Aika

LEAGUE ETANIA VILLAS LLP · Rangareddy · RERA P02400008538

Aika is a residential gated-community layout with villas at Manchirevula Village, Gandipet Mandal, Ranga Reddy District. The registered promoter is LEAGUE ETANIA VILLAS LLP. The site area is 176928.43 sq. m, and the HMDA permit records 195 dwelling units, generally planned as Ground Floor + 2 Floors; the supplied RERA-normalized configuration data does not disclose villa configurations. The project is registered with TG-RERA under P02400008538, with proposed completion stated as 24/10/2030.

01What we found

RegisteredTG-RERA
107documents on file - each fact links to its page
91court cases on this project's land (survey 1, 362, 369, 372, 373, 374 and 5 more, Manchirevula)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project photo

1. Project at a glance

Project identity

FieldRecord
Registered project nameAika. RERA record
Project typeResidential; the filed material and approvals describe a gated community/layout with villas. RERA record RERA filing
Phase / registered portionA registered project portion is not separately identified in the supplied registration record. RERA record
TG-RERA registrationP02400008538. RERA record
Registration validity29/06/2024 to 24/06/2030; the certificate states 5 Years, 11 Months, 26 Day period. This is registration validity, not an occupancy certificate or evidence of completion.
Registered promoterLEAGUE ETANIA VILLAS LLP, an LLP; GSTIN 36ACEFA5424C1ZV. RERA record Corporate record RERA filing
RERA statusRegistration certificate on file. The supplied certificate is not marked extended.

Land and geographic identity

FieldRecord
LocalityManchirevula Village, Gandipet Mandal. RERA record RERA filing
Revenue villageManchirevula. RERA record Land records
Mandal / district / PINGandipet / Ranga Reddy / 500075. RERA record
Project survey numbers and subdivisions, as identified in the RERA record362/P, 375, 376, 378/P, 369/P, 372, 373/P, 374/P, 377, 380/P, 381/P, 382/P. RERA record
Site extentTotal area 176928.43 sq. m; net area 135779.00 sq. m in the RERA land details. The HMDA revised permit separately records site and net area as 176928.43 Sq. Mt. RERA filing
Boundaries filedEast: Neighbours Land; West: Road to Gandipet Lake; North: Neighbours Land; South: Road to Manchirevula Village. RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the supplied record also includes a Narsingi Municipality building-permit order. Approvals record
Principal HMDA permitLayout Permit 1682/HMDA/SWDL/2026, dated 11/02/2026, for a layout with housing. Approvals record
RERA-recorded earlier permit referenceRevised Draft Layout Permit 26/LO/Plg/HMDA/2016, shown with date 29/06/2024 in the filed drawing.
Approved built-up areaHMDA revised permit records Total Sanctioned Built Up Area 51666.18. A separate environmental clearance document records a built-up area of 46,714.1 Sq.m.
Building / villa countHMDA permit records 195 dwelling units; the RERA project fields record 195 total building units as per approved plan. RERA filing
Sanctioned configurationThe revised plans show villas generally as Ground Floor + 2 Floors; specified plan entries describe individual villa buildings and the amenity building.
Parking levels / provisionThe HMDA permit refers to cellar and stilts approved for parking, but the supplied extracts do not establish a total parking-space count for the entire registered project.
Unit countRERA fields show 195 total building units as per approved plan and 146 proposed building units as per agreement. The HMDA revised permit records 195 dwelling units. RERA filing

Offering and status

FieldRecord
Unit typeVillas in a residential gated-community layout. RERA record
RERA booking / availabilityThe portal-derived unit data shows 773 available and 0 booked, but the record carries no as-of date and includes rows filed as floors/common-area labels rather than confirmed sale homes. Treat this count as indicative, not a verified count of saleable villas. RERA unit table
RERA-filed unit labelsThe submitted table includes “FIRST FLOOR,” “GROUND FLOOR,” “SECOND FLOOR,” “LIFT” and variants of “LIFT ST HEAD ROOM”; the supplied normalized record classifies these as floors/common areas rather than sale configurations. RERA unit table RERA unit details
Construction stageNo independently verified site progress is supplied. The RERA amenity/progress schedule records internal roads and footpaths at 30% and community buildings at 25%; listed percentages for several other infrastructure items are 0%. RERA amenities
Completion dateThe RERA project fields state proposed completion 24/10/2030. The registration certificate is valid through 24/06/2030; these are distinct dates recorded in separate fields. RERA record
Occupancy / completion certificateNo project-wide completion or occupancy certificate is recorded in the supplied project materials. The HMDA revised permit requires completion/occupancy certification before occupation.

