Bommarillu Enclave
BOMMARILLU CONSTRUCTIONS · Sangareddy · RERA P01100002537
BOMMARILLU ENCLAVE is a residential apartment project in AMEENAPUR / AMEENPUR, AMEENPUR Mandal, Sangareddy District. It is being developed by the registered promoter BOMMARILLU CONSTRUCTIONS on 696.77 sq. m. of land, with one building / one tower comprising 1 stilt + 5 upper floors and 20 2BHK apartments. The project is registered under TG-RERA registration P01100002537, with a proposed completion date of 07/08/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | BOMMARILLU ENCLAVE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration is for the project |
| TG-RERA registration | P01100002537 |
| Registration validity | 01/02/2021 to 07/08/2026; no extension is recorded in the supplied certificate |
| Registered promoter | BOMMARILLU CONSTRUCTIONS |
| RERA status | The certificate records registration under section 5. Its stated validity ends 07/08/2026; current status beyond that date is not established by the supplied record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | AMEENAPUR / AMEENPUR |
| Revenue village | AMEENAPUR; the supplied records also use “Ameenpur Village” RERA filing |
| Mandal | AMEENPUR; the approval document says “Ameenpur Muncipality Mandal” |
| District / PIN | Sangareddy / 502032 |
| Project survey number and subdivision | 300/EE2 |
| Registered site extent | 696.77 sq. m. in the RERA land details and technical-approval document RERA filing |
| Net / total area | RERA records total and net area as 696.77 sq. m.; affected area is recorded as 00 RERA filing |
| Boundaries | East: land in Sy. No. 299; west: 9-metre road; north: land in Sy. No. 300 P; south: land in Sy. No. 298 RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval identifies Ameenpur Municipality as the delegated authority for local sanction Approvals record |
| Principal technical approval | 035921/SKP/R1/U6/HMDA/21052020, dated 07/08/2020 Approvals record |
| Approved building configuration | 1 stilt + 5 upper floors |
| Approved built-up area | 1708.65 sq. m. recorded as “Built up Area”; the approval also records “Total Built up Area” and “Proposed Built-up Area” as 2091.96. These are distinct labels in the approval, not interchangeable measures |
| Height | 14.99 m |
| Building / tower count | One building / one tower in the supplied project record RERA filing RERA unit table |
| Parking levels and count | The technical approval refers to stilt parking, but no sanctioned parking-space count is supplied |
| Unit count | Approved-plan unit count is recorded as 1 in the RERA land details; the RERA unit schedule records 20 apartments RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 2BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 106.83 sq. m. RERA unit table RERA unit details |
| Booked / available | 0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative RERA unit table |
| Construction stage | The supplied RERA filing does not establish current construction progress. An HMDA occupancy certificate in the file records the building as fit for occupation; its project/building scope is described below |
| Proposed completion date | 07/08/2026, as shown in the RERA project information RERA filing |
| Occupancy certificate | HMDA record 000605/OC/HMDA/SKP/2022, dated 11 April 2022; it identifies a residential building on Survey No. 300/EE2 Approvals record |
The project story
BOMMARILLU ENCLAVE is registered with TG-RERA as a residential apartment project at AMEENAPUR, AMEENPUR Mandal, Sangareddy District, on Survey No. 300/EE2. The filed land area is 696.77 sq. m., and the technical approval describes a single residential building with a stilt and five upper floors. The RERA unit schedule lists 20 two-bedroom apartments. RERA filing RERA unit table
The project’s RERA record gives a proposed completion date of 07/08/2026, while the file also contains an HMDA occupancy certificate for a residential building on Survey No. 300/EE2. That certificate records completion on 26 October 2021 and says the building was inspected and declared fit for occupation. The supplied evidence does not establish whether the certificate covers every unit now listed under the RERA registration, so its scope should be confirmed against the certificate and the registered project records. RERA filing
Master plan, architecture & building design
The filed technical approval describes a proposed residential building on Survey No. 300/EE2, with a 696.77 sq. m. extent, 1 stilt + 5 upper floors, and a building height of 14.99 m. It records a built-up area of 1708.65 sq. m. and separately lists total and proposed built-up area as 2091.96. The supplied records do not define those area labels further; they should not be treated as saleable area or carpet area.
