Sign in

Go Green Park

M/s GO GREEN INFRA PROJECTS · Medchal-Malkajgiri · RERA P02200006947

GO GREEN PARK is a residential apartment project in Cherlapally, Kapra Mandal, Medchal-Malkajgiri District. The registered promoter is M/s GO GREEN INFRA PROJECTS. The project has a land area of 434.61 sq. m and one building with 1 Stilt + 5 upper floors, comprising 10 3BHK homes. It is registered under TG-RERA number P02200006947, issued 14 September 2023, with a proposed completion date of 25 August 2026.

More from Go Green Infra Projects · 4 projects →

01What we found

Period endedTG-RERA registration ran to 25 Aug 2026 - check its extension on TG-RERA
22documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameGO GREEN PARK RERA record
Project type / registered portionResidential apartment project; one registered project. Phase-specific scope is not separately identified in the supplied record. RERA record RERA filing
TG-RERA registrationP02200006947, issued 14 September 2023; validity recorded as 14 September 2023 to 25 August 2026. This is the registration period, not the construction-completion deadline. RERA record
Registered promoterM/s GO GREEN INFRA PROJECTS; RERA record identifies the entity as a partnership. RERA record RERA filing
RERA status in supplied record“New Project”; registration certificate issued under section 5. The supplied record does not establish a later extension. RERA filing

Land and geographic identity

ItemProject record
Locality / revenue villageCherlapally; the building-permit record also spells the locality “Cherlapalli.” Revenue village: Cherlapally Village. RERA record RERA filing
Mandal / district / PINKapra / Medchal-Malkajgiri / 501301. RERA record
Project survey number(s)Survey No. 70; no subdivision is stated in the supplied project record. RERA filing Land records
Registered site extent434.61 sq. m (the GHMC permit’s site area); RERA land details give total area 434.61 sq. m, affected area 11.44 sq. m, and net area 423.17 sq. m. Land records
Boundaries (RERA-filed)East: neighbours’ land; west: 9 MTS WIDE ROAD; north: Plot No. 118; south: 9 MTS WIDE ROAD. Land records
Plot identifiersPlot Nos. 115 & 116. Land records

Development identity

ItemProject record
Sanctioning authority / principal approvalGreater Hyderabad Municipal Corporation (GHMC), Building Permit Order 2/C1/10241/2021, dated 26 November 2021; file no. 2/C1/07948/2021. Approvals record
Building / sanctioned configurationOne residential building identified in the permit as W1-1 (GO GREEN INFRA PROJECTS AND OTHERS); 1 Stilt + 5 upper floors. Sanctioned height: 15.00 m.
Approved area figuresGHMC permit records residential upper-floor area 1,101.70 m², stilt parking area 205.38 m², site area 434.61 m², and net area 423.17 m². These are permit figures; the record does not label the upper-floor figure as carpet or saleable area.
Building / unit countsOne building; the project record states one building unit, while the RERA unit schedule lists 10 3BHK homes. RERA filing RERA unit table
Parking configurationStilt parking is shown in the permit. The supplied material does not establish the sanctioned number of car spaces or unit-wise allocations.

Offering and status

ItemProject record
RERA-filed homes3BHK, 10 units; filed saleable area 134.06 m² per unit. RERA unit table RERA unit details
Bookings / availabilityPortal snapshot lists 0 booked and 10 available; no as-of date is supplied, so these counts are indicative rather than a live inventory confirmation. RERA unit table RERA unit details
Completion deadlineRERA header and Form B document 352365 state 25 August 2026 as the promoter’s completion undertaking. This is separate from registration validity. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied documents. The GHMC permit requires an occupancy certificate before occupation; this does not itself establish whether construction is complete.
Construction stageNo independently verified site-progress evidence or dated construction percentage is supplied. RERA amenity progress fields show 0% for listed items; these are portal-declared progress entries, not an independent site inspection. RERA amenities

2. The project story

GO GREEN PARK is a single-building residential apartment project registered with TG-RERA for land identified as Survey No. 70, Plot Nos. 115 & 116, in Cherlapally Village, Kapra Mandal, Medchal-Malkajgiri District. The GHMC building permit describes one residential building, W1-1, with a stilt and five upper floors. The RERA schedule offers ten 3BHK homes. RERA record Land records RERA unit table

The record establishes a conditional building permit and a promoter’s stated completion deadline of 25 August 2026. It does not provide independently verified construction progress or an occupancy certificate. The completion date is therefore a promoter undertaking in the RERA-filed Form B, not evidence that the building has been completed or occupied. RERA amenities

3. Master plan, architecture & building design

The GHMC-sanctioned scheme is for one residential building with 1 stilt + 5 upper floors, a stated height of 15.00 m, and 1,101.70 m² of residential upper-floor area. The permit separately records 205.38 m² of stilt parking area. The project site is 434.61 m², with a recorded net area of 423.17 m².