2. The project story

Aika is recorded with TG-RERA as a residential project at Manchirevula Village, Gandipet Mandal, Ranga Reddy District. Its filed plans describe a gated-community layout with housing, arranged as individual villas rather than a conventional apartment tower scheme. The HMDA revised permit identifies 195 dwelling units and plans for Ground Floor + 2 Floors. RERA record

The site plan presents plots, internal roads, open spaces, utility areas and villa structures. It labels the broader layout as a draft layout with housing and identifies some structures as permitted, proposed or altered; those drawing labels describe plan status, not independently verified construction completion.

No independent construction inspection or site-progress verification is included. The RERA progress schedule reports some infrastructure progress, including 30% for internal roads and footpaths and 25% for community buildings; those are recorded progress figures, not an independent site assessment. RERA amenities

3. Master plan, architecture & building design

The HMDA revised permit records a site and net layout area of 176928.43 Sq. Mt., with 0 road-affected area and 0 nala-affected area in that permit’s area statement. Its land-use table allocates 104831.74 sq.m to plotted area (59.25%), 5395.27 sq.m to amenities plots (3.05%), 46679.63 sq.m to roads (26.38%), 17972.89 sq.m to organized open space (10.16%) and 2048.80 sq.m to utilities (1.16%).

The site drawing depicts a network of internal roads, green strips, tot-lots, amenity areas and villa sites. The plan extract lists road widths including 12.0 m, 15.0 m and 18.00 m; the HMDA permit also describes 18-metre-and-above roads in its conditions.

The HMDA permit names 195 dwelling units and an approved built-up area of 51666.18. The supplied plan entries describe villas principally as Ground Floor + 2 Floors, with individual designs and areas; these figures are plan-record particulars, not a single project-wide saleable or carpet-area measure.

The HMDA permit also records an amenities building and utility plots. It does not establish that all proposed or planned facilities have been completed.

4. Homes, configurations & floor plans

The RERA-filed unit table does not provide recognizable villa configurations in the supplied normalized record. It contains floor labels and lift/head-room entries; these should not be treated as homes for sale. The portal-derived counts are indicative and lack an as-of date. RERA unit table RERA unit details

Recognizable villa configuration
UnitsNot disclosed in the supplied RERA-normalized configuration data
BookedNot established
AvailableNot established
RERA saleable areaNot disclosed as a villa configuration
Measured carpet areaNot measured in the supplied villa drawings
Loading (if supplied)Not supplied

The HMDA drawing schedules contain villa-specific built-up-area and floor information, including Ground Floor + 2 Floors entries. These are drawing/approval particulars; they are not RERA-filed saleable-area or carpet-area figures. The supplied software-measured 1BHK and 2BHK figures relate to drawing-derived configurations that are not matched to the RERA villa filing and are therefore not used here as the project’s offered home types. RERA unit details Floor plans

5. Parking & vehicle circulation

The HMDA permit refers to cellar and stilt areas approved for parking and states they are to be used exclusively for vehicle parking. The plan extracts also name “STACK PARKING,” “Parking” and “Visitors Parking,” but the supplied materials do not establish the number of spaces, the number designated for visitors or accessible use, or unit-specific parking allocations.

The environmental clearance states that each villa is provided with 2 parking spaces; this is a project document’s stated provision, not evidence that those spaces have been individually allocated or delivered.

The HMDA permit requires electric-vehicle charging infrastructure in building parking places. The supplied evidence does not verify that charging equipment has been installed.

6. Amenities, recreation & open spaces

The site and permit drawings identify amenity areas and open-space elements. The figures below describe the plans or RERA progress schedule; they do not establish independent completion or current availability. RERA amenities

Clubhouse / amenities building
Description / sizeHMDA plan identifies an amenities building; the site plan labels a club house and amenities block. No single project-wide clubhouse area is established by these entries.
Declared progress / verified statusRERA schedule reports community buildings at 25%; independent completion not verified. RERA amenities
Open space
Description / sizeOrganized open space 17972.89 sq.m (10.16%) in the HMDA site-area statement.
Declared progress / verified statusPlanned; no independent completion verification.
Roads
Description / size46679.63 sq mts (26.38%) in the HMDA permit’s land-use statement.
Declared progress / verified statusRERA schedule reports internal roads and footpaths at 30%; independent verification not supplied. RERA amenities
Tot-lots
Description / sizeHMDA permit records 17972.89 for “Tot Lot (m2)” in its area table; the site plan labels multiple tot-lots.
Declared progress / verified statusPlanned; RERA progress schedule reports green strip/tot lot/park at 0%. RERA amenities
Utility area
Description / size2048.80 (1.16%) in the HMDA permit’s land-use statement.
Declared progress / verified statusPlanned; independent completion not verified.

The HMDA plan also labels indoor and community uses including banquet, badminton, clinic, convenience, yoga, cafeteria, mini-theatres, snooker, gym, table tennis and spa/salon. These are plan labels; the supplied records do not confirm that each is sanctioned as a delivered facility or operational.

