BLUE BIRDS HABITAT is a residential apartment project in Yousufguda Basthi, Khairatabad mandal, Hyderabad. It is being developed by registered promoter SHAFALI INFRATECH LLP on a site area of 4,585.87 sq.m, with one building and 65 3BHK apartments. The TG-RERA registration number is P02500000633, and the proposed completion date is 20/02/2024.

01What we found

Period endedTG-RERA registration ran to 20 Feb 2024 - check its extension on TG-RERA
24documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from magicbricks.comPhoto from housing.com
▦ View all 2 photos
Yousufguda Basthi, Khairtabad, Hyderabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameBLUE BIRDS HABITAT RERA record
Project typeResidential apartment project RERA record
Phase / registered portionPhase not separately identified in the supplied registration record; registered portion is not further described. RERA record
TG-RERA registration numberP02500000633 RERA record
Registration validity22/04/2019 to 20/02/2024; the certificate says four years, unless extended by the Authority. This is registration validity, not an occupancy certificate. RERA record
Registered promoterSHAFALI INFRATECH LLP RERA record
RERA statusThe project record describes it as “On-Going Project.” The supplied certificate’s validity ended on 20/02/2024; no extension is recorded in the supplied evidence. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageYousufguda / YOUSUFGUDA BASTHI. The building permit also identifies the village as Yousufguda. RERA record RERA filing
Mandal / district / PINKHAIRTABAD, Hyderabad, 500045 RERA record
Project survey number(s)Sy. No. 111. No subdivision is stated in the project identity record. RERA record Land records
Plot / site identifiersRegistration certificate: 8­2­263/1/A, 236/B, 1/D, 1/C and 1/1/A, 1/A/2 and 1/A/3. The building-permit extraction records 8-3-236/1/A, 236/1/B, 1/D, 1/C & 1/A/1, 1/A/2 & 1/A/3.
Site extent4,585.87 sq.m total site area; 4,521.01 sq.m net area. The permit records 64.86 sq.m as road-affected land for surrender to GHMC. Land records
Boundaries in the RERA project recordEast: house belonging to Smt G E Patel; west: house belonging to Late Mohiuddin Mehmood; north: Sy. No. 111 part and road; south: neighbours’ property in Sy. Nos. 102 and 103. Land records

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order 53440/HO/CZ/Cir-10/2016, approved 21 02 2018; file no. 116279/14/02/2017/HO. Approvals record
Approved built-up area11,868.14 sq.m permitted area. The permit extraction separately lists 11,837.11 as proposed area. RERA filing
Building countOne building is recorded in the project fields. RERA filing
Sanctioned configurationPermit records 2 cellars for parking, Ground + (5) upper floors as the earlier permitted residential building, and a conversion of an amenities block into residential flats with “Ground + 13' floor” and one flat on each floor. The supplied extraction does not fully explain the relationship between these descriptions.
Parking levels2 cellars are identified for parking; the permit also refers to cellar and stilt parking provisions.
Unit countGHMC permit extraction states “2 (Total - 65)”; the TG-RERA unit record reports 65 units in total. RERA unit table
RERA-declared units65 apartments, all recorded as booked in the last portal read; the portal record has no as-of date. RERA unit table

Offering and status

ItemRecord
Unit type3BHK apartments; RERA filing rows include “3BHK,” “THREE BEDROOM” and “THREE BEDROOOM.” RERA unit table RERA unit details
RERA-filed saleable area193.77–195.2 sq.m (the filed rows record 193.77, 194.56 and 195.2 sq.m). RERA unit table RERA unit details
Booked / available65 booked / 0 available, as last read from the TG-RERA portal; no as-of date is supplied. RERA unit table
Construction stageThe supplied amenity/infrastructure progress record contains item-level percentages, but no independently verified overall construction stage or site inspection result is provided. RERA amenities
Completion datesOriginal and revised proposed completion dates are both 20/02/2024. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation. Document index

2. The project story

BLUE BIRDS HABITAT is a residential apartment development registered with TG-RERA under P02500000633, at Sy. No. 111, Yousufguda, in Yousufguda Basthi, Khairatabad mandal, Hyderabad. The RERA record describes one building and 65 3BHK apartments; the filed unit rows show all 65 booked, although the portal extract does not give a booking-data date. RERA record Land records RERA unit table

GHMC’s permit record concerns residential flats at the site and describes two cellars for parking. It also records conversion of an amenities block into residential flats, with one flat per floor, while separately referring to a Ground + 13-floor description and an earlier Ground + 5-upper-floor residential permission. The supplied permit extraction does not resolve the precise relationship between those descriptions, so the detailed building arrangement should be checked against the stamped sanctioned drawings.

