VINDHYA is a residential apartment project in Sheikpet-19, Shaikpet Mandal, Hyderabad District, developed by SRI GAYATRI HOUSING PRIVATE LIMITED. It occupies 393.91 sq. m and comprises one residential building with 1 Stilt + 5 upper floors and 10 homes: five 2.5BHK and five 3BHK apartments. The project is registered under TG-RERA **P02500009447**, with proposed completion by **17 February 2028**.

More from Sri Gayatri Housing Pvt Ltd · 15 projects →

01What we found

RegisteredTG-RERA - valid till 17 Feb 2028
21documents on file - each fact links to its page
7court cases on this project's land (survey 1, 4, 10, 327, Sheikpet)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameVINDHYA; the TG-RERA certificate gives this spelling. RERA record
Project type / phaseResidential apartment project; the record identifies one proposed residential building, not a separate named phase. RERA record RERA filing
TG-RERA registrationP02500009447. RERA record
Registration validity17/02/2025–17/02/2028, subject to extension under the Act and rules. This is the registration period, not evidence of the building’s completion or occupancy status. RERA record
Registered promoterSRI GAYATRI HOUSING PRIVATE LIMITED, a company. RERA record Corporate record
RERA statusThe registration is recorded as a new project. A GHMC Occupancy Certificate and an architect’s completion certificate are also in the supplied project documents; see “Offering and status” below. RERA record Document index

Land and geographic identity

FieldRecord
LocalityRERA-filed locality: Sheikpet-19. The building-permit record also identifies SHEIKPET -19. RERA record RERA filing
Revenue villageShaikpet / Sheikpet, as stated in the project and approval records. RERA record
Mandal / district / PINShaikpet / Hyderabad / 500081. RERA record RERA filing
Site identifiersPlot Nos. 243 and 244 part; House Nos. 8-1-297/SN/243 and 8-1-297/SN/244 part; Survey No. 327 PAIKI (OLD), 602 AND 605 (NEW); T.S. Nos. 1 and 4 in Block-C and T.S. No. 10 in Block-G; Ward 13, with the plan also specifying Ward No. 8, Block No. 1. RERA filing
Site area393.91 sq. m total and net site area in the building-permit record; road-affected and nala-affected areas are each recorded as 0.0 sq. m there.
BoundariesEast: SOCIETY LAND; West: PART OF PLOT NO 244; North: NEIGHBOURS LAND; South: 9MT WIDE MAINROAD. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permit4802/GHMC/KHB/2025-BP, dated 17 February 2025. Approvals record
BuildingOne residential building, sanctioned as 1 Stilt + 5 upper floors; the permit records NO OF FLOORS: 6 and building height 14.95 MT.
Approved built-up areaThe filed plan records TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1165.30 and TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1398.40 sq. m.
Units10 units in the sanctioned-plan extraction and 10 units in the TG-RERA unit record. RERA unit table
ParkingParking is shown in the sanctioned plan; the extracted figures include PARKING AREA 233.10 sq. m in one plan record and Total Parking Area 176.8 in the permit extraction. A separate completion-certificate extraction gives sanctioned parking area 218.96 sq. m. No verified number of parking spaces or unit-by-unit allocation is supplied.

Offering and status

FieldRecord
Configurations2.5BHK and 3BHK. RERA unit table
RERA-filed saleable area2.5BHK: 121.7 sq. m; 3BHK: 148.64 sq. m. RERA unit table
Booked / available2.5BHK: 5 units, 0 booked, 5 available. 3BHK: 5 units, 3 booked, 2 available. Counts are from the TG-RERA portal record; no as-of date is supplied, so they are indicative. RERA unit table
Completion commitmentThe Form-B declaration states completion by 17 February 2028; the building permit also records construction to be completed before 17 February 2028.
Occupancy / completion statusThe supplied GHMC certificate records an Occupancy Certificate for the residential building, 017212/GHMC/07406/SWOC/GLC2/2026, dated 08/05/2026, and states that the building is fit for occupation. The architect’s Form–1A dated 20-05-2026 certifies overall completion. These documents identify the building/project; the supplied record does not provide a separate tower-wise OC scope because there is one recorded building.
Construction stageAn OC and architect completion certificate are present in the supplied records. No independent site inspection or independently verified physical-progress measurement is supplied. Document index

2. The project story

VINDHYA is a residential apartment development on Plot Nos. 243 and 244 part at Shaikpet, in the locality recorded as Sheikpet-19. The registered land description includes Survey No. 327 PAIKI (OLD), 602 and 605 (NEW), T.S. Nos. 1 and 4 in Block-C, and T.S. No. 10 in Block-G. RERA record RERA filing

The approved scheme is one building with a stilt level and five upper floors, containing 10 residential units. The TG-RERA unit record lists five 2.5BHK and five 3BHK apartments; it reports three 3BHK units booked and seven units available overall, but does not include an as-of date for those counts. RERA unit table

The project file includes a GHMC Occupancy Certificate dated 08/05/2026 and an architect’s completion certificate dated 20-05-2026. These are documentary completion and occupancy records, not an independent site inspection. The promoter’s Form-B completion undertaking and the permit’s completion date are 17 February 2028; registration validity also runs to 17/02/2028. These dates describe different matters and are not interchangeable.

