Jubilee Hills
SHRUNJITH ESTATES · Adilabad · RERA P00100006434
JUBILEE HILLS is a residential plotted development in Mavala village, Mavala mandal, Adilabad district. The registered promoter is SHRUNJITH ESTATES, a partnership. The project covers 69,003.9 sq. m and comprises 209 residential plots, with drawing-derived plot sizes ranging from 111.13 sq. m to 343.16 sq. m; no towers or floors are stated. It is registered with TG-RERA under P00100006434, and the promoter-stated proposed completion date is 08/05/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | JUBILEE HILLS |
| Project type | Plotted development / residential layout RERA record |
| Phase or registered portion | Not separately identified as a phase; registration covers the project described by the listed survey numbers |
| TG-RERA registration | P00100006434; registered from 07/07/2023 to 08/05/2026. The certificate says registration may be extended by the Authority; no extension is recorded in the supplied certificate |
| Registered promoter | SHRUNJITH ESTATES, a partnership RERA filing Corporate record |
| RERA project status | “New Project” in the RERA record RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Mavala; the registered locality is “MAVALA VILLAGE ADILABAD MUNICIPALITY” RERA record RERA filing |
| Mandal / district / PIN | Mavala mandal; Adilabad district; 504002 RERA record |
| Project survey numbers and subdivisions as filed | 181/37 NEW 181/37/1/1; 181/37; 181/38 NEW 181/28/2; 181/37 NEW 181/27 |
| Registered site extent | 69,003.9 sq. m (RERA land-details entry) RERA filing |
| Net / total land area | RERA lists total and net area as 69,003.90 sq. m; the approved drawing’s area statement lists 69,001.97 sq. m RERA filing Layout record |
| Boundaries filed with RERA | East: ROAD; West: OTHRES LAND; North: OTHERS LAND; South: OTHERS LAND RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Adilabad Municipality / Municipal Corporation Approvals record |
| Principal layout approval | Tentative Layout Plan 0005/LO/3025/2023, approved 05/09/2023 |
| Final layout approval | Final LP 0033/FLT/3025/2025, dated 08 January 2025; final layout plan reference 001286/LO/DTCP/3025/0003/2023 |
| Development form and scale | Residential plotted layout; 209 plots |
| Approved built-up area | RERA record lists 36,746 sq. m RERA filing |
| Buildings, floors and parking levels | Not disclosed in the supplied project records; this is a plotted layout, and individual building permissions are to be considered separately under the final-layout conditions |
| RERA-declared mortgage area | 6,367 sq. m RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Unit type | Residential plots; the final layout conditions specify detached dwelling use for a single family per site |
| Plot count and sizes | The approved drawing schedule was software-read as 209 plots; sizes range from 111.13 sq. m to 343.16 sq. m. These drawing-derived measurements should be checked against the approved drawing Layout record |
| Booked / available counts | Not supplied in the reviewed evidence RERA filing |
| Construction stage | Not established by independent site inspection. The RERA file includes an architect’s completion certificate dated 31/03/2025 stating the project is complete in all aspects; see the certificate and local-authority record below for their stated scope |
| Promoter-stated completion date | 08/05/2026 in the RERA Form B declaration |
| Occupancy / completion record | A local-authority document records a final layout approval dated 08 January 2025. An architect’s certificate dated 31/03/2025 identifies an occupancy certificate issued on 08/01/2025, number 013433/FLT/ADIL/3025/0057/2024. These records relate to the plotted layout; no tower-wise or individual-house OC information is supplied |
2. The project story
JUBILEE HILLS is registered as a residential plotted development at Mavala village, Mavala mandal, Adilabad district. Its RERA filing identifies land in the survey numbers and subdivisions listed above, and the approved layout record describes a 209-plot residential layout. The final layout conditions provide for detached, single-family dwelling use on each site; they do not establish that individual houses have been built. RERA record
The approved drawing allocates land to plots, roads, open space, social infrastructure and utilities. Roads must remain open to provide access to neighbouring lands. The tentative approval also describes infrastructure and amenities to be carried out by the applicant, while the final-layout record identifies areas earmarked for utilities and other public-purpose uses. These are approval and development requirements, not independent evidence that each work has been completed.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The approved layout drawing is described as covering 69,001.97 sq. m and containing 209 plots. Software-measured drawing data records plot areas from 111.13 sq. m to 343.16 sq. m; the software notes that the plot schedule and area should be verified against the drawing. Layout record
The drawing’s land-use table reports:
| Layout use | Area | Share |
|---|---|---|
| Plots | 36,744.71 sq. m | 53.37% |
| Roads | 22,474.69 sq. m | 32.64% |
| Parks / open space | 6,735.32 sq. m | 9.78% |
| Utilities | 697.97 sq. m | 1.01% |
| Social infrastructure | 1,722.11 sq. m | 2.50% |
| Amenities | 0.00 sq. m | 0.00% |
These are drawing-derived figures, not a RERA unit-area schedule. The approval documents also state the corresponding land allocations and require roads, open space and utilities to be provided or handed over as specified in the approval conditions. Layout record
