CRISTAL COUNTY - IV is a plotted development in KYASARAM, PATANCHERU Mandal, Sangareddy District, developed by the registered promoter BHASHYAM PROJECTS. The site area is 69,500.59 sq.m, and the drawing-derived record identifies 114 numbered residential plots; a plot-size schedule is not disclosed. The project is registered under TG-RERA number P01100002378, with a proposed completion date of 05/11/2022.

More from Bhashyam Projects · 10 projects →

01What we found

Period endedTG-RERA registration ran to 5 Nov 2022 - check its extension on TG-RERA
21documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Kyasaram, Patancheru, Sangareddy · geocoded — approximate.

Project at a glance

Project identity

ItemRecord
Registered project nameCRISTAL COUNTY - IV RERA record
Project typePlotted development / open-plot layout RERA record
Phase / registered portionThe registration identifies the project as CRISTAL COUNTY - IV; no further phase description is disclosed. RERA record
TG-RERA registrationP01100002378 RERA record
Registration validity17/12/2020 to 05/11/2022; the certificate records no extension. This is the registration period, not a statement of project completion or occupancy status. Approvals record
Registered promoterBHASHYAM PROJECTS RERA record Corporate record
RERA statusThe record labels this a “New Project.” The certificate establishes registration; the supplied evidence does not establish current registration status beyond its stated validity dates. RERA record

Land and geographic identity

ItemRecord
LocalityKYASARAM RERA record
Revenue villagesNANDIGAMA and KYASARAM
MandalPATANCHERU RERA record
DistrictSangareddy RERA record
PIN533341 RERA record
Project survey numbers / subdivisions as recorded425/P 0F NANDIGAMA; 50/P; 51/P; 53/P OF KYASARAM RERA record
Site areaTotal site area: 69,500.59 sq.m; master-plan-road-affected area: 4,272.15 sq.m; net site area: 65,228.44 sq.m. RERA filing
BoundariesEast: ROAD WIDTH 12; West: CTS NO; North: CTS NO; South: CTS NO. RERA filing

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approvalDraft Layout Permit No. 000334/LO/P g/HMDA/2019, approved 05 November, 2019 Approvals record
Application number023495/SKP/LT/U6/HMDA/09052019
Approved built-up area40,172.49 sq.m is listed as “Approved Built up Area” in the RERA project fields; it is also labelled “Plotted area” in the layout area statement. It should not be read as a building-area or home-area measurement. RERA filing
Building / floor configurationNot disclosed; the approval is for a plotted layout, not a multi-storey building plan.
Approved plot countThe drawing-derived layout record identifies plot numbers 1 to 114; it flags that plot-count extraction should be verified against the drawing. Layout record
ParkingNo parking-space count or parking-allocation schedule is supplied. RERA amenities

Offering and status

ItemRecord
Unit typeResidential plots; the RERA-filed layout record does not provide a plot-size schedule. RERA record Layout record
Plot size / offering detailNot disclosed in the supplied RERA project record. A third-party listing describes a 209 sq.yd residential plot, but this is not a RERA-filed figure. Promoter website
Booked / available countsNot supplied. Layout record
Construction stageNo independently verified site-progress evidence is supplied. The approval describes a draft layout and required development works; the RERA filing does not establish which works are now complete.
Completion date05/11/2022, as stated in the Form-B completion undertaking; the supplied registration certificate runs to the same date and records no extension.
Occupancy / completion certificateNo occupancy or completion certificate is supplied. For this plotted layout, the available approval refers to a draft layout and conditions for release of the final layout plan.

The project story

CRISTAL COUNTY - IV is a registered plotted development in the revenue villages of NANDIGAMA and KYASARAM, PATANCHERU Mandal, Sangareddy District. The TG-RERA certificate identifies the project and its land by survey references 425/P 0F NANDIGAMA; 50/P; 51/P; and 53/P OF KYASARAM. The HMDA document describes a draft open-plot layout, with the site not to be enclosed by a compound wall or fencing under that permission.

The filed layout area statement records a total site area of 69,500.59 sq.m, including 4,272.15 sq.m affected by a master plan road, and a net layout area of 65,228.44 sq.m. It allocates land to plots, roads, open space and social infrastructure; the drawing-derived record identifies 114 numbered plots, but says the plot count should be checked against the drawing. Layout record

The promoter’s RERA Form-B declares completion by 05/11/2022. That date is a declared completion commitment; the evidence supplied does not independently establish construction progress, completion of the layout works, final layout release, or a completion certificate.

