Sarva Shakthi Sadan
BHAGAWATHI CONSTRUCTIONS · Hyderabad · RERA P02500004962
SARVA SHAKTHI SADAN is a residential apartment project in Yousufguda Basthi, KHAIRTABAD mandal, Hyderabad district, developed by BHAGAWATHI CONSTRUCTIONS. It occupies **444.96 sq. m** and comprises one building with **1 Stilt + 5 upper floors** and **10** 3BHK units, each with a RERA-filed saleable area of **143.8 sq. m**. The project is registered under TG-RERA number **P02500004962**, with a promoter-declared completion deadline of 11 October 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | TG-RERA record |
|---|---|
| Registered project name | SARVA SHAKTHI SADAN RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name or phase breakdown is disclosed; registration is for the project at Plot No. 4, Survey No. 128/1 |
| TG-RERA registration number | P02500004962 |
| Registration validity | 29 August 2022 to 11 October 2024; the certificate states a two-year validity. No extension is recorded on the certificate |
| Registered promoter | BHAGAWATHI CONSTRUCTIONS |
| RERA status | Registration period shown on the certificate has ended; the certificate does not record an extension |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Yousufguda / Yousufguda Basthi; the building-permit record also identifies the locality as Yousufguda (Eragadda Ext) RERA record |
| Revenue village | YOUSUFGUDA BASTHI, as recorded for the project RERA record RERA filing |
| Mandal | KHAIRTABAD RERA record RERA filing |
| District | Hyderabad RERA record |
| PIN | 500018 RERA record |
| Plot / survey identity | Plot No. 4; Survey No. 128/1 RERA filing |
| Site area | Total area 444.96 sq. m; net area 444.96 sq. m; road-affected area recorded as 0 in the project land fields and building-permit extraction RERA filing |
| Boundaries | East: 30 WIDE ROAD; West: 30 WIDE ROAD; North: PLOT NO 5; South: PLOT NO 3 RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | 0556/GHMC/SLP/2021-BP, approved 11 October 2021 Approvals record |
| Building-permit file number | 001453/GHMC/0851/SLP2/2021-BP Approvals record |
| Approved built-up area | 1,172.60 sq. m, residential, in the building-permit record |
| Building count | One building is recorded in the RERA project fields RERA filing |
| Sanctioned configuration | 1 Stilt + 5 upper floors |
| Height stated in permit | 14.95 m |
| Parking provision | Stilt parking area 205.82 sq. m in the permit record; the permit requires the approved parking area to be used exclusively for vehicle parking |
| Approved versus RERA-declared units | The RERA record lists 10 units; the permit extraction gives a condition that sanctioned unit numbers must not be increased without prior GHMC approval, but the supplied extraction does not state the approved unit count RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units RERA unit table |
| RERA-filed saleable area | 143.8 sq. m per filed 3BHK configuration RERA unit table |
| Booked / available | 6 booked, 4 available, as last read from the TG-RERA portal; the portal record has no as-of date, so these counts are indicative RERA unit table |
| Construction stage | A GHMC occupancy certificate is on file for the residential building; its stated completion date is 05 March 2023 |
| Promoter-declared completion deadline | 11 October 2024 |
| Occupancy certificate | GHMC OC 1038/GHMC/SLP/2023-OC, dated 26 April 2023, for the building at Plot No. 4, Survey No. 128/1 Approvals record |
2. The project story
SARVA SHAKTHI SADAN is registered as a residential apartment project at Plot No. 4, Survey No. 128/1, Yousufguda Basthi, KHAIRTABAD mandal, Hyderabad. The RERA-filed land area is 444.96 sq. m, and the GHMC permit describes one residential building comprising a stilt level and five upper floors. RERA record RERA filing
The RERA unit record lists ten 3BHK apartments, with saleable area of 143.8 sq. m per filed configuration. Its portal-derived booking snapshot shows six booked and four available, without an as-of date. RERA unit table
The project record contains a GHMC occupancy certificate for the building; this is an authority-issued certificate, not a statement of independently inspected current condition. The certificate records a completion date of 05 March 2023. The RERA registration certificate records validity only through 11 October 2024 and shows no extension.
