Sign in

Amr Sunshine Homes

SARANYA CONSTRUCTIONS · Rangareddy · RERA P02400006650

AMR SUNSHINE HOMES is a residential apartment project in HYATHNAGAR, Hayathnagar mandal, Ranga Reddy district, developed by the registered promoter SARANYA CONSTRUCTIONS. The project has a land area of 334.16 sq. m and one residential building with 1 Stilt + 5 upper floors. It comprises 10 2BHK homes, each with a saleable area of 89.77 sq. m. Its TG-RERA registration is P02400006650, and its proposed completion date is 16/05/2025.

More from Saranya Constructions · 4 projects →

01What we found

Period endedTG-RERA registration ran to 16 May 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameAMR SUNSHINE HOMES RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration is for this project. RERA record
TG-RERA registrationP02400006650, Form C; registered from 26/07/2023 to 16/05/2025. The certificate records no extension.
Registered promoterSARANYA CONSTRUCTIONS; listed in the RERA record as a partnership. RERA record RERA filing
RERA statusThe recorded registration validity ended on 16/05/2025. Registration validity is distinct from the construction completion deadline and from occupancy certification.

Land and geographic identity

ItemProject record
LocalityHYATHNAGAR; the building-permit record describes Hayathnagar Locality, Bagh Hayathnagar. RERA record RERA filing
Revenue villageHyathnagar is the RERA project-record village; the title and building-permit documents refer to Bagh Hayathnagar village. RERA record Land records
MandalNot disclosed in the RERA project fields; the building-permit document identifies Hayathnagar mandal. Land records
District / PINRanga Reddy district; 500070 in the project record. RERA record RERA filing
Survey numbers and subdivisions11, 11/S/P, 12, 12/E/P (as recorded for the RERA project). RERA record Land records
Plot reference in RERA fieldsPlot No. 181. RERA filing
Site extentRERA land fields: total area 334.16 sq. m, affected area 13.89 sq. m, net area 320.27 sq. m. RERA filing
BoundariesNorth: 30FEET ROAD; south, east and west: NEIGHBOUR LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC), with the building permit delegated to LB NAGAR ZONE.
Principal building permit1440/GHMC/LBN/2022-BP, approved 16 May 2022; file no. 003091/GHMC/1562/LBN2/2022-BP. Approvals record
Approved built-up areaThe permit lists 897.75 sq. m residential area and 165.4 sq. m stilt area. The RERA fields separately state approved built-up area 1079.55 sq. m; these are reported as recorded, not treated as interchangeable measures. RERA filing
Building / floorsOne residential building; permit configuration 1 Stilt + 5 upper floors, height 15.00 m. RERA filing
ParkingThe permit lists total parking area 165.4 and requires the approved stilt parking to be used exclusively for vehicle parking. A parking-space count is not provided.
Unit count10 units in the RERA unit record; the land-fields entry separately states total building units (as per approved plan) 1 and proposed building units (as per agreement) 1. RERA unit table RERA filing

Offering and status

ItemProject record
RERA-filed configuration2BHK, 10 units. RERA unit table RERA unit details
RERA-filed saleable area89.77 sq. m per unit (recorded as the minimum and maximum). RERA unit table RERA unit details
Booked / available0 booked; 10 available in the TG-RERA portal data; that record has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Construction stageThe supplied portal amenity data lists progress percentages for common infrastructure and services, but no overall construction-completion percentage or independently verified site status is supplied. RERA amenities
Completion deadlinePromoter’s Form B declaration and the registration certificate state 16/05/2025 as the completion/validity end date, respectively.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The permit states that an occupancy certificate is required before occupation. Document index

2. The project story

AMR SUNSHINE HOMES is registered with TG-RERA as a residential apartment project promoted by SARANYA CONSTRUCTIONS. The RERA record identifies land associated with survey numbers 11, 11/S/P, 12 and 12/E/P and Plot No. 181 in the Hyathnagar project locality. The title and building-permit records describe the site as Bagh Hayathnagar village. RERA record Land records RERA filing

GHMC’s building permit sanctions one residential building comprising 1 stilt + 5 upper floors. The RERA unit record lists ten 2BHK units, each with a filed saleable area of 89.77 sq. m. The project record gives 16/05/2025 as the proposed completion date, while the TG-RERA certificate states registration validity through that date. These dates do not establish that the building was completed or that an occupancy certificate was issued. No independently verified construction-status report or occupancy certificate was supplied. RERA unit table Document index

