Sign in

Cnr Golden City

CHITTEDDY · Yadadri Bhuvanagiri · RERA P02000008104

CNR GOLDEN CITY is a plotted development in ARRUR, Valigonda mandal, Yadadri Bhuvanagiri district. The registered promoter is Chitteddy Abhitej Reddy. The project’s total and net land area is 29339.46 sqmts, with 98 residential plots; no plot-size range is supplied. It is registered under TG-RERA number P02000008104, with a proposed completion date of 10/11/2025.

01What we found

Period endedTG-RERA registration ran to 10 Nov 2025 - check its extension on TG-RERA
19documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameCNR GOLDEN CITY RERA record
Project typePlotted development; plot category RERA record RERA filing
Phase / registered portionNo phase name or phase-wise boundary is disclosed. The registration record concerns the plotted project at Aroor/Arrur. RERA record Land records
TG-RERA registration numberP02000008104 RERA record Approvals record
Registration validity27 April 2024 to 10 November 2025, unless extended by the Authority; the supplied record does not establish an extension. Registration validity is distinct from the completion deadline. RERA record Approvals record
Registered promoterChitteddy Abhitej Reddy on the registration certificate; project identity fields use CHITTEDDY as the promoter name. Corporate record
RERA statusListed as “On-Going Project.” This is the supplied project status, not an independently verified site-progress finding. RERA record RERA filing

Land and geographic identity

FieldProject record
Locality / streetARRUR RERA record RERA filing
Revenue villageArrur in the filed layout documents; project fields and registration certificate render the village as AROOR.
MandalValigonda RERA record RERA filing
DistrictYadadri Bhuvanagiri RERA record RERA filing
PIN508112 RERA record RERA filing
Survey numbers / subdivisions700/AA/1 and 700/A/1, as stated in the draft layout documents. The project-level land record does not disclose survey numbers. Land records
Filed layout extentAc.7.25 CENTS; 35090.00 SQ.YDS.
RERA land areaTotal area 29339.46 sqmts; net area 29339.46 sqmts. Land records
Filed layout land-use scheduleOpen space/park: 10%, Ac.0.725 CENTS; 3509.00 SQ.YDS.; road area: 33.32%, Ac. 2.416 CENTS; 11693.44 SQ.YDS.; owners land area: 2.30%, Ac.O.166 CENTS; 803.44 SQ. YDS.; plotted area: 54.38%, Ac.3.943 CENTS; 19084.12 SQ.YDS.; mortgage area on plotted area: 15.77%, Ac.0.622 CENTS; 3010.48 SQ.YDS.
Boundaries in RERA land recordEast: 100 FEET ROAD; West: OTHERS LAND; North: 33 FEET ROAD; South: OTHERS LAND. Land records

Development identity

FieldProject record
Sanctioning authorityDirector of Town and Country Planning, Government of Telangana; the filed permission delegates layout-related matters to Arrur Gram Panchayat. Approvals record
Principal layout referenceT.L.P.NO.245/ 2023 / H; filed as a draft technical layout pattern.
Approval date10-11-2023 in the filed layout-permission extraction.
Approved built-up area00 in the RERA fields; this is a plotted layout, and no building built-up area is supplied. RERA filing
Plot count98 plots in the draft layout record.
Buildings / floors / parking levelsNo building count, floor configuration, parking levels or sanctioned parking count is disclosed in the supplied project record. RERA filing Document index

Offering and status

FieldProject record
Unit typePlots; the project registration and filed layout describe residential plots. RERA record
Filed plot count and area bands98 plots are stated; individual plot sizes and a plot-size range are not supplied.
Booked / available countsNot disclosed in the supplied project data. Document index
Construction stageThe record labels the project “On-Going Project” and gives completeness as 80%; the basis, measurement date and independent verification of that progress are not supplied. RERA record
Original / revised completion10/11/2025 / 10/11/2025 in the project record. RERA record
Completion / occupancy certificate statusNo project completion or occupancy certificate is established by the supplied documents. The architect’s Form–1A extraction states only “NOT APPLICABLE.”