3. Master plan, architecture & building design

GHMC’s building-permit record describes a residential building on a 393.91 sq. m site, comprising 1 Stilt + 5 upper floors. The filed plan gives 1165.30 sq. m as proposed built-up area excluding parking and 1398.40 sq. m including parking. These are plan-record figures, not carpet or saleable areas.

The sanctioned-plan extraction lists a VACANT PLOT AREA 160.85, PARKING AREA 233.10, and a TOTAL BUA 1416.40 with DEDUCTIONS 18.00 and NET BUA 1165.30. The permit extraction separately records residential upper floors area of 1,165.30 Sq.Mt. and stilt area of 218.96. The records supplied do not explain the basis of every differently labelled area figure; this Overview retains the labels as extracted rather than treating them as interchangeable.

The plan identifies a proposed residential building and lists a green strip, tot-lot, transformer space, rainwater harvesting, lift and parking. It does not provide enough drawing-derived information here to describe flat-per-floor arrangements, building footprint, lift or stair counts, entries, internal circulation, or the precise extent of open/recreational areas. The registration record includes a layout approval reference, 1867/TPS/GHMC/MV/2011, but the supplied evidence does not include a separately verified approved-layout drawing. Approvals record HMDA

4. Homes, configurations & floor plans

The TG-RERA filing lists 10 homes across two configurations. The portal’s booked and available counts have no supplied as-of date. RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2.5BHK505121.7 sq. mNot measured in supplied drawing dataNot supplied
3BHK532148.64 sq. mMedian 85.4 sq. m; measured range 76.7–94.4 sq. m43%

The 3BHK carpet figures and loading are software measurements from the approved floor-plan drawing geometry, not TG-RERA disclosures; the measurement record says four flat designs were measured and one requires review. The TG-RERA saleable area includes a different area basis and should not be read as carpet area. RERA unit details Floor plans

The measured first-floor 3BHK drawing example shows a living/dining room, kitchen, three bedrooms, three toilets, two balconies and a utility area. The drawing extraction gives room dimensions, including living/dining 6.25 × 4.16 m, kitchen 2.33 × 2.76 m, and bedrooms 3.45 × 4.35 m, 4.7 × 3.0 m, and 3.7 × 4.08 m. These are drawing-based software measurements and should be checked against the plan. No measured 2.5BHK floor-plan data is supplied. RERA unit details

5. Parking & vehicle circulation

The sanctioned plan includes parking, and GHMC’s permit requires the stilt/cellar parking area shown in the plan to be used exclusively for vehicle parking and not misused or partitioned. The supplied record does not establish the number of car or two-wheeler spaces, visitor or accessible bays, a mechanical-parking system, EV-charging installations as built, or an allocation of individual bays to apartments.

The plan records parking-area figures of 233.10 sq. m and, in the permit extraction, 176.8; the occupancy-certificate extraction gives sanctioned 218.96 sq. mts and completion 240.0 sq. mts. These are recorded as area figures, not space counts. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allotment to a particular buyer.

6. Amenities, recreation & open spaces

Green strip / tot-lot
Description / sizeGreen strip and tot-lot are listed; no size is supplied.
Evidence sourceSanctioned-plan extraction; TG-RERA amenities record RERA amenities
Declared progress / verified statusPlan condition calls for tree planting and maintaining the tot-lot as greenery. No independent completion verification supplied.
Rainwater harvesting
Description / sizeOne rainwater-harvesting pit is recorded.
Evidence sourceBuilding permit and occupancy-certificate extraction
Declared progress / verified statusListed in the permit; OC extraction records one pit. No independent site verification supplied.
Internal roads and footpaths
Description / sizeTG-RERA amenities record marks “YES”, 100%; dimensions are not supplied as project-internal facility measurements.
Evidence sourceTG-RERA amenities record RERA amenities
Declared progress / verified statusRERA-declared at 100%; not independently site-verified here.
Street lighting
Description / sizeTG-RERA amenities record marks “YES”, 100%.
Evidence sourceTG-RERA amenities record RERA amenities
Declared progress / verified statusRERA-declared at 100%; not independently site-verified here.
Recreational open space
Description / sizeTG-RERA amenities record marks “YES”, 100%; area is not supplied.
Evidence sourceTG-RERA amenities record RERA amenities
Declared progress / verified statusRERA-declared at 100%; not independently site-verified here.
Community buildings
Description / sizeNo community building is recorded in the amenities data (0%).
Evidence sourceTG-RERA amenities record RERA amenities
Declared progress / verified statusNot declared in the supplied record.

