Sign in

Jubilee Shubha Tulasi

JUBILEE CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200009128

JUBILEE SHUBHA TULASI is a residential apartment project in Nagole, Uppal, Medchal-Malkajgiri. The registered promoter is JUBILEE CONSTRUCTIONS, recorded as a partnership. The project occupies 497.50 sq. m. of land and comprises one building with 1 stilt + 5 upper floors and 10 3BHK apartments, each with a RERA-filed saleable area of 170.24 sq. m. Its TG-RERA registration number is P02200009128, and the proposed completion date is 08/05/2027.

More from Jubilee Constructions · 8 projects →

01What we found

RegisteredTG-RERA - valid till 8 May 2027
19documents on file - each fact links to its page
1court case on this project's land (survey 123, Nagole)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from squareyards.com

Project at a glance

Project identity

ItemRecord
Registered project nameJUBILEE SHUBHA TULASI RERA record
Project type / registered portionResidential apartment project; the supplied records identify one building, not a separately described phase. RERA record RERA filing
TG-RERA registrationP02200009128 RERA record
Registration validity8 May 2024 to 8 May 2027, unless extended by the Authority. This is the registration period, not an occupancy certificate. RERA record
Registered promoterJUBILEE CONSTRUCTIONS, recorded as a partnership. RERA record Corporate record
RERA status in supplied recordRegistration is recorded; its stated validity ends 8 May 2027. The project is also supported by an occupancy certificate described below. RERA record

Land and geographic identity

ItemRecord
Locality / site descriptionNagole / New Nagole; Plot Nos. 2-4-479 and 2-4-480, Plot 18 and 17, Nagole. The building-permit document describes Plot Nos. 17 and 18. RERA filing
Revenue villageNagole. RERA record RERA filing
Mandal / district / PINUppal / Medchal-Malkajgiri / 500035. RERA record RERA filing
Survey number(s)Survey No. 123; no subdivision is stated in the supplied project identity or cited building records. RERA filing
Site extentRERA land details: 497.50 sq. m. total, 10.45 sq. m. affected area, and 487.05 sq. m. net area. The GHMC permit and OC records state net site area of 487.04 sq. m. RERA filing
Boundaries in RERA filingEast: Plot Nos. 19, 20 and 21; west: Plot Nos. 13 and 14; north: road; south: road. RERA filing

Development identity

ItemRecord
Sanctioning authority / principal building permitGreater Hyderabad Municipal Corporation (GHMC); permit No. 0934/GHMC/LBN/2024-BP, dated 08 May 2024.
Sanctioned buildingOne residential building, identified as A (B), with 1 stilt + 5 upper floors in the permit description; stated building height 14.95 m.
Area figures in the building-plan record1,307.80 sq. m. proposed built-up area excluding parking; 1,569.40 sq. m. including parking; parking area 261.60 sq. m. These are plan-record figures, not apartment saleable or carpet area.
Units10 units in the supplied sanctioned-plan extraction and 10 in the RERA unit record. RERA unit table
Parking levels / countStilt parking is identified; a cellar is recorded in the occupancy-certificate building description. No total parking-space count is supplied.

Offering and status

ItemRecord
RERA-filed configuration3BHK, 10 units. RERA unit table
RERA-filed saleable area170.24 sq. m. per unit as recorded for the 3BHK configuration. RERA unit table
Booked / availablePortal-derived count is 0 booked / 10 available; the portal record provides no as-of date, so these counts are indicative rather than a dated availability confirmation. RERA unit table
Promoter-declared completion deadline08/05/2027 in the RERA project information and Form B declaration. RERA filing
Completion / occupancy recordOccupancy Certificate 013599/GHMC/06177/SWOC/LBN2/2026, dated 16 June 2026, is recorded for the building at Plot Nos. 17 and 18, Survey No. 123, Nagole. The certificate records completion date 24/12/2025 and certifies the building fit for occupation.
Scope of OC evidenceThe supplied OC identifies the single building on the stated plots and survey number; the architect’s completion certificates also identify the registered project.

The project story

JUBILEE SHUBHA TULASI is a single-building residential apartment project in Nagole, Uppal Mandal, on Plot Nos. 17 and 18 in Survey No. 123. Its RERA record lists 10 three-bedroom apartments. The registered land record identifies a 497.50 sq. m. site, with 10.45 sq. m. affected area and 487.05 sq. m. net area; the building-plan records state a 487.04 sq. m. net site area. RERA record RERA filing RERA unit table

The GHMC permit describes one building with a stilt and five upper floors. A local-authority occupancy certificate and architect completion certificates are on file for the project/building. This supports reporting it as occupancy-certified in the supplied records; it is distinct from the project’s RERA registration validity, which is recorded through 8 May 2027.

