Cheela Life Spaces Maya Haridwar
CHEELA LIFE SPACES P LTD (OPC) · Medchal-Malkajgiri · RERA P02200008681
CHEELA LIFE SPACES MAYA HARIDWAR is a residential apartment project in Pet Basherbad, Qutballapur mandal, Medchal-Malkajgiri district. It is being developed by CHEELA LIFE SPACES P LTD (OPC) on a site of 472.84 sq. m., with one residential building comprising 1 Stilt + 5 upper floors and 10 3BHK units. The project is registered under TG-RERA registration number P02200008681, and its proposed completion is 6 May 2027.
More from Cheela Life Spaces P Ltd (opc) · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | CHEELA LIFE SPACES MAYA HARIDWAR RERA record |
| Project type / use | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified in the supplied record; registration is for the project at Pet Basherbad, Survey Nos. 31 & 32 RERA record |
| TG-RERA registration | P02200008681 RERA record |
| Registration validity | 20 August 2024 to 6 May 2027, unless extended by the Authority RERA record |
| Registered promoter | CHEELA LIFE SPACES P LTD (OPC) RERA record Corporate record |
| RERA status | New Project; registration certificate on file. Registration validity is distinct from the completion undertaking and any occupancy certificate. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Pet Bahseerabad / Pet Basherbad; the RERA certificate gives the revenue village as Pet Basherbad. RERA record RERA filing |
| Mandal / district / PIN | Qutballapur / Medchal-Malkajgiri / 500067 RERA record |
| Project survey numbers | Survey Nos. 31 & 32; no project subdivision is disclosed in the supplied project identity record. RERA record RERA filing |
| Registered site extent | 472.84 sq. m.; the building-permit record also gives net plot area as 472.84 sq. m. RERA filing |
| Total / net area | Total area 472.84 sq. m.; net area 472.84 sq. m. RERA filing |
| Boundaries recorded by RERA | East: Plot No. 122 Part; West: Road; North: Neighbours Land; South: Plot No. 122 Part South Side Portion and Neighbours RERA filing |
| Plot description in RERA certificate | Plot Nos. 122/1/P (Middle Portion), 122/1/P (North Side), 122/P (Western Side), and 122/P (Western Side), at Pet Basherbad |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit No. 0971/GHMC/KPL/2024-BP, approved 06 May 2024; file No. 003086/GHMC/1494/KPL2/2024-BP Approvals record |
| Approved built-up area | 1,276.30 sq. m. (the plan extraction labels this net BUA and proposed built-up area excluding parking); parking area is separately stated as 255.30 sq. m. |
| Building count / arrangement | One residential building, identified as “RESI (CHEELA LIFE SPACES MAYA HARIDWAR)” |
| Sanctioned floors | 1 Stilt + 5 upper floors; plan extraction states six floors and building height 14.50 m, excluding stilt. |
| Parking levels / area | Stilt is approved for parking; the permit states total parking area 195.3 (unit not specified in the extracted parameter) and the plan extraction states parking area 255.30 sq. m. Counts of parking spaces are not disclosed in the supplied extracts. |
| Unit count | 10 units in the RERA unit record; the floor-plan approval extract also states 10 units. RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the portal record supplies no as-of date, so counts are indicative. RERA unit table |
| RERA-filed saleable area | 127.6 sq. m. per 3BHK unit RERA unit table |
| Construction stage | The supplied records do not establish an independently verified site-construction stage. The RERA amenities record shows 0% for listed progress items; it is not a physical-site verification. RERA amenities |
| Completion timeline | Promoter’s Form B declaration, dated 15 May 2024, undertakes completion within three years from permission, stated as 6 May 2027. The GHMC permit states construction to be completed before 6 May 2027. |
| Occupancy / completion certificate | No completion certificate or occupancy certificate is evidenced in the supplied records; the building permit makes an occupancy certificate necessary before occupation. |
2. The project story
The registered project is a small, single-building residential apartment development on a recorded site of 472.84 sq. m. in Pet Basherbad, Qutballapur, Medchal-Malkajgiri. The GHMC permit identifies one residential building and sanctions a stilt level with five upper floors. The RERA unit record lists 10 three-bedroom apartments, all shown as available in the portal capture, whose count has no stated as-of date. RERA record RERA filing RERA unit table
The promoter’s RERA-filed Form B gives a completion undertaking of 6 May 2027, and the GHMC permit also states that construction is to be completed before that date. These are declared and sanctioned timelines, not evidence of completed construction. No completion or occupancy certificate, independently verified site progress, or phase-wise handover status is supplied.