The building-permit extraction identifies a 2.5 m setback and lists 2.5 m at each of the side I, side II, front and rear setbacks in the separate permit extraction. The permit also records a periphery greenery strip, tree planting, a garbage house, transformer space, rainwater-harvesting structure and ETP requirements. The available data does not establish building footprint, floor-by-floor flat count, number of lifts or stairs, internal circulation details, or a complete sanctioned drawing schedule.

The supplied figures should be kept distinct: 1,101.70 m² is the permit’s residential upper-floor area; 205.38 m² is the stilt parking area; and 134.06 m² is the RERA-filed saleable area for each home. The record does not provide a separate FSI-counted area or gross built-up-area breakdown. RERA unit table

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010134.06 m² per unit81.8–93.6 m²; median 87.7 m²35%

Unit counts, booking counts and saleable area are from the RERA filing; booking figures have no supplied as-of date. The carpet-area range and median are software measurements from floor-plan drawing geometry in document 352363—not RERA-filed measurements—and the supplied data says two measurements need review. Verify them against the drawing and the unit-specific agreement. The RERA saleable area and software-measured carpet area describe different area bases; the supplied drawing-analysis caveat states that saleable area includes the home’s share of common areas. RERA unit table RERA unit details Floor plans

A measured typical-floor-plan example identifies a hall, kitchen, dining area, three bedrooms, three toilets, a utility area and a balcony. The software-measured example records the utility area as 2.97 m² and excludes it, along with the balcony, from carpet area. Room dimensions are drawing-derived and should be checked on the approved plan; no separate RERA-filed room-dimension schedule is supplied. RERA unit details

5. Parking & vehicle circulation

The sanctioned plan records a stilt parking level of 205.38 m². GHMC conditions require the stilt area approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not to be converted to another use. The supplied permit extraction does not state the number of sanctioned car or two-wheeler bays, accessible or visitor spaces, or unit-wise parking allocations.

No ramp arrangement, separate vehicle entry/exit, pedestrian separation, EV charging provision, or legally documented parking allocation is established by the supplied project records. A parking-area figure alone does not establish an exclusive parking right for any particular home.

6. Amenities, recreation & open spaces

Water supply
Description / sizeListed as available “YES”; no source, storage or capacity is stated.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; not independently verified.
Sewerage / sewage treatment
Description / sizeSewerage (chambers, lines, septic tank, STP) and treatment/disposal of sewage and sullage are listed; the building permit requires an ETP.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entries: 0%; not independently verified.
Storm-water drains
Description / sizeListed in RERA amenities; no dimensions or capacity stated.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; not independently verified.
Green strip / tot-lot / park
Description / sizeListed in RERA amenities. GHMC permit records “Tot-lot (m2) 0” and requires a fenced tot-lot maintained as greenery before occupancy.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; delivery not independently verified.
Tree planting
Description / sizePermit records 20 Trees and requires planting along the periphery and in front of the premises.
Declared progress / verified statusRequired by permit; completion not independently verified.
Street lighting
Description / sizeListed in RERA amenities; no quantity or specification stated.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; not independently verified.
Community buildings
Description / sizeListed in RERA amenities; no building or area specified.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; not independently verified.
Solid-waste management and disposal
Description / sizeListed in RERA amenities; GHMC permit also requires a garbage house within the premises.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; not independently verified.
Rainwater harvesting
Description / sizeListed in RERA amenities; GHMC permit requires a rainwater-harvesting structure/percolation pit.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; not independently verified.
Energy management
Description / sizeListed in RERA amenities; no system or capacity stated.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; not independently verified.
Fire protection and fire safety
Description / sizeListed in RERA amenities; permit conditions require fire-safety provisions and a Fire NOC before issue of occupancy certificate.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; no completed system or Fire NOC is evidenced here.
Electrical meter room / sub-station / receiving station
Description / sizeListed as available “YES”; GHMC requires transformer space on site.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; completion not independently verified.
Recreational open space
Description / sizeListed in RERA amenities; no area is stated.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress entry: 0%; not independently verified.

