Sign in

Fortune Professionals Paradise 8 Lp

FORTUNE INFRA DEVELOPERS PVT LTD · Rangareddy · RERA P02400002560

FORTUNE PROFESSIONALS PARADISE 8 LP is a plotted development in FORTUNE BUTTERFLY CITY, Kadthal village, Kadthal mandal, Ranga Reddy district, developed by the registered promoter FORTUNE INFRA DEVELOPERS PVT LTD. The RERA land record states an area of 76232.24 sqmts, and the DTCP draft-layout document describes 161 plots; plot-size configurations are not disclosed. The project is registered with TG-RERA under P02400002560, with a proposed completion date of 29/07/2021.

More from Fortune Infra Developers Pvt Ltd · 31 projects →

01What we found

Period endedTG-RERA registration ran to 29 Jul 2021 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameFORTUNE PROFESSIONALS PARADISE 8 LP RERA record
Project type / statusPlotted development; recorded as a “New Project” RERA record RERA filing
Phase / registered portionNo phase number or separate phase description disclosed; registration is for the project named above
TG-RERA registrationP02400002560; registration certificate issued 23/02/2021, valid through 29/07/2021. The certificate states an extension is possible under the Act and rules; the supplied record marks it as not extended. Registration validity is distinct from the completion date Approvals record
Registered promoterFORTUNE INFRA DEVELOPERS PVT LTD RERA record
RERA status in supplied recordRegistration certificate is present. The filed proposed completion date is 29/07/2021; a current completion or occupancy certificate is not provided RERA record RERA filing Document index

Land and geographic identity

ItemProject record
LocalityFORTUNE BUTTERFLY CITY RERA record RERA filing
Revenue village / mandal / districtKadthal / Kadthal / Ranga Reddy RERA record
PIN509358 RERA record
All project survey numbers886, 887, 888, 890, 891; the DTCP draft layout document identifies them as 886/P, 887/P, 888/P, 890/P and 891/P Approvals record
Registered site extentRERA land record: 76232.24 sqmts total and net area. The DTCP draft-layout document separately describes a layout area of Ac. 18.8375 Cents; 91173.50 Sq. Yds. Land records RERA filing
Boundaries recorded on RERA formEast: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: EXISTING PLOTS RERA filing
Site-area components in draft-layout documentPlotted area: Ac. 9.8945 Cents; 47889.38 Sq. Yds. (52.53%); road area: Ac. 7.06 Cents; 34170.40 Sq. Yds. (37.47%); open space: Ac. 1.883 Cents; 9113.72 Sq. Yds. (10.00%). Mortgage area: Ac. 1.52 Cents; 7356.80 Sq. Yds. (15.36%)

Development identity

ItemProject record
Sanctioning authorityDirector of Town and Country Planning (DTCP); document states delegation to Kadthal Gram Panchayat Approvals record
Principal approvalDraft - TLP.No.156/2019/ H, approved 30-07-2019; proceedings Lr.Roc.No.3118/2019/H; file DTCP-HT2/11/2019-HYD Sec-DTCP Approvals record
Approved development describedDraft technical layout pattern for 161 plots
Approved built-up area / buildings / floorsNot disclosed in the supplied project record. This is a plotted layout, not a disclosed apartment-building scheme RERA filing Document index
Mortgage provision in layoutPlots 2 to 5, 8 to 11, 14 to 17 and 29 to 39 are identified for mortgage in favour of the Gram Panchayat; document states the area as Ac. 1.52 Cents; 7356.80 Sq. Yds.

Offering and status

ItemProject record
OfferingPlots; project record identifies a plotted development RERA record RERA filing
RERA unit counts / plot-size rangeRERA-filed plot count and plot-size range are not present in the supplied fields. The DTCP draft-layout document describes 161 plots
Booked / available countsNot disclosed in the supplied records
Construction stageNo current construction-stage evidence is supplied. RERA-listed amenities and infrastructure show 0% progress in the supplied amenity record; this is a recorded progress field, not independent site verification RERA amenities
Completion timelineRERA project information lists proposed completion as 29/07/2021. A Form B declaration states that the project shall be completed within 2 years, but the supplied declaration date appears only as “27 day of 2018” RERA record RERA filing
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied for the plotted layout Document index

2. The project story

FORTUNE PROFESSIONALS PARADISE 8 LP is a plotted development registered with TG-RERA under P02400002560. The project is identified in Kadthal village, Kadthal mandal, Ranga Reddy district, within the locality recorded as FORTUNE BUTTERFLY CITY. Its RERA land identity comprises survey numbers 886, 887, 888, 890 and 891; the draft-layout approval refers to the corresponding portions 886/P, 887/P, 888/P, 890/P and 891/P. RERA record RERA filing

The project is represented in the DTCP document as a 161-plot draft layout. That document allocates land among plotted area, roads, open space and mortgage plots. It describes a draft approval subject to conditions, including demarcation, mortgage documentation, payment of charges, completion of development works and submission of proposals for final layout. The record does not establish that those later steps were completed.