3. Master plan, architecture & building design
The GHMC building permit is for a residential building on a 472.84 sq. m. plot, with net plot area also stated as 472.84 sq. m. It sanctions 1 Stilt + 5 upper floors. The approval extracts state a height of 14.50 m excluding the stilt and a total height of 20.25 m; they also give proposed built-up area excluding parking as 1,276.30 sq. m., total proposed built-up area including parking as 1,531.60 sq. m., and total BUA as 1,554.30 with deductions of 22.70 and net BUA of 1,276.30. These plan-extracted labels are retained as recorded and are not interchangeable area measures.
The permit identifies one building; the supplied extracts do not establish flats per floor, a unit-by-unit floor arrangement, footprint dimensions, lift count or capacity, stair configuration, or detailed internal circulation. The plan extract records a 5.20 m driveway and 9.00 m roads in its drawing-derived road-width entries. The permit requires a fenced tot-lot maintained as greenery, peripheral greenery and a rainwater-harvesting structure; the supplied records do not provide a measured open-space area or establish delivery.
GHMC permit No. 0971/GHMC/KPL/2024-BP is the principal building approval. The RERA-filed layout document, by contrast, states that the project is an unapproved layout and that its layout is not signed; no approved layout plan is established by the supplied evidence.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 127.6 sq. m. | 83.4–103.8 sq. m.; median 93.6 sq. m. | 27% |
The RERA filing provides the unit count, booking/availability and saleable area. The carpet-area range, median and loading are software measurements from the approved floor-plan drawing, not RERA-filed measurements; the drawing measurements cover four flat designs and are flagged as needing review. They should be checked against the actual drawing and unit documentation. RERA unit table Floor plans
The supplied plan extraction includes a first-floor unit layout with living, dining, kitchen, three bedrooms, toilets, wash area and utility. The utility is excluded from the software-measured carpet area in that extracted example. Carpet area, saleable area and any common-area share are distinct measures; the available evidence does not provide a separately verified balcony area or unit-specific area schedule. RERA unit details Floor plans
5. Parking & vehicle circulation
The sanctioned scheme uses the stilt for parking. The GHMC permit records total parking area 195.3 (the extracted parameter does not state a unit); the plan extract separately records parking area 255.30 sq. m. The approval condition says the stilt and any cellar approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. No cellar is identified in the supplied project extracts.
The supplied records do not establish the number of car or two-wheeler spaces, visitor or accessible spaces, a parking-allocation schedule, or a legally documented exclusive allocation to any apartment. The plan extract shows a 5.20 m driveway; the supplied evidence does not describe separate pedestrian circulation or an EV-charging installation. GHMC’s permit includes a condition requiring parking places to have EV charging infrastructure in accordance with the cited requirements.
6. Amenities, recreation & open spaces
| Description / size | Recorded as available “YES”; no area or dimensions supplied. GHMC permit requires the tot-lot to be fenced and maintained as greenery. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress recorded as 0%; not independently verified complete. |
| Description / size | Recorded as available “YES”; permit requires rainwater-harvesting structure and specifies four pits. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress recorded as 0%; installation not independently verified. |
| Description / size | Listed; no dimensions or completion evidence supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress recorded as 0%. |
| Description / size | Listed; no specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress recorded as 0%. |
| Description / size | Listed; no building, size or facility details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress recorded as 0%. |
| Description / size | Listed in third-party vendor information only: indoor games, kids’ play areas and sand pits. No size or capacity supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/vendor information; no RERA-filed delivery status or independent verification supplied. |
The RERA amenities record also lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, electrical meter/substation/receiving station and aggregate recreational open space. It gives no specific sizes, capacities or completion evidence for those items; listed progress is 0%. RERA amenities
7. Utilities, building services & safety
The building-plan extraction lists an overhead water tank and a separate underground static water-storage tank with a stated capacity of 25,000 litres, plus a separate terrace tank of 25,000 litres for residential buildings. It also lists a septic tank. The RERA amenities record lists water supply and sewerage, but no water source, treatment plant, reuse arrangement, STP capacity or sewer connection details are supplied. RERA amenities
For electrical and building services, the plan extraction lists a distribution transformer, generator and emergency lighting; the GHMC permit also requires space for a transformer. No generator capacity, backup coverage or electrical load details are supplied. A lift and staircase are listed, without quantities, capacity or detailed specifications.
