Bhagavata

VENKATA SREENIDHI PROJECTS PRIVATE LIMITED · Sangareddy · RERA P01100006559

BHAGAVATA is a residential apartment project in SY NO 191, AMEENPUR, Sangareddy district. It is being developed by registered promoter VENKATA SREENIDHI PROJECTS PRIVATE LIMITED on a site of 748.86 m², with 1 building comprising 1 Stilt + 5 upper floors and 20 homes: 15 2BHK and 5 3BHK apartments. The 2BHK apartments have a saleable area of 104.83 m² each, and the 3BHK apartments have a saleable area of 146.32 m² each. The TG-RERA registration number is P01100006559, and the promoter’s Form B declares completion by 01.04.2026.

More from Venkata Sreenidhi Projects Pvt Ltd · 8 projects →

01What we found

Period endedTG-RERA registration ran to 1 Apr 2026 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameBHAGAVATA RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase designation is not disclosed. The RERA registration identifies Survey No. 191 and Plot Nos. 327, 316/PART-A, 316/PART-B & 315.
TG-RERA registrationP01100006559
Registration validityCertificate states validity from 07/07/2023 to 01/04/2026; no extension is recorded in the supplied certificate. This is registration validity, not an occupancy certificate.
Registered promoterVENKATA SREENIDHI PROJECTS PRIVATE LIMITED
RERA statusThe project is registered. The registration certificate gives its stated validity period; current live portal status is not established by the supplied record.

Land and geographic identity

FieldProject record
Locality / revenue villageLocality: SY NO 191; revenue-village references in the project records include AMEENAPUR, AMEENPUR and AMEENPOOR. RERA record RERA filing
Mandal / district / PINAMEENPUR, Sangareddy, 502032 RERA record
Survey number and plot identifiersSurvey No. 191; Plot Nos. 327, 316/PART-A, 316/PART-B & 315.
Registered site extent748.86 m²
Total / net areaTotal site area: 748.86 m²; net area: 748.86 m²; road-affected area recorded in the building approval: 0 m².
Boundaries filed with RERAEast: 30 Feet Road; West: 30 Feet Road; North: PLOT NO 328 and 314; South: plot no 326 and 317 RERA filing

Development identity

FieldProject record
Sanctioning authorityAmeenpur Municipality/Municipal Corporation
Principal building approval0029/BP/3121/2023, dated 01 April, 2023; file no. 001967/BP/DTCP/3121/0014/2023
Approved built-up area1,779.55 sq. m recorded as Residential in the building approval; 343.04 sq. m recorded separately as Stilt. These are distinct approval figures.
Buildings / towers1 building/unit in the RERA project record; the building approval describes one residential building. RERA filing RERA unit table
Sanctioned floor configuration1 Stilt + 5 upper floors; the approval records building height 14.95 m.
Parking levels / provisionStilt is approved for parking; the approval also says any cellar and stilt approved in the plan are to be used exclusively for vehicle parking. A cellar is not identified in the supplied floor configuration. Parking-space counts are not available.
Unit countsThe RERA record lists 20 units in total: 15 2BHK and 5 3BHK. RERA unit table
Approval unit-count figureThe extracted building-approval information does not state a numeric sanctioned apartment count.

Offering and status

FieldProject record
RERA-filed configurations2BHK: 15 units, saleable area 104.83 m² each; 3BHK: 5 units, saleable area 146.32 m² each. RERA unit table
Booked / availablePortal-read counts show 2BHK: 0 booked / 15 available; 3BHK: 0 booked / 5 available. The portal record has no as-of date, so these counts are indicative, not a current availability confirmation. RERA unit table
Construction-stage recordAn architect’s Form–1A dated 31/03/2025 certifies the project as completed in all aspects and identifies an occupancy certificate. This is a filed architect certification, not an independent site inspection.
Completion undertakingThe promoter’s Form B declares completion by 01.04.2026.
Occupancy certificateThe architect’s Form–1A identifies GHMC occupancy certificate 0157/OC/3121/2025, dated 06.03.2025, for BHAGAVATA. The supplied extraction does not state a separate tower-wise or unit-wise OC scope.

