KAPIL BHAVAN - PEDDAPALLY is a commercial project at Sy No : 24, Rangampalli, Peddapalli Mandal, Peddapalli District. It is being developed by KAPIL FOODS AND STRUCTURES PRIVATE LIMITED. The project site covers 607.03 sq.mts and the RERA record lists one building unit and four APARTMENT UNIT units, each with a saleable area of 200.9 sq.m. It is registered with TG-RERA under P02900000582, issued 09/04/2019, with a promoter-declared completion deadline of 31/03/2020.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | KAPIL BHAVAN - PEDDAPALLY RERA record |
| Project type | Commercial in the TG-RERA project record. The filed occupancy record describes the completed building as commercial. RERA filing |
| Phase / registered portion | Phase designation not disclosed; the registration is for the project under registration number P02900000582. |
| TG-RERA registration | P02900000582, issued 09/04/2019; recorded validity 09/04/2019–31/03/2020. No extension is recorded in the supplied registration certificate. Registration validity is distinct from the project’s completion and occupancy status. RERA record |
| Registered promoter | KAPIL FOODS AND STRUCTURES PRIVATE LIMITED, a company. RERA record Corporate record |
| RERA status | The supplied certificate records the registration period above; current registration status is not established by the supplied record. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / site address | Sy No: 24; existing house numbers 2-8, 2-9 and 2-10. RERA filing |
| Revenue village | Rangampalli (also rendered “Rangampally” in supplied documents). RERA record |
| Mandal | Peddapalli. RERA record |
| District | Peddapalli in the project identity record and technical-clearance document. The registration certificate separately records Warangal Urban; district identity requires confirmation against the official project record. RERA record |
| PIN | 505172. RERA record |
| Project survey number(s) | Survey No. 24; no project subdivision is stated in the supplied project record. RERA filing Land records |
| Site extent | RERA land record: 607.03 sq.mts total and net. The technical-clearance document also records 607.03 sq.mtr. RERA filing Land records |
| Boundaries | East: Land of Jagan Mohan Reddy; West: 100 feet Road; North: House of Thurupati Yellaiah; South: House of Thurupati Shivalinga Murthy. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority / principal approval | Director of Town and Country Planning, Government of Telangana; Technical Clearance B.P.No.14/2017/W, dated 07-03-2018, for the site at existing house numbers 2-8, 2-9 and 2-10. Approvals record |
| Approved built-up area | 1,004.5 sq.mts in the RERA project fields. RERA filing |
| Building count | One building unit in the RERA project fields. RERA filing |
| Floor configuration | The technical-clearance extraction describes an apartment building and a commercial complex, each with stilt parking, ground floor and three upper floors. The later occupancy record describes the commercial building as one stilt floor and four upper floors. |
| Parking levels | Stilt parking is identified in the technical-clearance document. A parking-space count is not supplied. |
| Unit counts | The RERA record lists 1 total building unit and 1 proposed building unit; the unit schedule lists 4 APARTMENT UNIT units. RERA filing RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed unit type and saleable area | APARTMENT UNIT; 200.9 sq.m saleable area per listed unit. RERA unit table RERA unit details |
| Booked / available | 0 booked; 4 available, as last read from the TG-RERA portal. The portal record has no stated as-of date, so these counts are indicative. RERA unit table |
| Construction / completion | An occupancy certificate record identifies completion date 05/07/2025 and an occupancy certificate approved/issued 19/07/2025 for the commercial building described in that record. |
| Promoter-declared completion deadline | 31/03/2020, stated in the Form B declaration. |
| Occupancy-certificate scope | The supplied certificate refers to the commercial building Kapil Bhavan, Survey No. 24, at Rangampalli. It does not expressly describe a separate residential apartment building as occupied. |
The project story
KAPIL BHAVAN - PEDDAPALLY is registered as a commercial project on Survey No. 24 at existing house numbers 2-8, 2-9 and 2-10, Rangampalli, Peddapalli Mandal. The registered site extent is 607.03 sq.mts. RERA record RERA filing
The technical-clearance document describes an apartment building and a commercial complex, with stilt parking, a ground floor and three upper floors for each. The later municipal occupancy record describes a commercial building named Kapil Bhavan with one stilt floor and four upper floors and certifies it fit for occupation. The supplied evidence therefore supports an occupancy-certified commercial building; it does not establish the occupancy status of any separately described residential portion.
The registration record lists four apartment units, with none booked and four available in the portal data read for this report; the portal data has no as-of date. This is a recorded inventory snapshot, not independent confirmation of current sale availability. RERA unit table
Master plan, architecture & building design
The project fields record a total/net site area of 607.03 sq.mts, one building unit and approved built-up area of 1,004.5 sq.mts. RERA filing RERA filing
The municipal occupancy-certificate extraction describes the commercial building as one stilt floor and four upper floors, with building height 12.0 metres. The supplied evidence does not include readable floor-plan drawings from which to verify building arrangement, footprint, unit positions, circulation or room layout. Floor plans
The occupancy record states 940.3 sq. metres total built-up area as per sanctioned plan and 963.852 sq. metres as per completion plan. These are certificate-reported built-up figures; they are distinct from the RERA project-field figure of 1,004.5 sq.mts approved built-up area. The certificate also records a deviated built-up area of 23.55. No FSI-counted area, carpet area or project-wide saleable built-up total is supplied. RERA filing
The technical-clearance conditions call for a 1.0 m wide continuous green plantation strip in periphery on all sides and state that the parking area shown on the plan is to be used only for parking. The supplied extraction does not establish the strip’s delivered condition or provide a dimensioned site plan.
