Sign in

Ananths Enclave

ANANTH GROUP · Suryapet · RERA P01900007296

ANANTHS ENCLAVE is a residential apartment project in Kodad, Kodad mandal, Suryapet district. The registered promoter developing it is ANANTH GROUP. The project occupies 836.91 m² and comprises one building with 1 Stilt + 5 upper floors, with 20 apartments: 15 2BHK and 5 3BHK. It is registered under TG-RERA registration P01900007296, and Form B states completion by 29th DECEMBER 2025.

01What we found

Period endedTG-RERA registration ran to 29 Dec 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Kodad, Suryapet · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameANANTHS ENCLAVE
Project typeResidential apartment project
Phase / registered portionPhase not separately identified in the supplied record; the registered project concerns one building.
TG-RERA registrationP01900007296
Registration validityCertificate states validity from 24/11/2023 to 29/12/2025, unless extended by the Authority. An extension is not recorded in the supplied certificate. Registration validity is distinct from the completion undertaking and from occupancy certification.
Registered promoterANANTH GROUP; entity type stated in the project record as Proprietorship
RERA status in supplied recordThe project is registered. The certificate’s recorded validity ended on 29/12/2025; current extension or registration status is not established by the supplied certificate.

RERA record RERA filing Corporate record

Land and geographic identity

ItemRecord
Locality / project site descriptionKodad; the building permit and occupancy certificate describe the locality as IAS PRAKASH RAO NAGAR.
Revenue villageKodad (also rendered as “Kodada” in approval extracts)
MandalKodad
DistrictSuryapet
PIN508206
Project survey numbers / subdivisions487/1, 488, 489, 487/2
Site extent836.91 m² stated as site area; net area is also 836.91 m². The building approval records road-affected area as 0 m².
RERA-recorded plot referencesC-6, C-7, C-8, C-9
Boundaries in project filingNorth: 40 Feet Wide Road; South: Plot No C-8 C-9 Belongs to Kandibanda Naga Jyothi; East: Plot No A-1 A-2; West: Others Land.

RERA record RERA filing Land records

Development identity

ItemRecord
Sanctioning authorityKODADA Municipality/Municipal Corporation
Principal building approval0026/BP/3046/2022, dated 29 December, 2022
Building permit / proceedings reference012804/BP/DTCP/3046/0038/2022
Approved building arrangementOne residential building, IMMADI (CHAKRAVARTHI); 1 Stilt + 5 upper floors
Sanctioned height14.95 m
Approved residential floor area1,943.85 m²
Stilt area406.90 m²
Building countOne building / one block, as recorded in the project data
Approved versus RERA-filed homes20 units in the RERA unit schedule; the permit condition says the sanctioned unit count must not be increased without prior approval. A separate total sanctioned-unit count is not provided in the extracts.
Parking areaOccupancy certificate extract records 427.7 m²; a number of parking spaces is not supplied.
Approval-recorded site featuresTot-lot 41.86 m²; transformer space, garbage house and rainwater-harvesting structure are included in the listed approval conditions/features.

Approvals record RERA filing RERA unit table

Offering and status

ItemRecord
RERA-filed configurations2BHK and 3BHK
RERA-filed unit counts2BHK: 15; 3BHK: 5; total: 20
Booked / available2BHK: 1 booked / 14 available; 3BHK: 1 booked / 4 available. The portal-derived counts have no stated as-of date and are indicative.
RERA-filed saleable area2BHK: 112.33 m²; 3BHK: 145.02 m²
Completion undertakingForm B states completion by 29th DECEMBER 2025.
Occupancy certificateAn occupancy certificate, 0019/OC/3046/2024, dated 11 November, 2024, is recorded for the residential building at plots C-6, C-7, C-8 and C-9. It identifies the same survey numbers and a site area of 836.91 m².
Construction stageThe supplied occupancy-certificate extract reports that the building was inspected and declared fit for occupation; it records completion date 31 October, 2024. No independent site inspection or current construction verification is supplied.