The RERA record lists 36,746 sq. m as approved built-up area, but the supplied records do not provide a building-by-building schedule, building heights, floors, footprints or house designs. Individual building permissions are to be considered separately under the final-layout conditions. RERA filing
4. Homes, configurations & floor plans
The RERA project is a plotted layout, so the offering is plots rather than a filed schedule of apartment configurations.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 209 (drawing schedule) | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
Software-read data from the approved layout drawing gives plot sizes from 111.13 sq. m to 343.16 sq. m. The most common printed size is 167.23 sq. m for 141 plots. These are drawing-derived measurements, not RERA-filed saleable areas, and should be checked against the approved drawing. Layout record
The floor-plan review contains two layout sheets and no house or apartment floor plans suitable for measuring internal rooms. The supplied evidence therefore does not establish house configurations, room dimensions, orientation or individual plot-specific building designs. Floor plans
5. Parking & vehicle circulation
The final layout approval lists a Common Parking Area among the areas earmarked for utilities and related facilities, but the supplied material does not state its number of spaces, size, location or allocation arrangements.
The approved layout includes roads amounting to 22,474.69 sq. m in the drawing-derived land-use table. The tentative approval requires roads to be opened for access to neighbouring sites; the final layout conditions also require internal roads to remain open. No information is supplied on vehicle entry and exit points, ramps, pedestrian separation, accessible parking, EV charging or plot-specific parking rights. Layout record
6. Amenities, recreation & open spaces
The layout and approval records identify the following facilities or allocations. RERA amenity-list entries show no progress percentage above 0; the evidence does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 6,735.32 sq. m; drawing table shows 9.78% | Layout record | RERA amenity list marks “Green Strip/TOT LOT/Park” and aggregate recreational open space as available “YES,” with 0% progress; completion not independently verified RERA amenities |
| Social infrastructure site | 1,722.11 sq. m; 2.50% in drawing table | Layout record | Site allocation shown; facility, construction and handover status not supplied |
| Utilities site | 697.97 sq. m; 1.01% in drawing table | Layout record | Site allocation shown; completion not independently verified |
| Community buildings | No size supplied | RERA amenities | Listed without an availability entry; progress 0% RERA amenities |
| Internal roads and footpaths | Road area 22,474.69 sq. m in drawing table | Layout record | RERA amenity list marks “YES,” progress 0%; completion not independently verified RERA amenities |
| Common parking area | No count or size supplied | Earmarked in the final-layout record; delivery status not supplied |
7. Utilities, building services & safety
The tentative approval describes the layout development works as including black-top road formation, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are stated approval conditions and development requirements; the supplied evidence does not independently confirm installation or operational capacity.
The final-layout record earmarks utilities such as a water reservoir, septic tank / sewerage treatment plant, electric transformer, solid-waste management and garbage bin. Its RERA amenity list also names water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room / substation / receiving station. Capacity, specifications, completion and statutory clearance details are not supplied. RERA amenities
The supplied project evidence does not identify fire-system equipment or clearances, backup power, security/CCTV, accessibility provisions, or treatment and reuse capacities. Those details cannot be confirmed from the records reviewed here.
8. Location, access & connectivity
The registered location is Mavala village, Mavala mandal, Adilabad district, Telangana, PIN 504002. The RERA filing gives the locality as “MAVALA VILLAGE ADILABAD MUNICIPALITY.” RERA record RERA filing
The registered land-details entry records a road boundary to the east and other land to the west, north and south. The location data supplies a cadastral parcel centroid of 19.63950, 78.49904 and one sampled connectivity point: Outer Ring Road (nearest sampled interchange, approximate), 223.5 km. The supplied evidence does not identify a project approach-road name, public-transport service or other nearby landmarks. RERA filing Location record
9. Developer & development status
The registered promoter is SHRUNJITH ESTATES, identified in the RERA record as a partnership, with GSTIN 36AEAFS3037B1ZI. The listed partners are Aleti Kamalapathi Reddy, Lakshmi Garlapati and Vijayapal Reddy Kesara; Aleti Kamalapathi Reddy is also identified as an authorized signatory. RERA filing Corporate record Parties record
The RERA Form B declaration, signed by Aleti Kamalapathi Reddy on behalf of the promoter, declares a completion date of 08/05/2026, states that the land is free from encumbrances, and includes RERA fund-account and audit undertakings. These are promoter declarations in the filed document.