3. Master plan, architecture & building design
The GHMC building permit identifies a single residential building on a 444.96 sq. m plot, with 1 Stilt + 5 upper floors, a height of 14.95 m, and approved residential built-up area of 1,172.60 sq. m. These are permit-record figures; no separate FSI-counted area is supplied. The permit extraction records a stilt area of 205.82 sq. m and requires approved stilt/cellar parking space to remain exclusively for vehicle parking.
The permit also records setbacks of Front 3 2.5, Rear 2.5, Side I 2.5 and Side II 2.5. It names a tot-lot and a transformer space among permit conditions, and requires a garbage house and a rainwater-harvesting structure (percolation pit). The supplied material does not establish the building’s flat-per-floor arrangement, lift or stair configuration, entrances, circulation layout, or landscaped/open-space dimensions.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 6 | 4 | 143.8 sq. m | 99.6 sq. m (software-measured from drawing) | 31% (drawing-derived record) |
The unit count, booking snapshot and saleable area above are TG-RERA record values; the booking snapshot is undated. The carpet-area figure is software-measured from the second-floor plan in document 247430, not a RERA-filed carpet-area disclosure, and should be checked against the drawing. The drawing labels a living room, kitchen, dining area, foyer, three bedrooms, three toilets, a utility and a balcony. The measured utility and balcony are excluded from the software carpet-area calculation. RERA unit table RERA unit details Floor plans
Carpet area and saleable area are different measures: the supplied drawing measurement is for carpet area, while the RERA-filed 143.8 sq. m is identified as saleable area. No separate RERA-filed balcony area, utility area or unit-specific common-area allocation is provided. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit records 205.82 sq. m of stilt area for parking and requires approved stilt/cellar parking space to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied records do not state a sanctioned number of car or two-wheeler spaces, visitor or accessible parking counts, ramp/driveway arrangements, EV charging provision, or unit-specific parking allocations. A parking-space area in a plan does not establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The amenity schedule in the RERA data lists fourteen items, each with reported progress of 0%. These percentages are the recorded schedule values, not independent site verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | No size supplied; permit requires it to be fenced and maintained as greenery before OC issuance | RERA amenity schedule: 0%; no independent completion verification supplied RERA amenities | |
| Aggregate recreational open space | No area supplied | RERA amenities | 0% recorded RERA amenities |
| Community buildings | No size or description supplied | RERA amenities | 0% recorded RERA amenities |
| Internal roads and footpaths | No dimensions supplied | RERA amenities | 0% recorded RERA amenities |
| Street lighting | No further specification supplied | RERA amenities | 0% recorded RERA amenities |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply; sewerage, including chambers, lines, septic tank and STP; storm-water drains; sewage and sullage treatment/disposal; solid-waste management; water conservation and rainwater harvesting; energy management; fire protection and safety; and electrical meter room, sub-station and receiving station. Each is recorded at 0% in that schedule; the supplied material does not provide capacities or independently verified completion details. RERA amenities
The building permit requires space for a transformer, a garbage house within the premises and a rainwater-harvesting structure (percolation pit). It also requires a fire NOC from the Director (EV&DM) before issue of an occupancy certificate. The occupancy-certificate extraction lists rainwater harvesting and records the building as fit for occupation; it does not provide water-storage or treatment capacities, backup-power details, lift specifications, CCTV/access-control details, or accessibility specifications.