Master plan, architecture & building design

This is a plotted layout rather than a tower or apartment scheme. The HMDA approval and the drawing-derived layout record describe the land allocation as follows:

Layout componentAreaShare of net layout area / record
Total site area69,500.59 sq.mHMDA approval area statement
Master plan road affected area4,272.15 sq.mHMDA approval area statement
Net layout area65,228.44 sq.mHMDA approval and layout record Layout record
Plotted area40,172.49 sq.m61.6% of net layout area, as computed from the drawing’s area statement Layout record
Roads17,922.56 sq.m27.5% of net layout area, as computed from the drawing’s area statement Layout record
Parks / open space5,501.38 sq.m8.4% of net layout area, as computed from the drawing’s area statement Layout record
Social infrastructure1,632.00 sq.m2.5% of net layout area, as computed from the drawing’s area statement Layout record
Amenities area0.00 sq.mDrawing area statement Layout record

The drawing-derived percentages are software-calculated from the layout drawing’s own area statement; they are not a separate survey measurement. The RERA fields list 40,172.49 sq.m as approved built-up area, while the HMDA/layout area statement identifies that same figure as plotted area. RERA filing Layout record

The HMDA approval identifies plot numbers 1 to 114 in the drawing-derived record. No plot-size schedule, building footprint, residential building configuration, or sanctioned floor plan is supplied. The layout approval lists roads of “18 mts and above” and “60 feet and above roads,” and separately refers to a “30 mtrs wide Master plan road.” Layout record

Homes, configurations & floor plans

The RERA record supports a plotted offering, but no RERA-filed schedule of plot sizes, booked plots, available plots, or individual plot areas is supplied. The layout drawing extraction identifies 114 numbered plots, with a caveat that the count should be verified against the drawing. Layout record

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots114 numbered plots in drawing-derived record; verify against drawingNot suppliedNot suppliedNot suppliedNot applicableNot supplied

A third-party listing describes a “Residential Plot” of 209 sq.yd; that is a third-party listing, not a RERA-filed plot-size schedule. Promoter website The supplied floor-plan record concerns software measurement from drawings and reports no measured plans, one scan pending, and one drawing with no flats; it does not provide plot dimensions. Floor plans

Parking & vehicle circulation

The HMDA layout approval provides for internal roads and requires roads to be opened for access to neighbouring sites. It also states road-width categories of “18 mts and above” and “60 feet and above roads,” and refers to a “30 mtrs wide Master plan road.”

No parking-space count, resident or visitor parking schedule, accessible parking provision, parking layout, vehicle ramp, EV charging provision, or plot-specific parking allocation is supplied. A plot’s purchase should not be assumed to include a separately allotted or exclusive parking space on the basis of this record. RERA amenities

Amenities, recreation & open spaces

The RERA amenities record lists several layout infrastructure items, but the supplied progress percentages are 0 and do not establish completion. HMDA’s draft-layout approval specifies land set aside for open space and social infrastructure and includes requirements before final layout release. RERA amenities

Parks / open space
Description / size5,501.38 sq.m in the HMDA layout area statement
Evidence sourceHMDA approval; drawing-derived layout area statement
Declared progress / verified statusNo completion verified; RERA amenities record shows 0% Layout record RERA amenities
Social infrastructure
Description / size1,632.00 sq.m in the HMDA layout area statement
Evidence sourceHMDA approval
Declared progress / verified statusNo completion verified; RERA amenities record shows 0% RERA amenities
Green strip / tot lot / park
Description / sizeListed as available “YES”; no facility size supplied
Evidence sourceRERA amenities record
Declared progress / verified status0%; actual completion not verified RERA amenities
Community buildings
Description / sizeListed in the RERA amenities record; no size or capacity supplied
Evidence sourceRERA amenities record
Declared progress / verified status0%; actual completion not verified RERA amenities
Rainwater harvesting
Description / sizeRainwater-harvesting pits are listed in the HMDA approval; RERA amenities record also lists water conservation/rainwater harvesting
Evidence sourceHMDA approval and RERA amenities record
Declared progress / verified statusNo completion verified; RERA amenities record shows 0% RERA amenities
Avenue plantation, landscaped green spaces, gated layout / security, Vaastu compliance
Description / sizeDescribed in third-party listing only
Evidence sourceThird-party listing Promoter website
Declared progress / verified statusNot established as sanctioned or completed by the supplied RERA/HMDA evidence Promoter website

Utilities, building services & safety

The HMDA layout approval lists a common septic tank / STP, overhead tank, transformer and rainwater-harvesting pits as planned layout utilities. The RERA amenities record lists water supply, sewerage/septic tank/STP, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management and disposal, street lighting, energy management, and an electrical meter room/sub-station/receiving station. These records establish listed provisions, not their present installation, capacity or operating status; the recorded progress percentages are 0. RERA amenities

