Greater Infras Gaura
GREATER INFRA PROJECTS PRIVATE LIMITED · Sangareddy · RERA P01100006545
GREATER INFRAS GAURA is a residential apartment project in Ameenapur, AMEENPUR Mandal, Sangareddy district, developed by registered promoter GREATER INFRA PROJECTS PRIVATE LIMITED. It has a land area of 501.68 sq. m and 1 residential building with 1 Stilt + 5 upper floors, comprising 10 homes: 5 2BHK and 5 3BHK. The project is registered under TG-RERA P01100006545, with proposed completion by 09-02-2026.
📘 Project brochure from the promoter’s website ↗More from Greater Infra Projects Pvt Ltd · 24 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | GREATER INFRAS GAURA RERA record |
| Project type / phase | Residential apartment project; phase or separately identified registered portion: not disclosed. RERA record RERA filing |
| TG-RERA registration | P01100006545 |
| Registration validity | Certificate states validity from 07/07/2023 to 09/02/2026; the supplied registration record says it was not extended. Validity is separate from the building’s occupancy certification. |
| Registered promoter | GREATER INFRA PROJECTS PRIVATE LIMITED RERA record |
| RERA project status | New Project in the supplied project record. RERA record RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Ameenpur / AMEENAPUR; the building-permit and occupancy-certificate records identify Ameenpur Village. RERA record RERA filing |
| Mandal | AMEENPUR RERA record RERA filing |
| District | Sangareddy; the permit and OC spell the district “Sanga Reddy.” RERA record |
| PIN | 502032 RERA record |
| Project survey number(s) | Survey No. 333; no project subdivision is stated in the supplied registration, permit or OC records. RERA filing |
| Plot numbers | Plot Nos. 162 and 163 |
| Registered site extent | 501.68 sq. m in the RERA project record and approval documents. RERA filing |
| Total / net area | Both recorded as 501.68 sq. m; road-widening area is recorded as 0.00 in the OC extraction. RERA filing |
| Boundaries in RERA filing | East: PLOT NO 151 AND 152; West: 40 FEET WIDE ROAD; North: PLOT NO 161; South: PLOT NOS 164 AND 149. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | HMDA |
| Principal building-permit approval | 011496/BP/HMDA/2382/SKP/2022, approved 09 February, 2023; proceedings no. 002305/BP/HMDA/SKP/2023. |
| Approved building use and form | Residential building comprising 1 Stilt + 5 upper floors, on Plot Nos. 162 and 163. The later OC records Cellar, Stilt, Ground Floor, 5 Upper Floor. |
| Approved built-up area | 1,436.82 Sq.mts. Total Built up Area in the permit extraction. The same extraction also lists 1,204.45 Sq.mts. total built up area; the supplied record does not explain the distinction. |
| Buildings / blocks | 1 in the RERA project record; the permit concerns one residential building. RERA filing |
| Parking floors / provision | The permit describes a stilt and says it is to be used exclusively for vehicle parking; no sanctioned parking-space count or unit-wise allocation is supplied. |
| Approved versus RERA-declared units | The RERA filing lists 10 units (5 2BHK and 5 3BHK); the approved-plan extraction does not provide a separate sanctioned unit count. RERA unit details |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 5 units; saleable area 116.6 sq. m each. 3BHK: 5 units; saleable area 167.69 sq. m each. RERA unit table |
| Booked / available | 4 booked / 6 available in total: 2 booked and 3 available in each configuration. Portal counts are indicative; the supplied record has no as-of date for these counts. RERA unit table RERA unit details |
| Construction stage | The supplied HMDA occupancy-certificate records state the building was inspected and declared fit for occupation. The RERA status field still reads “New Project.” RERA filing |
| Completion date / undertaking | Promoter’s Form B undertaking states completion by 09-02-2026. The OC extraction records completion notice submission on 02 August, 2024. |
| Occupancy certificate | HMDA OC 005996/OC/HMDA/SKP/2024, dated 24 October, 2024, for the residential building at Plot Nos. 162 and 163, Survey No. 333. The supplied certificate identifies the building as fit for occupation. |
| Architect’s completion certificate | Form 1A dated 02-04-2025 certifies overall completion of the registered project and identifies the HMDA OC. |
2. The project story
GREATER INFRAS GAURA is recorded with TG-RERA as a residential apartment project at Plot Nos. 162 and 163 in Survey No. 333, Ameenapur Village, Ameenpur Mandal, Sangareddy district. The project site extent recorded in the filing and HMDA documents is 501.68 sq. m. RERA record RERA filing
The approved development is one residential building with a stilt and five upper floors. HMDA’s OC records a cellar, stilt, ground floor and five upper floors; the certificate says the inspected building is fit for occupation. A Form 1A architect’s certificate dated 02-04-2025 also certifies overall project completion. These are documentary completion and occupancy records, not an independent site inspection for this report.
