Sri Kausalya Nilayam
SHUBAM CONSTRUCTIONS · Rangareddy · RERA P02400011280
SRI KAUSALYA NILAYAM is a residential apartment project in ANMAGAL, Hayathnagar Mandal, Ranga Reddy District, developed by registered promoter SHUBAM CONSTRUCTIONS. The registered site is Plot Nos. 53 North Part and 78 North Part, with a net area of 384.27 sq m; it comprises one building sanctioned as 1 Stilt + 5 upper floors. The RERA unit schedule lists five 2BHK apartments of 116.12 sq m and five 3BHK apartments of 146.32 sq m. Its TG-RERA registration number is P02400011280, and the proposed completion date is 10 December 2027.
More from Shubam Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SRI KAUSALYA NILAYAM RERA record |
| Project type | Residential apartment project RERA record |
| Registered portion / phase | Phase not separately identified in the supplied record; the registered site is described as Plot Nos. 53 North Part and 78 North Part |
| TG-RERA registration | P02400011280 |
| Registration validity | 10 December 2024 to 10 December 2027; the certificate states a three-year validity. This is the registration period, not a statement of completion or occupancy. |
| Registered promoter | SHUBAM CONSTRUCTIONS |
| RERA status | Recorded as an ongoing project; the registration certificate was issued under section 5. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue-village description | ANMAGAL; Anmagal-Hayathnagar Village is the village wording in the filed title and approval records. The supplied record does not separately confirm whether the locality label and revenue-village name are identical. RERA record Land records |
| Mandal | Hayathnagar RERA record |
| District | Ranga Reddy (the building-permit extraction spells it “Rangareddy”) RERA record |
| PIN | 501505 RERA record |
| Project survey numbers | 3, 20, 21, 22 and 27; no subdivisions are specified in the supplied project identity record. RERA record Land records |
| Plot identifiers | 53 North Part and 78 North Part Land records |
| Registered site extent | RERA land details state total area 390.19 sq m, affected area 5.92 sq m, and net area 384.27 sq m. Land records |
| Sanctioned-plan site area | GHMC permit states plot area 390.19 sq m and net plot area 384.27 sq m. |
| Boundaries | North: 33 Feet Wide Road; South: Plots No 53 South Part and Plot No 78 South Part; East: 30 Feet Wide Road; West: 40 Feet Wide Road. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | 3906/GHMC/LBN/2024-BP, approved 10 December 2024 RERA record Approvals record |
| File number | 010520/GHMC/4856/LBN2/2024-BP Approvals record |
| Approved built-up area | 1,052.75 Sq.Mt. stated as residential upper-floor area in the permit extraction. The permit separately records stilt area of 186.17 Sq.Mt. |
| Buildings / towers | One building / one tower is recorded in the project data. Land records RERA unit table |
| Sanctioned configuration | 1 Stilt + 5 upper floors; the supplied permit extraction does not specify a basement or podium. |
| Parking levels / area | Permit records Total Parking Area 198.7 (unit not stated in the extraction); the stilt is identified as approved for parking. No separate parking-space count is supplied. |
| Approved versus RERA-declared homes | The RERA land record lists 1 total building unit; the filed unit schedule records 10 apartments—five 2BHK and five 3BHK. The supplied evidence does not explain the difference in these counts. Land records RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 5 units; 3BHK: 5 units RERA unit table RERA unit details |
| RERA-filed saleable areas | 2BHK: 116.12 sq m; 3BHK: 146.32 sq m RERA unit table RERA unit details |
| Booked / available | Portal-derived counts show 0 booked and 5 available in each configuration, 10 available overall. The portal record supplied has no as-of date; treat these counts as indicative, not current confirmation. RERA unit table RERA unit details |
| Construction stage | RERA records the project as ongoing. A separate, independently verified site-progress assessment is not supplied here. RERA record |
| Completion dates | RERA project record and Form B declaration state 10/12/2027; the building-permit extraction gives a completion-before date of 10 December 2027. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. The building permit requires an occupancy certificate before occupation. |
2. The project story
SRI KAUSALYA NILAYAM is a RERA-registered residential apartment development on the north portions of Plots 53 and 78 in Anmagal-Hayathnagar Village, Hayathnagar Mandal, Ranga Reddy District. Its project land is identified across Survey Nos. 3, 20, 21, 22 and 27. The filed record describes one building, sanctioned by GHMC as 1 Stilt + 5 upper floors, for residential use. RERA record Land records
The RERA unit schedule lists ten homes: five 2BHK and five 3BHK apartments. The registration and completion dates are distinct: registration runs from 10 December 2024 to 10 December 2027, while the stated project completion date is 10 December 2027. The supplied materials classify the project as ongoing, but do not provide an independently verified construction-progress inspection or an occupancy certificate. RERA record RERA unit table
3. Master plan, architecture & building design
The GHMC building permit conditionally sanctions a residential building of 1 Stilt + 5 upper floors on a net plot area of 384.27 Sq. Mtrs. It records residential upper-floor area of 1,052.75 Sq.Mt. and stilt area of 186.17 Sq.Mt.; these are permit-recorded areas, not carpet or saleable-area figures. The permit also records the site’s total plot area as 390.19 Sq. Mtrs.