2. The project story

CNR GOLDEN CITY is registered as a plotted development in the Valigonda mandal, Yadadri Bhuvanagiri district, at the locality recorded as ARRUR and village rendered as AROOR in the RERA record. Its filed draft layout identifies Survey Nos. 700/AA/1 and 700/A/1 and sets out a 98-plot residential layout with roads, a park/open-space reservation and designated plots shown as mortgage land. RERA record

The project record states 80% completeness, but the supplied evidence does not identify the measurement method, the date to which that percentage relates, or independently verified site progress. The completion date recorded by RERA is 10/11/2025; the supplied record does not establish that the layout has been completed or that a completion/occupancy certificate has been issued. RERA record

3. Master plan, architecture & building design

The filed plan is a draft technical layout pattern for residential plots, not a building design. It shows 98 plots and a land-use schedule with 10% reserved for open space/park, 33.32% for roads, 2.30% for owners’ land area and 54.38% as plotted area. It separately identifies a 15.77% mortgage area on the plotted area, covering plots 8, 19, 20, 39, 40 and 47 to 50.

The draft plan identifies proposed 33'-0" roads, including road-width entries of 33'-0" WIDE ROAD, 33-0" WIDE ROAD, 33'-0" × 43'-6', 33'-0" X 45'-0" and 33'-0" ROAD. The document’s layout-scale entry is SCALE = 1": 100'-0".

The layout permission states that the draft layout is legally valid only on release/approval after fulfilment of its conditions. It also requires development works and transfer of open-space and road areas to the Gram Panchayat before release of the final layout. The supplied material does not include evidence of that final release.

No building footprint, apartment or villa configuration, tower/block arrangement, floor count, building height, or residential/commercial building-area split is supplied. This project is presented in the filed material as a plotted layout, not as an apartment scheme. RERA filing

4. Homes, configurations & floor plans

This is a plotted project. The filed layout states 98 plots, but the supplied RERA data does not provide plot-by-plot sizes, a plot-size range, booked or available counts, or a RERA-filed saleable-area schedule. Document index

The vendor data lists “Plot” and “built-up 1,414 - 4,333 sq ft”; this is a vendor claim, not a plot-area schedule established by the supplied RERA layout record. Promoter website

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots98Not disclosedNot disclosedNot disclosedNot applicableNot supplied

The four drawings associated with floor-plan review are scans pending measurement; 0 drawings are measured. The supplied drawing data therefore establishes no software-measured plot or home dimensions. Floor plans

5. Parking & vehicle circulation

The filed layout identifies internal roads, including proposed 33'-0" roads, but the supplied evidence does not give a parking-space count, visitor or accessible parking provision, parking levels, vehicle ramps, or a legally documented parking allocation for an individual plot. No spaces-per-home ratio can be established.

6. Amenities, recreation & open spaces

The draft layout reserves a park/open-space area. The filed approval conditions also describe layout infrastructure to be undertaken by the layout owner/developer, including roads, drains, greenery, street lighting, electricity facilities, sewerage disposal and protected water supply. These are approval-record requirements or disclosed layout provisions; the supplied evidence does not independently verify their completion.

Open space / park
Description / size10%; Ac.0.725 CENTS; 3509.00 SQ.YDS.
Evidence sourceFiled draft layout
Declared progress / verified statusReserved in the draft layout; completion or handover is not verified.
Roads
Description / size33.32%; Ac. 2.416 CENTS; 11693.44 SQ.YDS.; proposed road widths include 33'-0" entries.
Evidence sourceFiled draft layout
Declared progress / verified statusShown/proposed in the layout; formation and handover are not verified.
Landscape / greenery
Description / sizeGreenery and fencing of open spaces are included among the stated development works.
Evidence sourceLayout-permission conditions
Declared progress / verified statusRequired development work; completion is not verified.
Community buildings
Description / sizeNo size or facility detail supplied.
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusNo completion status supplied.
Indoor, sports or recreation facilities
Description / sizeNo specific facilities or sizes supplied beyond the park/open-space reservation.
Evidence sourceRERA-filed layout and amenity record RERA amenities
Declared progress / verified statusNo completion status supplied.

