020, dated 20/08/2020. The technical approval directs that building plans be sanctioned by the Executive Authority in conformity with HMDA’s approval and identifies Nagaram Municipality as the delegated local authority.
Approved built-up area: 15902.28 (the approval extract labels this “Total Built up Area”; units are not stated in that extracted field).
Approved buildings and floors: Block A: 2Cellar + 1Ground + 5; Blocks B and C: 1Ground + 5 each.
Parking levels: The technical approval says cellar/stilt areas are to be used exclusively for vehicle parking; Block A is shown with two cellars. A project-wide parking-space count is not available in the supplied records.
Units: Approved plan: 3 building units; RERA filing: 3 proposed building units and 78 total apartments.
Approved area by block: Block A 7210.8; Block B 7210.8; Block C 1480.68. These are extracted approval figures; the supplied extract does not state their units in the block-by-block fields.
Offering and status
RERA-filed configuration: 3BHK; 78 units.
RERA-filed saleable area: 231.23 sq. m per 3BHK, as supplied in the RERA unit data.
Booked / available: Portal-derived count: 0 booked / 78 available, but the record gives no “as of” date; treat as indicative, not a current inventory confirmation.
Completion commitment: Form B states completion “on or before 20/08/2026.”
Other proposed completion date in project header: 20/12/2026; its status and basis are not explained in the supplied material.
Construction stage: No construction-progress percentage or independently verified site-stage evidence is supplied. The technical approval and RERA filing identify a proposed development.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied records. The approval requires an occupancy certificate before occupation.
2. The project story
The RERA record describes a residential group-housing project on Plots 400/A–400/E at Rampally Village, Keesara, across Survey Nos. 58, 59, 60, 61, 62, 63 and 65. Its approved organization comprises three residential blocks, with 78 apartments recorded in the RERA unit data and a single 3BHK configuration.
The HMDA technical approval describes the blocks as proposed and records the floor arrangements: Block A has two cellars, a ground floor and five upper floors; Blocks B and C each have a ground floor and five upper floors. This is evidence of the approved building configuration, not evidence that the blocks have been built or are occupied. No construction progress, tower-wise completion, or OC is established in the supplied documents.
The promoter’s Form B undertaking gives 20/08/2026 as the completion date, while the project header separately records 20/12/2026 as the proposed completion date. The basis for the latter date is not identified here; the two dates are reported as supplied, without inferring an extension or completion status.
3. Master plan, architecture & building design
The approved site is stated as 6,688.40 sq. m in HMDA’s technical approval, with three proposed residential blocks on Plots 400/A–400/E. The RERA land record reports total and net area as 6688.40 sq. m. HMDA’s extracted approval records a total built-up area of 15902.28, but its extracted field does not state the unit; the block-specific figures are also reported without units in the extracted fields.
| Block | Floor configuration in HMDA technical approval | Extracted block built-up area |
|---|---|---|
| A | 2Cellar + 1Ground + 5 | 7210.8 |
| B | 1Ground + 5 | 7210.8 |
| C | 1Ground + 5 | 1480.68 |
The technical approval says cellars/stilt are to be used exclusively for vehicle parking, prohibits parking or construction in setback areas, and requires prior approval for construction modifications. It also requires a tot-lot/open-space/buffer area to remain greenery and not be used for another purpose. The available extract does not provide block footprints, floor-by-floor apartment layouts, flats per floor, lift/stair counts, circulation drawings, or quantified open-space area.
The approved floor-plan file is identified in the supplied unit measurement record as document 192768; a software measurement was made for one 3BHK design. This measurement is drawing-derived, not a RERA area disclosure, and the measurement record says it needs review.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 78 | 0 | 78 | 231.23 sq. m | 108.1 sq. m (software-measured from one drawing design) | 53% (as supplied with the drawing measurement) |
The 108.1 sq. m carpet-area figure is measured by software from the ground-floor plan in document 192768, not filed as a RERA carpet-area disclosure; the source advises checking the measurement against the drawing. The RERA-filed figure is saleable area, which the supplied drawing record explains includes the home’s share of common areas and is not the same measure as carpet area. The drawing record labels balcony and utility areas as excluded from its carpet-area calculation.
The measured design records three bedrooms, living and dining areas, a kitchen, sit-out, balconies, utility, and two toilets. One balcony is labelled “1.52M Wide Balcony” and the other “1.20M WIDE BALCONY”; room dimensions and areas are drawing-derived and relate to the single measured flat design, not necessarily every apartment.
5. Parking & vehicle circulation
HMDA’s technical approval requires cellar/stilt areas to be used exclusively for vehicle parking without partition walls or rolling shutters. Block A’s approved floor configuration includes two cellars; the available extract does not identify a cellar in Blocks B or C. The RERA registration filing lists a mortgage area of 1602.19 sq. m, but the supplied records do not establish a project-wide count of parking spaces, visitor or accessible bays, or unit-specific parking allocations.
