HIMANY RESIDENCY is a residential apartment project in Madeenaguda, Miyapur revenue village, Serilingampally Mandal, Ranga Reddy District. The registered promoter is HIMALAYACONSTRUCTIONS. The project site is 568.94 sq m and comprises one proposed residential building, recorded as Stilt + 5 with five residential upper floors, and 10 homes, all filed as 2BHK. It is registered with TG-RERA as P02400000795, with a proposed completion date of 29 April 2024.

More from Himalaya Constructions · 12 projects →

01What we found

Period endedTG-RERA registration ran to 29 Apr 2024 - check its extension on TG-RERA
10documents on file - each fact links to its page
1court case on this project's land (survey 25, Miyapur)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

ItemProject record
Registered nameHIMANY RESIDENCY RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionPhase not separately identified; the TG-RERA record describes this project registration
TG-RERA registrationP02400000795 RERA record
Registration validity25 May 2019 to 29 April 2024; the certificate states four years, unless extended by the Authority. No extension is recorded in the supplied evidence. This is the registration period, not a statement of completion or occupancy status. RERA record
Registered promoterHIMALAYACONSTRUCTIONS RERA record
RERA statusRecorded as “On-Going Project”; the certificate’s stated validity ended 29 April 2024. RERA filing

Land and geographic identity

ItemProject record
Locality / PINMadeenaguda (also recorded as Miyapur locality); PIN 500049 RERA record RERA filing
Revenue villageMiyapur, Serilingampally Mandal, Ranga Reddy District RERA record
Project survey number(s)Survey No. 25; no subdivision is specified in the supplied RERA record Land records
Registered site extent568.94 sq m; the RERA land record gives the same figure as total and net area, with affected area 0 RERA filing
Boundaries recorded by RERANorth: Garlakunta Tank; South: road and “FLOT 51”; East: “ROAD NO 48 47 37 AND 49”; West: neighbours’ land RERA filing
Cadastral contextBhu Bharati records the whole of Survey No. 25 as 4,977.93 sq m; that survey-wide figure is not the project site extent. Cadastral map

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalBuilding Permit Order No. 2/C12/07466/2018; approved 29 April 2018. File No. 2/C12/02650/2018. Approvals record
Building configurationOne proposed residential building, “Building - PROP (HIMALAYA CONST),” recorded as Stilt + 5; sanctioned residential upper floors: 5; stated height: 14.9 m.
Approved area figuresSanctioned residential area: 1,080.80 m²; stilt area: 202.71 m²; sanctioned net site area: 568.94 m². These are the figures stated in the building-permit extraction.
Approved versus RERA-declared homesThe permit states that the number of units must not be increased without prior GHMC approval but does not supply an extracted unit count. RERA records 10 units, all filed as 2BHK. RERA unit table
Parking levelsPermit conditions identify cellar and stilt as approved for vehicle parking, but the extracted floor configuration specifies Stilt + 5 and provides no cellar level or parking-space count.

Offering and status

ItemProject record
RERA-filed configuration2BHK; 10 units; filed saleable area 146.78 m² per unit. RERA unit table RERA unit details
Booking / availabilityPortal snapshot: 0 booked and 10 available; no as-of date is provided, so these counts are indicative only. RERA unit table
Completion dateRERA proposed and revised completion date: 29 April 2024. The Form B declaration also states 29 April 2024 as the completion period. RERA record
Construction stageRERA project status is “On-Going Project”; the supplied evidence does not establish current physical progress independently. RERA filing RERA record
Occupancy / completion certificateThe supplied building-permit extraction records no completion certification. No occupancy or completion certificate is included in the supplied documents; certificate status should therefore be treated as not established by this evidence.