3. Master plan, architecture & building design

The supplied GHMC building-permit order covers a single proposed residential building, named in the permit as “PROPOSED (AENUGU MANOHAR REDDY AND D PREETHI),” with 1 Stilt + 5 upper floors and a stated building height of 15.00 m. The permit lists a residential area of 897.75 sq. m and stilt area of 165.4 sq. m. The RERA fields record approved built-up area of 1079.55 sq. m; no basis for reconciling or reclassifying these measures is supplied, so they remain separately attributed. RERA filing

The RERA land fields give a total site area of 334.16 sq. m, an affected area of 13.89 sq. m, and a net area of 320.27 sq. m. The building permit also records a plot area of 334.16 sq. m, road-affected area of 13.89 sq. m, and net plot area of 318.34 sq. m. The permit identifies the site as Survey No. 181 PART. RERA filing

The approved floor-plan drawings supplied for measurement do not yield a measured design matched to the RERA-filed 2BHK configuration. No reliable drawing-derived carpet area, room dimensions, floor-by-floor unit arrangement, lift or stair details, or internal circulation data are supplied. Floor plans RERA unit details

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001089.77 sq. mNot available for a RERA-matched 2BHK drawingNot supplied

RERA-filed unit counts, booking counts and saleable area come from the project’s TG-RERA unit record; the booking counts have no stated as-of date. RERA unit table RERA unit details

The supplied drawing-measurement data does not provide a usable carpet-area measurement for the filed 2BHK configuration. Carpet area measured from a drawing, where available, is a software measurement and not a TG-RERA disclosure; saleable area is a separate filed figure and should not be treated as carpet area. No balcony, utility, room-dimension or loading figures are established by the supplied records. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit lists a total parking area of 165.4 and identifies the stilt as approved for parking; its conditions require approved stilt parking to be used exclusively for vehicles, without partition walls or rolling shutters. The permit also refers to cellar and stilt parking in its condition, but the supplied floor configuration identifies 1 Stilt + 5 upper floors and does not establish a cellar level for this project.

No sanctioned number of car or two-wheeler spaces, visitor or accessible-space allocation, parking layout, ramp arrangement, EV provision, or legally documented unit-by-unit parking allocation is supplied. The RERA project record lists a mortgage area of 101.12 sq. m, but the supplied information does not establish a unit parking allocation from that figure. RERA filing

6. Amenities, recreation & open spaces

The TG-RERA portal data marks the following project infrastructure and facilities as available, with the recorded progress percentages shown below. These entries are portal progress data, not independent confirmation of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedTG-RERA portal data RERA amenitiesMarked YES; 16%; not independently verified
Water SupplyDetails and capacity not suppliedTG-RERA portal data RERA amenitiesMarked YES; 24%; not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Specific system details not suppliedTG-RERA portal data RERA amenitiesMarked YES; 17%; not independently verified
Storm Water DrainsDetails not suppliedTG-RERA portal data RERA amenitiesMarked YES; 28%; not independently verified
Green Strip / TOT LOT / ParkSize not suppliedTG-RERA portal data RERA amenitiesMarked YES; 19%; not independently verified
Street LightingDetails not suppliedTG-RERA portal data RERA amenitiesMarked YES; 15%; not independently verified
Community BuildingsType and size not suppliedTG-RERA portal data RERA amenitiesMarked YES; 21%; not independently verified
Treatment and Disposal of Sewage and Sullage WaterSystem details not suppliedTG-RERA portal data RERA amenitiesMarked YES; 23%; not independently verified
Solid Waste Management and DisposalDetails not suppliedTG-RERA portal data RERA amenitiesMarked YES; 29%; not independently verified
Water Conservation / Rainwater HarvestingPermit separately specifies 5 rainwater-harvesting pitsTG-RERA portal data RERA amenities; GHMC permitPortal marks YES; 16%; not independently verified
Energy managementDetails not suppliedTG-RERA portal data RERA amenitiesMarked YES; 28%; not independently verified
Fire Protection and Fire Safety RequirementsSystems/details not suppliedTG-RERA portal data RERA amenitiesMarked YES; 35%; not independently verified
Electrical Meter Room / Sub-Station / Receiving StationDetails not suppliedTG-RERA portal data RERA amenitiesMarked YES; 34%; not independently verified
Aggregate area of recreational open spaceArea not suppliedTG-RERA portal data RERA amenitiesMarked YES; 29%; not independently verified