Homes, configurations & floor plans
The TG-RERA unit schedule lists four units under APARTMENT UNIT, with 0 booked and 4 available in the portal snapshot; its as-of date is not stated. The listed RERA saleable area is 200.9 sq.m per unit. No software-measured carpet area or loading figure is available: the supplied floor-plan record says the drawings have not been measured and two drawings remain pending scan review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Unspecified; filed as APARTMENT UNIT | 4 | 0 | 4 | 200.9 sq.m per unit | Not measured / not available | Not supplied |
The RERA saleable-area figure is the filed figure; no drawing-based carpet-area measurement is available to compare with it. RERA unit details Floor plans
Parking & vehicle circulation
Stilt-floor parking is identified in the technical-clearance document, and the municipal occupancy record describes one stilt floor in the commercial building. The supplied records do not state the number or type of parking spaces, visitor or accessible provision, parking allocation to units, ramp arrangement, vehicle entries/exits, EV charging or pedestrian separation. The clearance states that the plan’s parking area is to be used only for parking.
Amenities, recreation & open spaces
The TG-RERA amenity record lists the following facilities and records 0% progress for each listed item. These percentages are portal-recorded declarations; no independent completion verification is supplied. “YES” appears for sewerage, storm-water drains and rainwater harvesting in the available field. RERA amenities
| Category | Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|---|
| Landscape / open space | Green Strip/TOT LOT/Park | Size not supplied | RERA amenities | 0%; not independently verified |
| Landscape / open space | Aggregate area of recreational Open Space | Area not supplied | RERA amenities | 0%; not independently verified |
| Convenience / community | Community Buildings | Details not supplied | RERA amenities | 0%; not independently verified |
The technical-clearance conditions also refer to greenery and a 1.0 m wide continuous green plantation strip in periphery on all sides. The supplied evidence does not establish delivery or independent verification.
Utilities, building services & safety
The TG-RERA amenity record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, street lighting, and an electrical meter room/sub-station/receiving station. It records 0% progress for each listed item; sewerage, storm-water drains and rainwater harvesting are additionally marked “YES” in the available field. No capacities, system specifications or independent completion evidence are supplied. RERA amenities
The technical-clearance conditions refer to rainwater-harvesting structures, greenery and compliance with applicable environmental provisions. This records a condition, not proof that the relevant works were completed. The supplied evidence does not specify water sources or storage, sewage-treatment capacity or reuse, power backup, lift provision or capacity, fire-system details, waste segregation arrangements, security systems, or accessibility features.
Location, access & connectivity
The registered project location is Rangampalli, Peddapalli Mandal, Peddapalli District, PIN 505172, at Sy No: 24 and existing house numbers 2-8, 2-9 and 2-10. The project record identifies a 100 feet Road along the western boundary. RERA record RERA filing RERA filing
The supplied location data provides a cadastral parcel-centroid coordinate of 18.59932600593784, 79.37517249957149. It lists the nearest sampled Outer Ring Road interchange at approximately 143.4 km. No other approach-road, public-transport or landmark distances are supplied. Location record
Developer & development status
The registered promoter is KAPIL FOODS AND STRUCTURES PRIVATE LIMITED, a company. The project record lists directors KRISHNA MOHAN UDUTHALA, SANJEEVA ALUVALA and SALUGARI THUKARAM, and authorized signatory VENU SANA. Corporate record Parties record
The supplied registration certificate records the promoter office as Warangal Urban, PIN 506001, without a complete street address. The project profile lists a promoter address in Subedari, Peddapalli; the supplied evidence gives no official contact number, email or website. Parties record
The Form B declaration, signed by authorized signatory SANA VENU on 16/12/2018, states a completion undertaking of 31/03/2020. The municipal occupancy-certificate record describes the commercial building as completed on 05/07/2025 and certified fit for occupation under an occupancy certificate dated 19/07/2025. These records concern different milestones: the promoter’s declared deadline and the recorded completion/occupancy dates.