2. The project story

BHAGAVATA is registered as a residential apartment project at Survey No. 191, Ameenapur/Ameenpur, Sangareddy district. The registered site is 748.86 m², identified with Plot Nos. 327, 316/PART-A, 316/PART-B & 315. The RERA record describes one building and a 20-unit offering comprising 15 2BHK and 5 3BHK apartments. RERA record RERA unit table

The building approval records 1 Stilt + 5 upper floors. The project file includes an architect’s completion certificate dated 31/03/2025, which says the development is completed in all aspects and identifies an occupancy certificate issued by GHMC on 06.03.2025. Those are filed professional and authority-document claims; no independent physical inspection or separate tower-by-tower completion assessment is supplied here.

3. Master plan, architecture & building design

The building-construction approval identifies a single residential building on a site and net area of 748.86 m², with 1,779.55 recorded for Residential and 343.04 recorded for Stilt. It specifies 1 Stilt + 5 upper floors and a height of 14.95 m. The extracted record does not provide a building-footprint figure, flats per floor, lift or stair count, apartment-entry arrangement, or a floor-by-floor unit schedule.

The approval records 14% Open Space Contribution Charges and lists a tot-lot area as NA in its area schedule; it separately requires a fenced tot-lot and peripheral greenery. The supplied material does not include a measured landscape/open-space plan or a quantified open-space area. The layout-plan document entry (doc 321768) is not extracted as a separate layout schedule; floor-plan drawings from that document are referenced for unit measurements below.

4. Homes, configurations & floor plans

RERA-filed unit counts and saleable areas are shown below. Carpet-area figures are software measurements from the approved floor-plan drawings, not RERA-filed disclosures; the drawing-derived measurement is subject to review. Saleable area and carpet area are different measures, and saleable area includes the home’s share of common areas according to the supplied measurement note. No separate balcony, utility or common-area measurements are provided. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15015104.83 m²58.6–75.1 m²; median 64.8 m² (software-measured)38%
3BHK505146.32 m²99.6–99.8 m²; median 99.7 m² (software-measured)32%

The 2BHK measurements cover four drawn designs; the 3BHK measurements cover two. The typical-floor drawing is labelled “TYPICAL - 1, 3, 4& 5 FLOOR PLAN.” One measured 2BHK layout shows two bedrooms, living/kitchen and two toilets; one measured 3BHK layout shows three bedrooms, drawing room, dining, kitchen and two toilets. These room descriptions and software measurements are drawing-based, not a substitute for verifying the executed unit and its registered sale agreement.

5. Parking & vehicle circulation

The building approval identifies the stilt as a parking level and requires any cellar and stilt approved in the plan to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied approval extraction does not establish whether a cellar is actually part of this building, or provide counts for resident, visitor, accessible or two-wheeler spaces. The RERA record does not establish unit-specific parking allocation or exclusive ownership of any bay. RERA unit table

A vendor listing describes “Closed Car Parking,” but the supplied project records do not give a parking-space count or allocation schedule; that listing is not evidence of a sanctioned count or a legally allocated space. Promoter website

6. Amenities, recreation & open spaces

The table reflects the project’s RERA amenity-status entries and approval conditions. A 100% entry is the status recorded in the supplied RERA amenity data; it is not presented as an independent inspection. RERA amenities

Green strip / tot-lot / park
Description / sizeGreen strip/tot-lot/park; approval requires a fenced tot-lot and peripheral greenery. No area or capacity is supplied.
Evidence sourceRERA amenity record; building approval
Declared progress / verified statusRERA entry: 100%; independent completion verification not supplied. RERA amenities
Community buildings
Description / sizeNo further description or size supplied.
Evidence sourceRERA amenity record
Declared progress / verified statusRERA progress entry: 0%. RERA amenities
Aggregate recreational open space
Description / sizeNo area supplied.
Evidence sourceRERA amenity record
Declared progress / verified statusRERA progress entry: 0%. RERA amenities

No clubhouse or indoor recreation, sports facilities, or convenience/community facilities are identified in the supplied project-specific evidence. Site services and utilities are covered separately below.