The plan extraction lists hose reel, down corner, automatic sprinkler system and emergency lighting. The GHMC permit places responsibility for structural and means-of-escape safety on the project’s responsible parties and requires an Occupancy Fire NOC before issue of an occupancy certificate. These are approval requirements and plan-listed provisions; the supplied evidence does not establish installation, testing, clearance or completed statutory compliance.
GHMC’s permit also requires a garbage house within the premises, rainwater harvesting and compliance with the stated construction and safety conditions. The supplied records do not specify waste-segregation arrangements, CCTV, access-control systems, accessibility features or ramp provision.
8. Location, access & connectivity
The registered location is Pet Basherbad, Qutballapur mandal, Medchal-Malkajgiri district, Telangana, PIN 500067; the RERA certificate describes the project site as Plot Nos. 122/1/P (Middle Portion), 122/1/P (North Side), 122/P (Western Side), and 122/P (Western Side), in Survey Nos. 31 & 32. RERA record
The GHMC permit refers to the site abutting an 18 m road, while the floor-plan extraction includes 9.00 m existing/proposed roads and a 5.20 m driveway. The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. No public-transport details or other verified landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is CHEELA LIFE SPACES P LTD (OPC), identified in the RERA records as a company and in the Form B declaration as a One Person Company. The recorded GSTIN is 36AAFCC7263D1ZR. The promoter address on the RERA record is HARI VILLA, GAYATRI NAGAR, Pet Basheerabad, Pet Bahseerabad, Qutballapur, Medchal-Malkajgiri, 500067. RAMU CHEELA is identified as an authorized signatory; the supplied records do not provide an official phone number, email address or company website. Corporate record Parties record RERA filing
The RERA record lists 10 3BHK units and gives a completion undertaking of 6 May 2027. No independent construction-progress verification or occupancy certificate is supplied; the RERA amenities progress entries are recorded as 0%. The sanctioned building is a single block, with no separate phase-wise development or handover schedule established in the supplied documents. RERA unit table RERA amenities
10. Approvals, official records & documents
| Identifier / date | P02200008681; valid 20 August 2024–6 May 2027 unless extended |
|---|---|
| What the supplied record establishes | Form C registration certificate for CHEELA LIFE SPACES MAYA HARIDWAR and its promoter. |
| Identifier / date | 0971/GHMC/KPL/2024-BP; approved 06 May 2024; file No. 003086/GHMC/1494/KPL2/2024-BP |
|---|---|
| What the supplied record establishes | Residential building permission for one building, 1 Stilt + 5 upper floors. |
| Identifier / date | File No. 360/tp10/ghmc; LTP licence TS/015709/2024 |
|---|---|
| What the supplied record establishes | Plan-extracted project configuration, areas, utilities and building-services items. |
| Identifier / date | Document 442119 |
|---|---|
| What the supplied record establishes | States that the layout is unapproved and not signed. |
| Identifier / date | Dated 15 May 2024 |
|---|---|
| What the supplied record establishes | Promoter’s declarations on title, encumbrances, project-account arrangements and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No completion certificate or occupancy certificate is evidenced in the supplied records. |
1. Project at a glance
Project identity
Registered project name: CHEELA LIFE SPACES MAYA HARIDWAR
Project type / use: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; registration is for the project at Pet Basherbad, Survey Nos. 31 & 32
TG-RERA registration: P02200008681
Registration validity: 20 August 2024 to 6 May 2027, unless extended by the Authority
Registered promoter: CHEELA LIFE SPACES P LTD (OPC)
RERA status: New Project; registration certificate on file. Registration validity is distinct from the completion undertaking and any occupancy certificate.