The RERA portal’s unit counts show all 10 apartments as available and none booked, but the record has no as-of date. Confirm current unit availability and the particular unit’s status directly before relying on it. RERA unit table

Master plan, architecture & building design

The project is recorded as a new residential building on Plot Nos. 17 and 18 in Survey No. 123, Nagole. The GHMC plan extraction describes one building, one stilt level and five upper floors, a 14.95 m building height, and 10 dwelling units. The occupancy-certificate extraction describes the completed building as one cellar, one stilt and five upper floors.

The plan record gives 497.50 sq. m. plot area, 10.45 sq. m. road-affected area and 487.04 sq. m. net plot area. It separately states 1,307.80 sq. m. proposed built-up area excluding parking, 1,569.40 sq. m. including parking, and 261.60 sq. m. parking area. The OC extraction records sanctioned total built-up area of 1,307.8 sq. m. and completion-plan total built-up area of 1,355.816 sq. m., with 48.02 total deviated built-up area for the block. These figures retain their document labels and are not carpet or saleable-area figures.

The plan identifies a 225.47 sq. m. vacant plot area and requires a tot-lot to be fenced and maintained as greenery, as well as tree planting and a peripheral green strip. The supplied materials do not provide a complete architectural description of the building footprint, flats per floor, lift capacity, stair arrangement, or a detailed common-area schedule.

Homes, configurations & floor plans

The RERA unit record lists 10 3BHK apartments, with 0 booked and 10 available as last read from the portal; no as-of date is supplied. The filed saleable area is 170.24 sq. m. per unit. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010170.24 sq. m.96.1 sq. m. median; range 90.5–110.1 sq. m.44%

The carpet measurements are software measurements from the approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures; the record notes that the measurements need review. Eight flat designs were measured, with four flagged as needing review. Saleable area and measured carpet area are different measures; the supplied drawing analysis describes saleable area as including the home’s share of common areas. Verify any unit-specific area against the approved drawing and executed agreement. Floor plans RERA unit details

One typical-plan sample identifies bedrooms, living/dining, kitchen, toilets, balconies and a utility area. For that sample, the drawing extraction lists a 1.14 m wide balcony and a utility; the supplied material does not establish that every apartment has the same arrangement. RERA unit details

Parking & vehicle circulation

The building-plan record identifies 261.60 sq. m. as parking area and calls for parking in the stilt; the OC building description also records a cellar. The plan specifies a minimum entry/exit width of 4.5 m and height clearance of 5 m.

No total number of car or two-wheeler spaces, visitor or accessible-space allocation, EV-charging installation status, or apartment-specific parking allocation is established in the supplied evidence. A parking-area figure or drawn parking provision alone does not establish an exclusive space for a particular apartment.

Amenities, recreation & open spaces

Landscape/open space
FacilityTot-lot
Description / sizeSize not stated; plan conditions require it to be fenced and maintained as greenery.
Declared progress / verified statusIncluded in the plan conditions; completion status for this facility is not separately established.
Landscape/open space
FacilityGreen belt / peripheral greenery
Description / sizeSize not stated; plan conditions refer to a peripheral green strip and tree planting.
Declared progress / verified statusRequired in plan conditions; no separate completion verification supplied.
Landscape/open space
FacilityGreen Strip/TOT LOT/Park
Description / sizeNo size stated.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record marks available “YES”; progress percentage is 0.
Convenience/community
FacilityGarbage house
Description / sizeWithin the premises; no size stated.
Declared progress / verified statusRequired by plan conditions; completion status not separately established.

No clubhouse or indoor recreation facilities are identified in the supplied RERA amenity and plan records. The amenities record reports 14 entries, but does not provide measured completion percentages above 0 for the listed entries. RERA amenities

Utilities, building services & safety

The building-plan extraction lists rainwater harvesting, a percolation pit, a sump, a septic tank, a lift, a staircase, transformer space, a garbage house, a generator, emergency lighting, and fire-fighting equipment including a hose reel, down corner, automatic sprinkler system and fire-fighting installations. It specifies separate underground static water storage and terrace tanks, each with 25,000 litres capacity. These are plan-record provisions; the supplied evidence does not establish the operational status or capacity of the other services.