The supplied permit extraction identifies setbacks as Front 3, Rear 2, Side I 2 and Side II 2, without giving units in that field. It lists a tot-lot, a transformer space, a garbage house and one rainwater-harvesting pit. No drawing-derived information is supplied on building footprint, floor-by-floor apartment arrangement, lifts, stairs, entrances, detailed circulation, landscaping area or common-area distribution.
The approval record also lists C/GHMC/055233/2020 as the approved layout/LRS proceeding number and 03279/TDR/2024 as the TDR DRC number. The supplied materials do not include a drawing-based layout review establishing the detailed site arrangement. Approvals record
4. Homes, configurations & floor plans
The following counts and saleable areas are from the TG-RERA unit schedule. The portal-derived booking counts have no as-of date in the supplied record and are therefore indicative. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 116.12 sq m | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 146.32 sq m | Not available | Not supplied |
A floor-plan drawing is listed, but the supplied measurement record shows no successfully measured drawing; no software-measured carpet areas or room dimensions can therefore be reported. RERA saleable area is the filed unit-area figure and should not be treated as a measured carpet-area figure. The supplied data does not separately state balcony, utility or loading measurements. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records a Total Parking Area 198.7 (unit not stated in the extracted field) and identifies the stilt as approved for parking. The permit condition says the approved cellar and stilt parking space, where shown in the plan, is to be used exclusively for vehicle parking and not partitioned or converted to another use; the supplied extraction does not identify a cellar in the sanctioned floor configuration.
No count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, ramp or driveway arrangement, pedestrian separation, or EV-charging provision is supplied. The permit includes a general condition that parking places in buildings shall have EV charging infrastructure, but the record does not establish installed charging facilities or allocated spaces at this project.
6. Amenities, recreation & open spaces
The GHMC permit lists a tot-lot, a space for a transformer, a garbage house and one rainwater-harvesting pit. The RERA amenity record includes service and infrastructure categories, with the reported percentages reproduced below; these are recorded progress figures, not independent completion verification. A percentage of 0 is shown as recorded and should not by itself be read as proof that a facility is absent. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot; size not supplied. Permit requires it to be fenced and maintained as greenery before OC. | GHMC permit; RERA amenity record RERA amenities | Green Strip/TOT LOT/Park: 90% recorded; not independently verified complete. |
| Aggregate recreational open space | Size not supplied | RERA amenity record RERA amenities | 0% recorded. |
| Community buildings | No facility details supplied | RERA amenity record RERA amenities | 0% recorded. |
| Internal roads and footpaths | Details not supplied | RERA amenity record RERA amenities | 0% recorded. |
No clubhouse, indoor recreation or sports facilities are identified in the supplied project evidence. Water, drainage, waste, electrical and other site services are addressed below rather than treated as recreational amenities. RERA amenities
7. Utilities, building services & safety
| Service | Supplied project evidence |
|---|---|
| Water | RERA amenity record lists Water Supply as “YES” and 100%. The permit states public water connections are to be provided only on production of an occupancy certificate. Source, storage and treatment capacity are not supplied. RERA amenities |
| Sewerage and storm water | Sewerage (chamber, lines, septic tank, STP) is listed “YES” at 92%; storm-water drains are listed “YES” at 90%; treatment and disposal of sewage and sullage water is listed “YES” at 90%. No system capacities or reuse details are supplied. RERA amenities |
| Water conservation | RERA lists water conservation/rainwater harvesting as “YES” at 90%; the permit specifies 1 No. of Rain Water Harvesting Pits and requires a rainwater-harvesting structure (percolation pit). RERA amenities |
