The 41 West
SAVYA REALTY LLP · Rangareddy · RERA P02400009340
THE 41 WEST is a residential apartment project in Khanamet, Serilingampally Mandal, Ranga Reddy District, developed by registered promoter SAVYA REALTY LLP. It has a site extent of 9,946.01 sq.m and one residential building with 3 cellars, 1 ground floor and 19 upper floors. TG-RERA lists 152 homes in 3.5BHK and 4.5BHK configurations, with saleable areas of 330.27 sq.m and 481.36 sq.m, respectively. The TG-RERA registration number is P02400009340, and the proposed completion date is 06/05/2030.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | THE 41 WEST RERA record |
| Project type / phase | Residential apartment project; phase or separately registered portion is not specified in the supplied record. RERA record |
| TG-RERA registration | P02400009340; valid 06/01/2025–06/01/2030. This is the registration period, not the project completion deadline. RERA record Approvals record |
| Registered promoter | SAVYA REALTY LLP; LLP. RERA record Corporate record |
| RERA status | On-Going Project, as recorded in the project information. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Khanamet (also rendered as KHANAMET in the building-permit record). RERA record RERA filing |
| Revenue village | Kannamet in the TG-RERA registration record; the building-permit extraction uses KHANAMET. RERA record |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500084. RERA record |
| Survey number | 41/14; no subdivision is specified in the project identity record. Land records |
| Site extent | Total area 9,946.01 sq.m; net area 9,932.81 sq.m; the permit plan records 13.20 sq.m as splay area. Land records |
| Boundaries recorded in RERA land details | East: Neighbours Land; West: 100 ft Wide Road; North: 60 ft Wide Road; South: Plot No 11 in Sy No 41 -14 part. Land records |
| Plot reference | Plot No. 12. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | 4235/GHMC/SLP/2025-BP, approved 06 January 2025. Approvals record |
| Building / floor arrangement | One residential building; 3 cellars + 1 ground + 19 upper floors in the GHMC permit. |
| Building height | 67.7 (as recorded in the permit’s sanctioned parameters); the submitted plan extraction also records 67.69 MT. |
| Approved built-up area | The permit extraction lists Residential 62,082.00, Commercial 3,052.85, and Parking 22,160.84; it also records Total Parking Area 22,160.84. The submitted plan extraction separately states TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 87,295.69 and TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 65,134.85. |
| Parking provision in sanctioned-plan extraction | No of Cars Proposed: 386; the extraction lists required parking area 21,830.33 and proposed parking area 22,160.84. |
| Unit count | TG-RERA unit table lists 152 homes: 38 3.5BHK and 113 4.5BHK; the building-plan extraction states 151 sanctioned units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 3.5BHK and 4.5BHK. RERA unit table |
| RERA-filed saleable area | 3.5BHK: 330.27 sq.m; 4.5BHK: 481.36 sq.m. RERA unit table |
| Booked / available | Portal figures show 0 booked and 38 available 3.5BHK units, and 0 booked and 113 available 4.5BHK units. Booking figures are indicative: the record has no as-of date. RERA unit table |
| Construction stage | The project is recorded as “On-Going Project.” The supplied amenities record reports sewerage (including STP) at 40% and other listed infrastructure items at 0%; no independent site verification is supplied. RERA filing RERA amenities |
| Completion timeline | The RERA registration record gives proposed and revised completion as 06/05/2030; the Form-B declaration states completion by 06 January 2030. RERA record |
| Occupancy / completion certificate | No occupancy certificate or completion certificate is included in the supplied project evidence. The permit requires an occupancy certificate before occupation. Document index |
2. The project story
THE 41 WEST is registered with TG-RERA as a residential apartment project on Plot No. 12, Survey No. 41/14, in Kannamet/Khanamet village, Serilingampally Mandal, Ranga Reddy District. The GHMC building permit authorizes one building with three cellar levels, a ground floor and 19 upper floors. The permit also identifies residential and commercial areas, but the supplied evidence does not describe the commercial component’s intended use or configuration. RERA record Land records
TG-RERA’s unit table records two home configurations, 3.5BHK and 4.5BHK. It reports 0 booked units and 151 available units across those configurations, with booking counts lacking an as-of date. The project is recorded as ongoing; the supplied materials do not provide an independently verified construction-progress inspection or an occupancy/completion certificate. The RERA completion date shown in the project record is 06/05/2030. RERA unit table RERA filing RERA record Document index
3. Master plan, architecture & building design
The GHMC building permit and plan extraction identify a single residential building on a site recorded as 9,946.01 sq.m, with net plot area 9,932.81 sq.m and splay area 13.20 sq.m. The permit describes 3 Cellars + 1 Ground + 19 upper floors, with building height recorded as 67.7; the plan extraction states 67.69 MT.