The RERA filing offers ten apartments: five 2BHK and five 3BHK. Its portal-derived booking snapshot lists four booked and six available, but provides no date for that inventory snapshot. RERA unit table RERA unit table
3. Master plan, architecture & building design
The HMDA building-permit extraction describes a single residential building on 501.68 sq. m, with 1 Stilt + 5 upper floors. The occupancy-certificate extraction describes the completed building as Cellar, Stilt, Ground Floor, 5 Upper Floor. The permit extraction lists 1,436.82 Sq.mts. Total Built up Area and separately lists 1,204.45 Sq.mts. total built up area; the supplied documents do not explain how these two figures relate, so they are retained as recorded rather than treated as interchangeable.
The approved-plan extraction identifies the stilt/cellar as exclusively for vehicle parking, without partition walls or rolling shutters. It also records an HMDA requirement for an STP and rainwater-harvesting structures, and says the approach road is to be developed and maintained as a black-topped road before release of the occupancy certificate.
The supplied plan record does not establish the building footprint, floor-by-floor apartment arrangement, flats per floor, lift or stair configuration, internal open-space dimensions, or any phase-wise organization. The extracted plan document was not available as a measured drawing in the supplied evidence. Document index
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 2 | 3 | 116.6 sq. m | Software-measured median 84.7 sq. m; range 83.6–85.7 sq. m | 27% |
| 3BHK | 5 | 2 | 3 | 167.69 sq. m | Not supplied | Not supplied |
RERA-filed counts and saleable areas are from the project’s unit records; booked and available counts are portal-derived and have no supplied as-of date. RERA unit table RERA unit table RERA unit details
For the 2BHK, the carpet-area figures are software measurements from the approved floor-plan drawing (two designs measured), not a RERA disclosure; the drawing measurement is flagged as needing review. The supplied plan extraction gives one example with a drawing room, living/dining area, kitchen, two bedrooms, three toilets and utility areas. The listed utility spaces are excluded from the measured carpet area. RERA unit details Floor plans
Carpet area, saleable area and the stated loading are distinct measures: the supplied record describes carpet area as drawing-measured and smaller than saleable area, which includes the home’s share of common areas. No drawing-measured carpet area is supplied for the 3BHK. Floor plans RERA unit details
5. Parking & vehicle circulation
The HMDA permit specifies that the stilt/cellar should be used exclusively for vehicle parking and not partitioned. A 4.5mts. road width is among the permit’s extracted road-width entries, and the permit also requires the approach road shown in the plan to be developed and maintained as a black-topped road before occupancy-certificate release.