10. Approvals, official records & documents
| Identifier / date | P00100006434; issued 07/07/2023, valid through 08/05/2026 |
|---|---|
| What the supplied record establishes | Form C registration for JUBILEE HILLS under section 5; includes a condition requiring 70% of amounts realised to be deposited in a separate account |
| Identifier / date | 0005/LO/3025/2023; 05/09/2023 |
|---|---|
| What the supplied record establishes | Tentative residential layout approval for 209 plots, subject to development and handover conditions |
| Identifier / date | 0033/FLT/3025/2025; 08 January 2025 |
|---|---|
| What the supplied record establishes | Final layout approval for a 209-plot residential layout; the record identifies Final Layout Plan No. 001286/LO/DTCP/3025/0003/2023 |
| Identifier / date | 013433/FLT/ADIL/3025/0057/2024; 08/01/2025 |
|---|---|
| What the supplied record establishes | Identified in the architect’s certificate as the occupancy certificate issued by Adilabad Municipal Corporation for the layout |
| Identifier / date | Form–1A, dated 31/03/2025 |
|---|---|
| What the supplied record establishes | Architect’s certificate states that the registered project was completed in all aspects; it names architect M. Srinasa Rao, license CA/1995/18764, and structural engineer K. Shiva Shanker, license 25052320412 |
| Identifier / date | 04 day of 2023 as transcribed in the filed declaration |
|---|---|
| What the supplied record establishes | Promoter declaration by Aleti Kamalapathi Reddy on title, encumbrances, completion date and RERA fund-account obligations |
The approval documents state that the tentative approval is not proof of land title and require the applicant to complete specified infrastructure and handover works. Full title-chain, encumbrance and approval-condition analysis is addressed in the relevant due-diligence sections.
1. Project at a glance
Project identity
Registered project name: JUBILEE HILLS
Project type: Plotted development / residential layout
Phase or registered portion: Not separately identified as a phase; registration covers the project described by the listed survey numbers
TG-RERA registration: P00100006434; registered from 07/07/2023 to 08/05/2026. The certificate says registration may be extended by the Authority; no extension is recorded in the supplied certificate
Registered promoter: SHRUNJITH ESTATES, a partnership
RERA project status: “New Project” in the RERA record
Land and geographic identity
Locality / revenue village: Mavala; the registered locality is “MAVALA VILLAGE ADILABAD MUNICIPALITY”
Mandal / district / PIN: Mavala mandal; Adilabad district; 504002
Project survey numbers and subdivisions as filed: 181/37 NEW 181/37/1/1; 181/37; 181/38 NEW 181/28/2; 181/37 NEW 181/27
Registered site extent: 69,003.9 sq. m (RERA land-details entry)
Net / total land area: RERA lists total and net area as 69,003.90 sq. m; the approved drawing’s area statement lists 69,001.97 sq. m
Boundaries filed with RERA: East: ROAD; West: OTHRES LAND; North: OTHERS LAND; South: OTHERS LAND
Development identity
Sanctioning authority: Adilabad Municipality / Municipal Corporation
Principal layout approval: Tentative Layout Plan 0005/LO/3025/2023, approved 05/09/2023
Final layout approval: Final LP 0033/FLT/3025/2025, dated 08 January 2025; final layout plan reference 001286/LO/DTCP/3025/0003/2023
Development form and scale: Residential plotted layout; 209 plots
Approved built-up area: RERA record lists 36,746 sq. m
Buildings, floors and parking levels: Not disclosed in the supplied project records; this is a plotted layout, and individual building permissions are to be considered separately under the final-layout conditions
RERA-declared mortgage area: 6,367 sq. m
Offering and status
Unit type: Residential plots; the final layout conditions specify detached dwelling use for a single family per site
Plot count and sizes: The approved drawing schedule was software-read as 209 plots; sizes range from 111.13 sq. m to 343.16 sq. m. These drawing-derived measurements should be checked against the approved drawing
Booked / available counts: Not supplied in the reviewed evidence
Construction stage: Not established by independent site inspection. The RERA file includes an architect’s completion certificate dated 31/03/2025 stating the project is complete in all aspects; see the certificate and local-authority record below for their stated scope
Promoter-stated completion date: 08/05/2026 in the RERA Form B declaration
Occupancy / completion record: A local-authority document records a final layout approval dated 08 January 2025. An architect’s certificate dated 31/03/2025 identifies an occupancy certificate issued on 08/01/2025, number 013433/FLT/ADIL/3025/0057/2024. These records relate to the plotted layout; no tower-wise or individual-house OC information is supplied
2. The project story
JUBILEE HILLS is registered as a residential plotted development at Mavala village, Mavala mandal, Adilabad district. Its RERA filing identifies land in the survey numbers and subdivisions listed above, and the approved layout record describes a 209-plot residential layout. The final layout conditions provide for detached, single-family dwelling use on each site; they do not establish that individual houses have been built.
