DARBAR is a residential apartment project in Ameenapur, Ameenpur mandal, Sangareddy district. The registered promoter is MCOR PROJECTS LLP. The project has a registered site area of 999.6 m² and one residential building with 1 Stilt + 5 upper floors, comprising 25 apartments: 15 2BHK and 10 3BHK, with RERA-filed saleable areas of 70.03 m² and 61.14 m², respectively. It is registered under TG-RERA **P01100004476**, with a promoter-declared completion date of **31.03.2025**.

More from Mcor Projects LLP · 6 projects →

01What we found

Period endedTG-RERA registration ran to 31 Mar 2025 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameDARBAR RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo separate phase name is disclosed; the registration and certificate identify the building on the survey numbers listed below. RERA record
TG-RERA registrationP01100004476 RERA record
Registration validity02/05/2022 to 31/03/2025. No extension is recorded on the supplied registration certificate. Registration validity is distinct from the completion date and the occupancy certificate. RERA record
Registered promoterMCOR PROJECTS LLP RERA record Corporate record
RERA record statusThe registration certificate states the registration period above; the supplied record does not establish a current extension. An occupancy certificate is also on file, described below.

Land and geographic identity

FieldRecord
Locality / revenue villageAmeenapur (also rendered “AMEENPUR” in approval documents); the registration certificate locality is “AMEENAPUR, AMEENPUR.” RERA record Land records
Mandal / district / PINAmeenpur / Sangareddy / 502032. RERA record
Project survey numbers and subdivisions413/E/1, 413/E/2, 414/A, 414, 409 and 411. RERA record Land records
Registered site area999.6 m²; RERA land details give total and net area as 999.60 m², with 0 area affected by road widening/FTL/Nala widening. RERA record Land records
Boundaries in RERA land recordEast: 30 FEETS WIDE ROAD AND NEIGHBOURS LAND; west: SY NO 413 PART; north: NEIGHBOURS LAND AND SY NO 413 PART; south: SY NO 411 AND 413 PART. Land records
Landowners recorded in RERA dataFive landowners are listed under area-share agreements: MRS MADDIPATLA GANITHA PRAMEELA, MR PAVAN KUMAR KOVVURI, MR SABBELLA LAKSHMANA REDDY, MR BANDARU VENKATAKUMAR RAJU and MRS M PRAGNA. Parties record

Development identity

FieldRecord
Sanctioning authorityAMEENPUR Municipality/Municipal Corporation. Approvals record
Principal building approvalPermit 0010/BP/3121/2022, dated 31 March, 2022; file number 001272/BP/DTCP/3121/0015/2022. Approvals record
Approved built-up area2,348.50 m²; the permit also records residential upper-floor area of 2,348.50 m² and stilt area of 516.66 m². These are the stated approval figures, not carpet or saleable area. RERA record
Building count and floor configurationOne proposed residential building: 1 Stilt + 5 upper floors; sanctioned height 14.95 m. RERA record
Parking provision in approval recordsThe permit says cellar and stilts approved for parking are to be used exclusively for vehicles. The supplied extracts do not give a sanctioned parking-space count.
Unit countRERA unit schedule records 25 units: 15 2BHK and 10 3BHK. The approval requires that the sanctioned number of units not be increased without prior approval. RERA unit table

Offering and status

FieldRecord
RERA-filed configurations and saleable area2BHK: 15 units, 70.03 m² each; 3BHK: 10 units, 61.14 m² each. RERA unit table
Booked / availablePortal figures read in the supplied record show 0 booked and 15 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal extract has no as-of date, so these counts are indicative, not a current inventory confirmation. RERA unit table
Construction / completion recordThe local authority occupancy certificate identifies the building as inspected and fit for occupation; the architect’s Form–1A certifies overall completion. These documents concern the single building and the listed project survey numbers.
Promoter-declared completion date31.03.2025 in the Form B declaration and the RERA registration record. This is separate from the occupancy certificate issued in 2023. RERA record
Occupancy certificateCertificate 0083/OC/3121/2023, dated 04 July, 2023, for the residential building on the listed survey numbers. The certificate records a completion notice submitted on 14 April, 2023. Approvals record

2. The project story

DARBAR is registered as a residential apartment project in Ameenapur, Ameenpur mandal, Sangareddy district. Its RERA-filed land area is 999.6 m², and the building permit describes one residential building with a stilt level and five upper floors. The project schedule lists 25 apartments: 15 2BHK and 10 3BHK. RERA record Land records RERA unit table

The supplied local-authority occupancy certificate states that the building was inspected and declared fit for occupation, while the architect’s Form–1A records overall completion of the registered project. Both identify the same project survey numbers. Thus, the supplied record describes a completed, occupancy-certified building rather than a proposed or under-construction portion. This is a document-based status; no independent site inspection is included.

The promoter’s Form B declaration undertook completion by 31.03.2025. The local authority’s occupancy certificate is dated 04 July, 2023; these are different milestones and are reported separately.