No approved parking-space count, resident or visitor allocation, accessible parking provision, mechanical-parking details, EV charging provision, parking plan, or legally documented unit-wise parking allocation is available in the supplied records. A parking bay or general parking provision alone would not establish exclusive ownership. Document index
6. Amenities, recreation & open spaces
The following status percentages are RERA-portal entries, not independent verification of completed facilities. “YES” and 100% are reproduced as recorded; zero entries are not treated as a determination that the facility is legally required or unavailable. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | Size not supplied | TG-RERA amenity record | “YES”, 100% declared; not independently verified. RERA amenities |
| Community buildings | Size and details not supplied | TG-RERA amenity record | 0% recorded. RERA amenities |
| Aggregate area of recreational open space | Area not supplied | TG-RERA amenity record | 0% recorded. RERA amenities |
The supplied RERA amenity record does not identify a clubhouse or other indoor recreation facility. RERA amenities
7. Utilities, building services & safety
The TG-RERA amenity record marks Water Supply, Water Conservation, Rain water Harvesting, Electrical Meter Room, Sub-Station, Receiving Station, GENRATOR, and CC CEMARA as “YES” and 100%. These are portal declarations, not independent verification of installation or operational status. RERA amenities
The HMDA building permit requires an STP and rainwater-harvesting structures, and requires the stilt/cellar to be kept for vehicle parking. The amenity record lists sewerage (including STP), storm-water drains, treatment and disposal of sewage and sullage, fire protection and fire-safety requirements, and street lighting at 0%. The supplied evidence does not state water source or storage capacity, STP capacity, reuse arrangements, electrical or generator capacity, lift number or capacity, fire-system details, CCTV coverage beyond the portal entry, or accessibility arrangements. RERA amenities
8. Location, access & connectivity
The registered project location is Ameenapur village, Ameenpur Mandal, Sangareddy district, PIN 502032. The RERA land record describes the western boundary as a 40 FEET WIDE ROAD; the building-permit extraction lists 4.5mts. and refers to the approach road shown in the plan. RERA record RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.7 km. This is a mapped distance, not a travel-time estimate. No other independently measured connectivity distances or public-transport details are supplied. Location record
9. Developer & development status
The registered promoter is GREATER INFRA PROJECTS PRIVATE LIMITED, a company, GSTIN 36AAHCG8193L1ZX. The project record gives its address as 217/A, OPP METRO STATION, AMEENPUR, AMEENPUR, AMEENPUR, Sangareddy, 502032. RERA record Corporate record Parties record
The RERA record identifies NEKKANTI SRINIVAS as an authorized signatory. The Form B affidavit is signed by N. Srinivas on behalf of the promoter and declares a completion date of 09-02-2026. Parties record
HMDA’s occupancy certificate identifies the building as fit for occupation, and the architect’s Form 1A dated 02-04-2025 certifies overall completion of the registered project. This document-based status is distinct from a fresh physical inspection. The supplied project data does not provide a separate construction-progress percentage.
10. Approvals, official records & documents
| Identifier / date | P01100006545; issued 07/07/2023; validity stated through 09/02/2026 |
|---|---|
| Scope and evidence | Form C for GREATER INFRAS GAURA; identifies Survey No. 333 and the registered promoter. |
| Identifier / date | 011496/BP/HMDA/2382/SKP/2022; 09 February, 2023; proceedings 002305/BP/HMDA/SKP/2023 |
|---|---|
| Scope and evidence | Residential building at Plot Nos. 162 and 163, Survey No. 333; permit extraction describes 1 stilt + 5 upper floors. |
| Identifier / date | 005996/OC/HMDA/SKP/2024; 24 October, 2024; application 008675/OC/HMDA/2178/SKP/2024 |
|---|---|
| Scope and evidence | Residential building at Plot Nos. 162 and 163, Survey No. 333; OC extraction records completion notice submission on 02 August, 2024 and the building fit for occupation. |
| Identifier / date | Dated 02-04-2025 |
|---|---|
| Scope and evidence | Certifies overall completion of the registered project and cites the HMDA occupancy certificate. |
| Identifier / date | Dated March, 2023 |
|---|---|
| Scope and evidence | Authorized signatory’s affidavit concerning title basis, encumbrance declaration, RERA obligations and completion undertaking. |
| Identifier / date | No sheet confidently assigned |
|---|---|
| Scope and evidence | The supplied HMDA record says the relevant published sheet could not be confidently assigned for the stated mandal/locality. HMDA |
| Identifier / date | No LP number in the RERA record; portal source unavailable |
|---|---|
| Scope and evidence | Public lookup was reported unavailable; this is not evidence of approval or refusal. HMDA |
1. Project at a glance
Project identity
Registered project name: GREATER INFRAS GAURA
Project type / phase: Residential apartment project; phase or separately identified registered portion: not disclosed.