The permit extraction lists residential area as 62,082.00, commercial area as 3,052.85, and parking area as 22,160.84. It separately reports TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 87,295.69 and TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 65,134.85. These are reported as stated in the submitted and permit-derived records; no FSI-counted area or carpet area for the project as a whole is supplied.
The plan extraction includes a Tot-lot, green strip, rainwater-harvesting structure, pump house/motor room, garbage house, sewage-treatment plant and utility/parking areas. The supplied material does not establish floor-by-floor apartment arrangements, flats per floor, lift or stair counts, or the extent of landscaped/open space beyond the listed plan features.
4. Homes, configurations & floor plans
TG-RERA lists the following apartment configurations and saleable areas. The portal’s booked/available figures are indicative because the evidence provides no as-of date. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3.5BHK | 38 | 0 | 38 | 330.27 sq.m | Not supplied as a matched drawing measurement | Not supplied |
| 4.5BHK | 113 | 0 | 113 | 481.36 sq.m | Not supplied as a matched drawing measurement | Not supplied |
The approved-plan document is the source for drawing-based measurements, but the supplied measurements identify 1BHK, 3BHK, 4BHK and 5BHK drawings rather than the TG-RERA-filed 3.5BHK and 4.5BHK configurations. Those drawing measurements therefore cannot be presented as carpet areas for the RERA-listed configurations. The software-measured drawing figures are: 1BHK median 155.9 sq.m (range 147.7–164.1 sq.m); 3BHK median 213.4 sq.m (range 213.4–213.5 sq.m); 4BHK median 256.2 sq.m (range 207.9–330.2 sq.m); and 5BHK median 287.1 sq.m (range 271.6–291.2 sq.m). These are software measurements from drawing geometry, not RERA disclosures, and the records note that some measurements need review. Floor plans RERA unit details
RERA saleable area is not the same measure as carpet area: the supplied floor-plan note says saleable area also includes the home’s share of common areas. No matched carpet-area, balcony/utility-area or loading figure for the RERA-filed configurations is provided. Floor plans RERA unit table
5. Parking & vehicle circulation
The submitted plan extraction records No of Cars Proposed: 386, required parking area 21,830.33, and proposed parking area 22,160.84. The GHMC permit describes three cellar levels, and its conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking; no parking count by level or two-wheeler count is supplied.
The permit requires one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts. It also directs that parking places be provided with electric-vehicle charging infrastructure. The supplied record does not establish the number or location of EV chargers, visitor or accessible bays, pedestrian separation, or legally documented parking allocation to individual units. A plan provision does not by itself establish exclusive unit ownership.