7. Utilities, building services & safety

The building approval requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house. It also requires technical supervision of services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations. These are approval conditions, not evidence that each facility has been installed or independently tested.

The RERA amenity data records water conservation/rainwater harvesting, treatment and disposal of sewage and sullage water, and an electrical meter room/sub-station/receiving station as 100%. It records Water Supply, Sewerage, Storm Water Drains, Street Lighting, Solid Waste Management and Disposal, Energy management, and Fire Protection and Fire Safety Requirements at 0%. The supplied material does not specify water sources or storage, treatment capacity, STP or reuse details, electrical capacity or backup, lift count/capacity, fire-system equipment, CCTV/security, or accessibility provisions. RERA amenities

8. Location, access & connectivity

The registered project location is in revenue village references recorded as AMEENAPUR, AMEENPUR and AMEENPOOR, within AMEENPUR Mandal, Sangareddy district, PIN 502032. The supplied location record gives a cadastral parcel-centroid coordinate of 17.518440034213082, 78.33984200248408; this is a software-reported parcel centroid, not a surveyed entrance point. RERA record RERA filing Location record Cadastral map

The nearest sampled Outer Ring Road interchange is recorded at approximately 8.6 km. No approach-road name, public-transport information, or other measured landmark distances are supplied. Location record

9. Developer & development status

The registered legal promoter is VENKATA SREENIDHI PROJECTS PRIVATE LIMITED, a private limited company. Its GSTIN is 36AAICV0692G1Z4. The RERA registration certificate lists the promoter office as Village: Nizampet, Mandal: Bachupally, District: Medchal-Malkajgiri, PIN 500090; a separate contact number, email address or official project website is not provided in the supplied project record. Corporate record

The promoter’s Form B affidavit, dated 30 April 2023, undertakes completion by 01.04.2026. The project file also contains the architect’s Form–1A completion certification dated 31/03/2025 and the identified GHMC occupancy certificate dated 06.03.2025. These dates describe, respectively, a promoter undertaking and a filed completion/OC record; they should not be confused with the RERA registration-validity end date.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100006559, issued 07/07/2023
What the supplied record establishesForm C registration for BHAGAVATA; stated validity to 01/04/2026.
Building-construction approval
Identifier / date0029/BP/3121/2023, 01 April, 2023; file no. 001967/BP/DTCP/3121/0014/2023
What the supplied record establishesAmeenpur Municipality/Municipal Corporation approval for a residential building; extracted configuration is 1 Stilt + 5 upper floors.
Occupancy certificate identified in architect’s filing
Identifier / date0157/OC/3121/2025, dated 06.03.2025
What the supplied record establishesIdentified as issued by GHMC; the architect’s Form–1A dated 31/03/2025 certifies project completion in all aspects.
Architect’s Form–1A
Identifier / dateDated 31/03/2025
What the supplied record establishesFiled completion certification for BHAGAVATA by architect Basith Ali.
RERA Form B declaration
Identifier / dateDated 30 April 2023
What the supplied record establishesPromoter declaration concerning title basis, encumbrances, separate-account obligations and completion undertaking.
Project floor-plan / layout-plan record
Identifier / dateDocument 321768
What the supplied record establishesListed as layout-plan material; drawing-based unit measurements are available, but no separate extracted layout schedule is supplied.

Frequently asked questions

Is BHAGAVATA registered with Telangana RERA?

Yes. BHAGAVATA is registered with the Telangana Real Estate Regulatory Authority as P01100006559; the registration status is New Project.

Who is the developer of BHAGAVATA?

The promoter named in the RERA registration is VENKATA SREENIDHI PROJECTS PRIVATE LIMITED.

Where is BHAGAVATA located?

BHAGAVATA is in SY NO 191, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).

When will BHAGAVATA be completed?

The promoter's proposed date of completion filed with RERA is 01/04/2026. This is the promoter's declaration, not a guarantee.