Land and geographic identity
Locality / revenue village: Pet Bahseerabad / Pet Basherbad; the RERA certificate gives the revenue village as Pet Basherbad.
Mandal / district / PIN: Qutballapur / Medchal-Malkajgiri / 500067
Project survey numbers: Survey Nos. 31 & 32; no project subdivision is disclosed in the supplied project identity record.
Registered site extent: 472.84 sq. m.; the building-permit record also gives net plot area as 472.84 sq. m.
Total / net area: Total area 472.84 sq. m.; net area 472.84 sq. m.
Boundaries recorded by RERA: East: Plot No. 122 Part; West: Road; North: Neighbours Land; South: Plot No. 122 Part South Side Portion and Neighbours
Plot description in RERA certificate: Plot Nos. 122/1/P (Middle Portion), 122/1/P (North Side), 122/P (Western Side), and 122/P (Western Side), at Pet Basherbad
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit No. 0971/GHMC/KPL/2024-BP, approved 06 May 2024; file No. 003086/GHMC/1494/KPL2/2024-BP
Approved built-up area: 1,276.30 sq. m. (the plan extraction labels this net BUA and proposed built-up area excluding parking); parking area is separately stated as 255.30 sq. m.
Building count / arrangement: One residential building, identified as “RESI (CHEELA LIFE SPACES MAYA HARIDWAR)”
Sanctioned floors: 1 Stilt + 5 upper floors; plan extraction states six floors and building height 14.50 m, excluding stilt.
Parking levels / area: Stilt is approved for parking; the permit states total parking area 195.3 (unit not specified in the extracted parameter) and the plan extraction states parking area 255.30 sq. m. Counts of parking spaces are not disclosed in the supplied extracts.
Unit count: 10 units in the RERA unit record; the floor-plan approval extract also states 10 units.
Offering and status
RERA-filed configuration: 3BHK; 10 units
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the portal record supplies no as-of date, so counts are indicative.
RERA-filed saleable area: 127.6 sq. m. per 3BHK unit
Construction stage: The supplied records do not establish an independently verified site-construction stage. The RERA amenities record shows 0% for listed progress items; it is not a physical-site verification.
Completion timeline: Promoter’s Form B declaration, dated 15 May 2024, undertakes completion within three years from permission, stated as 6 May 2027. The GHMC permit states construction to be completed before 6 May 2027.
Occupancy / completion certificate: No completion certificate or occupancy certificate is evidenced in the supplied records; the building permit makes an occupancy certificate necessary before occupation.
2. The project story
The registered project is a small, single-building residential apartment development on a recorded site of 472.84 sq. m. in Pet Basherbad, Qutballapur, Medchal-Malkajgiri. The GHMC permit identifies one residential building and sanctions a stilt level with five upper floors. The RERA unit record lists 10 three-bedroom apartments, all shown as available in the portal capture, whose count has no stated as-of date.
The promoter’s RERA-filed Form B gives a completion undertaking of 6 May 2027, and the GHMC permit also states that construction is to be completed before that date. These are declared and sanctioned timelines, not evidence of completed construction. No completion or occupancy certificate, independently verified site progress, or phase-wise handover status is supplied.
3. Master plan, architecture & building design
The GHMC building permit is for a residential building on a 472.84 sq. m. plot, with net plot area also stated as 472.84 sq. m. It sanctions 1 Stilt + 5 upper floors. The approval extracts state a height of 14.50 m excluding the stilt and a total height of 20.25 m; they also give proposed built-up area excluding parking as 1,276.30 sq. m., total proposed built-up area including parking as 1,531.60 sq. m., and total BUA as 1,554.30 with deductions of 22.70 and net BUA of 1,276.30. These plan-extracted labels are retained as recorded and are not interchangeable area measures.