The RERA amenity record marks water supply, storm-water drains, green strip/tot-lot/park, rainwater harvesting, and electrical meter room/sub-station/receiving station as “YES,” while showing 0 progress for its listed entries. The plan also requires a transformer space, garbage house and rainwater-harvesting structure. RERA amenities

The permit conditions require fire-safety installations and state that an occupancy fire NOC is to be obtained before issue of the OC. The supplied OC establishes that an occupancy certificate was issued; the evidence provided here does not include a separate fire NOC or detailed verification of individual fire-safety systems, lift capacity, accessibility features, CCTV, sewage-treatment plant, backup-power capacity, or water-treatment/reuse arrangements.

Location, access & connectivity

The registered location is Nagole, Uppal Mandal, Medchal-Malkajgiri district, PIN 500035. The site is described as New Nagole, on Plot Nos. 17 and 18 in Survey No. 123. The plan record shows adjoining roads on the north and south boundaries and refers to proposed and existing roads, including a 9.00 MT wide proposed road and a 7.62 MT wide existing road. RERA record RERA filing

The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 9.1 km. No public-transport details or other measured landmark distances are supplied. Location record

Developer & development status

The registered promoter is JUBILEE CONSTRUCTIONS, recorded as a partnership, with GSTIN 36AAMFJ1746L1ZY. The promoter address in the supplied record is CHANDRA COMPLEX, OLD BUS ROAD, NEW NAGOLE, NAGOLE, Uppal, Medchal-Malkajgiri, 500035. The RERA record names CHINTAKUNTLA RAJANI and CHINTAKUNTLA SHYAM KIRAN as partners, and identifies CHINTAKUNTLA SHYAM KIRAN as an authorized signatory. Corporate record RERA filing Parties record

The Form B affidavit records the promoter’s undertaking to complete the project by 08.05.2027. Separately, the supplied local-authority OC and architect certificates record completion/occupancy certification for the building in June 2026. The portal unit inventory is indicative only and has no as-of date. RERA unit table

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200009128; valid 08/05/2024–08/05/2027
What it recordsForm C certificate for JUBILEE SHUBHA TULASI and promoter Jubilee Constructions.
GHMC building permit order
Identifier / date0934/GHMC/LBN/2024-BP; 08 May 2024
What it recordsResidential building permission for one building with stilt and five upper floors on the stated Nagole site.
Plan drawing / plan record
Identifier / dateLTP licence TS/002946/2024; Survey No. 123
What it recordsPlan extraction describes the proposed residential building and its areas, unit count, parking, utilities and conditions.
GHMC-related plan references in the permit extraction
Identifier / dateFile No. 001396/GHMC/0670/LBN2/2024-BP; layout reference BA/G1/BP/97/90; TDR DRC No. 01793/TDR/2022
What it recordsIdentifiers recorded in the permit extraction.
Occupancy certificate
Identifier / date013599/GHMC/06177/SWOC/LBN2/2026; 16 June 2026
What it recordsLocal-authority certificate for the building at Plot Nos. 17 and 18, Survey No. 123, Nagole; records it fit for occupation.
Architect completion certificates
Identifier / date16 June 2026 and 16 July 2026
What it recordsCertificates identify the project and the same occupancy-certificate number.
Form B promoter declaration
Identifier / dateDeclaration dated NOV-11-2024
What it recordsPromoter declaration including the stated completion undertaking and RERA-related declarations.
Agreement-for-sale template
Identifier / dateFiled template; particulars left blank
What it recordsTemplate document only; it does not establish an executed agreement for a specific unit.

Frequently asked questions

Is JUBILEE SHUBHA TULASI registered with Telangana RERA?

Yes. JUBILEE SHUBHA TULASI is registered with the Telangana Real Estate Regulatory Authority as P02200009128; the registration status is New Project.

Who is the developer of JUBILEE SHUBHA TULASI?

The promoter named in the RERA registration is JUBILEE CONSTRUCTIONS.

Where is JUBILEE SHUBHA TULASI located?

JUBILEE SHUBHA TULASI is in NAGOLE, Uppal, Medchal-Malkajgiri, Telangana (500035).

When will JUBILEE SHUBHA TULASI be completed?

The promoter's proposed date of completion filed with RERA is 08/05/2027. This is the promoter's declaration, not a guarantee.

More projects in Nagole