7. Utilities, building services & safety

The layout-permission conditions identify the following development works or services: side drains, rain-water harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. The RERA amenity record also marks water supply, sewerage, storm-water drains, street lighting and water conservation/rain-water harvesting as available (YES), but reports 0% progress for the listed items. These entries do not establish completed or independently verified facilities. RERA amenities

Water
Evidence in the supplied recordProtected water supply is specified in the layout conditions; water supply is marked “YES” in the amenity record.
Status limitationSource, capacity, storage, treatment and completion are not supplied. RERA amenities
Sewerage / drainage
Evidence in the supplied recordSewerage disposal and side drains are specified; the RERA amenity record identifies sewerage and storm-water drains.
Status limitationNo system capacity, connection details or verified completion evidence supplied. RERA amenities
Rain-water management
Evidence in the supplied recordRain-water harvesting pits are specified; water conservation/rain-water harvesting is marked “YES” in the amenity record.
Status limitationCapacity and completion are not verified. RERA amenities
Electrical / lighting
Evidence in the supplied recordElectricity facilities and street lighting are specified in the layout conditions; street lighting is marked “YES” in the amenity record.
Status limitationSupply capacity, substation details and completion evidence are not supplied. RERA amenities
Waste, security, accessibility and fire safety
Evidence in the supplied recordNo specific facilities, capacities or completion evidence supplied.
Status limitationNot established by the supplied record. RERA amenities Document index

8. Location, access & connectivity

The registered project location is ARRUR, village AROOR in the supplied RERA fields, Valigonda mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508112. The RERA land record describes the east boundary as a 100 FEET ROAD and the north boundary as a 33 FEET ROAD; the filed draft layout also shows proposed 33-foot roads. RERA record RERA filing Land records

The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 9.3 km. This is a location-data distance, not a stated travel time. Location record Vendor data separately claims National Highway 9 is 3.04 km away; this is a vendor-reported connectivity detail. Promoter website

9. Developer & development status

The registration certificate names Chitteddy Abhitej Reddy as promoter; the project identity record uses CHITTEDDY. The legal entity type, corporate registration identifiers, registered office and official project contact/site are not established in the supplied evidence. The certificate gives a promoter address with incomplete locality fields; the project record separately lists PAVANI ANSUYA TOWERS, ROAD NO. 1, ARRUR, ARRUR, Valigonda, Yadadri Bhuvanagiri, 508112 as the promoter address. Corporate record Parties record

See project status and completion details above. RERA record

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceRegistration Certificate, P02000008104
What it establishesRegistration of CNR GOLDEN CITY and the stated validity period, 27/04/2024 to 10/11/2025, unless extended by the Authority.
Principal layout record
Supplied evidenceDraft Technical Layout Pattern T.L.P.NO.245/ 2023 / H; Lr.Roc.No. 15702/2450/2023/H; dated 10-11-2023
What it establishesDraft layout for the stated 98-plot scheme, with conditions for development, mortgage, open-space/road handover and final release.
Layout drawing / approval filing
Supplied evidenceLayout plan and filed approval material
What it establishesResidential plotted layout in Survey Nos. 700/AA/1 and 700/A/1, with the area and land-use schedule set out above.
Form B declarations
Supplied evidenceForm B extractions dated 2 8 MAR 2024
What it establishesPromoter/authorised-person declarations concerning title, encumbrances, project funds, audits, approvals and completion undertaking. OCR does not reliably identify all declarants or registration details.
Completion certificate material
Supplied evidenceArchitect’s Form–1A extraction
What it establishesOCR states only “NOT APPLICABLE”; no completion certificate is established.

The supplied record does not include evidence of final layout release, an occupancy/completion certificate, or a project-specific certificate confirming completion of infrastructure works. The project land record also omits survey numbers; the filed draft layout supplies 700/AA/1 and 700/A/1. Land records

Frequently asked questions

Is CNR GOLDEN CITY registered with Telangana RERA?

Yes. CNR GOLDEN CITY is registered with the Telangana Real Estate Regulatory Authority as P02000008104; the registration status is On-Going Project.

Who is the developer of CNR GOLDEN CITY?

The promoter named in the RERA registration is CHITTEDDY.

Where is CNR GOLDEN CITY located?

CNR GOLDEN CITY is in ARRUR, AROOR, Valigonda, Yadadri Bhuvanagiri, Telangana (508112).

When will CNR GOLDEN CITY be completed?

The promoter's proposed date of completion filed with RERA is 10/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Valigonda