Bommarillu Brindavan
BOMMARILLU DEVELOPERS · Sangareddy · RERA P01100008673
BOMMARILLU BRINDAVAN is a residential apartment project in Ameenpur, Ameenpur mandal, Sangareddy district, developed by the registered promoter BOMMARILLU DEVELOPERS. The project covers 995.79 sq. m and comprises one residential building with 1 stilt + 5 upper floors and 25 apartments: 15 2BHK and 10 3BHK. Its TG-RERA registration number is P01100008673, and the proposed completion date is 5 June 2027.
More from Bommarillu Developers · 11 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | BOMMARILLU BRINDAVAN RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration covers the project at Survey No. 312 RERA record |
| TG-RERA registration | P01100008673 RERA record |
| Registration validity | 20 August 2024 to 5 June 2027, unless extended by the Authority RERA record |
| Registered promoter | BOMMARILLU DEVELOPERS RERA record |
| RERA status | Registered project; the certificate states the registration period above RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Ameenpur RERA record |
| Revenue village | Ameenapur / Ameenpur, as rendered in the project record and filed documents RERA record |
| Mandal | Ameenpur RERA record |
| District | Sangareddy RERA record |
| PIN | 502032 RERA record |
| Project survey identifiers | Survey No. 312; the filed layout-plan record also lists 312/AA PART. The commencement approval and registration certificate identify Survey No. 312. Land records |
| Registered site extent | 995.79 sq. m Land records |
| Total / net site area | Total area 995.79 sq. m; net area 995.79 sq. m; road-affected area recorded as 0. Land records |
| Boundaries | Not disclosed in the supplied project record Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Ameenpur Municipality / Municipal Corporation; the filed approval-plan record identifies TS-DTCP as the authority and Ameenpur Municipality as the delegated authority Approvals record |
| Principal building approval | Approval No. 0047/BP/3121/2024, dated 05 June 2024 Approvals record |
| Approved built-up area | 2,452.20 sq. m excluding parking; 3,023.30 sq. m including parking |
| Building count and floors | One residential building; 1 stilt + 5 upper floors |
| Building height | 14.99 m recorded for the sanctioned height |
| Parking | 11 cars proposed; parking area 571.10 sq. m in the filed plan |
| Approved / RERA-filed units | The filed plan states 25 units; the TG-RERA unit record also lists 25 apartments: 15 2BHK and 10 3BHK. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Unit types | 2BHK and 3BHK apartments RERA unit table |
| RERA-filed saleable area | 2BHK: 115.5 sq. m; 3BHK: 143.07 sq. m RERA unit table |
| Booked / available | Portal data lists 0 booked and 15 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal extract has no as-of date; treat counts as indicative. RERA unit table |
| RERA-declared completion deadline | 5 June 2027 RERA record |
| Occupancy certificate status | An Ameenpur Municipality occupancy certificate is filed for the residential building at Survey No. 312. It identifies 1 stilt + 5 upper floors and a completion date of 11 June 2025. The certificate is building-specific in the supplied record. |
| Construction stage | The filed architect’s Form 1A states the project is completed in all aspects; the municipal occupancy certificate is also filed. This is documentary completion evidence, not an independent site inspection by this report. |
2. The project story
BOMMARILLU BRINDAVAN is registered as a residential apartment development in Ameenpur, Sangareddy district. The RERA-filed site is 995.79 sq. m in Survey No. 312, with the filed layout-plan record additionally identifying Survey No. 312/AA PART. RERA record Land records
The sanctioned scheme is one apartment building with a stilt and five upper floors. The RERA unit record lists 25 homes—15 two-bedroom and 10 three-bedroom apartments. The filed architect’s completion certificate describes the project as completed in all aspects, and a municipal occupancy certificate is provided for the building. These are filed certifications and records; no independent physical inspection is included here. RERA unit table
3. Master plan, architecture & building design
The filed building permission is for a residential building with 1 stilt + 5 upper floors, on a site recorded as 995.79 sq. m. The plan states 2,452.20 sq. m of proposed built-up area excluding parking and 3,023.30 sq. m including parking; it separately records 571.10 sq. m of parking area. These figures are the plan’s stated categories and are not carpet-area measurements.