The permit requires a tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued. A promoter-vendor listing separately advertises a lift, power backup, community hall, security, CCTV, common garden, fire safety, borewell water, waste management and bike parking; these are marketing claims and are not used here as confirmation of sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

The TG-RERA portal lists water supply, sewerage, storm-water drainage, sewage and sullage treatment, solid-waste management, rainwater harvesting, energy management, fire-safety requirements, and an electrical meter room/sub-station/receiving station, each with a recorded progress percentage. The records do not specify water sources or storage capacity, treatment capacity, reuse arrangements, power-backup capacity, lift details, security systems or accessibility provisions. The portal percentages do not independently establish completion. RERA amenities

The GHMC permit requires rainwater harvesting, a space for a transformer, and a garbage house within the premises. It also requires a fire NOC from the Director (EV&DM) before issue of an occupancy certificate and makes an occupancy certificate compulsory before occupation. These are permit conditions; the supplied documents do not establish that the required works, NOC or certificate have been completed or issued.

8. Location, access & connectivity

The project’s RERA locality is HYATHNAGAR, in Ranga Reddy district, PIN 500070. The building-permit record places it in Hayathnagar Locality, Bagh Hayathnagar village, and shows a 30FEET ROAD on the north boundary. RERA record RERA filing RERA filing

The supplied location data identifies a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda) as an anchor 1.2 km away. No other verified approach-road, public-transport or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is SARANYA CONSTRUCTIONS, recorded as a partnership. The supplied corporate identifier is GSTIN 36ADVFS3211P1ZE. The RERA address record lists Flat No. 401, Sanavi Nivas, Road No. 1, Bagh Hayathnagar, Hyathnagar, Ranga Reddy, Telangana, PIN 500070. The project record names VENKAIAH MADHAVARAPU as partner and authorized signatory and SUBBULAMMA MADHAVARAPU as partner; the Form B declaration is signed by MADHAVARAPU VENKAIAH. Corporate record Parties record RERA filing

The promoter’s Form B affidavit declares a completion date of 16-05-2025 and states that 70% of amounts realized from allottees would be deposited in a separate account for construction and land cost, with withdrawals tied to completion certification. These are promoter declarations, not evidence of completed construction or an occupancy certificate.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for AMR SUNSHINE HOMES, registration P02400006650, dated 26/07/2023, valid through 16/05/2025; certificate records no extension.
GHMC building permitBuilding Permit Order 1440/GHMC/LBN/2022-BP, dated 16 May 2022; file no. 003091/GHMC/1562/LBN2/2022-BP; one residential building, 1 Stilt + 5 upper floors.
GHMC permit-related identifiersApproved Layout No. / LRS Proceeding No. / Sub division No. C/GHMC/022555/2020; TDR DRC No. 01462/TDR/2022; notarised affidavit No. 2898/2022.
Layout-plan fileRERA document list includes a layout-plan request, but the supplied file is not extracted as an approved layout plan.
Title documents filed with RERATitle investigation report dated 23-11-2022 and development-agreement/GPA, mortgage-affidavit and other title-report documents are listed in the project file.
Promoter declarationForm B affidavit for the project, dated 16 December 2022.
Occupancy / completion certificateNo such certificate is present in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation. Document index

Frequently asked questions

Is AMR SUNSHINE HOMES registered with Telangana RERA?

Yes. AMR SUNSHINE HOMES is registered with the Telangana Real Estate Regulatory Authority as P02400006650; the registration status is New Project.

Who is the developer of AMR SUNSHINE HOMES?

The promoter named in the RERA registration is SARANYA CONSTRUCTIONS.

Where is AMR SUNSHINE HOMES located?

AMR SUNSHINE HOMES is in HYATHNAGAR, Rangareddy, Telangana (500070).

When will AMR SUNSHINE HOMES be completed?

The promoter's proposed date of completion filed with RERA is 16/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Rangareddy