No clubhouse, indoor recreation facility, sports facility, or specific community-room size is established in the supplied RERA and permit records. RERA amenities

7. Utilities, building services & safety

The RERA amenity schedule marks water supply and the electrical meter room/sub-station/receiving-station item as available, but supplies no source, storage, treatment capacity, power capacity or completion verification. GHMC conditions state that public water and electricity connections will be provided only on production of an occupancy certificate. The permit also requires transformer space and a rainwater-harvesting percolation pit. RERA amenities

For sewerage and drainage, the RERA schedule lists sewerage, treatment/disposal of sewage and sullage, and storm-water drains. GHMC’s permit requires an ETP. No treatment capacity, reuse scheme, drainage design or completed-system evidence is supplied. RERA amenities

The permit requires fire-fighting installations, structural safety and means-of-escape safety provisions, and a Fire NOC before issue of an occupancy certificate. These are approval conditions; the supplied records do not establish installation, testing, clearance or operational readiness. The available information does not specify lifts, lift capacity, backup power, CCTV, access control, waste segregation arrangements, accessible routes or ramps.

8. Location, access & connectivity

The registered project location is Cherlapally Village, Kapra Mandal, Medchal-Malkajgiri District, Telangana, PIN 501301, at Plot Nos. 115 & 116 in Survey No. 70. The permit identifies the road as ROAD NO: 1, SRI RAMAKRISHNA NAGAR COLONY and refers to an 18 mt. road in its conditions. RERA record Land records

The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 7.9 km. This is a supplied approximate distance; no route or travel time is provided. No project-specific public-transport stops or other measured landmark distances are established in the supplied record. Location record

9. Developer & development status

The registered legal promoter is M/s GO GREEN INFRA PROJECTS, identified in the project record as a partnership, with GSTIN 36AAOFG6865D1Z2. The RERA record names VENKATA RAO PUSALA as partner and authorized signatory and RAJANI SRI PUSALA as partner. The promoter address recorded in the project data is at Sri Rama Towers, Tilak Road, Road No. 1, Sri Ramakrishna Nagar Colony, Cherlapally Village, Kapra Mandal, Medchal-Malkajgiri District, PIN 501301. Corporate record RERA filing Parties record

The GHMC permit authorizes the building configuration described above; the promoter’s Form B states a completion undertaking of 25 August 2026. The supplied records do not establish a construction-progress percentage verified by an independent site inspection or an issued occupancy certificate.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200006947, Form C, issued 14 September 2023
What the supplied record establishesRegistration of GO GREEN PARK under section 5, with stated validity to 25 August 2026.
GHMC building permit
Identifier / datePermit 2/C1/10241/2021; file 2/C1/07948/2021; 26 November 2021
What the supplied record establishesConditional building permission for a residential building with 1 stilt + 5 upper floors at Survey No. 70, Plot Nos. 115 & 116.
Promoter Form B
Identifier / dateDocument 352365, dated 25 August 2023
What the supplied record establishesPromoter-filed declaration and completion undertaking of 25 August 2026.
Additional promoter Form B
Identifier / dateDocument 354714, dated 25 August 2023
What the supplied record establishesForm B document in the supplied file set.
Floor-plan drawing file
Identifier / dateDocument 352363
What the supplied record establishesDrawing identified in the supplied measurement record as the source for software-measured unit and room information. The supplied project record does not provide a separate extracted layout-approval number.
Occupancy / completion certificate
Identifier / dateNot identified in the supplied documents
What the supplied record establishesThe GHMC permit states that an occupancy certificate is compulsory before occupation; no issued certificate is evidenced in this supplied document set.

Frequently asked questions

Is GO GREEN PARK registered with Telangana RERA?

Yes. GO GREEN PARK is registered with the Telangana Real Estate Regulatory Authority as P02200006947; the registration status is New Project.

Who is the developer of GO GREEN PARK?

The promoter named in the RERA registration is M/s GO GREEN INFRA PROJECTS.

Where is GO GREEN PARK located?

GO GREEN PARK is in CHERLAPALLY, Kapra, Medchal-Malkajgiri, Telangana (501301).

When will GO GREEN PARK be completed?

The promoter's proposed date of completion filed with RERA is 25/12/2026. This is the promoter's declaration, not a guarantee.

More projects in Cherlapally