The plan records a building height of 14.99 m, six floors, a 555.91 sq. m stilt area, and balconies totalling 144.70 sq. m. It identifies a proposed 9.00 MT road, a 4.50 m driveway, and a further 9.00 MT south road. The plan also lists a 9.00 MT wide existing road.
The filed plan names a lift and staircase and identifies a residential use; it does not provide a reliable floor-by-floor apartment schedule, lift capacity, or detailed circulation description in the supplied extracts. The plan lists vacant plot area of 424.68 sq. m, but the supplied record does not specify the detailed use or configuration of all open areas.
4. Homes, configurations & floor plans
TG-RERA lists 25 apartments in two configurations. Saleable areas and unit counts below are RERA-filed. Carpet areas are software-measured from the filed drawing, not RERA disclosures; the drawing geometry should be checked against the approved plan. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 115.5 sq. m | 57.8–79.3 sq. m; median 59.7 sq. m | 48% |
| 3BHK | 10 | 0 | 10 | 143.07 sq. m | 80.8 sq. m | 43% |
The measured 2BHK range comes from five drawing-measured designs; the 3BHK measurement comes from three. The fifth-floor plan extract shows a 2BHK example with two bedrooms, hall, kitchen, two toilets and a balcony, and a 3BHK example with three bedrooms, hall, kitchen, two toilets and a wash area. Room dimensions are drawing-derived measurements, not RERA-filed room specifications. RERA unit details
Carpet area describes the measured internal area shown by the drawing geometry. RERA saleable area is a separately filed figure and may include the home’s share of common areas; balcony and other excluded spaces are not interchangeable with carpet area. The filing marks both configurations as mortgaged. Floor plans RERA unit table
5. Parking & vehicle circulation
The filed plan states 11 proposed car spaces and 571.10 sq. m of parking area. The building permission says the stilt approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. A driveway is identified in the filed plan as 4.50 m wide. The supplied extracts do not establish visitor or accessible-space counts, two-wheeler provision, parking allotment to particular apartments, EV-charger locations or a vehicle-entry/exit arrangement. The plan’s EV-charging requirement is a sanction condition; the supplied evidence does not confirm installed charging infrastructure.
6. Amenities, recreation & open spaces
The following facilities appear in the filed plan or RERA amenity schedule. The schedule shows 0% progress for the listed items; those percentages are not independent verification of site condition. The occupancy and completion documents certify the building/project but do not separately verify each listed facility. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot listed; plan records 0 m² for the tot-lot | RERA amenity schedule: 0%; not independently verified | |
| Lift | Listed in the filed plan | RERA amenity schedule does not establish installation status | |
| Staircase | Listed in the filed plan | RERA amenity schedule does not establish installation status | |
| Rainwater harvesting | Percolation pit; plan records 3 RWHPs | RERA schedule marks water conservation/rainwater harvesting “YES”, 0%; not independently verified | |
| Sump | Listed in the filed plan | Not independently verified | |
| STP / septic tank | Both are listed in the filed plan | RERA schedule lists sewerage facilities as “YES”, 0%; no capacity or operational status supplied | |
| Distribution transformer | Listed in the filed plan | RERA schedule lists electrical meter room/sub-station/receiving station as “YES”, 0%; not independently verified | |
| Garbage house | Required by the building-sanction conditions | Condition stated; completion not independently verified | |
| Internal roads and footpaths | Listed in the RERA amenity schedule | RERA amenities | 0%; not independently verified |
| Storm-water drains | RERA schedule marks “YES” | RERA amenities | 0%; not independently verified |
| Street lighting | Listed in the RERA amenity schedule | RERA amenities | 0%; not independently verified |
| Community buildings | Listed in the RERA amenity schedule | RERA amenities | 0%; not independently verified |
| Solid-waste management and disposal | Listed in the RERA amenity schedule | RERA amenities | 0%; not independently verified |
| Fire protection and fire safety | RERA schedule marks “YES” | RERA amenities | 0%; not independently verified |
| Energy management | RERA schedule marks “YES” | RERA amenities | 0%; not independently verified |
| Recreational open space | Aggregate area listed in the RERA schedule; area not supplied | RERA amenities | 0%; not independently verified |
7. Utilities, building services & safety
The filed plan identifies a sump, STP, septic tank, distribution transformer and rainwater-harvesting provision. The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection, and electrical meter room/sub-station/receiving station as available or provided, while showing 0% progress for the listed items. The supplied records do not provide capacities, operating details or independent service testing. RERA amenities
The building-permission conditions require a rainwater-harvesting structure, transformer space and garbage house. They also specify parking-area EV charging infrastructure, dual piping as a building-system description, and fire/life-safety and other conditions. These are approval conditions; the supplied evidence does not establish that each system is installed, commissioned or independently verified.