2. The project story

HIMANY RESIDENCY is registered with TG-RERA as a residential apartment project on a 568.94 m² site in Survey No. 25, Miyapur revenue village, Serilingampally Mandal, Ranga Reddy District. The project record identifies Madeenaguda as the locality and gives Garlakunta Tank as the northern boundary. RERA record RERA filing

The GHMC building-permit record describes one proposed residential building, Stilt + 5, with five residential upper floors. TG-RERA lists 10 homes, all recorded as 2BHK. The permit extract does not establish the number of flats on each floor or a floor-by-floor distribution. RERA unit table

The registered completion date was 29 April 2024, and the project is recorded as “On-Going Project.” The evidence supplied here does not establish the present construction stage through an independent site inspection, nor does it include an occupancy or completion certificate. Registration validity, the stated completion date and certificate status are separate matters. RERA record RERA filing

3. Master plan, architecture & building design

GHMC’s Building Permit Order dated 29 April 2018 records a proposed residential building on Survey No. 25, with a sanctioned site extent of 568.94 m², a stated residential area of 1,080.80 m², a stilt area of 202.71 m² and a building height of 14.9 m. The extracted configuration is Stilt + 5, with five residential upper floors. The permit also records a compound wall of 96.07 RM, two rainwater-harvesting structures and 25 trees.

These are the figures and design particulars available from the building-permit extraction; it does not provide an extracted floor plan sufficient to describe flat placement, floor-by-floor unit counts, lifts, stairs, entrances, internal circulation, landscaped-area measurements or common-area distribution. No separate approved-layout plan is available in the supplied material. Document index

The area figures above should not be read as RERA saleable or carpet area. TG-RERA lists 146.78 m² as the saleable area for each filed 2BHK unit. A separate software measurement of a drawing records carpet area for a drawing labelled 3BHK; it is not a TG-RERA disclosure. RERA unit table Floor plans

4. Homes, configurations & floor plans

TG-RERA records 10 apartments, all filed as 2BHK, with saleable area of 146.78 m² per unit. The portal snapshot shows none booked and 10 available, but provides no as-of date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK (TG-RERA filed)10010146.78 m²Not supplied for this filed configurationNot supplied

The supplied drawing measurement concerns one plan labelled 3BHK, not a configuration in the TG-RERA unit schedule. Software measured its carpet area as 86.3 m² (928 sq ft); this is a drawing-based measurement, not a RERA-filed carpet-area figure, and the measurement is flagged as needing review. The drawing labels bedrooms, living/kitchen, wash, toilet and balcony; the balcony is excluded from the software-measured carpet area. Floor plans RERA unit details

Carpet area and saleable area are different measures. The supplied floor-plan record notes that saleable area includes the home’s share of common areas, while the drawing-based carpet measurement excludes the identified balcony. No loading figure is supplied. Floor plans

5. Parking & vehicle circulation

The GHMC permit conditions state that cellar and stilt areas approved for parking should be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted building configuration identifies a stilt and five residential upper floors but does not state a cellar level or quantify parking spaces.

The supplied evidence does not establish resident, visitor or accessible-space counts, parking allocation to individual units, ramp or driveway arrangements, pedestrian separation, mechanical parking or EV charging. A parking provision in the permit does not by itself establish exclusive parking rights for a particular apartment. RERA unit table

6. Amenities, recreation & open spaces

The GHMC permit lists a tot-lot, rainwater-harvesting structures, transformer space and a garbage house. The RERA amenity record marks water supply, sewerage, green strip/tot-lot/park, rainwater harvesting, energy management and an electrical meter room/sub-station/receiving station as available, but shows 0% progress for its listed items. These are record entries, not independent confirmation of delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / indoor — no facility established in supplied project recordsNot suppliedRERA amenitiesNot established
Sports / recreation — tot-lot / green strip, tot-lot or parkSize and quantity not suppliedGHMC permit; RERA amenity record RERA amenitiesRERA marks the item available and records 0% progress; not independently verified complete
Landscape / open space — trees and greenery25 trees; open-space area not suppliedGHMC permitPermit figure only; present condition not independently verified
Convenience / community — garbage houseSize not suppliedGHMC permitRequired in permit conditions; completion not established
Convenience / community — community buildingsNo specific facility or size suppliedRERA amenity record RERA amenities0% recorded; not established as delivered