TG-RERA registration: P01100006545
Registration validity: Certificate states validity from 07/07/2023 to 09/02/2026; the supplied registration record says it was not extended. Validity is separate from the building’s occupancy certification.
Registered promoter: GREATER INFRA PROJECTS PRIVATE LIMITED
RERA project status: New Project in the supplied project record.
Land and geographic identity
Locality / revenue village: Ameenpur / AMEENAPUR; the building-permit and occupancy-certificate records identify Ameenpur Village.
Mandal: AMEENPUR
District: Sangareddy; the permit and OC spell the district “Sanga Reddy.”
PIN: 502032
Project survey number(s): Survey No. 333; no project subdivision is stated in the supplied registration, permit or OC records.
Plot numbers: Plot Nos. 162 and 163
Registered site extent: 501.68 sq. m in the RERA project record and approval documents.
Total / net area: Both recorded as 501.68 sq. m; road-widening area is recorded as 0.00 in the OC extraction.
Boundaries in RERA filing: East: PLOT NO 151 AND 152; West: 40 FEET WIDE ROAD; North: PLOT NO 161; South: PLOT NOS 164 AND 149.
Development identity
Sanctioning authority: HMDA
Principal building-permit approval: 011496/BP/HMDA/2382/SKP/2022, approved 09 February, 2023; proceedings no. 002305/BP/HMDA/SKP/2023.
Approved building use and form: Residential building comprising 1 Stilt + 5 upper floors, on Plot Nos. 162 and 163. The later OC records Cellar, Stilt, Ground Floor, 5 Upper Floor.
Approved built-up area: 1,436.82 Sq.mts. Total Built up Area in the permit extraction. The same extraction also lists 1,204.45 Sq.mts. total built up area; the supplied record does not explain the distinction.
Buildings / blocks: 1 in the RERA project record; the permit concerns one residential building.
Parking floors / provision: The permit describes a stilt and says it is to be used exclusively for vehicle parking; no sanctioned parking-space count or unit-wise allocation is supplied.
Approved versus RERA-declared units: The RERA filing lists 10 units (5 2BHK and 5 3BHK); the approved-plan extraction does not provide a separate sanctioned unit count.
Offering and status
RERA-filed configurations: 2BHK: 5 units; saleable area 116.6 sq. m each. 3BHK: 5 units; saleable area 167.69 sq. m each.
Booked / available: 4 booked / 6 available in total: 2 booked and 3 available in each configuration. Portal counts are indicative; the supplied record has no as-of date for these counts.
Construction stage: The supplied HMDA occupancy-certificate records state the building was inspected and declared fit for occupation. The RERA status field still reads “New Project.”
Completion date / undertaking: Promoter’s Form B undertaking states completion by 09-02-2026. The OC extraction records completion notice submission on 02 August, 2024.
Occupancy certificate: HMDA OC 005996/OC/HMDA/SKP/2024, dated 24 October, 2024, for the residential building at Plot Nos. 162 and 163, Survey No. 333. The supplied certificate identifies the building as fit for occupation.
Architect’s completion certificate: Form 1A dated 02-04-2025 certifies overall completion of the registered project and identifies the HMDA OC.
2. The project story
GREATER INFRAS GAURA is recorded with TG-RERA as a residential apartment project at Plot Nos. 162 and 163 in Survey No. 333, Ameenapur Village, Ameenpur Mandal, Sangareddy district. The project site extent recorded in the filing and HMDA documents is 501.68 sq. m.