6. Amenities, recreation & open spaces
The RERA amenities record identifies proposed project infrastructure and reports progress percentages. The GHMC plan extraction also identifies tot-lot and green-strip provisions. The supplied evidence does not independently verify that any facility is complete. RERA amenities
| Facility | Green Strip / TOT LOT / Park |
|---|---|
| Description / size | Plan extraction lists a tot-lot and green strip; GHMC permit extraction records “Tot Lot 994.94.” |
| Evidence source | GHMC permit / submitted plan |
| Declared progress / verified status | RERA amenities record: 0%; no independent completion verification. RERA amenities |
| Facility | Aggregate area of recreational open space |
|---|---|
| Description / size | Listed as available; area not supplied. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Community buildings |
|---|---|
| Description / size | Listed as available; size and facilities not specified. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Internal roads & footpaths |
|---|---|
| Description / size | Listed as available; dimensions not supplied. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Water supply |
|---|---|
| Description / size | Listed as available; source and capacity not specified in this amenities entry. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Sewerage (chamber, lines, septic tank, STP) |
|---|---|
| Description / size | Listed; the plan extraction also names a sewage-treatment plant. RERA amenities |
| Evidence source | RERA amenities record / submitted plan |
| Declared progress / verified status | 40%; no independent completion verification. RERA amenities |
| Facility | Storm-water drains |
|---|---|
| Description / size | Listed as available; dimensions not supplied. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Treatment and disposal of sewage and sullage water |
|---|---|
| Description / size | Listed as available; treatment capacity and reuse details not supplied. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Solid-waste management and disposal |
|---|---|
| Description / size | Listed as available; operational details not supplied. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Water conservation / rainwater harvesting |
|---|---|
| Description / size | Listed in RERA amenities; plan extraction names a rainwater-harvesting structure (percolation pit). RERA amenities |
| Evidence source | RERA amenities record / submitted plan |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Street lighting |
|---|---|
| Description / size | Listed as available; specification not supplied. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Fire protection and fire safety requirements |
|---|---|
| Description / size | Listed as available; the permit includes fire-safety conditions. RERA amenities |
| Evidence source | RERA amenities record / GHMC permit |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Electrical meter room, sub-station, receiving station |
|---|---|
| Description / size | Listed as available; the plan extraction also names a distribution transformer and space for a transformer. RERA amenities |
| Evidence source | RERA amenities record / submitted plan |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
| Facility | Energy management |
|---|---|
| Description / size | Listed in the RERA amenities record; details not supplied. RERA amenities |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. RERA amenities |
7. Utilities, building services & safety
The plan extraction lists a Sewage Treatment Plant, septic tank, rainwater-harvesting structure, sump, underground static water tank of 25,000 lits., separate residential terrace tank of 25,000lits, transformer, generator, garbage house, garbage pit and pump house/motor room. The records do not provide water-source details, treatment capacity, storage beyond the stated tank figures, STP capacity, reuse arrangements, or backup-power capacity.
GHMC’s permit conditions require storm-water drainage provisions and rainwater-harvesting pits, and refer to services, utilities, sewerage and garbage disposal as shown in plans submitted to GHMC. The permit also requires a fire NOC from the Director (EV&DM) before an occupancy certificate; lists fire-safety installation and emergency-lighting conditions; and calls for fire-resistant swing doors for collapsible lifts. These are approval conditions, not evidence that the systems have been installed, tested or certified.
The permit requires one entrance and one exit with a minimum 4.5mts. width and 5mts. height clearance, and requires EV-charging infrastructure in parking places. No lift count, service-lift count, accessibility route or ramp specification is supplied.
