Aadhya Laxmi Urbania

PJMR DEVELOPERS · Rangareddy · RERA P02400007544

AADHYA LAXMI URBANIA is a residential apartment project in Adibatla, Ibrahimpatnam mandal, Ranga Reddy district, developed by registered promoter PJMR DEVELOPERS. It covers 8,093.33 sq. m and comprises two proposed residential blocks, each with 1 Stilt + 5 upper floors. The TG-RERA filing lists 170 apartments: 120 2BHK and 50 3BHK. Its TG-RERA registration is P02400007544, and the promoter’s Form-B undertaking states a completion date of 21 November 2025.

01What we found

Period endedTG-RERA registration ran to 21 Nov 2025 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameAADHYA LAXMI URBANIA RERA record
Project type / categoryResidential apartments RERA record RERA filing
Phase / registered portionPhase designation not disclosed; the RERA record identifies the site as Survey Nos. 102/PART and 103/PART and the approval covers two proposed blocks RERA record
TG-RERA registrationP02400007544 RERA record
Registration validity21/11/2022–21/11/2025; the supplied certificate says three years. This is the registration period, not a statement of current validity
Registered promoterPJMR DEVELOPERS, a partnership RERA record Corporate record
RERA/project statusThe supplied project record labels it “New Project.” No construction-stage verification or occupancy/completion certificate is supplied RERA record Document index

Land and geographic identity

ItemRecord
Locality / revenue villageAdibatla / Adibatla RERA record RERA filing
Mandal / district / PINIbrahimpatnam / Ranga Reddy / 501510 RERA record
Project survey numbers and subdivisions102/PART and 103/PART RERA record
Registered site extent8,093.33 sq. m (RERA land details and building-permit record) RERA filing
Land area fieldsTotal area 8,093.33 sq. m; net area 8,093.33 sq. m; affected area shown as 0 RERA filing
Boundaries (as filed)East: Settlor Land and 40 Feet Road; West: Part of Survey No. 103A; North: Survey No. 101 and 108; South: Survey No. 104 and 97 RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the order also states that building plans are to be sanctioned and released by the municipality/municipal corporation Approvals record
Principal building approval000784/BP/HMDA/0128/SMD/2022, approved 21 November 2022; proceedings no. 001816/BP/HMDA/SMD/2022 Approvals record
Approved built-up areaRERA project fields state 19,830.31 sq. m. The HMDA approval extraction separately records 39,660.60 as proposed built-up area and 49,252.76 sq. m as total built-up area; see the source document and full approval review for the approval’s area entries RERA filing
Buildings / blocksTwo residential blocks: PROPOSED (BLOCK 2) and PROPOSED (BLOCK A)
Sanctioned floor configurationEach block: 1 Stilt + 5 upper floors
Parking levels / approved parking countA stilt level is shown; a total parking-space count and detailed parking allocation are not established by the supplied extracts RERA amenities
Approved vs. RERA-declared unitsApproved plan unit count: 2 as recorded in the RERA land details; RERA filing: 170 apartments (120 2BHK and 50 3BHK). The supplied approval extract does not explain the “2” field as an apartment count, so it should not be read as the project’s total home count RERA filing RERA unit table RERA unit details

Offering and status

ItemRecord
RERA-filed configurations2BHK: 120; 3BHK: 50 RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 113.26 sq. m; 3BHK: 146.27 sq. m RERA unit table RERA unit details
Booked / availablePortal-derived filing data shows 0 booked and 120 available 2BHK units; 0 booked and 50 available 3BHK units. Counts are indicative: the portal record has no as-of date RERA unit table RERA unit details
Construction stageNot established by the supplied records; the approval and RERA documents describe proposed development, not independently verified progress Document index
Completion datePromoter’s Form-B undertaking: 21 November 2025
Occupancy / completion certificateNo occupancy or completion certificate is supplied for either block; each block’s OC status is therefore not established from the reviewed evidence Document index

2. The project story

AADHYA LAXMI URBANIA is registered as a residential apartment project in Adibatla revenue village, Ibrahimpatnam mandal, Ranga Reddy district. Its registered land identity is Survey Nos. 102/PART and 103/PART, and the RERA filing records a site extent of 8,093.33 sq. m. RERA record RERA filing

HMDA’s building-permit record describes two proposed residential blocks, Block 2 and Block A, each with 1 Stilt + 5 upper floors. The RERA unit schedule lists 170 apartments: 120 2BHK and 50 3BHK. The project documents identify the intended residential use, but the supplied evidence does not establish how much construction has been completed or whether either block has received an occupancy certificate. RERA unit table RERA unit details Document index

The promoter’s Form-B declaration states a completion undertaking of 21 November 2025. That is the declared completion date in the filed document; it is separate from the registration validity period and does not itself establish completion or occupation.

3. Master plan, architecture & building design

The HMDA approval extract identifies two residential blocks, each with 1 Stilt + 5 upper floors. It records a building height of 14.9 in the technical-approval extraction, but the supplied extract does not state a unit for that figure. The approval record also lists 24,626.38 as a built-up-area entry without enough context in the supplied extraction to assign it to a particular area category. These figures are reported as recorded, not reclassified.