No clubhouse or indoor recreation facility is identified in the supplied TG-RERA amenity and approval data. The developer/vendor amenities list is not used here as evidence of sanctioned or delivered facilities. RERA amenities

7. Utilities, building services & safety

The permit lists a lift, transformer space and rainwater harvesting; it also requires a garbage house within the premises, and the plan records a rainwater-harvesting structure. The occupancy-certificate extraction records one rainwater-harvesting pit. No capacity or independent verification is supplied for water storage, water treatment, sewage-treatment plant, wastewater reuse, storm-water drainage, backup power, lift capacity, or waste-processing equipment.

TG-RERA’s amenities record marks water supply, sewerage, fire protection and fire-safety requirements, energy management, and an electrical meter room/sub-station/receiving station as available at 100%. These are project-file declarations; the supplied evidence does not identify capacities or provide an independent services inspection. The vendor data mentions additional services, but they are not treated here as confirmed TG-RERA project provision. RERA amenities

The approval conditions require services such as sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical personnel’s supervision. They also call for structural and fire-safety responsibility and an Occupancy Fire NOC before issue of the OC. These are approval conditions, not a standalone finding about the installation or operation of each system.

8. Location, access & connectivity

The registered project location is Shaikpet, Hyderabad, PIN 500081, with the RERA locality recorded as Sheikpet-19. The building-plan description places it at Plot Nos. 243 and 244 part, House Nos. 8-1-297/SN/243 and 8-1-297/SN/244 part, in Shaikpet Village and Mandal. RERA record RERA filing

The plan identifies a 9.00MT WIDE MAINROAD and also lists road widths of 4.50M WIDE DRIVE WAY, 2.50 M. WIDE PASSAGE, 60'-0" WIDE ROAD, 40'-0" WIDE ROAD and 30'-0" WIDE ROAD. The supplied information does not establish which of the listed widths describes a project-access route or provide a verified public-transport or landmark-distance schedule.

The supplied location record gives the Financial District (Nanakramguda) as 1.2 km from the cadastral parcel-centroid location. No travel time is supplied. Location record

9. Developer & development status

The registered promoter is SRI GAYATRI HOUSING PRIVATE LIMITED, a private limited company, GSTIN 36AAGCN4740F1ZJ. The supplied corporate data does not provide a verified registered-office address, official contact details, or official website. Corporate record RERA filing

TG-RERA records three landowners/promoter parties under an AreaShare arrangement: Mr. THATIKONDA SANDEEP, Mr. NALLAPATI VEERAIAH, and SRI.GAYATRI HOUSING PVT.LTD. The building permit identifies the owners and the developer acting through the development arrangement. Parties record

A GHMC Occupancy Certificate for the project building and an architect’s certificate of overall completion are included in the supplied records. No independent physical inspection is provided. The promoter’s Form-B declaration states a completion commitment of 17 February 2028; registration validity is also recorded through 17/02/2028, which is a separate regulatory date.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500009447; valid 17/02/2025–17/02/2028
What the supplied record establishesForm C certificate for VINDHYA, naming Sri Gayatri Housing Private Limited as promoter and recording the project land identifiers.
GHMC building permit
Identifier / date4802/GHMC/KHB/2025-BP; 17 February 2025
What the supplied record establishesPermit for one residential building, 1 Stilt + 5 upper floors, on a 393.91 sq. m site.
Sanctioned-plan document
Identifier / date1867/TPS/GHMC/MV/2011 appears as the approved-layout/LRS/subdivision reference
What the supplied record establishesPlan extraction describes the residential building, land identifiers, unit count, area figures, and approval conditions. A separate approved-layout drawing is not supplied here.
GHMC Occupancy Certificate
Identifier / date017212/GHMC/07406/SWOC/GLC2/2026; 08/05/2026
What the supplied record establishesCertificate for the residential building; states it was inspected and declared fit for occupation. The extraction records completion submitted on 10/03/2026 and a total deviated built-up area of 37.47.
Architect’s completion certificate
Identifier / dateForm–1A; dated 20-05-2026
What the supplied record establishesArchitect’s certificate stating completion in all aspects and referring to the GHMC OC.
Promoter declaration
Identifier / dateForm-B; 10.03.2025
What the supplied record establishesPromoter declaration containing title, encumbrance, project-fund and completion undertakings, including the stated completion date of 17 February 2028.
GHMC fees intimation
Identifier / dateApplication 001916/GHMC/0909/KHB2/2024-BP; application date 15 February 2024
What the supplied record establishesFees-intimation document, not a building permit order; the building permit is separately recorded above.

The supplied RERA registration certificate, building permit, plan extraction, Form-B declaration, Occupancy Certificate and architect’s completion certificate are the principal project records available for this Overview. Document index

Frequently asked questions

Is VINDHYA registered with Telangana RERA?

Yes. VINDHYA is registered with the Telangana Real Estate Regulatory Authority as P02500009447; the registration status is New Project.

Who is the developer of VINDHYA?

The promoter named in the RERA registration is SRI GAYATRI HOUSING PRIVATE LIMITED.

Where is VINDHYA located?

VINDHYA is in Sheikpet-19, Shaikpet, Hyderabad, Telangana (500081).

When will VINDHYA be completed?

The promoter's proposed date of completion filed with RERA is 17/02/2028. This is the promoter's declaration, not a guarantee.