The permit identifies one building; the supplied extracts do not establish flats per floor, a unit-by-unit floor arrangement, footprint dimensions, lift count or capacity, stair configuration, or detailed internal circulation. The plan extract records a 5.20 m driveway and 9.00 m roads in its drawing-derived road-width entries. The permit requires a fenced tot-lot maintained as greenery, peripheral greenery and a rainwater-harvesting structure; the supplied records do not provide a measured open-space area or establish delivery.
GHMC permit No. 0971/GHMC/KPL/2024-BP is the principal building approval. The RERA-filed layout document, by contrast, states that the project is an unapproved layout and that its layout is not signed; no approved layout plan is established by the supplied evidence.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 127.6 sq. m. | 83.4–103.8 sq. m.; median 93.6 sq. m. | 27% |
The RERA filing provides the unit count, booking/availability and saleable area. The carpet-area range, median and loading are software measurements from the approved floor-plan drawing, not RERA-filed measurements; the drawing measurements cover four flat designs and are flagged as needing review. They should be checked against the actual drawing and unit documentation.
The supplied plan extraction includes a first-floor unit layout with living, dining, kitchen, three bedrooms, toilets, wash area and utility. The utility is excluded from the software-measured carpet area in that extracted example. Carpet area, saleable area and any common-area share are distinct measures; the available evidence does not provide a separately verified balcony area or unit-specific area schedule.
5. Parking & vehicle circulation
The sanctioned scheme uses the stilt for parking. The GHMC permit records total parking area 195.3 (the extracted parameter does not state a unit); the plan extract separately records parking area 255.30 sq. m. The approval condition says the stilt and any cellar approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. No cellar is identified in the supplied project extracts.
The supplied records do not establish the number of car or two-wheeler spaces, visitor or accessible spaces, a parking-allocation schedule, or a legally documented exclusive allocation to any apartment. The plan extract shows a 5.20 m driveway; the supplied evidence does not describe separate pedestrian circulation or an EV-charging installation. GHMC’s permit includes a condition requiring parking places to have EV charging infrastructure in accordance with the cited requirements.
6. Amenities, recreation & open spaces
| Description / size | Recorded as available “YES”; no area or dimensions supplied. GHMC permit requires the tot-lot to be fenced and maintained as greenery. |
|---|---|
| Declared progress / verified status | RERA progress recorded as 0%; not independently verified complete. |
| Description / size | Recorded as available “YES”; permit requires rainwater-harvesting structure and specifies four pits. |
|---|---|
| Declared progress / verified status | RERA progress recorded as 0%; installation not independently verified. |
| Description / size | Listed; no dimensions or completion evidence supplied. |
|---|---|
| Declared progress / verified status | RERA progress recorded as 0%. |
| Description / size | Listed; no specification supplied. |
|---|---|
| Declared progress / verified status | RERA progress recorded as 0%. |
| Description / size | Listed; no building, size or facility details supplied. |
|---|---|
| Declared progress / verified status | RERA progress recorded as 0%. |
| Description / size | Listed in third-party vendor information only: indoor games, kids’ play areas and sand pits. No size or capacity supplied. |
|---|---|
| Declared progress / verified status | Marketing/vendor information; no RERA-filed delivery status or independent verification supplied. |
The RERA amenities record also lists water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, electrical meter/substation/receiving station and aggregate recreational open space. It gives no specific sizes, capacities or completion evidence for those items; listed progress is 0%.
7. Utilities, building services & safety
The building-plan extraction lists an overhead water tank and a separate underground static water-storage tank with a stated capacity of 25,000 litres, plus a separate terrace tank of 25,000 litres for residential buildings. It also lists a septic tank. The RERA amenities record lists water supply and sewerage, but no water source, treatment plant, reuse arrangement, STP capacity or sewer connection details are supplied.
For electrical and building services, the plan extraction lists a distribution transformer, generator and emergency lighting; the GHMC permit also requires space for a transformer. No generator capacity, backup coverage or electrical load details are supplied. A lift and staircase are listed, without quantities, capacity or detailed specifications.