The approved development is one residential building with a stilt and five upper floors. HMDA’s OC records a cellar, stilt, ground floor and five upper floors; the certificate says the inspected building is fit for occupation. A Form 1A architect’s certificate dated 02-04-2025 also certifies overall project completion. These are documentary completion and occupancy records, not an independent site inspection for this report.
The RERA filing offers ten apartments: five 2BHK and five 3BHK. Its portal-derived booking snapshot lists four booked and six available, but provides no date for that inventory snapshot.
3. Master plan, architecture & building design
The HMDA building-permit extraction describes a single residential building on 501.68 sq. m, with 1 Stilt + 5 upper floors. The occupancy-certificate extraction describes the completed building as Cellar, Stilt, Ground Floor, 5 Upper Floor. The permit extraction lists 1,436.82 Sq.mts. Total Built up Area and separately lists 1,204.45 Sq.mts. total built up area; the supplied documents do not explain how these two figures relate, so they are retained as recorded rather than treated as interchangeable.
The approved-plan extraction identifies the stilt/cellar as exclusively for vehicle parking, without partition walls or rolling shutters. It also records an HMDA requirement for an STP and rainwater-harvesting structures, and says the approach road is to be developed and maintained as a black-topped road before release of the occupancy certificate.
The supplied plan record does not establish the building footprint, floor-by-floor apartment arrangement, flats per floor, lift or stair configuration, internal open-space dimensions, or any phase-wise organization. The extracted plan document was not available as a measured drawing in the supplied evidence.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 2 | 3 | 116.6 sq. m | Software-measured median 84.7 sq. m; range 83.6–85.7 sq. m | 27% |
| 3BHK | 5 | 2 | 3 | 167.69 sq. m | Not supplied | Not supplied |
RERA-filed counts and saleable areas are from the project’s unit records; booked and available counts are portal-derived and have no supplied as-of date.
For the 2BHK, the carpet-area figures are software measurements from the approved floor-plan drawing (two designs measured), not a RERA disclosure; the drawing measurement is flagged as needing review. The supplied plan extraction gives one example with a drawing room, living/dining area, kitchen, two bedrooms, three toilets and utility areas. The listed utility spaces are excluded from the measured carpet area.
Carpet area, saleable area and the stated loading are distinct measures: the supplied record describes carpet area as drawing-measured and smaller than saleable area, which includes the home’s share of common areas. No drawing-measured carpet area is supplied for the 3BHK.
5. Parking & vehicle circulation
The HMDA permit specifies that the stilt/cellar should be used exclusively for vehicle parking and not partitioned. A 4.5mts. road width is among the permit’s extracted road-width entries, and the permit also requires the approach road shown in the plan to be developed and maintained as a black-topped road before occupancy-certificate release.
No approved parking-space count, resident or visitor allocation, accessible parking provision, mechanical-parking details, EV charging provision, parking plan, or legally documented unit-wise parking allocation is available in the supplied records. A parking bay or general parking provision alone would not establish exclusive ownership.
6. Amenities, recreation & open spaces
The following status percentages are RERA-portal entries, not independent verification of completed facilities. “YES” and 100% are reproduced as recorded; zero entries are not treated as a determination that the facility is legally required or unavailable.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | Size not supplied | TG-RERA amenity record | “YES”, 100% declared; not independently verified. |
| Community buildings | Size and details not supplied | TG-RERA amenity record | 0% recorded. |
| Aggregate area of recreational open space | Area not supplied | TG-RERA amenity record | 0% recorded. |
The supplied RERA amenity record does not identify a clubhouse or other indoor recreation facility.
7. Utilities, building services & safety
The TG-RERA amenity record marks Water Supply, Water Conservation, Rain water Harvesting, Electrical Meter Room, Sub-Station, Receiving Station, GENRATOR, and CC CEMARA as “YES” and 100%. These are portal declarations, not independent verification of installation or operational status.