The RERA land-detail fields state 19,830.31 sq. m as approved built-up area. The building-permit extraction separately lists proposed built-up area 39,660.60, required mortgage area 3,966.06, provided mortgage area 2,014.18, and total 49,252.76. The supplied extracts do not explain all area labels or reconcile their scope, so these quantities should be checked against the complete sanctioned drawings and conditions rather than treated as interchangeable. RERA filing

The supplied drawing records do not establish building footprints, flat layouts, flats per floor, lift or stair counts, entries and exits, internal circulation, or the residential/common-area distribution. The available floor-plan set contains two drawings, neither measured and both recorded as having no flats identified for measurement. Floor plans

4. Homes, configurations & floor plans

The TG-RERA filing lists 170 apartments across two configurations. The filed saleable area is shown below; no drawing-based carpet-area measurement is available in the supplied floor-plan review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1200120113.26 sq. mNot measuredNot supplied
3BHK50050146.27 sq. mNot measuredNot supplied

The booked and available counts are portal-derived and have no supplied as-of date, so treat them as indicative. The floor-plan records describe software measurement of carpet area as drawing-based and not a RERA disclosure; in this case, the supplied drawings were not measured. Saleable area and carpet area are distinct measures, and no project-specific common-area loading figure is supplied. RERA unit table Floor plans

5. Parking & vehicle circulation

The approved building configuration includes one stilt level in each block. The RERA filing records 2,014.18 sq. m as mortgage area, while the HMDA approval documents describe this as mortgaged built-up area; it is not a parking-space count. RERA filing

The supplied records do not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible parking provision, parking allocation to individual units, parking ramps, or detailed internal vehicle circulation. The HMDA permit states that the approach road is to be developed and maintained as a black-topped road before release of the occupancy certificate; that condition does not establish that the road has been completed.

6. Amenities, recreation & open spaces

The RERA project record marks the following site-service and common-development items as available in its amenity schedule. The supplied data records 0% progress for each listed item; it does not independently verify installation or completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkSize not suppliedRERA amenity schedule RERA amenitiesListed as available; 0% progress recorded; completion not independently verified
Community buildingsDetails not suppliedRERA amenity schedule RERA amenities0% progress recorded; no further status established
Aggregate recreational open spaceArea not suppliedRERA amenity schedule RERA amenities0% progress recorded; no further status established

The supplied RERA amenity schedule does not identify a clubhouse, indoor recreation facility, sports facility, or their sizes. Such facilities are therefore not represented here as RERA-filed or delivered amenities. RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, sewerage (including STP), storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, fire-protection and fire-safety requirements, and electrical meter room/substation/receiving station as available. It records 0% progress for the schedule items; the entries do not independently verify completed services. RERA amenities

HMDA’s technical-approval extract specifies an STP, transformer, garbage house, rainwater-harvesting structures, a separate underground static water-storage tank of 25,000 Its., and a separate terrace tank of 25,000 Its. capacity for residential buildings. These are approval-record provisions; the supplied material does not establish their installation or operation.

The building-permit record also requires a minimum-width approach road as indicated in the plan, to be developed and maintained as a black-topped road before release of the occupancy certificate. The supplied extracts do not establish lift details, backup power, EV charging, CCTV or access-control systems, accessible circulation, or the installed condition of fire and life-safety systems.

8. Location, access & connectivity

The registered location is Adibatla village, Ibrahimpatnam mandal, Ranga Reddy district, Telangana, PIN 501510. The cadastral parcel centroid is recorded as 17.235603349984416, 78.56127097054399; this is a parcel-centroid location, not a surveyed site entrance. RERA record Cadastral map Location record

The nearest sampled Outer Ring Road interchange is listed at approximately 1.3 km. This is a supplied location-data measurement; no public-transport details or verified travel times are provided. Location record

9. Developer & development status

The registered promoter is PJMR DEVELOPERS, identified in the project record as a partnership. The supplied GSTIN is 36AAZFP0314R1ZH. The promoter’s address on the project record is 2-3-479/A, Sai Nagar Colony, Adibatla, Adibatla, Ibrahimpatnam, Ranga Reddy, 501510; a registered office distinct from this address and official contact details are not established in the supplied material. Corporate record Parties record RERA record

The TG-RERA certificate names PJMR Developers and gives a promoter-office entry with PIN 500068, but the supplied record does not provide a complete office address. The RERA Form-B declaration, signed by the authorized signatory for PJMR DEVELOPERS, identifies Kallem Rahul Reddy as landowner and states a completion undertaking of 21 November 2025.

The available evidence does not verify construction progress, completed works, or occupancy certification for either block. The registration period, the promoter’s completion undertaking, and any future or issued occupancy certificate are separate matters. Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for AADHYA LAXMI URBANIA, registration P02400007544, with validity stated as 21/11/2022–21/11/2025
Principal building approvalHMDA approval 000784/BP/HMDA/0128/SMD/2022, dated 21 November 2022; proceedings no. 001816/BP/HMDA/SMD/2022
Building-permit / technical-approval recordsTwo supplied HMDA approval extracts describing proposed Block 2 and Block A, each with 1 Stilt + 5 upper floors
Landowner–promoter declarationForm-B affidavit-cum-declaration naming PJMR DEVELOPERS and Kallem Rahul Reddy, and stating the completion undertaking
Layout recordThe RERA file includes a layout-plan requirement entry, but the supplied record does not establish an approved layout document Document index
Occupancy / completion certificatesNone supplied for either block Document index
HMDA master-plan zoningAn image-only HMDA Master Plan 2031 sheet is available for the area; the exact survey-level zone is not established by the supplied map record HMDA

Frequently asked questions

Is AADHYA LAXMI URBANIA registered with Telangana RERA?

Yes. AADHYA LAXMI URBANIA is registered with the Telangana Real Estate Regulatory Authority as P02400007544; the registration status is New Project.

Who is the developer of AADHYA LAXMI URBANIA?

The promoter named in the RERA registration is PJMR DEVELOPERS.

Where is AADHYA LAXMI URBANIA located?

AADHYA LAXMI URBANIA is in Adibatla, Ibrahimpatnam, Rangareddy, Telangana (501510).

When will AADHYA LAXMI URBANIA be completed?

The promoter's proposed date of completion filed with RERA is 21/11/2025. This is the promoter's declaration, not a guarantee.