3. Master plan, architecture & building design

The building permit describes a single proposed residential building on a site of 999.6 m², with 1 Stilt + 5 upper floors and a sanctioned height of 14.95 m. The approval records 2,348.50 m² of residential upper-floor area and 516.66 m² of stilt area. These figures are reported as stated in the permit and should not be read as apartment carpet or saleable areas.

The permit records a 55.61 m² tot-lot and 14% open-space contribution charges of 16,96,460.00. It also requires a periphery greenery strip and that the tot-lot be fenced and maintained as greenery. The supplied drawing extract does not establish the building footprint, flat count per floor, internal circulation, lift or stair arrangements, or the distribution and dimensions of other common areas.

The occupancy-certificate extract describes the same Stilt + 5 Upper Floor building. It records a 1.25% deviation figure and a compounding fee calculated at 72251/-; this Overview records those document contents without interpreting them.

4. Homes, configurations & floor plans

The RERA unit schedule lists 25 apartments. RERA saleable areas are shown below; the 2BHK carpet figures are separate, software-measured estimates from the approved floor-plan drawing, not RERA-filed disclosures. The supplied drawings do not support a usable 3BHK carpet measurement. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1501570.03 m²Software-measured median 59.6 m²; range 58.9–59.6 m² (six flat designs measured)Not supplied
3BHK1001061.14 m²Not available from the supplied drawing measurementsNot supplied

The measured 2BHK carpet area was derived by software from drawing geometry for document 229546 and is marked as needing review. Carpet area and saleable area are different measures: the latter may include the home’s share of common areas. No balcony/utility-area schedule or verified loading figure is supplied here. Booking and availability counts are portal-read figures without an as-of date. RERA unit details Floor plans RERA unit table

For one measured 2BHK drawing (second-floor plan, flat 05), room labels and dimensions include drawing room 2.75 × 3.54 m, dining 3.0 × 3.77 m, bedrooms 2.75 × 3.0 m and 2.92 × 3.54 m, kitchen 2.81 × 2.92 m, wash 1.25 × 2.92 m, and two toilets 1.46 × 2.03 m and 1.43 × 2.03 m. These are drawing-based software measurements, not RERA room-area disclosures. RERA unit details

5. Parking & vehicle circulation

The building permit states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking. The approval data records a stilt area of 516.66 m²; the occupancy-certificate extract separately reports parking area of 529.5 as per sanctioned plan and 55.61 as per site building plan, without a unit for those two figures in the supplied extract.

No sanctioned parking-space count, resident/visitor/accessibility allocation, parking allotment schedule, ramp or driveway arrangement, or EV-charging provision is established by the supplied RERA documents. A parking area or drawn bay alone does not establish exclusive allocation to a particular apartment.

6. Amenities, recreation & open spaces

The RERA-filed amenity schedule reports the following project-level facilities and progress entries. The percentages are the figures recorded in the schedule; no independent site verification is supplied. The building permit also requires a garbage house and a transformer space, and specifies a tot-lot and rainwater-harvesting structures. RERA amenities

Green strip / tot-lot / park
Description / sizePermit specifies a tot-lot of 55.61 m² and requires it to be fenced and maintained as greenery.
Evidence sourceRERA amenity schedule; building permit RERA amenities
Declared progress / verified statusAmenity schedule: available YES, 100%. Permit condition; independent completion verification not supplied.
Water supply
Description / sizeNo source or capacity specified in the RERA amenity schedule.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusAvailable YES, 100%; not independently verified here.
Sewerage (chambers, lines, septic tank, STP)
Description / sizeSchedule lists the combined facility category; no capacity or separate STP specification is supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusAvailable YES, 100%; not independently verified here.
Storm-water drains
Description / sizeNo dimensions or capacity supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusAvailable YES, 100%; not independently verified here.
Water conservation / rainwater harvesting
Description / sizePermit requires rainwater-harvesting structures and specifies 4 RWHPs.
Evidence sourceRERA amenity schedule; building permit RERA amenities
Declared progress / verified statusSchedule: available YES, 100%; independent completion verification not supplied.
Fire protection and fire-safety requirements
Description / sizeNo system or equipment details supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified statusAvailable YES, 100%; not independently verified here.
Electrical meter room / sub-station / receiving station
Description / sizePermit requires space for a transformer; the schedule lists this combined electrical-facility category.
Evidence sourceRERA amenity schedule; building permit RERA amenities
Declared progress / verified statusAvailable YES, 100%; independent completion verification not supplied.
Internal roads and footpaths
Description / sizeNo further design description supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0% recorded.
Street lighting
Description / sizeNo further detail supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0% recorded.
Community buildings
Description / sizeNone described in the supplied RERA schedule.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0% recorded.
Treatment and disposal of sewage and sullage water
Description / sizeNo further system detail supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0% recorded.
Solid-waste management and disposal
Description / sizePermit separately requires a garbage house within the premises; the amenity schedule records this category.
Evidence sourceRERA amenity schedule; building permit RERA amenities
Declared progress / verified statusSchedule: 0% recorded; the permit states the requirement, not completion.
Energy management
Description / sizeNo detail supplied.
Evidence sourceRERA amenity schedule RERA amenities
Declared progress / verified status0% recorded.
Aggregate recreational open space
Description / sizeNo area stated in the schedule; permit records the tot-lot separately.
Evidence sourceRERA amenity schedule; building permit RERA amenities
Declared progress / verified status0% recorded.