| Electrical | Electrical meter room/sub-station/receiving station is recorded at 94%. The permit requires transformer space and states public electricity connections are to be provided only on production of an occupancy certificate. Backup capacity is not supplied. RERA amenities |
| Lifts and circulation | No lift number, type, capacity or service-lift information is supplied. |
| Fire and life safety | The permit requires fire-fighting installation and structural/means-of-escape safety provisions and states that an occupancy Fire NOC is to be obtained before an occupancy certificate. The supplied evidence does not establish completion or statutory clearance. |
| Waste | Solid-waste management and disposal is listed “YES” at 90%; the permit requires a garbage house within the premises and directs construction-and-demolition waste to a designated collection point. RERA amenities |
| Accessibility | No project-specific accessibility features are documented in the supplied evidence. |
| Other recorded amenity progress | Street lighting, energy management and fire protection/fire-safety requirements each appear at 0% in the RERA amenity record. These entries are not an independent site inspection. RERA amenities |
8. Location, access & connectivity
The project’s RERA location is ANMAGAL, in the Anmagal-Hayathnagar area, Hayathnagar Mandal, Ranga Reddy District, PIN 501505. The permit identifies the site as Anmagal Hayathnagar, Hayathnagar Mandal. Its recorded boundaries are a 33 Feet Wide Road to the north, a 30 Feet Wide Road to the east, a 40 Feet Wide Road to the west, and Plots 53 South Part and 78 South Part to the south. RERA record Land records
A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 1.8 km. No public-transport information, other measured landmark distances or verified journey times are supplied. Location record
9. Developer & development status
The TG-RERA registered promoter is SHUBAM CONSTRUCTIONS, recorded as a partnership. Its supplied promoter address is Sai Enclave, Green Hills Colony, ANMAGAL HAYATHNAGAR, ANMAGAL, Hayathnagar, Ranga Reddy, 501505; GSTIN is 36AEMFS2664C1ZX. No official website or project contact details are supplied here. Parties record Corporate record RERA record
The RERA Form B declaration is made by authorized signatory VEERAREDDY MANOJ REDDY on behalf of the promoter and states a completion undertaking of 10 December 2027. The promoter’s filed declaration also identifies landowner Pulasani Ashok Reddy and refers to Development Agreement-cum-General Power of Attorney No. 784/2025. These are filed declarations and do not constitute an independent site-progress report.
See the project status and certificate information above.
10. Approvals, official records & documents
| Identifier / date | P02400011280; issued 03 October 2026; valid 10 December 2024–10 December 2027 |
|---|---|
| What the supplied record establishes | Registers SRI KAUSALYA NILAYAM and lists promoter conditions including the separate-account requirement and quarterly updates. |
| Identifier / date | 3906/GHMC/LBN/2024-BP; approved 10 December 2024 |
|---|---|
| What the supplied record establishes | Conditional sanction for residential construction of 1 Stilt + 5 upper floors. |
| Identifier / date | 010520/GHMC/4856/LBN2/2024-BP; 10 December 2024 |
|---|---|
| What the supplied record establishes | File number shown in the building-permit extraction. |
| Identifier / date | C/GHMC/055233/2020 |
|---|---|
| What the supplied record establishes | Identified in the permit as Approved Layout No./LRS Proceeding No./Sub division No.; a separate authenticated layout drawing is not provided in the supplied material. |
| Identifier / date | 03279/TDR/2024 |
|---|---|
| What the supplied record establishes | Listed in the building-permit extraction. |
| Identifier / date | Verified at Hyderabad, 7 September 2026 |
|---|---|
| What the supplied record establishes | Records the promoter’s land-title, development-agreement, encumbrance and completion declarations. |
| Identifier / date | Not identified in the supplied documents |
|---|---|
| What the supplied record establishes | The building permit requires an occupancy certificate before occupation; no such certificate is supplied here. |
The supplied evidence does not include a separate occupancy certificate or a site-progress verification report. The approval conditions and their detailed application are set out in the GHMC permit record.