The project record identifies one building and one tower. The approval calls for stilt parking and includes conditions for a tot-lot/greenery, rainwater-harvesting structure, transformer space and garbage house. Detailed floor plans, unit-by-floor arrangements, building footprint, lift and stair details, internal circulation, open-space measurements and a verified master-plan land-use assignment are not available in the supplied evidence. RERA unit table HMDA
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 106.83 sq. m. | Not measured from supplied drawings | Not supplied |
Unit counts, booking counts and saleable area are from the TG-RERA filing; the booking snapshot has no as-of date and is indicative. The floor-plan dataset contains two drawings, but neither has been measured. Consequently, no drawing-based carpet area, room dimensions, balcony or utility measurements are available. Saleable area is the RERA-filed figure; it is not a measured carpet-area figure. RERA unit table RERA unit details Floor plans
Parking & vehicle circulation
The HMDA technical approval describes a stilt level and requires the cellar/stilt parking shown in the plan to be used exclusively for vehicle parking. It does not provide a parking-space count in the supplied extract. No verified resident or visitor allocation, accessible-space provision, parking plan, ramp or driveway details, EV charging provision, or unit-specific parking allocation is available. A parking bay in a plan, where shown, would not by itself establish exclusive ownership.
Amenities, recreation & open spaces
| Description / size | Tot-lot to be fenced and maintained as greenery; no size supplied |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Approval condition; completion not established |
| Description / size | Percolation pit / rainwater-harvesting structure; no capacity supplied |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Required by approval; completion not established |
| Description / size | Space to be provided within the site; no capacity supplied |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Approval condition; completion not established |
| Description / size | To be provided within the premises; no size supplied |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Approval condition; completion not established |
| Description / size | Third-party listing claims these facilities; no supplied RERA filing or approval evidence confirms them |
|---|---|
| Evidence source | Vendor listing Promoter website |
| Declared progress / verified status | Marketing/listing claims only; delivery and independent verification not established |
TG-RERA’s amenities record marks several project-service categories—including water supply, sewerage, rainwater harvesting, energy management, fire protection and electrical meter/substation facilities—as “YES,” but records 0% progress for the listed categories. These are filing entries, not independent confirmation that the facilities are complete or operational. RERA amenities
Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/substation/receiving station as available; the same record shows 0% progress for each listed category. The HMDA technical approval calls for rainwater harvesting, transformer space and a garbage house. The supplied evidence does not provide water source or storage capacity, sewerage-treatment capacity, reuse arrangements, storm-water design, electrical backup capacity, lift details, fire-system specifications, CCTV or access-control details, or accessibility provisions. RERA amenities
The HMDA approval makes an occupancy certificate compulsory before occupation and lists construction and safety conditions. The occupancy certificate in the file records the building as fit for occupation, but it does not supply detailed system capacities in the material reviewed here.
Location, access & connectivity
The registered location is AMEENAPUR / AMEENPUR, AMEENPUR Mandal, Sangareddy District, PIN 502032. The parcel boundaries in the RERA land record identify a 9-metre road on the west. A location dataset gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km; this is a dataset distance, not a travel-time claim. RERA filing Location record
Developer & development status
The registered promoter is BOMMARILLU CONSTRUCTIONS, identified as a partnership in the project record. The listed partners are GOPATHI MAHENDER, BATHINENI RADHA KRISHNAIAH and PEDDYREDDY KRISHNA KANTH REDDY; GOPATHI MAHENDER is listed as authorized signatory. The supplied record gives the promoter address as FOUNTAIN HEAD APARTMENT, VEDIRI TOWNSHIP, AMEENPUR, AMEENAPUR, AMEENPUR, Sangareddy, 502032. No company registration identifier, official contact details or official website is supplied. Corporate record Parties record RERA record
The RERA project information records a proposed completion date of 07/08/2026. The promoter’s Form B declaration leaves its completion-period statement blank, so it does not provide a separate completed undertaking date in the supplied extract. The RERA unit record indicates 20 units, but the current construction progress is not independently established by the supplied material. RERA filing RERA unit table
Approvals, official records & documents
| Identifier / date | P01100002537; issued 01/02/2021; stated validity to 07/08/2026 |
|---|---|
| What the supplied record establishes | Form C records registration of BOMMARILLU ENCLAVE and identifies Survey No. 300/EE2 |
| Identifier / date | 035921/SKP/R1/U6/HMDA/21052020; 07/08/2020 |
|---|---|
| What the supplied record establishes | Technical approval for a residential building on Survey No. 300/EE2, with a stilt and five upper floors |
| Identifier / date | 000605/OC/HMDA/SKP/2022; 11 April 2022 |
|---|---|
| What the supplied record establishes | Records a residential building on Survey No. 300/EE2 as fit for occupation; certificate records completion on 26 October 2021 |
| Identifier / date | Document 147756 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project funds, audits and approvals; completion-period field is blank |