The project’s proposed and revised completion dates are both 20/02/2024, and the supplied record labels the project ongoing. The available material does not establish current construction completion by independent site inspection, or identify an issued OC. Item-level progress figures are reported in the amenities and infrastructure section below; they are not an independent certification of overall completion. RERA record RERA amenities Document index

3. Master plan, architecture & building design

The RERA record gives a total site area of 4,585.87 sq.m and net area of 4,521.01 sq.m; the GHMC permit records the 64.86 sq.m road-affected portion for surrender to GHMC. The registered project fields record 11,868.14 sq.m as approved built-up area, while the permit extraction separately identifies 11,837.11 as proposed area. These are distinct recorded figures and should not be treated as interchangeable area measures. Land records RERA filing

The project record identifies one building. The permit extraction describes 2 cellars for parking, an earlier residential configuration of Ground + 5 upper floors, and a conversion of an amenities block into residential flats described as Ground + 13' floor, with one flat per floor. It does not provide a complete floor-by-floor plan or enough detail to reconcile these descriptions. The supplied drawing records comprise 15 floor-plan sheets, but all 15 are scans pending measurement; no drawing-based floor, room, circulation, or carpet-area measurements are available here. RERA filing Floor plans

The permit also lists a tot-lot of 459.59 m', 10 rainwater-harvesting structures, and a transformer space. Detailed evidence on building footprint, typical floor layouts, lifts, stairs, internal residential/common-area distribution, and open-space arrangement is not available in the supplied extracts.

4. Homes, configurations & floor plans

The TG-RERA filing lists 65 units across three 3-bedroom-labelled rows. The stated saleable areas are RERA-filed figures; no carpet area or loading figure is available from the supplied floor-plan measurements. The floor-plan set is reported as 15 scans pending measurement, so there are no software-measured carpet areas or room dimensions to report. RERA unit details RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK (filed as “3BHK”)35350195.2 sq.mNot available; drawings not measuredNot supplied
THREE BEDROOM29290194.56 sq.mNot available; drawings not measuredNot supplied
THREE BEDROOOM110193.77 sq.mNot available; drawings not measuredNot supplied

Saleable area is the area disclosed in the RERA filing; a carpet-area measurement from drawings would be a separate measurement and is not available in this review. The portal booking figures have no as-of date and should be treated as indicative. RERA unit details RERA unit table Floor plans

5. Parking & vehicle circulation

The GHMC permit identifies 2 cellars for parking and states that approved cellar and stilt areas for parking are to be used exclusively for vehicle parking. It also specifies one entry and one exit, each with a minimum width of 4.5 m and height clearance of 5 m.

The supplied material does not establish the sanctioned number of parking bays, separate car or two-wheeler counts, visitor or accessible spaces, mechanical parking, EV charging, or a unit-by-unit parking allocation. A partially completed RERA-filed allotment-letter template refers to two car-parking spaces, but it leaves the flat and other transaction details blank and does not establish allocation to a particular buyer or unit.

6. Amenities, recreation & open spaces

The permit lists a tot-lot and rainwater-harvesting structures; the TG-RERA progress record gives item-level status for certain site facilities. The progress percentages are record entries and are not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot-lot / parkPermit lists tot-lot 459.59 m' and requires the tot-lot to be fenced and maintained as greenery.GHMC permit; TG-RERA progress record RERA amenitiesTG-RERA progress record: 50%. Independent completion verification not supplied.
Community buildingsNo description or size supplied.TG-RERA progress record RERA amenities0% recorded.
Aggregate recreational open spaceNo area or layout detail supplied.TG-RERA progress record RERA amenities0% recorded.

The vendor record mentions landscaped gardens, a swimming pool, fitness centre, indoor play area and children’s activity zone, but these are vendor-attributed claims, not established here as sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

The GHMC permit requires specified building services and safety provisions. It lists a generator as alternate electric supply, emergency lighting in corridors/common passages and staircases, a transformer space, rainwater-harvesting percolation pits, a garbage house, and underground and terrace water tanks of 25,000 litres each for residential buildings. It also sets out fire-safety provisions, including extinguishers, a manual alarm system, and sprinklers if basement area exceeds 200 sq.m. These are permit conditions; the supplied evidence does not establish completed installation or statutory compliance.