The vendor-source list mentions a swimming pool, gym, children’s play area, clubhouse and covered car parking. These are not substantiated as sanctioned or delivered facilities in the supplied TG-RERA and building-permit records, so they are not treated here as confirmed project provision. Promoter website

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterThe RERA amenity record marks water supply “YES”; it does not state a source, storage capacity or treatment system. RERA amenities
Sewerage and drainageThe RERA amenity record marks sewerage “YES” but supplies no system capacity or detail. The permit requires rainwater harvesting; the permit extraction records two structures. RERA amenities
ElectricalRERA marks an electrical meter room, sub-station or receiving station “YES”; the permit requires transformer space. Capacity and backup arrangements are not supplied. RERA amenities
Vertical transportationLift count, type and capacity are not supplied. Document index
Fire and life safetyThe permit states that structural-safety and fire-safety requirements are the responsibility of the owner, builder/developer, architect and structural engineer. The supplied extraction does not establish specific fire systems, clearances or completed safety works.
WasteThe permit requires a garbage house; the RERA amenity record does not provide implementation details for solid-waste management. RERA amenities
AccessibilityRamps and accessible circulation details are not supplied. Document index

These records describe permit conditions and RERA amenity entries; they do not establish that the relevant systems are completed or independently inspected. RERA amenities

8. Location, access & connectivity

The registered location is Miyapur revenue village, Serilingampally Mandal, Ranga Reddy District, PIN 500049; the project fields identify the locality as Madeenaguda. The GHMC permit also identifies the site as Madinaguda. RERA record RERA filing

The permit extraction records road widths of 18 mt. The supplied location data gives HITEC City at a measured distance of 6.0 km from the project’s stated cadastral parcel centroid. No route-specific travel time or public-transport distance is supplied. Location record

9. Developer & development status

The registered promoter is HIMALAYACONSTRUCTIONS, identified in the RERA record as a partnership. Its recorded address is Siri Nilayam, Road No. 1, Madhinaguda, Madeenaguda, Serilingampally, Ranga Reddy, 500049. The supplied evidence does not provide an independently verified company registration number, official website or project contact number. RERA record RERA filing Parties record

The Form B declaration is signed by Ambati Venkata Narasa Reddy, identified as managing partner and declaring for M/s. Himalaya Constructions; it states a completion period ending 29 April 2024. This is the promoter’s filing declaration, not independent confirmation of completion.

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificate, P02400000795Form C registration for HIMANY RESIDENCY, issued 25 May 2019; stated validity ended 29 April 2024 unless extended. No extension is recorded in the supplied evidence.
GHMC Building Permit Order No. 2/C12/07466/2018; File No. 2/C12/02650/2018Approved 29 April 2018 for a proposed residential building on Survey No. 25; extracted configuration Stilt + 5.
Form B declarationPromoter-filed declaration by Ambati Venkata Narasa Reddy for M/s. Himalaya Constructions, verified at GHMC Town Planning Section on 29 April 2018.
Title report and development agreementThe supplied RERA documents include a title-investigation report and a Development Agreement-cum-General Power of Attorney relating to Survey No. 25.
Approved layout planA RERA document entry requests a layout approval letter or stamped layout plan; no extracted approved-layout plan is available in the supplied evidence. Document index
Completion / occupancy certificateNo such certificate is included in the supplied project documents; the building-permit extraction records completion as not certified.

The GHMC permit records requirements concerning construction commencement, completion notice, occupancy certificate before occupation, rainwater harvesting, transformer space, garbage-house provision and parking use. The table above is an evidence index, not a full account of permit conditions.

Frequently asked questions

Is HIMANY RESIDENCY registered with Telangana RERA?

Yes. HIMANY RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02400000795; the registration status is On-Going Project.

Who is the developer of HIMANY RESIDENCY?

The promoter named in the RERA registration is HIMALAYACONSTRUCTIONS.

Where is HIMANY RESIDENCY located?

HIMANY RESIDENCY is in MADEENAGUDA, Miyapur, Serilingampally, Rangareddy, Telangana (500049).

When will HIMANY RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 29/04/2024. This is the promoter's declaration, not a guarantee.