| Identifier / date | Included with technical approval |
|---|---|
| What the supplied record establishes | Includes conditions on parking use, tot-lot greenery, rainwater harvesting, transformer space, garbage house and obtaining an occupancy certificate before occupation |
The supplied records identify Survey No. 300/EE2 throughout the project registration and the cited HMDA building records. Detailed drawing sheets and a public HMDA layout lookup are not available in the supplied evidence; the listed approvals and certificates do not replace review of the complete sanctioned plans and their conditions. HMDA
Project at a glance
Project identity
Registered name: BOMMARILLU ENCLAVE
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration is for the project
TG-RERA registration: P01100002537
Registration validity: 01/02/2021 to 07/08/2026; no extension is recorded in the supplied certificate
Registered promoter: BOMMARILLU CONSTRUCTIONS
RERA status: The certificate records registration under section 5. Its stated validity ends 07/08/2026; current status beyond that date is not established by the supplied record
Land and geographic identity
Locality: AMEENAPUR / AMEENPUR
Revenue village: AMEENAPUR; the supplied records also use “Ameenpur Village”
Mandal: AMEENPUR; the approval document says “Ameenpur Muncipality Mandal”
District / PIN: Sangareddy / 502032
Project survey number and subdivision: 300/EE2
Registered site extent: 696.77 sq. m. in the RERA land details and technical-approval document
Net / total area: RERA records total and net area as 696.77 sq. m.; affected area is recorded as 00
Boundaries: East: land in Sy. No. 299; west: 9-metre road; north: land in Sy. No. 300 P; south: land in Sy. No. 298
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval identifies Ameenpur Municipality as the delegated authority for local sanction
Principal technical approval: 035921/SKP/R1/U6/HMDA/21052020, dated 07/08/2020
Approved building configuration: 1 stilt + 5 upper floors
Approved built-up area: 1708.65 sq. m. recorded as “Built up Area”; the approval also records “Total Built up Area” and “Proposed Built-up Area” as 2091.96. These are distinct labels in the approval, not interchangeable measures
Height: 14.99 m
Building / tower count: One building / one tower in the supplied project record
Parking levels and count: The technical approval refers to stilt parking, but no sanctioned parking-space count is supplied
Unit count: Approved-plan unit count is recorded as 1 in the RERA land details; the RERA unit schedule records 20 apartments
Offering and status
Configuration: 2BHK
RERA-filed saleable area: 106.83 sq. m.
Booked / available: 0 booked / 20 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative
Construction stage: The supplied RERA filing does not establish current construction progress. An HMDA occupancy certificate in the file records the building as fit for occupation; its project/building scope is described below
Proposed completion date: 07/08/2026, as shown in the RERA project information
Occupancy certificate: HMDA record 000605/OC/HMDA/SKP/2022, dated 11 April 2022; it identifies a residential building on Survey No. 300/EE2
The project story
BOMMARILLU ENCLAVE is registered with TG-RERA as a residential apartment project at AMEENAPUR, AMEENPUR Mandal, Sangareddy District, on Survey No. 300/EE2. The filed land area is 696.77 sq. m., and the technical approval describes a single residential building with a stilt and five upper floors. The RERA unit schedule lists 20 two-bedroom apartments.
The project’s RERA record gives a proposed completion date of 07/08/2026, while the file also contains an HMDA occupancy certificate for a residential building on Survey No. 300/EE2. That certificate records completion on 26 October 2021 and says the building was inspected and declared fit for occupation. The supplied evidence does not establish whether the certificate covers every unit now listed under the RERA registration, so its scope should be confirmed against the certificate and the registered project records.
Master plan, architecture & building design
The filed technical approval describes a proposed residential building on Survey No. 300/EE2, with a 696.77 sq. m. extent, 1 stilt + 5 upper floors, and a building height of 14.99 m. It records a built-up area of 1708.65 sq. m. and separately lists total and proposed built-up area as 2091.96. The supplied records do not define those area labels further; they should not be treated as saleable area or carpet area.
The project record identifies one building and one tower. The approval calls for stilt parking and includes conditions for a tot-lot/greenery, rainwater-harvesting structure, transformer space and garbage house. Detailed floor plans, unit-by-floor arrangements, building footprint, lift and stair details, internal circulation, open-space measurements and a verified master-plan land-use assignment are not available in the supplied evidence.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 106.83 sq. m. | Not measured from supplied drawings | Not supplied |
Unit counts, booking counts and saleable area are from the TG-RERA filing; the booking snapshot has no as-of date and is indicative. The floor-plan dataset contains two drawings, but neither has been measured. Consequently, no drawing-based carpet area, room dimensions, balcony or utility measurements are available. Saleable area is the RERA-filed figure; it is not a measured carpet-area figure.
Parking & vehicle circulation
The HMDA technical approval describes a stilt level and requires the cellar/stilt parking shown in the plan to be used exclusively for vehicle parking. It does not provide a parking-space count in the supplied extract. No verified resident or visitor allocation, accessible-space provision, parking plan, ramp or driveway details, EV charging provision, or unit-specific parking allocation is available. A parking bay in a plan, where shown, would not by itself establish exclusive ownership.