1. Project at a glance
Project identity
Registered project name: SRI KAUSALYA NILAYAM
Project type: Residential apartment project
Registered portion / phase: Phase not separately identified in the supplied record; the registered site is described as Plot Nos. 53 North Part and 78 North Part
TG-RERA registration: P02400011280
Registration validity: 10 December 2024 to 10 December 2027; the certificate states a three-year validity. This is the registration period, not a statement of completion or occupancy.
Registered promoter: SHUBAM CONSTRUCTIONS
RERA status: Recorded as an ongoing project; the registration certificate was issued under section 5.
Land and geographic identity
Locality / revenue-village description: ANMAGAL; Anmagal-Hayathnagar Village is the village wording in the filed title and approval records. The supplied record does not separately confirm whether the locality label and revenue-village name are identical.
Mandal: Hayathnagar
District: Ranga Reddy (the building-permit extraction spells it “Rangareddy”)
PIN: 501505
Project survey numbers: 3, 20, 21, 22 and 27; no subdivisions are specified in the supplied project identity record.
Plot identifiers: 53 North Part and 78 North Part
Registered site extent: RERA land details state total area 390.19 sq m, affected area 5.92 sq m, and net area 384.27 sq m.
Sanctioned-plan site area: GHMC permit states plot area 390.19 sq m and net plot area 384.27 sq m.
Boundaries: North: 33 Feet Wide Road; South: Plots No 53 South Part and Plot No 78 South Part; East: 30 Feet Wide Road; West: 40 Feet Wide Road.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 3906/GHMC/LBN/2024-BP, approved 10 December 2024
File number: 010520/GHMC/4856/LBN2/2024-BP
Approved built-up area: 1,052.75 Sq.Mt. stated as residential upper-floor area in the permit extraction. The permit separately records stilt area of 186.17 Sq.Mt.
Buildings / towers: One building / one tower is recorded in the project data.
Sanctioned configuration: 1 Stilt + 5 upper floors; the supplied permit extraction does not specify a basement or podium.
Parking levels / area: Permit records Total Parking Area 198.7 (unit not stated in the extraction); the stilt is identified as approved for parking. No separate parking-space count is supplied.
Approved versus RERA-declared homes: The RERA land record lists 1 total building unit; the filed unit schedule records 10 apartments—five 2BHK and five 3BHK. The supplied evidence does not explain the difference in these counts.
Offering and status
RERA-filed configurations: 2BHK: 5 units; 3BHK: 5 units
RERA-filed saleable areas: 2BHK: 116.12 sq m; 3BHK: 146.32 sq m
Booked / available: Portal-derived counts show 0 booked and 5 available in each configuration, 10 available overall. The portal record supplied has no as-of date; treat these counts as indicative, not current confirmation.
Construction stage: RERA records the project as ongoing. A separate, independently verified site-progress assessment is not supplied here.
Completion dates: RERA project record and Form B declaration state 10/12/2027; the building-permit extraction gives a completion-before date of 10 December 2027.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. The building permit requires an occupancy certificate before occupation.
2. The project story
SRI KAUSALYA NILAYAM is a RERA-registered residential apartment development on the north portions of Plots 53 and 78 in Anmagal-Hayathnagar Village, Hayathnagar Mandal, Ranga Reddy District. Its project land is identified across Survey Nos. 3, 20, 21, 22 and 27. The filed record describes one building, sanctioned by GHMC as 1 Stilt + 5 upper floors, for residential use.
The RERA unit schedule lists ten homes: five 2BHK and five 3BHK apartments. The registration and completion dates are distinct: registration runs from 10 December 2024 to 10 December 2027, while the stated project completion date is 10 December 2027. The supplied materials classify the project as ongoing, but do not provide an independently verified construction-progress inspection or an occupancy certificate.