The approved drawing allocates land to plots, roads, open space, social infrastructure and utilities. Roads must remain open to provide access to neighbouring lands. The tentative approval also describes infrastructure and amenities to be carried out by the applicant, while the final-layout record identifies areas earmarked for utilities and other public-purpose uses. These are approval and development requirements, not independent evidence that each work has been completed.
3. Master plan, architecture & building design
This is a plotted layout rather than a multi-storey building project. The approved layout drawing is described as covering 69,001.97 sq. m and containing 209 plots. Software-measured drawing data records plot areas from 111.13 sq. m to 343.16 sq. m; the software notes that the plot schedule and area should be verified against the drawing.
The drawing’s land-use table reports:
| Layout use | Area | Share |
|---|---|---|
| Plots | 36,744.71 sq. m | 53.37% |
| Roads | 22,474.69 sq. m | 32.64% |
| Parks / open space | 6,735.32 sq. m | 9.78% |
| Utilities | 697.97 sq. m | 1.01% |
| Social infrastructure | 1,722.11 sq. m | 2.50% |
| Amenities | 0.00 sq. m | 0.00% |
These are drawing-derived figures, not a RERA unit-area schedule. The approval documents also state the corresponding land allocations and require roads, open space and utilities to be provided or handed over as specified in the approval conditions.
The RERA record lists 36,746 sq. m as approved built-up area, but the supplied records do not provide a building-by-building schedule, building heights, floors, footprints or house designs. Individual building permissions are to be considered separately under the final-layout conditions.
4. Homes, configurations & floor plans
The RERA project is a plotted layout, so the offering is plots rather than a filed schedule of apartment configurations.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | 209 (drawing schedule) | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
Software-read data from the approved layout drawing gives plot sizes from 111.13 sq. m to 343.16 sq. m. The most common printed size is 167.23 sq. m for 141 plots. These are drawing-derived measurements, not RERA-filed saleable areas, and should be checked against the approved drawing.
The floor-plan review contains two layout sheets and no house or apartment floor plans suitable for measuring internal rooms. The supplied evidence therefore does not establish house configurations, room dimensions, orientation or individual plot-specific building designs.
5. Parking & vehicle circulation
The final layout approval lists a Common Parking Area among the areas earmarked for utilities and related facilities, but the supplied material does not state its number of spaces, size, location or allocation arrangements.
The approved layout includes roads amounting to 22,474.69 sq. m in the drawing-derived land-use table. The tentative approval requires roads to be opened for access to neighbouring sites; the final layout conditions also require internal roads to remain open. No information is supplied on vehicle entry and exit points, ramps, pedestrian separation, accessible parking, EV charging or plot-specific parking rights.
6. Amenities, recreation & open spaces
The layout and approval records identify the following facilities or allocations. RERA amenity-list entries show no progress percentage above 0; the evidence does not independently verify completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organized open space | 6,735.32 sq. m; drawing table shows 9.78% | RERA amenity list marks “Green Strip/TOT LOT/Park” and aggregate recreational open space as available “YES,” with 0% progress; completion not independently verified | |
| Social infrastructure site | 1,722.11 sq. m; 2.50% in drawing table | Site allocation shown; facility, construction and handover status not supplied | |
| Utilities site | 697.97 sq. m; 1.01% in drawing table | Site allocation shown; completion not independently verified | |
| Community buildings | No size supplied | Listed without an availability entry; progress 0% | |
| Internal roads and footpaths | Road area 22,474.69 sq. m in drawing table | RERA amenity list marks “YES,” progress 0%; completion not independently verified | |
| Common parking area | No count or size supplied | Earmarked in the final-layout record; delivery status not supplied |
7. Utilities, building services & safety
The tentative approval describes the layout development works as including black-top road formation, storm-water drains, underground drainage lines and a common septic tank / STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical supply lines, street lights, a transformer, avenue planting, park development and rainwater-harvesting pits. These are stated approval conditions and development requirements; the supplied evidence does not independently confirm installation or operational capacity.