7. Utilities, building services & safety

The RERA-filed schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, fire protection/fire safety requirements, and the electrical meter room/sub-station/receiving-station category as available at 100%. These are schedule entries, not independent verification of commissioning or capacity. The promoter/vendor specification separately states bore-well water with provision for municipal water; that is a vendor claim, not a RERA-filed confirmation of operating sources. RERA amenities Promoter website

The building permit requires 4 rainwater-harvesting structures (RWHPs), transformer space, a garbage house, and construction-worker safety and insurance measures. It states that an occupancy certificate is compulsory before occupation. The supplied record does not specify water-storage or treatment capacities, STP capacity or reuse, backup-power capacity, fire-system details, CCTV coverage in RERA filings, accessible routes, or lift count/capacity.

The vendor specifications list a 6-passenger lift and a generator, but these are vendor-supplied details and are not established as sanctioned or independently verified services in the supplied RERA documents. Promoter website

8. Location, access & connectivity

The registered location is Ameenapur village, Ameenpur mandal, Sangareddy district, PIN 502032. The RERA land record describes the eastern boundary as “30 FEETS WIDE ROAD AND NEIGHBOURS LAND.” The building permit records an 18M road width. RERA record Land records

A supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.4 km. This is a measured-distance entry; no travel time is supplied. The project record does not provide verified public-transport routes or measured distances to schools, hospitals or other landmarks. Location record

9. Developer & development status

The registered promoter is MCOR PROJECTS LLP, an LLP, with GSTIN 36ABSFM8392G1ZI. The RERA-recorded promoter address is Rajendranath Vadala, SSPRIYA Estates, Ameenpur, Ward 01, Ameenpur, Sangareddy, Telangana, 502032. Corporate record Parties record

The Form B declaration is dated 08 April 2022, made by Managing Partner Rajendranath V on behalf of MCOR PROJECTS LLP. It declares the promoter’s title basis and that the land is free from encumbrances, and undertakes completion by 31.03.2025. These statements are promoter declarations. The occupancy certificate and architect’s completion certificate independently document the building’s occupancy/completion status in 2023.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01100004476; issued 02/05/2022; validity ends 31/03/2025
Scope and supplied evidenceDARBAR, MCOR Projects LLP; lists the project survey numbers and registration conditions. No extension is recorded on the certificate.
Building permit / approval
Identifier / date0010/BP/3121/2022, 31 March, 2022; file 001272/BP/DTCP/3121/0015/2022
Scope and supplied evidenceAMEENPUR Municipality/Municipal Corporation; residential building on the project survey numbers.
Occupancy certificate
Identifier / date0083/OC/3121/2023, 04 July, 2023; application 004042/OC/DTCP/3121/0044/2023
Scope and supplied evidenceLocal-authority certificate for the Stilt + 5 Upper Floor building on the project survey numbers; records inspection and fitness for occupation.
Architect’s Form–1A completion certificate
Identifier / dateDated 05-07-2023
Scope and supplied evidenceCertifies overall completion of DARBAR and records occupancy certificate 0083/OC/3121/2023.
Form B declaration
Identifier / date08 April 2022
Scope and supplied evidencePromoter declaration concerning title basis, encumbrances, fund-account undertakings and completion date.
Legal title report
Identifier / dateDated 13 April 2022
Scope and supplied evidenceAdvocate D. Venkateswara Rao’s title opinion, filed with RERA.
Development agreement cum GPA
Identifier / dateRegistered 12 January 2022, 1439/2022
Scope and supplied evidenceFiled title document describing development rights for the landowners’ and promoter’s project arrangement; see the document itself for its stated scope.
Sale deed in title documents
Identifier / date1435/2022, registered 12 January 2022
Scope and supplied evidenceFiled document relating to land in the project’s survey identity.
Layout plan document
Identifier / dateDocument 229546
Scope and supplied evidenceListed as a layout-plan submission; the supplied extraction does not provide substantive layout-plan text.

Frequently asked questions

Is DARBAR registered with Telangana RERA?

Yes. DARBAR is registered with the Telangana Real Estate Regulatory Authority as P01100004476; the registration status is New Project.

Who is the developer of DARBAR?

The promoter named in the RERA registration is MCOR PROJECTS LLP.

Where is DARBAR located?

DARBAR is in WARD 01, AMEENAPUR, AMEENPUR, Sangareddy, Telangana (502032).

When will DARBAR be completed?

The promoter's proposed date of completion filed with RERA is 31/03/2025. This is the promoter's declaration, not a guarantee.