8. Location, access & connectivity
The registered project location is Yousufguda Basthi, KHAIRTABAD mandal, Hyderabad district, PIN 500018, at Plot No. 4 in Survey No. 128/1. The building-permit record identifies the locality as Yousufguda (Eragadda Ext). The project fields record 30 WIDE ROAD on both the east and west boundaries. RERA record RERA filing
The supplied location record gives HITEC City at 5.4 km. It does not provide measured distances to public-transport stops or other landmarks. Location record
9. Developer & development status
The TG-RERA registration certificate names Bhagawathi Constructions as the registered promoter. The RERA fields describe the organization as a partnership and record GSTIN 36AAXFB9756B1ZY. The supplied promoter address is H NO 8-3-167/K/59, Kalyan Nagar Venture 3, Kalyan Nagar, Phase III, Yousufguda, KHAIRTABAD, Hyderabad, 500018. RERA filing Corporate record Parties record
The project Form B affidavit, dated 24 November 2021, is a promoter declaration by authorized signatories P.A.S. Murthy and Durga Rao Voonna. It declares title and freedom from encumbrances and undertakes completion by 11 October 2024; these are the promoter’s declarations. The GHMC OC record concerns the single residential building. No project-specific construction-progress percentage is supplied in the available records.
10. Approvals, official records & documents
| Identifier / date | P02500004962; issued 29 August 2022; valid through 11 October 2024 |
|---|---|
| Scope and evidence | Form C for SARVA SHAKTHI SADAN, Survey No. 128/1; no extension is recorded on the certificate |
| Identifier / date | 0556/GHMC/SLP/2021-BP, 11 October 2021; file no. 001453/GHMC/0851/SLP2/2021-BP |
|---|---|
| Scope and evidence | Residential building permit for 1 Stilt + 5 upper floors on 444.96 sq. m at Survey No. 128/1 |
| Identifier / date | 1038/GHMC/SLP/2023-OC, 26 April 2023; application no. 002739/GHMC/1334/SLP2/2023-OC |
|---|---|
| Scope and evidence | OC record for the residential building at Plot No. 4, Survey No. 128/1; the document records completion date as 05 March 2023 |
| Identifier / date | Dated 24 November 2021 |
|---|---|
| Scope and evidence | Project declaration by authorized signatories for Bhagawathi Constructions |
| Identifier / date | Document 247430 |
|---|---|
| Scope and evidence | Drawing used for software-measured configuration and room-area information; those measurements are not RERA-filed carpet-area disclosures |
| Identifier / date | Document 247430 |
|---|---|
| Scope and evidence | A layout-plan document is listed in the RERA file; no extracted layout-sheet details are supplied here Document index |
1. Project at a glance
Project identity
Registered project name: SARVA SHAKTHI SADAN
Project type: Residential apartment project
Phase / registered portion: No separate phase name or phase breakdown is disclosed; registration is for the project at Plot No. 4, Survey No. 128/1
TG-RERA registration number: P02500004962
Registration validity: 29 August 2022 to 11 October 2024; the certificate states a two-year validity. No extension is recorded on the certificate
Registered promoter: BHAGAWATHI CONSTRUCTIONS
RERA status: Registration period shown on the certificate has ended; the certificate does not record an extension
Land and geographic identity
Locality: Yousufguda / Yousufguda Basthi; the building-permit record also identifies the locality as Yousufguda (Eragadda Ext)
Revenue village: YOUSUFGUDA BASTHI, as recorded for the project
Mandal: KHAIRTABAD
District: Hyderabad
PIN: 500018
Plot / survey identity: Plot No. 4; Survey No. 128/1
Site area: Total area 444.96 sq. m; net area 444.96 sq. m; road-affected area recorded as 0 in the project land fields and building-permit extraction
Boundaries: East: 30 WIDE ROAD; West: 30 WIDE ROAD; North: PLOT NO 5; South: PLOT NO 3
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 0556/GHMC/SLP/2021-BP, approved 11 October 2021
Building-permit file number: 001453/GHMC/0851/SLP2/2021-BP
Approved built-up area: 1,172.60 sq. m, residential, in the building-permit record
Building count: One building is recorded in the RERA project fields
Sanctioned configuration: 1 Stilt + 5 upper floors
Height stated in permit: 14.95 m
Parking provision: Stilt parking area 205.82 sq. m in the permit record; the permit requires the approved parking area to be used exclusively for vehicle parking
Approved versus RERA-declared units: The RERA record lists 10 units; the permit extraction gives a condition that sanctioned unit numbers must not be increased without prior GHMC approval, but the supplied extraction does not state the approved unit count
Offering and status
RERA-filed configuration: 3BHK; 10 units
RERA-filed saleable area: 143.8 sq. m per filed 3BHK configuration
Booked / available: 6 booked, 4 available, as last read from the TG-RERA portal; the portal record has no as-of date, so these counts are indicative
Construction stage: A GHMC occupancy certificate is on file for the residential building; its stated completion date is 05 March 2023
Promoter-declared completion deadline: 11 October 2024
Occupancy certificate: GHMC OC 1038/GHMC/SLP/2023-OC, dated 26 April 2023, for the building at Plot No. 4, Survey No. 128/1
2. The project story
SARVA SHAKTHI SADAN is registered as a residential apartment project at Plot No. 4, Survey No. 128/1, Yousufguda Basthi, KHAIRTABAD mandal, Hyderabad. The RERA-filed land area is 444.96 sq. m, and the GHMC permit describes one residential building comprising a stilt level and five upper floors.