The final-layout record earmarks utilities such as a water reservoir, septic tank / sewerage treatment plant, electric transformer, solid-waste management and garbage bin. Its RERA amenity list also names water supply, sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room / substation / receiving station. Capacity, specifications, completion and statutory clearance details are not supplied.
The supplied project evidence does not identify fire-system equipment or clearances, backup power, security/CCTV, accessibility provisions, or treatment and reuse capacities. Those details cannot be confirmed from the records reviewed here.
8. Location, access & connectivity
The registered location is Mavala village, Mavala mandal, Adilabad district, Telangana, PIN 504002. The RERA filing gives the locality as “MAVALA VILLAGE ADILABAD MUNICIPALITY.”
The registered land-details entry records a road boundary to the east and other land to the west, north and south. The location data supplies a cadastral parcel centroid of 19.63950, 78.49904 and one sampled connectivity point: Outer Ring Road (nearest sampled interchange, approximate), 223.5 km. The supplied evidence does not identify a project approach-road name, public-transport service or other nearby landmarks.
9. Developer & development status
The registered promoter is SHRUNJITH ESTATES, identified in the RERA record as a partnership, with GSTIN 36AEAFS3037B1ZI. The listed partners are Aleti Kamalapathi Reddy, Lakshmi Garlapati and Vijayapal Reddy Kesara; Aleti Kamalapathi Reddy is also identified as an authorized signatory.
The RERA Form B declaration, signed by Aleti Kamalapathi Reddy on behalf of the promoter, declares a completion date of 08/05/2026, states that the land is free from encumbrances, and includes RERA fund-account and audit undertakings. These are promoter declarations in the filed document.
10. Approvals, official records & documents
| Identifier / date | P00100006434; issued 07/07/2023, valid through 08/05/2026 |
|---|---|
| What the supplied record establishes | Form C registration for JUBILEE HILLS under section 5; includes a condition requiring 70% of amounts realised to be deposited in a separate account |
| Identifier / date | 0005/LO/3025/2023; 05/09/2023 |
|---|---|
| What the supplied record establishes | Tentative residential layout approval for 209 plots, subject to development and handover conditions |
| Identifier / date | 0033/FLT/3025/2025; 08 January 2025 |
|---|---|
| What the supplied record establishes | Final layout approval for a 209-plot residential layout; the record identifies Final Layout Plan No. 001286/LO/DTCP/3025/0003/2023 |
| Identifier / date | 013433/FLT/ADIL/3025/0057/2024; 08/01/2025 |
|---|---|
| What the supplied record establishes | Identified in the architect’s certificate as the occupancy certificate issued by Adilabad Municipal Corporation for the layout |
| Identifier / date | Form–1A, dated 31/03/2025 |
|---|---|
| What the supplied record establishes | Architect’s certificate states that the registered project was completed in all aspects; it names architect M. Srinasa Rao, license CA/1995/18764, and structural engineer K. Shiva Shanker, license 25052320412 |
| Identifier / date | 04 day of 2023 as transcribed in the filed declaration |
|---|---|
| What the supplied record establishes | Promoter declaration by Aleti Kamalapathi Reddy on title, encumbrances, completion date and RERA fund-account obligations |
The approval documents state that the tentative approval is not proof of land title and require the applicant to complete specified infrastructure and handover works. Full title-chain, encumbrance and approval-condition analysis is addressed in the relevant due-diligence sections.
Frequently asked questions
Is JUBILEE HILLS registered with Telangana RERA?
Yes. JUBILEE HILLS is registered with the Telangana Real Estate Regulatory Authority as P00100006434; the registration status is New Project.
Who is the developer of JUBILEE HILLS?
The promoter named in the RERA registration is SHRUNJITH ESTATES.
Where is JUBILEE HILLS located?
JUBILEE HILLS is in MAVALA VILLAGE ADILABAD MUNICIPALITY, Mavala, Adilabad, Telangana (504002).
When will JUBILEE HILLS be completed?
The promoter's proposed date of completion filed with RERA is 08/05/2026. This is the promoter's declaration, not a guarantee.