3. Master plan, architecture & building design
The GHMC building permit conditionally sanctions a residential building of 1 Stilt + 5 upper floors on a net plot area of 384.27 Sq. Mtrs. It records residential upper-floor area of 1,052.75 Sq.Mt. and stilt area of 186.17 Sq.Mt.; these are permit-recorded areas, not carpet or saleable-area figures. The permit also records the site’s total plot area as 390.19 Sq. Mtrs.
The supplied permit extraction identifies setbacks as Front 3, Rear 2, Side I 2 and Side II 2, without giving units in that field. It lists a tot-lot, a transformer space, a garbage house and one rainwater-harvesting pit. No drawing-derived information is supplied on building footprint, floor-by-floor apartment arrangement, lifts, stairs, entrances, detailed circulation, landscaping area or common-area distribution.
The approval record also lists C/GHMC/055233/2020 as the approved layout/LRS proceeding number and 03279/TDR/2024 as the TDR DRC number. The supplied materials do not include a drawing-based layout review establishing the detailed site arrangement.
4. Homes, configurations & floor plans
The following counts and saleable areas are from the TG-RERA unit schedule. The portal-derived booking counts have no as-of date in the supplied record and are therefore indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 116.12 sq m | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 146.32 sq m | Not available | Not supplied |
A floor-plan drawing is listed, but the supplied measurement record shows no successfully measured drawing; no software-measured carpet areas or room dimensions can therefore be reported. RERA saleable area is the filed unit-area figure and should not be treated as a measured carpet-area figure. The supplied data does not separately state balcony, utility or loading measurements.
5. Parking & vehicle circulation
The GHMC permit records a Total Parking Area 198.7 (unit not stated in the extracted field) and identifies the stilt as approved for parking. The permit condition says the approved cellar and stilt parking space, where shown in the plan, is to be used exclusively for vehicle parking and not partitioned or converted to another use; the supplied extraction does not identify a cellar in the sanctioned floor configuration.
No count of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, ramp or driveway arrangement, pedestrian separation, or EV-charging provision is supplied. The permit includes a general condition that parking places in buildings shall have EV charging infrastructure, but the record does not establish installed charging facilities or allocated spaces at this project.
6. Amenities, recreation & open spaces
The GHMC permit lists a tot-lot, a space for a transformer, a garbage house and one rainwater-harvesting pit. The RERA amenity record includes service and infrastructure categories, with the reported percentages reproduced below; these are recorded progress figures, not independent completion verification. A percentage of 0 is shown as recorded and should not by itself be read as proof that a facility is absent.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot; size not supplied. Permit requires it to be fenced and maintained as greenery before OC. | GHMC permit; RERA amenity record | Green Strip/TOT LOT/Park: 90% recorded; not independently verified complete. |
| Aggregate recreational open space | Size not supplied | RERA amenity record | 0% recorded. |
| Community buildings | No facility details supplied | RERA amenity record | 0% recorded. |
| Internal roads and footpaths | Details not supplied | RERA amenity record | 0% recorded. |
No clubhouse, indoor recreation or sports facilities are identified in the supplied project evidence. Water, drainage, waste, electrical and other site services are addressed below rather than treated as recreational amenities.
7. Utilities, building services & safety
Water: RERA amenity record lists Water Supply as “YES” and 100%. The permit states public water connections are to be provided only on production of an occupancy certificate. Source, storage and treatment capacity are not supplied.
Sewerage and storm water: Sewerage (chamber, lines, septic tank, STP) is listed “YES” at 92%; storm-water drains are listed “YES” at 90%; treatment and disposal of sewage and sullage water is listed “YES” at 90%. No system capacities or reuse details are supplied.
Water conservation: RERA lists water conservation/rainwater harvesting as “YES” at 90%; the permit specifies 1 No. of Rain Water Harvesting Pits and requires a rainwater-harvesting structure (percolation pit).
Electrical: Electrical meter room/sub-station/receiving station is recorded at 94%. The permit requires transformer space and states public electricity connections are to be provided only on production of an occupancy certificate. Backup capacity is not supplied.
Lifts and circulation: No lift number, type, capacity or service-lift information is supplied.
Fire and life safety: The permit requires fire-fighting installation and structural/means-of-escape safety provisions and states that an occupancy Fire NOC is to be obtained before an occupancy certificate. The supplied evidence does not establish completion or statutory clearance.