The RERA unit record lists ten 3BHK apartments, with saleable area of 143.8 sq. m per filed configuration. Its portal-derived booking snapshot shows six booked and four available, without an as-of date.
The project record contains a GHMC occupancy certificate for the building; this is an authority-issued certificate, not a statement of independently inspected current condition. The certificate records a completion date of 05 March 2023. The RERA registration certificate records validity only through 11 October 2024 and shows no extension.
3. Master plan, architecture & building design
The GHMC building permit identifies a single residential building on a 444.96 sq. m plot, with 1 Stilt + 5 upper floors, a height of 14.95 m, and approved residential built-up area of 1,172.60 sq. m. These are permit-record figures; no separate FSI-counted area is supplied. The permit extraction records a stilt area of 205.82 sq. m and requires approved stilt/cellar parking space to remain exclusively for vehicle parking.
The permit also records setbacks of Front 3 2.5, Rear 2.5, Side I 2.5 and Side II 2.5. It names a tot-lot and a transformer space among permit conditions, and requires a garbage house and a rainwater-harvesting structure (percolation pit). The supplied material does not establish the building’s flat-per-floor arrangement, lift or stair configuration, entrances, circulation layout, or landscaped/open-space dimensions.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 6 | 4 | 143.8 sq. m | 99.6 sq. m (software-measured from drawing) | 31% (drawing-derived record) |
The unit count, booking snapshot and saleable area above are TG-RERA record values; the booking snapshot is undated. The carpet-area figure is software-measured from the second-floor plan in document 247430, not a RERA-filed carpet-area disclosure, and should be checked against the drawing. The drawing labels a living room, kitchen, dining area, foyer, three bedrooms, three toilets, a utility and a balcony. The measured utility and balcony are excluded from the software carpet-area calculation.
Carpet area and saleable area are different measures: the supplied drawing measurement is for carpet area, while the RERA-filed 143.8 sq. m is identified as saleable area. No separate RERA-filed balcony area, utility area or unit-specific common-area allocation is provided.
5. Parking & vehicle circulation
The GHMC permit records 205.82 sq. m of stilt area for parking and requires approved stilt/cellar parking space to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied records do not state a sanctioned number of car or two-wheeler spaces, visitor or accessible parking counts, ramp/driveway arrangements, EV charging provision, or unit-specific parking allocations. A parking-space area in a plan does not establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The amenity schedule in the RERA data lists fourteen items, each with reported progress of 0%. These percentages are the recorded schedule values, not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | No size supplied; permit requires it to be fenced and maintained as greenery before OC issuance | RERA amenity schedule: 0%; no independent completion verification supplied | |
| Aggregate recreational open space | No area supplied | 0% recorded | |
| Community buildings | No size or description supplied | 0% recorded | |
| Internal roads and footpaths | No dimensions supplied | 0% recorded | |
| Street lighting | No further specification supplied | 0% recorded |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply; sewerage, including chambers, lines, septic tank and STP; storm-water drains; sewage and sullage treatment/disposal; solid-waste management; water conservation and rainwater harvesting; energy management; fire protection and safety; and electrical meter room, sub-station and receiving station. Each is recorded at 0% in that schedule; the supplied material does not provide capacities or independently verified completion details.