The filed plan names a lift and staircase, but does not specify lift capacity, backup power, accessible routes, CCTV, waste-segregation arrangements or access-control details. The occupancy certificate records the building as fit for occupation; that does not by itself establish the operational status of every service described in the plan.
8. Location, access & connectivity
The registered project location is Ameenapur, Ameenpur, Sangareddy, 502032, with Survey No. 312 identified in the registration certificate. The filed site plan identifies a 9.00 MT wide existing road, a 9.00 MT wide proposed road, a 4.50 m driveway and a 9.00 MT wide south road.
The supplied location record gives a cadastral parcel-centroid coordinate of 17.52587, 78.33949 and an approximate 8.4 km distance to the nearest sampled Outer Ring Road interchange. No verified public-transport details or independently measured distances to other landmarks are supplied. Location record
9. Developer & development status
The registered promoter is BOMMARILLU DEVELOPERS, identified in the promoter record as a partnership, with GSTIN 36AAXFB5484A1Z7. The promoter’s registered office is not consistently stated in the supplied record; the RERA certificate lists an address at Miyapur, Serilingampally, Ranga Reddy, 500049, while the promoter-information record gives an address in Swarnapuri Colony, Ameenpur, Sangareddy, 502032. Corporate record
The Form-B declaration signed by Mahender Gopathi gives 5 June 2027 as the project completion undertaking. The project’s Form 1A architect certificate states completion in all aspects, and an Ameenpur Municipality occupancy certificate is filed for the building. The certificate identifies Survey No. 312 and 1 stilt + 5 upper floors.
10. Approvals, official records & documents
| Identifier / date | P01100008673; valid 20 August 2024–5 June 2027 |
|---|---|
| Scope and record | BOMMARILLU BRINDAVAN, promoted by Bommarillu Developers; identifies the site as Ameenapur, Ameenpur, Sangareddy, Survey No. 312. |
| Identifier / date | 0047/BP/3121/2024, 5 June 2024; file No. 003840/BP/DTCP/3121/0063/2024 |
|---|---|
| Scope and record | Ameenpur Municipality/Municipal Corporation building approval for a residential building at Survey No. 312. |
| Identifier / date | File No. 254/S-1/TP10/GHMC |
|---|---|
| Scope and record | Filed plan for the residential building in Survey Nos. 312 and 312/AA PART; records 25 units and the building and parking particulars summarized above. |
| Identifier / date | 002543/AMEE/00016/SWOC/2025, dated 9 July 2025 |
|---|---|
| Scope and record | Architect certifies BOMMARILLU BRINDAVAN as completed in all aspects and identifies an occupancy certificate. |
| Identifier / date | Proceedings No. 002543/AMEE/00016/SWOC/2025; completion date 11 June 2025 |
|---|---|
| Scope and record | Ameenpur Municipality certificate for the residential building at Survey No. 312, 1 stilt + 5 upper floors. |
| Identifier / date | Project completion undertaking: 05-06-2027 |
|---|---|
| Scope and record | Promoter declaration by Mahender Gopathi for BOMMARILLU DEVELOPERS. |
| Identifier / date | Document 476603 |
|---|---|
| Scope and record | Advocate’s title scrutiny and opinion concerning 995.79 sq. m in Survey No. 312, Ameenpur; detailed title-chain review belongs in the Land & Title section. |
| Identifier / date | Document No. 13342 of 2024, dated 20 May 2024 |
|---|---|
| Scope and record | Registered mortgage deed in favour of the Commissioner, Ameenpur Municipality, filed among project title documents. |
1. Project at a glance
Project identity
Registered name: BOMMARILLU BRINDAVAN
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration covers the project at Survey No. 312
TG-RERA registration: P01100008673
Registration validity: 20 August 2024 to 5 June 2027, unless extended by the Authority
Registered promoter: BOMMARILLU DEVELOPERS
RERA status: Registered project; the certificate states the registration period above
Land and geographic identity
Locality: Ameenpur
Revenue village: Ameenapur / Ameenpur, as rendered in the project record and filed documents
Mandal: Ameenpur
District: Sangareddy
PIN: 502032
Project survey identifiers: Survey No. 312; the filed layout-plan record also lists 312/AA PART. The commencement approval and registration certificate identify Survey No. 312.