The RERA-filed proposed completion date was 29/07/2021. The supplied material does not include a current progress inspection, a final layout approval, or a completion/occupancy certificate, so it does not establish the present physical completion status. RERA record RERA filing Document index

3. Master plan, architecture & building design

This is a plotted layout rather than a documented multi-storey residential building scheme. The DTCP document describes 161 plots on a stated layout area of Ac. 18.8375 Cents; 91173.50 Sq. Yds., with the following land-use split:

Layout componentArea and share stated in approval document
Plotted areaAc. 9.8945 Cents; 47889.38 Sq. Yds. (52.53%)
Road areaAc. 7.06 Cents; 34170.40 Sq. Yds. (37.47%)
Open spaceAc. 1.883 Cents; 9113.72 Sq. Yds. (10.00%)
Mortgage areaAc. 1.52 Cents; 7356.80 Sq. Yds. (15.36%)

The document identifies plots 2 to 5, 8 to 11, 14 to 17 and 29 to 39 as mortgage plots in favour of the Gram Panchayat. It also states that the draft layout must be executed within two years from approval, and that if not executed within that period it becomes invalid. The supplied evidence does not show completion of the required steps or final layout approval.

No plot-by-plot schedule, plot-size bands, surveyed internal-road drawing, utility-land schedule, or current approved-layout drawing is available in the supplied material. The listed approved built-up area is 00; building count, floor configuration and building arrangements are not disclosed. RERA filing Document index

4. Homes, configurations & floor plans

The project is a plotted development, and no RERA unit-type schedule, plot-size bands, booked/available inventory counts, or plot-level saleable-area schedule is supplied. The DTCP draft-layout document states a total of 161 plots; it does not provide individual plot dimensions in the supplied extraction. RERA filing

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots161 in DTCP draft-layout documentNot disclosedNot disclosedNot disclosedNot applicableNot disclosed

The floor-plan input contains two drawings, both listed as scans pending measurement; no software-measured carpet areas are available. Apartment carpet-area comparisons therefore do not apply to the evidence supplied for this plotted layout. Floor plans

5. Parking & vehicle circulation

No sanctioned parking count, visitor or accessible parking provision, parking allocation arrangement, or vehicle-entry/exit plan is provided. The layout document identifies a road area of Ac. 7.06 Cents; 34170.40 Sq. Yds. (37.47%), but the supplied extraction does not describe road widths or circulation details for this registered project. Document index

The promoter’s website material lists “40 and 60 ft wide roads”; this is a promoter-marketed claim, not a parking or circulation allocation established by the supplied TG-RERA record. Promoter website

6. Amenities, recreation & open spaces

The RERA amenity record lists infrastructure and facilities, but gives 0% progress for the entries shown. This records the supplied declaration/status fields; it does not independently verify whether any facility has been completed. The DTCP draft-layout document separately identifies open space. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsListed as available: YES; no size statedRERA amenities0%; not independently verified
Green strip / tot lot / parkListed as available: YES; no size statedRERA amenities0%; not independently verified
Aggregate recreational open spaceAc. 1.883 Cents; 9113.72 Sq. Yds. (10.00%) in the draft-layout documentRERA amenities0% in amenity record; completion not independently verified
Street lightingListed as available: YES; no specification statedRERA amenities0%; not independently verified
Community buildingsListed; no size or description statedRERA amenities0%; not independently verified
Sewerage infrastructure“Sewerage (Chamber, Lines, Septic Tank, STP)” listed as available: YES; no capacity or system detail statedRERA amenities0%; not independently verified
Water supplyListed as available: YES; no source or capacity statedRERA amenities0%; not independently verified
Storm-water drainsListed; no details statedRERA amenities0%; not independently verified
Sewage and sullage treatment/disposalListed; no capacity or process statedRERA amenities0%; not independently verified
Solid-waste management and disposalListed; no system details statedRERA amenities0%; not independently verified
Water conservation / rainwater harvestingListed; no capacity or design details statedRERA amenities0%; not independently verified
Energy managementListed; no system details statedRERA amenities0%; not independently verified
Fire protection and fire-safety requirementsListed; no systems or design details statedRERA amenities0%; not independently verified
Electrical meter room / sub-station / receiving stationListed; no capacity or location statedRERA amenities0%; not independently verified