Waste: Solid-waste management and disposal is listed “YES” at 90%; the permit requires a garbage house within the premises and directs construction-and-demolition waste to a designated collection point.
Accessibility: No project-specific accessibility features are documented in the supplied evidence.
Other recorded amenity progress: Street lighting, energy management and fire protection/fire-safety requirements each appear at 0% in the RERA amenity record. These entries are not an independent site inspection.
8. Location, access & connectivity
The project’s RERA location is ANMAGAL, in the Anmagal-Hayathnagar area, Hayathnagar Mandal, Ranga Reddy District, PIN 501505. The permit identifies the site as Anmagal Hayathnagar, Hayathnagar Mandal. Its recorded boundaries are a 33 Feet Wide Road to the north, a 30 Feet Wide Road to the east, a 40 Feet Wide Road to the west, and Plots 53 South Part and 78 South Part to the south.
A supplied location record gives the nearest sampled Outer Ring Road interchange as approximately 1.8 km. No public-transport information, other measured landmark distances or verified journey times are supplied.
9. Developer & development status
The TG-RERA registered promoter is SHUBAM CONSTRUCTIONS, recorded as a partnership. Its supplied promoter address is Sai Enclave, Green Hills Colony, ANMAGAL HAYATHNAGAR, ANMAGAL, Hayathnagar, Ranga Reddy, 501505; GSTIN is 36AEMFS2664C1ZX. No official website or project contact details are supplied here.
The RERA Form B declaration is made by authorized signatory VEERAREDDY MANOJ REDDY on behalf of the promoter and states a completion undertaking of 10 December 2027. The promoter’s filed declaration also identifies landowner Pulasani Ashok Reddy and refers to Development Agreement-cum-General Power of Attorney No. 784/2025. These are filed declarations and do not constitute an independent site-progress report.
See the project status and certificate information above.
10. Approvals, official records & documents
| Identifier / date | P02400011280; issued 03 October 2026; valid 10 December 2024–10 December 2027 |
|---|---|
| What the supplied record establishes | Registers SRI KAUSALYA NILAYAM and lists promoter conditions including the separate-account requirement and quarterly updates. |
| Identifier / date | 3906/GHMC/LBN/2024-BP; approved 10 December 2024 |
|---|---|
| What the supplied record establishes | Conditional sanction for residential construction of 1 Stilt + 5 upper floors. |
| Identifier / date | 010520/GHMC/4856/LBN2/2024-BP; 10 December 2024 |
|---|---|
| What the supplied record establishes | File number shown in the building-permit extraction. |
| Identifier / date | C/GHMC/055233/2020 |
|---|---|
| What the supplied record establishes | Identified in the permit as Approved Layout No./LRS Proceeding No./Sub division No.; a separate authenticated layout drawing is not provided in the supplied material. |
| Identifier / date | 03279/TDR/2024 |
|---|---|
| What the supplied record establishes | Listed in the building-permit extraction. |
| Identifier / date | Verified at Hyderabad, 7 September 2026 |
|---|---|
| What the supplied record establishes | Records the promoter’s land-title, development-agreement, encumbrance and completion declarations. |
| Identifier / date | Not identified in the supplied documents |
|---|---|
| What the supplied record establishes | The building permit requires an occupancy certificate before occupation; no such certificate is supplied here. |
The supplied evidence does not include a separate occupancy certificate or a site-progress verification report. The approval conditions and their detailed application are set out in the GHMC permit record.
Frequently asked questions
Is SRI KAUSALYA NILAYAM registered with Telangana RERA?
Yes. SRI KAUSALYA NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02400011280; the registration status is On-Going Project.
Who is the developer of SRI KAUSALYA NILAYAM?
The promoter named in the RERA registration is SHUBAM CONSTRUCTIONS.
Where is SRI KAUSALYA NILAYAM located?
SRI KAUSALYA NILAYAM is in ANMAGAL, Hayathnagar, Rangareddy, Telangana (501505).
When will SRI KAUSALYA NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 10/12/2027. This is the promoter's declaration, not a guarantee.
More projects in Anmagal