Registered site extent: 995.79 sq. m
Total / net site area: Total area 995.79 sq. m; net area 995.79 sq. m; road-affected area recorded as 0.
Boundaries: Not disclosed in the supplied project record
Development identity
Sanctioning authority: Ameenpur Municipality / Municipal Corporation; the filed approval-plan record identifies TS-DTCP as the authority and Ameenpur Municipality as the delegated authority
Principal building approval: Approval No. 0047/BP/3121/2024, dated 05 June 2024
Approved built-up area: 2,452.20 sq. m excluding parking; 3,023.30 sq. m including parking
Building count and floors: One residential building; 1 stilt + 5 upper floors
Building height: 14.99 m recorded for the sanctioned height
Parking: 11 cars proposed; parking area 571.10 sq. m in the filed plan
Approved / RERA-filed units: The filed plan states 25 units; the TG-RERA unit record also lists 25 apartments: 15 2BHK and 10 3BHK.
Offering and status
Unit types: 2BHK and 3BHK apartments
RERA-filed saleable area: 2BHK: 115.5 sq. m; 3BHK: 143.07 sq. m
Booked / available: Portal data lists 0 booked and 15 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal extract has no as-of date; treat counts as indicative.
RERA-declared completion deadline: 5 June 2027
Occupancy certificate status: An Ameenpur Municipality occupancy certificate is filed for the residential building at Survey No. 312. It identifies 1 stilt + 5 upper floors and a completion date of 11 June 2025. The certificate is building-specific in the supplied record.
Construction stage: The filed architect’s Form 1A states the project is completed in all aspects; the municipal occupancy certificate is also filed. This is documentary completion evidence, not an independent site inspection by this report.
2. The project story
BOMMARILLU BRINDAVAN is registered as a residential apartment development in Ameenpur, Sangareddy district. The RERA-filed site is 995.79 sq. m in Survey No. 312, with the filed layout-plan record additionally identifying Survey No. 312/AA PART.
The sanctioned scheme is one apartment building with a stilt and five upper floors. The RERA unit record lists 25 homes—15 two-bedroom and 10 three-bedroom apartments. The filed architect’s completion certificate describes the project as completed in all aspects, and a municipal occupancy certificate is provided for the building. These are filed certifications and records; no independent physical inspection is included here.
3. Master plan, architecture & building design
The filed building permission is for a residential building with 1 stilt + 5 upper floors, on a site recorded as 995.79 sq. m. The plan states 2,452.20 sq. m of proposed built-up area excluding parking and 3,023.30 sq. m including parking; it separately records 571.10 sq. m of parking area. These figures are the plan’s stated categories and are not carpet-area measurements.
The plan records a building height of 14.99 m, six floors, a 555.91 sq. m stilt area, and balconies totalling 144.70 sq. m. It identifies a proposed 9.00 MT road, a 4.50 m driveway, and a further 9.00 MT south road. The plan also lists a 9.00 MT wide existing road.
The filed plan names a lift and staircase and identifies a residential use; it does not provide a reliable floor-by-floor apartment schedule, lift capacity, or detailed circulation description in the supplied extracts. The plan lists vacant plot area of 424.68 sq. m, but the supplied record does not specify the detailed use or configuration of all open areas.