The building permit requires space for a transformer, a garbage house within the premises and a rainwater-harvesting structure (percolation pit). It also requires a fire NOC from the Director (EV&DM) before issue of an occupancy certificate. The occupancy-certificate extraction lists rainwater harvesting and records the building as fit for occupation; it does not provide water-storage or treatment capacities, backup-power details, lift specifications, CCTV/access-control details, or accessibility specifications.
8. Location, access & connectivity
The registered project location is Yousufguda Basthi, KHAIRTABAD mandal, Hyderabad district, PIN 500018, at Plot No. 4 in Survey No. 128/1. The building-permit record identifies the locality as Yousufguda (Eragadda Ext). The project fields record 30 WIDE ROAD on both the east and west boundaries.
The supplied location record gives HITEC City at 5.4 km. It does not provide measured distances to public-transport stops or other landmarks.
9. Developer & development status
The TG-RERA registration certificate names Bhagawathi Constructions as the registered promoter. The RERA fields describe the organization as a partnership and record GSTIN 36AAXFB9756B1ZY. The supplied promoter address is H NO 8-3-167/K/59, Kalyan Nagar Venture 3, Kalyan Nagar, Phase III, Yousufguda, KHAIRTABAD, Hyderabad, 500018.
The project Form B affidavit, dated 24 November 2021, is a promoter declaration by authorized signatories P.A.S. Murthy and Durga Rao Voonna. It declares title and freedom from encumbrances and undertakes completion by 11 October 2024; these are the promoter’s declarations. The GHMC OC record concerns the single residential building. No project-specific construction-progress percentage is supplied in the available records.
10. Approvals, official records & documents
| Identifier / date | P02500004962; issued 29 August 2022; valid through 11 October 2024 |
|---|---|
| Scope and evidence | Form C for SARVA SHAKTHI SADAN, Survey No. 128/1; no extension is recorded on the certificate |
| Identifier / date | 0556/GHMC/SLP/2021-BP, 11 October 2021; file no. 001453/GHMC/0851/SLP2/2021-BP |
|---|---|
| Scope and evidence | Residential building permit for 1 Stilt + 5 upper floors on 444.96 sq. m at Survey No. 128/1 |
| Identifier / date | 1038/GHMC/SLP/2023-OC, 26 April 2023; application no. 002739/GHMC/1334/SLP2/2023-OC |
|---|---|
| Scope and evidence | OC record for the residential building at Plot No. 4, Survey No. 128/1; the document records completion date as 05 March 2023 |
| Identifier / date | Dated 24 November 2021 |
|---|---|
| Scope and evidence | Project declaration by authorized signatories for Bhagawathi Constructions |
| Identifier / date | Document 247430 |
|---|---|
| Scope and evidence | Drawing used for software-measured configuration and room-area information; those measurements are not RERA-filed carpet-area disclosures |
| Identifier / date | Document 247430 |
|---|---|
| Scope and evidence | A layout-plan document is listed in the RERA file; no extracted layout-sheet details are supplied here |
Frequently asked questions
Is SARVA SHAKTHI SADAN registered with Telangana RERA?
Yes. SARVA SHAKTHI SADAN is registered with the Telangana Real Estate Regulatory Authority as P02500004962; the registration status is New Project.
Who is the developer of SARVA SHAKTHI SADAN?
The promoter named in the RERA registration is BHAGAWATHI CONSTRUCTIONS.
Where is SARVA SHAKTHI SADAN located?
SARVA SHAKTHI SADAN is in Yousufguda, YOUSUFGUDA BASTHI, KHAIRTABAD, Hyderabad, Telangana (500018).
When will SARVA SHAKTHI SADAN be completed?
The promoter's proposed date of completion filed with RERA is 11/10/2024. This is the promoter's declaration, not a guarantee.
More projects in Yousufguda Basthi