7. Utilities, building services & safety

The HMDA permit and drawings identify utility land, an STP, treated-water and raw-water sumps, a municipal-water sump, a transformer/transformer yard, garbage house, rainwater-harvesting structures and utility ducting. The plan labels include STP and sump areas, including 1112 SQM for “UTILITY -4 STP,” 240 SQM for an underground sump and 100SQM for another underground sump. These are plan particulars; installed capacity and commissioned status are not established by those labels.

The project-specific environmental clearance records water demand of 38.5 KLD, comprising 25 KLD fresh water and 13.5 KLD recycled water; wastewater generation of 30.8 KLD; and an STP - 40 KLD. It states that treated effluent is to be recycled/reused and that no treated water is proposed to be discharged into a municipal drain. These are clearance-document specifications and conditions, not verified operational performance.

The environmental clearance also specifies rainwater-harvesting pits, with at least one pit for each villa, and says groundwater is not to be used during construction. HMDA plan conditions refer to storm-water drainage, water supply, sewerage, street lighting and transformer provision.

HMDA plan conditions require EV charging infrastructure in parking places, dual piping for specified construction/group-housing thresholds, fire-safety requirements and completion/occupancy certification before occupation. The supplied record does not establish installation, commissioning or completed fire/life-safety approvals.

8. Location, access & connectivity

The registered location is Manchirevula Village, Gandipet Mandal, Ranga Reddy District, Telangana, PIN 500075. The RERA-filed boundary descriptions identify neighbours’ land to the east and north, a road to Gandipet Lake to the west, and a road to Manchirevula Village to the south. RERA record RERA filing RERA filing

The supplied location record lists the Financial District (Nanakramguda) at 4.6 km, ICICI Bank at 2.5 km, Holy Mary College at 1.5 km, Urban Primary Health Centre Narsingi at 1.3 km, an unnamed park at 1.1 km, and Rishi Public School at 1.7 km. These are recorded distances; no travel times are supplied in the official project record. Location record

9. Developer & development status

The registered legal promoter is LEAGUE ETANIA VILLAS LLP, an LLP, GSTIN 36ACEFA5424C1ZV. The promoter’s recorded address is Manchiruvella, Gandipet, Manchirevula Village, Gandipet Mandal, Ranga Reddy, 500075. The supplied materials do not identify an official website or contact number for the registered promoter. Corporate record Parties record RERA filing

The RERA Form B declaration in the supplied record is made by DUKES SAI VILLAS LLP and states a completion undertaking of on or before 24.06.2030. The current project fields state proposed completion of 24/10/2030. These are recorded in separate project materials; the overview reports each as filed and does not treat either as proof of construction progress. RERA record

The project’s RERA progress schedule records internal roads and footpaths at 30% and community buildings at 25%; it does not provide an independently verified construction-stage assessment. RERA amenities

10. Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificateForm C registration for Aika, P02400008538, valid 29/06/2024–24/06/2030.
HMDA revised permitLayout-with-housing revised permit 1682/HMDA/SWDL/2026, dated 11/02/2026; records the site area, 195 dwelling units, sanctioned built-up area and permit conditions.
HMDA revised drawing / site planFile 007367/HMDA/02195/SWDL/SKP1/2025-REV, with site plan, villa entries, internal roads, open spaces and utilities.
Earlier HMDA permit referenceRevised Draft Layout Permit 26/LO/Plg/HMDA/2016, referenced in the filed drawings.
Narsingi Municipality building permitBuilding Permit Order BA.NO:01/2024-25, covering a revised draft residential layout with housing and club house; the order states that occupancy certification is required before occupation.
Environmental clearanceSEIAA Telangana EC EC25C3801TG5151395N, dated 04/09/2025, for a residential villas project; records the covered survey numbers, environmental conditions and specified project services.
Irrigation & C.A.D. undertaking / clarification materialProject undertaking concerning Ac. 09-07.15 Gts. in the listed survey numbers and conditions relating to Osman Sagar FTL/buffer and natural flow.
HMDA draft layout letterRecords HMDA technical approval and forwarding for release of proceedings and plans; the document itself says those proceedings and plans are to be released by the municipal commissioner.
Project allotment and agreement formsPartially filled allotment and agreement-for-sale materials are on file; the supplied extracts do not establish an executed buyer-specific agreement.

The supplied materials do not include a project-wide occupancy certificate or completion certificate. The registered project identity and approved survey list are stated above; the HMDA permit and drawing documents provide the principal approval references for tracing the development.

Frequently asked questions

Is Aika registered with Telangana RERA?

Yes. Aika is registered with the Telangana Real Estate Regulatory Authority as P02400008538; the registration status is New Project.

Who is the developer of Aika?

The promoter named in the RERA registration is LEAGUE ETANIA VILLAS LLP.

Where is Aika located?

Aika is in Manchirevula Village, Gandipet Mandal, Manchirevula, Gandipet, Rangareddy, Telangana (500075).

When will Aika be completed?

The promoter's proposed date of completion filed with RERA is 24/10/2030. This is the promoter's declaration, not a guarantee.