4. Homes, configurations & floor plans
TG-RERA lists 25 apartments in two configurations. Saleable areas and unit counts below are RERA-filed. Carpet areas are software-measured from the filed drawing, not RERA disclosures; the drawing geometry should be checked against the approved plan.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 115.5 sq. m | 57.8–79.3 sq. m; median 59.7 sq. m | 48% |
| 3BHK | 10 | 0 | 10 | 143.07 sq. m | 80.8 sq. m | 43% |
The measured 2BHK range comes from five drawing-measured designs; the 3BHK measurement comes from three. The fifth-floor plan extract shows a 2BHK example with two bedrooms, hall, kitchen, two toilets and a balcony, and a 3BHK example with three bedrooms, hall, kitchen, two toilets and a wash area. Room dimensions are drawing-derived measurements, not RERA-filed room specifications.
Carpet area describes the measured internal area shown by the drawing geometry. RERA saleable area is a separately filed figure and may include the home’s share of common areas; balcony and other excluded spaces are not interchangeable with carpet area. The filing marks both configurations as mortgaged.
5. Parking & vehicle circulation
The filed plan states 11 proposed car spaces and 571.10 sq. m of parking area. The building permission says the stilt approved for parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. A driveway is identified in the filed plan as 4.50 m wide. The supplied extracts do not establish visitor or accessible-space counts, two-wheeler provision, parking allotment to particular apartments, EV-charger locations or a vehicle-entry/exit arrangement. The plan’s EV-charging requirement is a sanction condition; the supplied evidence does not confirm installed charging infrastructure.
6. Amenities, recreation & open spaces
The following facilities appear in the filed plan or RERA amenity schedule. The schedule shows 0% progress for the listed items; those percentages are not independent verification of site condition. The occupancy and completion documents certify the building/project but do not separately verify each listed facility.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot listed; plan records 0 m² for the tot-lot | RERA amenity schedule: 0%; not independently verified | |
| Lift | Listed in the filed plan | RERA amenity schedule does not establish installation status | |
| Staircase | Listed in the filed plan | RERA amenity schedule does not establish installation status | |
| Rainwater harvesting | Percolation pit; plan records 3 RWHPs | RERA schedule marks water conservation/rainwater harvesting “YES”, 0%; not independently verified | |
| Sump | Listed in the filed plan | Not independently verified | |
| STP / septic tank | Both are listed in the filed plan | RERA schedule lists sewerage facilities as “YES”, 0%; no capacity or operational status supplied | |
| Distribution transformer | Listed in the filed plan | RERA schedule lists electrical meter room/sub-station/receiving station as “YES”, 0%; not independently verified | |
| Garbage house | Required by the building-sanction conditions | Condition stated; completion not independently verified | |
| Internal roads and footpaths | Listed in the RERA amenity schedule | 0%; not independently verified | |
| Storm-water drains | RERA schedule marks “YES” | 0%; not independently verified | |
| Street lighting | Listed in the RERA amenity schedule | 0%; not independently verified | |
| Community buildings | Listed in the RERA amenity schedule | 0%; not independently verified | |
| Solid-waste management and disposal | Listed in the RERA amenity schedule | 0%; not independently verified | |
| Fire protection and fire safety | RERA schedule marks “YES” | 0%; not independently verified | |
| Energy management | RERA schedule marks “YES” | 0%; not independently verified | |
| Recreational open space | Aggregate area listed in the RERA schedule; area not supplied | 0%; not independently verified |
7. Utilities, building services & safety
The filed plan identifies a sump, STP, septic tank, distribution transformer and rainwater-harvesting provision. The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection, and electrical meter room/sub-station/receiving station as available or provided, while showing 0% progress for the listed items. The supplied records do not provide capacities, operating details or independent service testing.
The building-permission conditions require a rainwater-harvesting structure, transformer space and garbage house. They also specify parking-area EV charging infrastructure, dual piping as a building-system description, and fire/life-safety and other conditions. These are approval conditions; the supplied evidence does not establish that each system is installed, commissioned or independently verified.
The filed plan names a lift and staircase, but does not specify lift capacity, backup power, accessible routes, CCTV, waste-segregation arrangements or access-control details. The occupancy certificate records the building as fit for occupation; that does not by itself establish the operational status of every service described in the plan.