Water
Evidence in the recordWater supply is listed in RERA amenities; HMDA approval lists an overhead tank. RERA amenities
Status / limitationSource, storage capacity and completion status are not supplied; RERA record shows 0%.
Sewerage / drainage
Evidence in the recordCommon septic tank / STP is listed in HMDA approval; RERA record lists sewerage, storm-water drains and treatment/disposal of sewage and sullage water. RERA amenities
Status / limitationDesign capacity, reuse arrangements and completion status are not supplied; RERA record shows 0%.
Electrical
Evidence in the recordTransformer is listed in HMDA approval; RERA record lists an electrical meter room/sub-station/receiving station. RERA amenities
Status / limitationCapacity, power-backup arrangements and completion status are not supplied; RERA record shows 0%.
Rainwater harvesting
Evidence in the recordPits are listed in HMDA approval and rainwater harvesting is listed in RERA amenities. RERA amenities
Status / limitationNo capacity or completed installation is verified; RERA record shows 0%.
Fire and life safety
Evidence in the recordFire protection and fire safety requirements appear in the RERA amenities record. RERA amenities
Status / limitationNo specific systems, clearances or completion evidence supplied; RERA record shows 0%.
Waste management
Evidence in the recordSolid-waste management and disposal appear in the RERA amenities record. RERA amenities
Status / limitationNo operating details or completion evidence supplied; RERA record shows 0%.
Lifts, accessibility and security
Evidence in the recordNo RERA-filed layout-service details supplied.
Status / limitationNot disclosed in the supplied project record.

Location, access & connectivity

The registered location is KYASARAM, PATANCHERU Mandal, Sangareddy District, PIN 533341. The project’s registered survey identity also includes land in NANDIGAMA village: 425/P 0F NANDIGAMA; 50/P; 51/P; 53/P OF KYASARAM. RERA record

The RERA-linked cadastral location is recorded at parcel centroid 17.50884, 78.17197. A supplied connectivity record identifies the nearest sampled Outer Ring Road interchange at approximately 9.6 km; it does not identify the interchange or provide a travel time. Location record

The third-party listing describes a Prof Rama Reddy College of Engineering Technology at 1.9 Km and gives a Nandigama–Isnapur Road address. These are third-party details, not RERA-filed location or access disclosures. Promoter website

Developer & development status

The registered promoter is BHASHYAM PROJECTS, identified in the project record as a partnership. The project record lists Bhashyam Naveen as authorised signatory and Bhashyam Lavanya as partner. Corporate record Parties record The RERA certificate gives the promoter office as Village: Shamshabad, Mandal: Shamshabad, District: Ranga Reddy, PIN: 500038.

The promoter’s Form-B declaration states a completion commitment of 05/11/2022 and declares that the land is free from encumbrances and that the promoter has legal title and supporting title/development documents. These are promoter declarations in the filed affidavit, not independent verification.

No phase-wise construction-progress report or independent site-progress verification is supplied. The evidence also does not establish current plot inventory, bookings, completed infrastructure, or final layout release. Layout record RERA amenities

Approvals, official records & documents

TG-RERA Form C certificate
What it establishesRegistration of CRISTAL COUNTY - IV as P01100002378, valid 17/12/2020 to 05/11/2022; certificate states no extension.
HMDA draft layout approval
What it establishesDraft Layout Permit No. 000334/LO/P g/HMDA/2019, approved 05 November, 2019; identifies Bhashyam Projects, the villages, survey references, land-use areas and layout conditions.
HMDA layout-related instruments cited in the approval
What it establishesMortgage Deed No. 40305/2019 dated 16/9/2019; master-plan-road affected-area document No. 40306/2019 dated 16/9/2019; master-plan-road affected-area deed No. 4030702019 dated 16.09.2019.
RERA Form-B affidavit-cum-declaration
What it establishesPromoter declaration covering title, encumbrance, completion, project funds and related undertakings; completion date stated as 05/11/2022.
Layout drawing
What it establishesDrawing-derived plot count and area allocation; plot-size extraction is incomplete and flagged for verification.
ReferenceLayout record
Additional approval fragment
What it establishesOCR contains “LP No. 000215/O/L/HDA/20186,” but no legible heading, party, land or approval details establish its nature or terms.

No occupancy or completion certificate, final layout release, or record of completed infrastructure is supplied. The supplied evidence therefore describes the registration and draft-layout approval, but does not establish the present completion or occupancy status of the layout.

Frequently asked questions

Is CRISTAL COUNTY - IV registered with Telangana RERA?

Yes. CRISTAL COUNTY - IV is registered with the Telangana Real Estate Regulatory Authority as P01100002378; the registration status is New Project.

Who is the developer of CRISTAL COUNTY - IV?

The promoter named in the RERA registration is BHASHYAM PROJECTS.

Where is CRISTAL COUNTY - IV located?

CRISTAL COUNTY - IV is in KYASARAM, PATANCHERU, Sangareddy, Telangana (533341).

When will CRISTAL COUNTY - IV be completed?

The promoter's proposed date of completion filed with RERA is 05/11/2022. This is the promoter's declaration, not a guarantee.