No parking-space count, ramp or driveway design, EV charging provision, or legally documented exclusive parking allocation is supplied. A parking area shown or reserved in the approval does not by itself establish ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenities record identifies facilities and services below. Its progress fields are recorded as 0 where shown; this does not establish completed delivery. The HMDA approval also includes site requirements for some facilities. No independent completion verification is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | No size supplied; HMDA requires the tot-lot/open space/buffer to be maintained as greenery. | RERA amenities; HMDA technical approval | RERA record says available “YES” and progress 0; not independently verified. |
| Community buildings | No further description or size supplied. | RERA amenities | Progress 0; completion not established. |
| Water conservation / rainwater harvesting | No capacity or system details supplied. | RERA amenities; HMDA technical approval | RERA record says available “YES” and progress 0; not independently verified. |
| Internal roads and footpaths | No dimensions or layout details supplied. | RERA amenities | Progress 0; completion not established. |
| Street lighting | No further description supplied. | RERA amenities | Progress 0; completion not established. |
| Storm-water drains | No further description supplied. | RERA amenities | Progress 0; completion not established. |
| Solid-waste management and disposal | No system details supplied. | RERA amenities; HMDA technical approval | Progress 0; completion not established. |
The third-party vendor list mentions a gymnasium, swimming pool, children’s play area and clubhouse, among other advertised facilities; the supplied RERA and approval extracts do not establish their approval, size, or delivery status. They are therefore not presented here as confirmed project facilities.
7. Utilities, building services & safety
| Evidence in the supplied project record | RERA amenities record “Water Supply” as available “YES”; the technical approval requires the local authority to ensure water-supply arrangements. No source, storage capacity or treatment details are supplied. |
|---|---|
| Status / limitation | Recorded as available in the RERA amenities data; actual operation and capacity are not verified. |
| Evidence in the supplied project record | RERA amenities record sewerage as available “YES”; HMDA requires a septic tank and an STP at the site. ETP is also listed among the technical approval’s amenities/utilities. |
|---|---|
| Status / limitation | Proposed/required in the approval; no capacity, commissioning record or verified operating status is supplied. |
| Evidence in the supplied project record | Storm-water drains appear in the RERA amenities list; HMDA requires rainwater-harvesting structures. |
|---|---|
| Status / limitation | No design, capacity or completion evidence supplied. |
| Evidence in the supplied project record | RERA amenities record an electrical meter room/sub-station/receiving station as available “YES”; HMDA requires provision for a transformer. |
|---|---|
| Status / limitation | No capacity, permanent connection evidence or commissioning status supplied. |
| Evidence in the supplied project record | RERA amenities record fire protection and fire-safety requirements as available “YES”. |
|---|---|
| Status / limitation | The supplied records do not include a fire-clearance certificate or evidence of installed systems; an amenities entry alone does not establish statutory compliance. |
| Evidence in the supplied project record | No project-specific lift count or capacity, accessible-circulation details, generator capacity, CCTV/access-control specification, or security-system installation evidence is supplied. |
|---|---|
| Status / limitation | Not established by the supplied RERA/approval extracts. |
8. Location, access & connectivity
The registered project location is Rampally Village, Keesara Mandal, Medchal-Malkajgiri District, Telangana, PIN 501301, on Plot Nos. 400/A–400/E and Survey Nos. 58, 59, 60, 61, 62, 63 and 65. The RERA land record gives a 40 feet wide road on the north and a 100 feet wide internal road on the south.
The supplied location data identifies the Financial District (Nanakramguda) at 1.2 km, labelled as an anchor. No source context or route measurement method is supplied, so this is reported as the recorded distance only; no travel time is available.
9. Developer & development status
The registered promoter is SHWASA CONSTRUCTIONS, identified in the RERA filing as a proprietorship. The named proprietor and authorised signatory is AKULA KRANTHI KUMAR. The RERA registration certificate gives the promoter’s office as Rampally Village, Keesara Mandal, Medchal-Malkajgiri District, PIN 501301. No corporate registration identifier, official website, or contact details are supplied in the project record.
The RERA unit data records 78 3BHK apartments, with booking counts last read from the portal but no as-of date. No progress certificate or independently verified construction update is supplied. Form B records the promoter’s undertaking to complete on or before 20/08/2026; the header separately lists 20/12/2026 as the proposed completion date. No occupancy or completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C for SHWASA RESIDENCY - ALPHA TOWERS, registration P02200003553, valid 20/11/2021–20/08/2026.
Principal technical approval: HMDA Technical Approval No. 033172/GHT/R1/U6/HMDA/23012020, dated 20/08/2020; approval extract identifies the plots, survey numbers, three blocks and floor configurations.
Form B promoter declaration: Form B affidavit-cum-declaration dated 25-10-2021, including the promoter’s title, encumbrance and completion declarations.
Approved floor-plan material: Document 192768 is referenced by the supplied drawing-measurement record; one 3BHK design was software-measured.
Agreement / allotment material: A partially filled agreement for sale and a blank allotment-letter form are identified in the filed-document record; they do not establish a particular buyer’s completed sale.
Occupancy / completion certificate: Not included in the supplied documents.
Layout approval record: The filing includes a layout-plan document entry, but the supplied document extraction does not establish a separate approved-layout certificate.
The HMDA technical approval includes conditions concerning parking, rainwater harvesting, transformer and garbage-house provision, septic tank, STP, tot-lot/open space and occupancy certification. This overview indexes the available approval evidence; it does not establish that those conditions have been completed or cleared.
Frequently asked questions
Is SHWASA RESIDENCY - ALPHA TOWERS registered with Telangana RERA?
Yes. SHWASA RESIDENCY - ALPHA TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02200003553; the registration status is New Project.
Who is the developer of SHWASA RESIDENCY - ALPHA TOWERS?
The promoter named in the RERA registration is SHWASA CONSTRUCTIONS.
Where is SHWASA RESIDENCY - ALPHA TOWERS located?
SHWASA RESIDENCY - ALPHA TOWERS is in RAMPALLY VILLAGE, Keesara, Medchal-Malkajgiri, Telangana (501301).
When will SHWASA RESIDENCY - ALPHA TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 20/12/2026. This is the promoter's declaration, not a guarantee.