8. Location, access & connectivity
The registered project location is Ameenapur, Ameenpur, Sangareddy, 502032, with Survey No. 312 identified in the registration certificate. The filed site plan identifies a 9.00 MT wide existing road, a 9.00 MT wide proposed road, a 4.50 m driveway and a 9.00 MT wide south road.
The supplied location record gives a cadastral parcel-centroid coordinate of 17.52587, 78.33949 and an approximate 8.4 km distance to the nearest sampled Outer Ring Road interchange. No verified public-transport details or independently measured distances to other landmarks are supplied.
9. Developer & development status
The registered promoter is BOMMARILLU DEVELOPERS, identified in the promoter record as a partnership, with GSTIN 36AAXFB5484A1Z7. The promoter’s registered office is not consistently stated in the supplied record; the RERA certificate lists an address at Miyapur, Serilingampally, Ranga Reddy, 500049, while the promoter-information record gives an address in Swarnapuri Colony, Ameenpur, Sangareddy, 502032.
The Form-B declaration signed by Mahender Gopathi gives 5 June 2027 as the project completion undertaking. The project’s Form 1A architect certificate states completion in all aspects, and an Ameenpur Municipality occupancy certificate is filed for the building. The certificate identifies Survey No. 312 and 1 stilt + 5 upper floors.
10. Approvals, official records & documents
| Identifier / date | P01100008673; valid 20 August 2024–5 June 2027 |
|---|---|
| Scope and record | BOMMARILLU BRINDAVAN, promoted by Bommarillu Developers; identifies the site as Ameenapur, Ameenpur, Sangareddy, Survey No. 312. |
| Identifier / date | 0047/BP/3121/2024, 5 June 2024; file No. 003840/BP/DTCP/3121/0063/2024 |
|---|---|
| Scope and record | Ameenpur Municipality/Municipal Corporation building approval for a residential building at Survey No. 312. |
| Identifier / date | File No. 254/S-1/TP10/GHMC |
|---|---|
| Scope and record | Filed plan for the residential building in Survey Nos. 312 and 312/AA PART; records 25 units and the building and parking particulars summarized above. |
| Identifier / date | 002543/AMEE/00016/SWOC/2025, dated 9 July 2025 |
|---|---|
| Scope and record | Architect certifies BOMMARILLU BRINDAVAN as completed in all aspects and identifies an occupancy certificate. |
| Identifier / date | Proceedings No. 002543/AMEE/00016/SWOC/2025; completion date 11 June 2025 |
|---|---|
| Scope and record | Ameenpur Municipality certificate for the residential building at Survey No. 312, 1 stilt + 5 upper floors. |
| Identifier / date | Project completion undertaking: 05-06-2027 |
|---|---|
| Scope and record | Promoter declaration by Mahender Gopathi for BOMMARILLU DEVELOPERS. |
| Identifier / date | Document 476603 |
|---|---|
| Scope and record | Advocate’s title scrutiny and opinion concerning 995.79 sq. m in Survey No. 312, Ameenpur; detailed title-chain review belongs in the Land & Title section. |
| Identifier / date | Document No. 13342 of 2024, dated 20 May 2024 |
|---|---|
| Scope and record | Registered mortgage deed in favour of the Commissioner, Ameenpur Municipality, filed among project title documents. |
Other registrations of Bommarillu Brindavan
Frequently asked questions
Is BOMMARILLU BRINDAVAN registered with Telangana RERA?
Yes. BOMMARILLU BRINDAVAN is registered with the Telangana Real Estate Regulatory Authority as P01100008673; the registration status is New Project.
Who is the developer of BOMMARILLU BRINDAVAN?
The promoter named in the RERA registration is BOMMARILLU DEVELOPERS.
Where is BOMMARILLU BRINDAVAN located?
BOMMARILLU BRINDAVAN is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).
When will BOMMARILLU BRINDAVAN be completed?
The promoter's proposed date of completion filed with RERA is 05/06/2027. This is the promoter's declaration, not a guarantee.
More projects in Ameenapur