8. Location, access & connectivity
The registered location is Kannamet/Khanamet, Serilingampally Mandal, Ranga Reddy District, PIN 500084; the project survey is 41/14. The RERA land record describes the west boundary as a 100 ft Wide Road and the north boundary as a 60 ft Wide Road. The GHMC plan extraction lists roads of 18.00 MT and 30.00 MT, and the building permit refers to an 18 mt. road width. RERA record Land records
The supplied location data gives HITEC City — 2.2 km. This is the available recorded distance; no route, travel time or public-transport detail is supplied. Location record
9. Developer & development status
The registered legal promoter is SAVYA REALTY LLP, an LLP, with GSTIN 36AFHFS1999C1ZO. The supplied promoter address is Vasavi Corporate, Road No 12, Khanamet Village Serilingampally, Khanamet, Serilingampally, Ranga Reddy, 500084. The supplied corporate document is a Ministry of Corporate Affairs certificate of incorporation; it evidences incorporation, not a project construction or completion approval. Corporate record RERA filing
The project is recorded as ongoing. The RERA-filed completion date is 06/05/2030; the Form-B declaration dated 04.06.2026 states a completion undertaking of 06 January 2030. The evidence does not include an independently verified site-progress report or an occupancy/completion certificate. RERA filing RERA record Document index
10. Approvals, official records & documents
| Supplied evidence | Form C, registration P02400009340; records THE 41 WEST and SAVYA REALTY LLP, with validity 06/01/2025–06/01/2030. |
|---|---|
| Scope / status | Project registration; not a unit sale agreement or conveyance. |
| Supplied evidence | Permit 4235/GHMC/SLP/2025-BP, dated 06 January, 2025; building-permit record identifies Survey No. 41/14 and three cellars, ground floor and 19 upper floors. |
|---|---|
| Scope / status | Principal building sanction. |
| Supplied evidence | Plan record identifies Plot No. 12, Survey No. 41/14, site extent 9,946.01 sq.m, net area 9,932.81 sq.m, and proposed residential apartment construction. |
|---|---|
| Scope / status | Plan and approval data filed in the project evidence. |
| Supplied evidence | The supplied GHMC building permit is titled BUILDING PERMIT ORDER and includes commencement and occupancy-related conditions. No separate occupancy or completion certificate is supplied. |
|---|---|
| Scope / status | Permit and conditions; no OC evidence in the supplied set. |
| Supplied evidence | Form-B affidavit by SAVYA REALTY LLP for THE 41 WEST, dated 04.06.2026, containing promoter declarations and completion undertaking. |
|---|---|
| Scope / status | Promoter declaration, not independent verification. |
| Supplied evidence | Certificate of incorporation for SAVYA REALTY LLP. |
|---|---|
| Scope / status | Entity evidence; not a project permit. |
The supplied evidence does not include a separate occupancy/completion certificate or a public approved-layout lookup record. The GHMC permit contains project-specific conditions, including that its permission does not confer ownership rights; detailed title and sanction-condition review belongs in the relevant report sections. HMDA
1. Project at a glance
Project identity
Registered project name: THE 41 WEST
Project type / phase: Residential apartment project; phase or separately registered portion is not specified in the supplied record.
TG-RERA registration: P02400009340; valid 06/01/2025–06/01/2030. This is the registration period, not the project completion deadline.
Registered promoter: SAVYA REALTY LLP; LLP.
RERA status: On-Going Project, as recorded in the project information.
Land and geographic identity
Locality: Khanamet (also rendered as KHANAMET in the building-permit record).
Revenue village: Kannamet in the TG-RERA registration record; the building-permit extraction uses KHANAMET.
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500084.
Survey number: 41/14; no subdivision is specified in the project identity record.
Site extent: Total area 9,946.01 sq.m; net area 9,932.81 sq.m; the permit plan records 13.20 sq.m as splay area.
Boundaries recorded in RERA land details: East: Neighbours Land; West: 100 ft Wide Road; North: 60 ft Wide Road; South: Plot No 11 in Sy No 41 -14 part.
Plot reference: Plot No. 12.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: 4235/GHMC/SLP/2025-BP, approved 06 January 2025.
Building / floor arrangement: One residential building; 3 cellars + 1 ground + 19 upper floors in the GHMC permit.
Building height: 67.7 (as recorded in the permit’s sanctioned parameters); the submitted plan extraction also records 67.69 MT.
Approved built-up area: The permit extraction lists Residential 62,082.00, Commercial 3,052.85, and Parking 22,160.84; it also records Total Parking Area 22,160.84. The submitted plan extraction separately states TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 87,295.69 and TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 65,134.85.
Parking provision in sanctioned-plan extraction: No of Cars Proposed: 386; the extraction lists required parking area 21,830.33 and proposed parking area 22,160.84.