The permit also requires fire-resistant swing doors for collapsible lifts, fire-vehicle manoeuvrability through joint open space with neighbouring premises, and maintenance of clearances from high- and low-tension electrical lines. No lift count or capacity, water source, sewage-treatment capacity, backup-generator capacity, CCTV/security arrangements, accessibility features, or independently verified services status is supplied.

TG-RERA’s project progress record reports water supply at 80%, sewerage at 70%, storm-water drains at 80%, rainwater harvesting at 95%, energy management at 100%, fire protection and fire-safety requirements at 90%, and electrical meter room/sub-station/receiving station at 85%. These are declared progress entries, not independently verified completion findings. RERA amenities

8. Location, access & connectivity

The registered location is Yousufguda Basthi, Khairatabad mandal, Hyderabad, Telangana 500045, at Sy. No. 111. RERA record Land records

The supplied location record gives these distances: Yusufguda Metro 0.4 km; Police Line bus stop 0.5 km; State Bank 0.7 km; SGB Model High School 0.1 km; government school 0.3 km; Fehmi Care Hospital 0.2 km; Krishnakanth Park 0.3 km; an unnamed mall 1.6 km; Cloudtree Technologies 0.9 km; and Bharath Nagar railway station 2.7 km. These are supplied location-record distances; no measurement method or travel times are provided. Location record

9. Developer & development status

The registered legal promoter is SHAFALI INFRATECH LLP, an LLP. The TG-RERA registration certificate identifies the promoter’s office location as Yousufguda Basthi, Khairatabad, Hyderabad, PIN 500045. No official website, phone number, or email address is supplied in the project evidence. Corporate record

Form B is an affidavit-cum-declaration made by Sri. M. Narsaiah as authorised signatory for M/s. Shafali Infratech LLP. It contains promoter declarations concerning title, encumbrances, project funds, audits and approvals; its completion-period undertaking is left blank in the extracted text.

The project record gives 20/02/2024 as both original and revised proposed completion date. No separate phase-wise or tower-wise completion schedule, independently verified construction percentage, or occupancy/completion certificate is supplied. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for BLUE BIRDS HABITAT, registration P02500000633, issued 22/04/2019, valid through 20/02/2024 unless extended by the Authority.
GHMC building permitBuilding Permit Order 53440/HO/CZ/Cir-10/2016, approved 21 02 2018, file no. 116279/14/02/2017/HO, for Sy. No. 111, Yousufguda.
Earlier GHMC references recorded in permitEarlier file no. 46563/10/07/2014 and earlier permit no. 49947/HO/CZ/Cir-10/2016, dated 02-05-2016.
Title and encumbrance documents in the RERA filingLegal title report 15069; encumbrance statement 15064, recording a search period of 01-01-1989 to 26-09-2018 and one sale-deed entry. Document index
Promoter declarationForm B declaration by Sri. M. Narsaiah as authorised signatory for Shafali Infratech LLP.
Occupancy / completion certificateNot identified in the supplied documents. The GHMC permit states that an occupancy certificate is compulsory before occupation. Document index
Approved drawingsThe supplied floor-plan set contains 15 scans pending measurement; detailed drawing-based measurements are unavailable in this review. Floor plans
Layout approvalNo layout-plan number is supplied; the RERA record does not identify a separate layout approval document in the materials provided. HMDA Document index

Frequently asked questions

Is BLUE BIRDS HABITAT registered with Telangana RERA?

Yes. BLUE BIRDS HABITAT is registered with the Telangana Real Estate Regulatory Authority as P02500000633; the registration status is On-Going Project.

Who is the developer of BLUE BIRDS HABITAT?

The promoter named in the RERA registration is SHAFALI INFRATECH LLP.

Where is BLUE BIRDS HABITAT located?

BLUE BIRDS HABITAT is in Yousufguda, YOUSUFGUDA BASTHI, KHAIRTABAD, Hyderabad, Telangana (500045).

When will BLUE BIRDS HABITAT be completed?

The promoter's proposed date of completion filed with RERA is 20/02/2024. This is the promoter's declaration, not a guarantee.