The promoter’s website also markets a gym, swimming pool, restaurant, spa, clinic, tennis court, indoor games, party zone, library, parks and security. These are promoter-marketed descriptions; the supplied project-specific RERA amenity record does not identify them individually as approved or completed facilities. Promoter website

7. Utilities, building services & safety

The RERA amenity record lists water supply, sewerage infrastructure, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire-safety requirements and an electrical meter room/sub-station/receiving station. The supplied fields do not specify sources, capacities, technical designs, approvals, or completion status for these services; the listed amenity progress is 0%. RERA amenities

The promoter’s website describes underground drainage, underground power cable, avenue lighting, an overhead tank (OHT) and water-line network. These are promoter-marketed descriptions; no capacities or independent completion evidence are supplied. Promoter website

No project-specific details are supplied for backup power, EV charging, accessibility, security systems, or completed fire/life-safety arrangements. RERA amenities Promoter website

8. Location, access & connectivity

The registered location is Kadthal village, Kadthal mandal, Ranga Reddy district, PIN 509358, in the locality stated as FORTUNE BUTTERFLY CITY. The project record provides a cadastral parcel centroid of 16.97180, 78.49656. RERA record Location record

The supplied location record lists the nearest sampled Outer Ring Road interchange at approximately 29.6 km. The promoter’s website describes the development as situated on Sri Sailam Highway and mentions nearby cinemas, restaurants, shopping malls, clubhouses, gyms, spas, and health and fitness centres; it gives no measured distances or travel times. Location record Promoter website

9. Developer & development status

The registered legal promoter is FORTUNE INFRA DEVELOPERS PVT LTD, recorded as a company. Its GSTIN is 36AAACF9926B1ZR. The project record lists the promoter address as FORTUNE HOUSE, JUBILEE HILLS, SRISAILAM HIGHWAY, FORTUNE BUTTERFLY CITY, Kadthal, Ranga Reddy, 509358; the registration certificate states the promoter office as “Village: Mandal: District: Hyderabad, Pin: 500033.” RERA record Corporate record Parties record

The supplied record names BATTULA SESHAGIRI RAO as chairperson and authorised signatory and PANCHUMARTHI RAMESH as director. The Form B declaration by BATTULA SESHAGIRI RAO states that the project shall be completed within 2 years; the declaration date is recorded only as “27 day of 2018.” Parties record

The RERA record gives a proposed completion date of 29/07/2021, while the supplied registration certificate was valid through that date and is marked not extended. No current construction-stage record, final layout approval, or completion/occupancy certificate is supplied. RERA record RERA filing Approvals record Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateFORM ‘C’ for FORTUNE PROFESSIONALS PARADISE 8 LP, registration P02400002560, issued 23/02/2021, valid through 29/07/2021; certificate includes the separate-account condition and other registration conditions
DTCP draft technical layout patternDraft - TLP.No.156/2019/ H, approved 30-07-2019; file DTCP-HT2/11/2019-HYD Sec-DTCP; proceedings Lr.Roc.No.3118/2019/H; describes a 161-plot layout in 886/P, 887/P, 888/P, 890/P and 891/P
Project declaration, Form BPromoter declaration concerning title basis, encumbrances, project funds, pending approvals and a two-year completion undertaking
Encumbrance statementsFiled statements cover 01-05-1995 to 30-06-2019 and list transactions relating to Kadthal property; the supplied record says a fresh current EC is required to confirm current position
Layout drawing / final layout approvalA layout-plan upload is listed, but its contents were not extracted; final layout approval is not supplied Document index
Completion / occupancy certificateNot supplied Document index
Environmental-clearance searchNo environmental-clearance entry was found in a promoter-name search; the record notes this is not a project-specific match or clearance determination Regulatory record

Frequently asked questions

Is FORTUNE PROFESSIONALS PARADISE 8 LP registered with Telangana RERA?

Yes. FORTUNE PROFESSIONALS PARADISE 8 LP is registered with the Telangana Real Estate Regulatory Authority as P02400002560; the registration status is New Project.

Who is the developer of FORTUNE PROFESSIONALS PARADISE 8 LP?

The promoter named in the RERA registration is FORTUNE INFRA DEVELOPERS PVT LTD.

Where is FORTUNE PROFESSIONALS PARADISE 8 LP located?

FORTUNE PROFESSIONALS PARADISE 8 LP is in FORTUNE BUTTERFLY CITY, Kadthal, Rangareddy, Telangana (509358).

When will FORTUNE PROFESSIONALS PARADISE 8 LP be completed?

The promoter's proposed date of completion filed with RERA is 29/07/2021. This is the promoter's declaration, not a guarantee.

More projects in Kadthal