Unit count: TG-RERA unit table lists 152 homes: 38 3.5BHK and 113 4.5BHK; the building-plan extraction states 151 sanctioned units.
Offering and status
RERA-filed configurations: 3.5BHK and 4.5BHK.
RERA-filed saleable area: 3.5BHK: 330.27 sq.m; 4.5BHK: 481.36 sq.m.
Booked / available: Portal figures show 0 booked and 38 available 3.5BHK units, and 0 booked and 113 available 4.5BHK units. Booking figures are indicative: the record has no as-of date.
Construction stage: The project is recorded as “On-Going Project.” The supplied amenities record reports sewerage (including STP) at 40% and other listed infrastructure items at 0%; no independent site verification is supplied.
Completion timeline: The RERA registration record gives proposed and revised completion as 06/05/2030; the Form-B declaration states completion by 06 January 2030.
Occupancy / completion certificate: No occupancy certificate or completion certificate is included in the supplied project evidence. The permit requires an occupancy certificate before occupation.
2. The project story
THE 41 WEST is registered with TG-RERA as a residential apartment project on Plot No. 12, Survey No. 41/14, in Kannamet/Khanamet village, Serilingampally Mandal, Ranga Reddy District. The GHMC building permit authorizes one building with three cellar levels, a ground floor and 19 upper floors. The permit also identifies residential and commercial areas, but the supplied evidence does not describe the commercial component’s intended use or configuration.
TG-RERA’s unit table records two home configurations, 3.5BHK and 4.5BHK. It reports 0 booked units and 151 available units across those configurations, with booking counts lacking an as-of date. The project is recorded as ongoing; the supplied materials do not provide an independently verified construction-progress inspection or an occupancy/completion certificate. The RERA completion date shown in the project record is 06/05/2030.
3. Master plan, architecture & building design
The GHMC building permit and plan extraction identify a single residential building on a site recorded as 9,946.01 sq.m, with net plot area 9,932.81 sq.m and splay area 13.20 sq.m. The permit describes 3 Cellars + 1 Ground + 19 upper floors, with building height recorded as 67.7; the plan extraction states 67.69 MT.
The permit extraction lists residential area as 62,082.00, commercial area as 3,052.85, and parking area as 22,160.84. It separately reports TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 87,295.69 and TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 65,134.85. These are reported as stated in the submitted and permit-derived records; no FSI-counted area or carpet area for the project as a whole is supplied.
The plan extraction includes a Tot-lot, green strip, rainwater-harvesting structure, pump house/motor room, garbage house, sewage-treatment plant and utility/parking areas. The supplied material does not establish floor-by-floor apartment arrangements, flats per floor, lift or stair counts, or the extent of landscaped/open space beyond the listed plan features.
4. Homes, configurations & floor plans
TG-RERA lists the following apartment configurations and saleable areas. The portal’s booked/available figures are indicative because the evidence provides no as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3.5BHK | 38 | 0 | 38 | 330.27 sq.m | Not supplied as a matched drawing measurement | Not supplied |
| 4.5BHK | 113 | 0 | 113 | 481.36 sq.m | Not supplied as a matched drawing measurement | Not supplied |
The approved-plan document is the source for drawing-based measurements, but the supplied measurements identify 1BHK, 3BHK, 4BHK and 5BHK drawings rather than the TG-RERA-filed 3.5BHK and 4.5BHK configurations. Those drawing measurements therefore cannot be presented as carpet areas for the RERA-listed configurations. The software-measured drawing figures are: 1BHK median 155.9 sq.m (range 147.7–164.1 sq.m); 3BHK median 213.4 sq.m (range 213.4–213.5 sq.m); 4BHK median 256.2 sq.m (range 207.9–330.2 sq.m); and 5BHK median 287.1 sq.m (range 271.6–291.2 sq.m). These are software measurements from drawing geometry, not RERA disclosures, and the records note that some measurements need review.