The plan extraction lists hose reel, down corner, automatic sprinkler system and emergency lighting. The GHMC permit places responsibility for structural and means-of-escape safety on the project’s responsible parties and requires an Occupancy Fire NOC before issue of an occupancy certificate. These are approval requirements and plan-listed provisions; the supplied evidence does not establish installation, testing, clearance or completed statutory compliance.
GHMC’s permit also requires a garbage house within the premises, rainwater harvesting and compliance with the stated construction and safety conditions. The supplied records do not specify waste-segregation arrangements, CCTV, access-control systems, accessibility features or ramp provision.
8. Location, access & connectivity
The registered location is Pet Basherbad, Qutballapur mandal, Medchal-Malkajgiri district, Telangana, PIN 500067; the RERA certificate describes the project site as Plot Nos. 122/1/P (Middle Portion), 122/1/P (North Side), 122/P (Western Side), and 122/P (Western Side), in Survey Nos. 31 & 32.
The GHMC permit refers to the site abutting an 18 m road, while the floor-plan extraction includes 9.00 m existing/proposed roads and a 5.20 m driveway. The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. No public-transport details or other verified landmark distances are supplied.
9. Developer & development status
The registered promoter is CHEELA LIFE SPACES P LTD (OPC), identified in the RERA records as a company and in the Form B declaration as a One Person Company. The recorded GSTIN is 36AAFCC7263D1ZR. The promoter address on the RERA record is HARI VILLA, GAYATRI NAGAR, Pet Basheerabad, Pet Bahseerabad, Qutballapur, Medchal-Malkajgiri, 500067. RAMU CHEELA is identified as an authorized signatory; the supplied records do not provide an official phone number, email address or company website.
The RERA record lists 10 3BHK units and gives a completion undertaking of 6 May 2027. No independent construction-progress verification or occupancy certificate is supplied; the RERA amenities progress entries are recorded as 0%. The sanctioned building is a single block, with no separate phase-wise development or handover schedule established in the supplied documents.
10. Approvals, official records & documents
| Identifier / date | P02200008681; valid 20 August 2024–6 May 2027 unless extended |
|---|---|
| What the supplied record establishes | Form C registration certificate for CHEELA LIFE SPACES MAYA HARIDWAR and its promoter. |
| Identifier / date | 0971/GHMC/KPL/2024-BP; approved 06 May 2024; file No. 003086/GHMC/1494/KPL2/2024-BP |
|---|---|
| What the supplied record establishes | Residential building permission for one building, 1 Stilt + 5 upper floors. |
| Identifier / date | File No. 360/tp10/ghmc; LTP licence TS/015709/2024 |
|---|---|
| What the supplied record establishes | Plan-extracted project configuration, areas, utilities and building-services items. |
| Identifier / date | Document 442119 |
|---|---|
| What the supplied record establishes | States that the layout is unapproved and not signed. |
| Identifier / date | Dated 15 May 2024 |
|---|---|
| What the supplied record establishes | Promoter’s declarations on title, encumbrances, project-account arrangements and completion undertaking. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | No completion certificate or occupancy certificate is evidenced in the supplied records. |
Frequently asked questions
Is CHEELA LIFE SPACES MAYA HARIDWAR registered with Telangana RERA?
Yes. CHEELA LIFE SPACES MAYA HARIDWAR is registered with the Telangana Real Estate Regulatory Authority as P02200008681; the registration status is New Project.
Who is the developer of CHEELA LIFE SPACES MAYA HARIDWAR?
The promoter named in the RERA registration is CHEELA LIFE SPACES P LTD (OPC).
Where is CHEELA LIFE SPACES MAYA HARIDWAR located?
CHEELA LIFE SPACES MAYA HARIDWAR is in Pet Bahseerabad, Pet Basherbad, Qutballapur, Medchal-Malkajgiri, Telangana (500067).
When will CHEELA LIFE SPACES MAYA HARIDWAR be completed?
The promoter's proposed date of completion filed with RERA is 06/09/2027. This is the promoter's declaration, not a guarantee.
More projects in Pet Basherbad