Amenities, recreation & open spaces
| Description / size | Tot-lot to be fenced and maintained as greenery; no size supplied |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Approval condition; completion not established |
| Description / size | Percolation pit / rainwater-harvesting structure; no capacity supplied |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Required by approval; completion not established |
| Description / size | Space to be provided within the site; no capacity supplied |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Approval condition; completion not established |
| Description / size | To be provided within the premises; no size supplied |
|---|---|
| Evidence source | HMDA technical approval |
| Declared progress / verified status | Approval condition; completion not established |
| Description / size | Third-party listing claims these facilities; no supplied RERA filing or approval evidence confirms them |
|---|---|
| Evidence source | Vendor listing |
| Declared progress / verified status | Marketing/listing claims only; delivery and independent verification not established |
TG-RERA’s amenities record marks several project-service categories—including water supply, sewerage, rainwater harvesting, energy management, fire protection and electrical meter/substation facilities—as “YES,” but records 0% progress for the listed categories. These are filing entries, not independent confirmation that the facilities are complete or operational.
Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/substation/receiving station as available; the same record shows 0% progress for each listed category. The HMDA technical approval calls for rainwater harvesting, transformer space and a garbage house. The supplied evidence does not provide water source or storage capacity, sewerage-treatment capacity, reuse arrangements, storm-water design, electrical backup capacity, lift details, fire-system specifications, CCTV or access-control details, or accessibility provisions.
The HMDA approval makes an occupancy certificate compulsory before occupation and lists construction and safety conditions. The occupancy certificate in the file records the building as fit for occupation, but it does not supply detailed system capacities in the material reviewed here.
Location, access & connectivity
The registered location is AMEENAPUR / AMEENPUR, AMEENPUR Mandal, Sangareddy District, PIN 502032. The parcel boundaries in the RERA land record identify a 9-metre road on the west. A location dataset gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km; this is a dataset distance, not a travel-time claim.
Developer & development status
The registered promoter is BOMMARILLU CONSTRUCTIONS, identified as a partnership in the project record. The listed partners are GOPATHI MAHENDER, BATHINENI RADHA KRISHNAIAH and PEDDYREDDY KRISHNA KANTH REDDY; GOPATHI MAHENDER is listed as authorized signatory. The supplied record gives the promoter address as FOUNTAIN HEAD APARTMENT, VEDIRI TOWNSHIP, AMEENPUR, AMEENAPUR, AMEENPUR, Sangareddy, 502032. No company registration identifier, official contact details or official website is supplied.
The RERA project information records a proposed completion date of 07/08/2026. The promoter’s Form B declaration leaves its completion-period statement blank, so it does not provide a separate completed undertaking date in the supplied extract. The RERA unit record indicates 20 units, but the current construction progress is not independently established by the supplied material.
Approvals, official records & documents
| Identifier / date | P01100002537; issued 01/02/2021; stated validity to 07/08/2026 |
|---|---|
| What the supplied record establishes | Form C records registration of BOMMARILLU ENCLAVE and identifies Survey No. 300/EE2 |
| Identifier / date | 035921/SKP/R1/U6/HMDA/21052020; 07/08/2020 |
|---|---|
| What the supplied record establishes | Technical approval for a residential building on Survey No. 300/EE2, with a stilt and five upper floors |
| Identifier / date | 000605/OC/HMDA/SKP/2022; 11 April 2022 |
|---|---|
| What the supplied record establishes | Records a residential building on Survey No. 300/EE2 as fit for occupation; certificate records completion on 26 October 2021 |
| Identifier / date | Document 147756 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title basis, encumbrances, project funds, audits and approvals; completion-period field is blank |
| Identifier / date | Included with technical approval |
|---|---|
| What the supplied record establishes | Includes conditions on parking use, tot-lot greenery, rainwater harvesting, transformer space, garbage house and obtaining an occupancy certificate before occupation |
The supplied records identify Survey No. 300/EE2 throughout the project registration and the cited HMDA building records. Detailed drawing sheets and a public HMDA layout lookup are not available in the supplied evidence; the listed approvals and certificates do not replace review of the complete sanctioned plans and their conditions.
Frequently asked questions
Is BOMMARILLU ENCLAVE registered with Telangana RERA?
Yes. BOMMARILLU ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P01100002537; the registration status is New Project.
Who is the developer of BOMMARILLU ENCLAVE?
The promoter named in the RERA registration is BOMMARILLU CONSTRUCTIONS.
Where is BOMMARILLU ENCLAVE located?
BOMMARILLU ENCLAVE is in AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).
When will BOMMARILLU ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 07/08/2026. This is the promoter's declaration, not a guarantee.
More projects in Ameenapur