RERA saleable area is not the same measure as carpet area: the supplied floor-plan note says saleable area also includes the home’s share of common areas. No matched carpet-area, balcony/utility-area or loading figure for the RERA-filed configurations is provided.
5. Parking & vehicle circulation
The submitted plan extraction records No of Cars Proposed: 386, required parking area 21,830.33, and proposed parking area 22,160.84. The GHMC permit describes three cellar levels, and its conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking; no parking count by level or two-wheeler count is supplied.
The permit requires one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts. It also directs that parking places be provided with electric-vehicle charging infrastructure. The supplied record does not establish the number or location of EV chargers, visitor or accessible bays, pedestrian separation, or legally documented parking allocation to individual units. A plan provision does not by itself establish exclusive unit ownership.
6. Amenities, recreation & open spaces
The RERA amenities record identifies proposed project infrastructure and reports progress percentages. The GHMC plan extraction also identifies tot-lot and green-strip provisions. The supplied evidence does not independently verify that any facility is complete.
| Facility | Green Strip / TOT LOT / Park |
|---|---|
| Description / size | Plan extraction lists a tot-lot and green strip; GHMC permit extraction records “Tot Lot 994.94.” |
| Evidence source | GHMC permit / submitted plan |
| Declared progress / verified status | RERA amenities record: 0%; no independent completion verification. |
| Facility | Aggregate area of recreational open space |
|---|---|
| Description / size | Listed as available; area not supplied. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Community buildings |
|---|---|
| Description / size | Listed as available; size and facilities not specified. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Internal roads & footpaths |
|---|---|
| Description / size | Listed as available; dimensions not supplied. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Water supply |
|---|---|
| Description / size | Listed as available; source and capacity not specified in this amenities entry. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Sewerage (chamber, lines, septic tank, STP) |
|---|---|
| Description / size | Listed; the plan extraction also names a sewage-treatment plant. |
| Evidence source | RERA amenities record / submitted plan |
| Declared progress / verified status | 40%; no independent completion verification. |
| Facility | Storm-water drains |
|---|---|
| Description / size | Listed as available; dimensions not supplied. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Treatment and disposal of sewage and sullage water |
|---|---|
| Description / size | Listed as available; treatment capacity and reuse details not supplied. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Solid-waste management and disposal |
|---|---|
| Description / size | Listed as available; operational details not supplied. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Water conservation / rainwater harvesting |
|---|---|
| Description / size | Listed in RERA amenities; plan extraction names a rainwater-harvesting structure (percolation pit). |
| Evidence source | RERA amenities record / submitted plan |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Street lighting |
|---|---|
| Description / size | Listed as available; specification not supplied. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Fire protection and fire safety requirements |
|---|---|
| Description / size | Listed as available; the permit includes fire-safety conditions. |
| Evidence source | RERA amenities record / GHMC permit |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Electrical meter room, sub-station, receiving station |
|---|---|
| Description / size | Listed as available; the plan extraction also names a distribution transformer and space for a transformer. |
| Evidence source | RERA amenities record / submitted plan |
| Declared progress / verified status | 0%; no independent completion verification. |
| Facility | Energy management |
|---|---|
| Description / size | Listed in the RERA amenities record; details not supplied. |
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0%; no independent completion verification. |
7. Utilities, building services & safety
The plan extraction lists a Sewage Treatment Plant, septic tank, rainwater-harvesting structure, sump, underground static water tank of 25,000 lits., separate residential terrace tank of 25,000lits, transformer, generator, garbage house, garbage pit and pump house/motor room. The records do not provide water-source details, treatment capacity, storage beyond the stated tank figures, STP capacity, reuse arrangements, or backup-power capacity.
GHMC’s permit conditions require storm-water drainage provisions and rainwater-harvesting pits, and refer to services, utilities, sewerage and garbage disposal as shown in plans submitted to GHMC. The permit also requires a fire NOC from the Director (EV&DM) before an occupancy certificate; lists fire-safety installation and emergency-lighting conditions; and calls for fire-resistant swing doors for collapsible lifts. These are approval conditions, not evidence that the systems have been installed, tested or certified.