The HMDA building permit requires an STP and rainwater-harvesting structures, and requires the stilt/cellar to be kept for vehicle parking. The amenity record lists sewerage (including STP), storm-water drains, treatment and disposal of sewage and sullage, fire protection and fire-safety requirements, and street lighting at 0%. The supplied evidence does not state water source or storage capacity, STP capacity, reuse arrangements, electrical or generator capacity, lift number or capacity, fire-system details, CCTV coverage beyond the portal entry, or accessibility arrangements.
8. Location, access & connectivity
The registered project location is Ameenapur village, Ameenpur Mandal, Sangareddy district, PIN 502032. The RERA land record describes the western boundary as a 40 FEET WIDE ROAD; the building-permit extraction lists 4.5mts. and refers to the approach road shown in the plan.
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 8.7 km. This is a mapped distance, not a travel-time estimate. No other independently measured connectivity distances or public-transport details are supplied.
9. Developer & development status
The registered promoter is GREATER INFRA PROJECTS PRIVATE LIMITED, a company, GSTIN 36AAHCG8193L1ZX. The project record gives its address as 217/A, OPP METRO STATION, AMEENPUR, AMEENPUR, AMEENPUR, Sangareddy, 502032.
The RERA record identifies NEKKANTI SRINIVAS as an authorized signatory. The Form B affidavit is signed by N. Srinivas on behalf of the promoter and declares a completion date of 09-02-2026.
HMDA’s occupancy certificate identifies the building as fit for occupation, and the architect’s Form 1A dated 02-04-2025 certifies overall completion of the registered project. This document-based status is distinct from a fresh physical inspection. The supplied project data does not provide a separate construction-progress percentage.
10. Approvals, official records & documents
| Identifier / date | P01100006545; issued 07/07/2023; validity stated through 09/02/2026 |
|---|---|
| Scope and evidence | Form C for GREATER INFRAS GAURA; identifies Survey No. 333 and the registered promoter. |
| Identifier / date | 011496/BP/HMDA/2382/SKP/2022; 09 February, 2023; proceedings 002305/BP/HMDA/SKP/2023 |
|---|---|
| Scope and evidence | Residential building at Plot Nos. 162 and 163, Survey No. 333; permit extraction describes 1 stilt + 5 upper floors. |
| Identifier / date | 005996/OC/HMDA/SKP/2024; 24 October, 2024; application 008675/OC/HMDA/2178/SKP/2024 |
|---|---|
| Scope and evidence | Residential building at Plot Nos. 162 and 163, Survey No. 333; OC extraction records completion notice submission on 02 August, 2024 and the building fit for occupation. |
| Identifier / date | Dated 02-04-2025 |
|---|---|
| Scope and evidence | Certifies overall completion of the registered project and cites the HMDA occupancy certificate. |
| Identifier / date | Dated March, 2023 |
|---|---|
| Scope and evidence | Authorized signatory’s affidavit concerning title basis, encumbrance declaration, RERA obligations and completion undertaking. |
| Identifier / date | No sheet confidently assigned |
|---|---|
| Scope and evidence | The supplied HMDA record says the relevant published sheet could not be confidently assigned for the stated mandal/locality. |
| Identifier / date | No LP number in the RERA record; portal source unavailable |
|---|---|
| Scope and evidence | Public lookup was reported unavailable; this is not evidence of approval or refusal. |
Frequently asked questions
Is GREATER INFRAS GAURA registered with Telangana RERA?
Yes. GREATER INFRAS GAURA is registered with the Telangana Real Estate Regulatory Authority as P01100006545; the registration status is New Project.
Who is the developer of GREATER INFRAS GAURA?
The promoter named in the RERA registration is GREATER INFRA PROJECTS PRIVATE LIMITED.
Where is GREATER INFRAS GAURA located?
GREATER INFRAS GAURA is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).
When will GREATER INFRAS GAURA be completed?
The promoter's proposed date of completion filed with RERA is 09/02/2026. This is the promoter's declaration, not a guarantee.