RERA unit table RERA unit details RERA record

2. The project story

ANANTHS ENCLAVE is recorded with TG-RERA as a residential apartment project in Kodad, Suryapet district. The RERA filing identifies survey numbers 487/1, 488, 489 and 487/2, plots C-6 to C-9, and a single building. The building permit describes one stilt level and five upper floors, for residential use. RERA record RERA filing

The registered offering comprises 20 apartments—15 2BHK and 5 3BHK. Portal-derived inventory shows two units booked and 18 available, but the record provides no snapshot date for those counts. The project’s Form B completion undertaking is 29 December 2025. Separately, the supplied municipal occupancy-certificate extract records the building as inspected and fit for occupation, with a stated completion date of 31 October 2024. This is documentary evidence of certification; the supplied material does not include an independent site inspection confirming present condition or delivery. RERA unit table RERA unit details

3. Master plan, architecture & building design

The building approval records a site area and net area of 836.91 m², with approved residential floor area of 1,943.85 m², a 406.90 m² stilt level and a sanctioned height of 14.95 m. The approved arrangement is one building with one stilt level and five upper floors. The extracts do not provide a reliable floor-by-floor apartment schedule, building footprint, number of apartments per floor, lift or stair details, or a complete circulation and open-space drawing description.

The occupancy-certificate extract records a 427.7 m² parking area and a 41.86 m² tot-lot area. It also records height as 14.95 m as per the sanctioned plan and 15 m as per the site building plan. No further architectural interpretation of that entry is made here.

The floor-plan drawing source is listed as document 365348, but its layout approval document was not extracted in the supplied document index. Software measurements from the drawings are set out below; they are not RERA-filed carpet-area disclosures. No FSI-counted area is supplied. Floor plans

4. Homes, configurations & floor plans

The RERA filing records 20 apartments across two configurations. Saleable areas below are RERA-filed. Carpet-area and loading figures are software-measured from the approved floor-plan drawings and are not RERA disclosures; the supplied drawing-measurement data says the measurements need review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15114112.33 m²67.0–73.0 m²; median 70.7 m²37%
3BHK514145.02 m²91.9 m²37%

For the measured 2BHK plan example, the drawing labels a kitchen, living room, dining area, two bedrooms, two toilets and two balconies. For the measured 3BHK plan example, it labels a kitchen, living/dining area, three bedrooms, toilets and a balcony. These are examples from identified drawing panels, not a guarantee that every apartment has identical room dimensions or layout. The drawing-measurement extract identifies five measured 2BHK designs and two measured 3BHK designs.

Carpet area describes the internal floor area measured from the drawing geometry; saleable area is the RERA-filed area and is larger in the supplied records. The supplied software output reports a 37% loading figure but does not provide a RERA-filed carpet-area figure or a separate balcony/utility-area schedule. Verify room and area measurements against the approved drawings before relying on them. Floor plans RERA unit details

5. Parking & vehicle circulation

The occupancy-certificate extract records 427.7 m² of parking area, and the building permit conditions state that approved stilt parking is to be used exclusively for parking vehicles. The building arrangement includes one stilt level. The supplied material does not state the number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by apartment, ramps, entry/exit arrangements, or EV-charging provision. A recorded parking area does not establish exclusive ownership or allocation of a particular bay.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot41.86 m²Building approval and occupancy-certificate extractApproval record includes it; the approval requires it to be fenced and maintained as greenery before OC. The extract does not separately confirm its current condition.
Water supplyNo source, storage or capacity statedRERA amenity scheduleRecorded as available, 100%; no independent verification supplied.
Sewerage / sewage and sullage treatment and disposalSystem capacity and treatment details not statedRERA amenity scheduleRecorded as available, 100%; no independent verification supplied.
Storm-water drainsNo network or capacity details statedRERA amenity scheduleListed with progress 0%; no independent verification supplied.
Solid-waste management and disposalNo system or capacity details statedRERA amenity scheduleRecorded as available, 100%; no independent verification supplied.
Rainwater harvestingApproval extract specifies a percolation pit; occupancy-certificate extract records RWH as 0Building approval and occupancy-certificate extractApproval feature is specified; the supplied certificate extract does not establish a completed harvesting structure.
Transformer spaceSpace to be provided on site; no capacity statedBuilding approvalApproval condition; completion not independently verified.
Garbage houseRequired within the premises; no size statedBuilding approvalApproval condition; completion not independently verified.
Internal roads and footpathsNo description or size suppliedRERA amenity scheduleProgress 0% recorded.
Green strip / tot-lot / parkTot-lot area is stated above; no separate park or green-strip area suppliedRERA amenity schedule and building approvalSchedule progress 0%; approval records the tot-lot.
Street lightingNo details suppliedRERA amenity scheduleProgress 0% recorded.
Community buildingsNo details suppliedRERA amenity scheduleProgress 0% recorded.
Energy managementNo details suppliedRERA amenity scheduleProgress 0% recorded.
Fire protection and fire safety requirementsSystem details and capacities not suppliedRERA amenity scheduleRecorded as available, 100%; no independent verification supplied.
Electrical meter room / sub-station / receiving stationTransformer space is required by the approval; system capacity is not statedRERA amenity schedule and building approvalSchedule records 100%; no independent verification supplied.
Aggregate recreational open spaceNo separate area suppliedRERA amenity scheduleProgress 0% recorded.

RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule records water supply, sewerage, sewage/sullage treatment and disposal, solid-waste management, fire protection and electrical meter room/sub-station/receiving station as available at 100%. Those are filing entries, not independent confirmation of operation, capacity or present condition. It also records storm-water drains, internal roads and footpaths, street lighting, energy management, community buildings and aggregate recreational open space at 0%. RERA amenities

The building approval requires a transformer space, a garbage house and a rainwater-harvesting percolation pit. It also states that the sanctioned plan is to be followed, that an occupancy certificate is compulsory before occupation, and that stilt parking is to be used exclusively for vehicles. The supplied extracts do not specify water sources or storage, STP capacity or reuse, electrical backup, lift provision or capacity, detailed fire systems, escape stairs, CCTV, access control, waste segregation arrangements or accessible circulation.

8. Location, access & connectivity

The official project identity places the development in Kodad village, Kodad mandal, Suryapet district, Telangana, PIN 508206. The building approval and occupancy-certificate extract describe the locality as IAS PRAKASH RAO NAGAR. The project filing records a northern boundary of 40 Feet Wide Road. RERA record RERA filing

The supplied location data lists Financial District (Nanakramguda) at 1.2 km. No road route, measurement method, travel time, public-transport information or other verified nearby landmark is supplied. Location record

9. Developer & development status

The registered promoter is ANANTH GROUP, identified in the project record as a Proprietorship. Its recorded office address is 4-1/A/19, Ganesh Nagar, Kodad, Kodad, Suryapet, 508206. The RERA record names ANANTHA CHAKRAVARTHI IMMADI as authorized signatory. A full corporate identifier or official contact details are not available in the supplied material. Corporate record RERA filing Parties record

Form B, signed by the authorized signatory on behalf of ANANTH GROUP, identifies five landowners and states a completion undertaking of 29th DECEMBER 2025. That is a promoter declaration. The supplied municipal occupancy-certificate extract separately records an occupancy certificate for the single building. The supplied material does not establish a current site inspection or verify the status of each apartment’s sale, possession or fit-out.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01900007296, issued 24/11/2023
What the supplied record establishesForm C registration for ANANTHS ENCLAVE; validity stated through 29/12/2025, unless extended.
Building construction approval
Identifier / date0026/BP/3046/2022, 29 December, 2022
What the supplied record establishesKodada Municipality/Municipal Corporation approval for one residential building on 836.91 m², comprising one stilt level and five upper floors.
Building permit / proceedings reference
Identifier / date012804/BP/DTCP/3046/0038/2022
What the supplied record establishesReference recorded with the building approval.
Occupancy certificate
Identifier / date0019/OC/3046/2024, 11 November, 2024
What the supplied record establishesMunicipal certificate extract for the residential building at C-6, C-7, C-8 and C-9; records completion date 31 October, 2024.
Occupancy-certificate application
Identifier / date012353/OC/KODD/3046/0026/2024
What the supplied record establishesApplication reference recorded in the certificate extract.
Form B promoter declaration
Identifier / dateDocument 365352
What the supplied record establishesRecords the promoter’s title/development-document assertion, encumbrance declaration, separate-account undertaking and proposed completion date.
Approved floor-plan drawings
Identifier / dateDocument 365348
What the supplied record establishesUsed for the software-measured unit-area and room examples above; drawing-based measurements are not RERA disclosures.
RERA amenity schedule
Identifier / dateProject filing
What the supplied record establishesRecords facility availability/progress as summarized above.

RERA amenities

Frequently asked questions

Is ANANTHS ENCLAVE registered with Telangana RERA?

Yes. ANANTHS ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P01900007296; the registration status is New Project.

Who is the developer of ANANTHS ENCLAVE?

The promoter named in the RERA registration is ANANTH GROUP.

Where is ANANTHS ENCLAVE located?

ANANTHS ENCLAVE is in Kodad, Suryapet, Telangana (508206).

When will ANANTHS ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 29/12/2025. This is the promoter's declaration, not a guarantee.