The permit requires one entrance and one exit with a minimum 4.5mts. width and 5mts. height clearance, and requires EV-charging infrastructure in parking places. No lift count, service-lift count, accessibility route or ramp specification is supplied.
8. Location, access & connectivity
The registered location is Kannamet/Khanamet, Serilingampally Mandal, Ranga Reddy District, PIN 500084; the project survey is 41/14. The RERA land record describes the west boundary as a 100 ft Wide Road and the north boundary as a 60 ft Wide Road. The GHMC plan extraction lists roads of 18.00 MT and 30.00 MT, and the building permit refers to an 18 mt. road width.
The supplied location data gives HITEC City — 2.2 km. This is the available recorded distance; no route, travel time or public-transport detail is supplied.
9. Developer & development status
The registered legal promoter is SAVYA REALTY LLP, an LLP, with GSTIN 36AFHFS1999C1ZO. The supplied promoter address is Vasavi Corporate, Road No 12, Khanamet Village Serilingampally, Khanamet, Serilingampally, Ranga Reddy, 500084. The supplied corporate document is a Ministry of Corporate Affairs certificate of incorporation; it evidences incorporation, not a project construction or completion approval.
The project is recorded as ongoing. The RERA-filed completion date is 06/05/2030; the Form-B declaration dated 04.06.2026 states a completion undertaking of 06 January 2030. The evidence does not include an independently verified site-progress report or an occupancy/completion certificate.
10. Approvals, official records & documents
| Supplied evidence | Form C, registration P02400009340; records THE 41 WEST and SAVYA REALTY LLP, with validity 06/01/2025–06/01/2030. |
|---|---|
| Scope / status | Project registration; not a unit sale agreement or conveyance. |
| Supplied evidence | Permit 4235/GHMC/SLP/2025-BP, dated 06 January, 2025; building-permit record identifies Survey No. 41/14 and three cellars, ground floor and 19 upper floors. |
|---|---|
| Scope / status | Principal building sanction. |
| Supplied evidence | Plan record identifies Plot No. 12, Survey No. 41/14, site extent 9,946.01 sq.m, net area 9,932.81 sq.m, and proposed residential apartment construction. |
|---|---|
| Scope / status | Plan and approval data filed in the project evidence. |
| Supplied evidence | The supplied GHMC building permit is titled BUILDING PERMIT ORDER and includes commencement and occupancy-related conditions. No separate occupancy or completion certificate is supplied. |
|---|---|
| Scope / status | Permit and conditions; no OC evidence in the supplied set. |
| Supplied evidence | Form-B affidavit by SAVYA REALTY LLP for THE 41 WEST, dated 04.06.2026, containing promoter declarations and completion undertaking. |
|---|---|
| Scope / status | Promoter declaration, not independent verification. |
| Supplied evidence | Certificate of incorporation for SAVYA REALTY LLP. |
|---|---|
| Scope / status | Entity evidence; not a project permit. |
The supplied evidence does not include a separate occupancy/completion certificate or a public approved-layout lookup record. The GHMC permit contains project-specific conditions, including that its permission does not confer ownership rights; detailed title and sanction-condition review belongs in the relevant report sections.
Frequently asked questions
Is THE 41 WEST registered with Telangana RERA?
Yes. THE 41 WEST is registered with the Telangana Real Estate Regulatory Authority as P02400009340; the registration status is On-Going Project.
Who is the developer of THE 41 WEST?
The promoter named in the RERA registration is SAVYA REALTY LLP.
Where is THE 41 WEST located?
THE 41 WEST is in KHANAMET, Kannamet, Serilingampally, Rangareddy, Telangana (500084).
When will THE 41 WEST be completed?
The promoter's proposed date of completion filed with RERA is 06/05/2030. This is the promoter's declaration, not a guarantee.