Approvals, official records & documents
| Identifier / date | P02900000582; issued 09/04/2019; valid through 31/03/2020 |
|---|---|
| Scope shown in supplied evidence | Form C registration for KAPIL BHAVAN - PEDDAPALLY. |
| Identifier / date | B.P.No.14/2017/W; 07-03-2018; file Lr.D.Dis.No.3610/2016/W |
|---|---|
| Scope shown in supplied evidence | Site at existing house numbers 2-8, 2-9 and 2-10, Rangampalli; clearance describes an apartment building and commercial complex. |
| Identifier / date | 3014/W5/2019/0977; the occupancy record lists 03/03/2021 |
|---|---|
| Scope shown in supplied evidence | Peddapally Municipality record for the Kapil Bhavan building. |
| Identifier / date | 003811/PEDD/00005/SWOC/2025; 19/07/2025; file 3014/W5/2019/0977 |
|---|---|
| Scope shown in supplied evidence | Peddapally Municipality certificate for the commercial building Kapil Bhavan, Survey No. 24; completion date recorded as 05/07/2025. The record states the building is fit for occupation. |
| Identifier / date | Form B; 16/12/2018 |
|---|---|
| Scope shown in supplied evidence | Authorized-signatory declaration including a completion undertaking of 31/03/2020. |
| Identifier / date | Document 20041 |
|---|---|
| Scope shown in supplied evidence | OCR is too garbled to identify the approval type, issuer, parties, site or plan details reliably. |
The occupancy-certificate extraction records total built-up area of 940.3 sq. metres as per sanctioned plan and 963.852 sq. metres as per completion plan, a deviated built-up area of 23.55, and remaining compounding fees of 59148.18 INR. These are certificate-recorded particulars; this overview does not assess their regulatory effect.
Project at a glance
Project identity
Registered project name: KAPIL BHAVAN - PEDDAPALLY
Project type: Commercial in the TG-RERA project record. The filed occupancy record describes the completed building as commercial.
Phase / registered portion: Phase designation not disclosed; the registration is for the project under registration number P02900000582.
TG-RERA registration: P02900000582, issued 09/04/2019; recorded validity 09/04/2019–31/03/2020. No extension is recorded in the supplied registration certificate. Registration validity is distinct from the project’s completion and occupancy status.
Registered promoter: KAPIL FOODS AND STRUCTURES PRIVATE LIMITED, a company.
RERA status: The supplied certificate records the registration period above; current registration status is not established by the supplied record.
Land and geographic identity
Locality / site address: Sy No: 24; existing house numbers 2-8, 2-9 and 2-10.
Revenue village: Rangampalli (also rendered “Rangampally” in supplied documents).
Mandal: Peddapalli.
District: Peddapalli in the project identity record and technical-clearance document. The registration certificate separately records Warangal Urban; district identity requires confirmation against the official project record.
PIN: 505172.
Project survey number(s): Survey No. 24; no project subdivision is stated in the supplied project record.
Site extent: RERA land record: 607.03 sq.mts total and net. The technical-clearance document also records 607.03 sq.mtr.
Boundaries: East: Land of Jagan Mohan Reddy; West: 100 feet Road; North: House of Thurupati Yellaiah; South: House of Thurupati Shivalinga Murthy.
Development identity
Sanctioning authority / principal approval: Director of Town and Country Planning, Government of Telangana; Technical Clearance B.P.No.14/2017/W, dated 07-03-2018, for the site at existing house numbers 2-8, 2-9 and 2-10.
Approved built-up area: 1,004.5 sq.mts in the RERA project fields.
Building count: One building unit in the RERA project fields.
Floor configuration: The technical-clearance extraction describes an apartment building and a commercial complex, each with stilt parking, ground floor and three upper floors. The later occupancy record describes the commercial building as one stilt floor and four upper floors.
Parking levels: Stilt parking is identified in the technical-clearance document. A parking-space count is not supplied.
Unit counts: The RERA record lists 1 total building unit and 1 proposed building unit; the unit schedule lists 4 APARTMENT UNIT units.
Offering and status
RERA-filed unit type and saleable area: APARTMENT UNIT; 200.9 sq.m saleable area per listed unit.
Booked / available: 0 booked; 4 available, as last read from the TG-RERA portal. The portal record has no stated as-of date, so these counts are indicative.
Construction / completion: An occupancy certificate record identifies completion date 05/07/2025 and an occupancy certificate approved/issued 19/07/2025 for the commercial building described in that record.
Promoter-declared completion deadline: 31/03/2020, stated in the Form B declaration.
Occupancy-certificate scope: The supplied certificate refers to the commercial building Kapil Bhavan, Survey No. 24, at Rangampalli. It does not expressly describe a separate residential apartment building as occupied.
The project story
KAPIL BHAVAN - PEDDAPALLY is registered as a commercial project on Survey No. 24 at existing house numbers 2-8, 2-9 and 2-10, Rangampalli, Peddapalli Mandal. The registered site extent is 607.03 sq.mts.
The technical-clearance document describes an apartment building and a commercial complex, with stilt parking, a ground floor and three upper floors for each. The later municipal occupancy record describes a commercial building named Kapil Bhavan with one stilt floor and four upper floors and certifies it fit for occupation. The supplied evidence therefore supports an occupancy-certified commercial building; it does not establish the occupancy status of any separately described residential portion.
The registration record lists four apartment units, with none booked and four available in the portal data read for this report; the portal data has no as-of date. This is a recorded inventory snapshot, not independent confirmation of current sale availability.
Master plan, architecture & building design
The project fields record a total/net site area of 607.03 sq.mts, one building unit and approved built-up area of 1,004.5 sq.mts.
The municipal occupancy-certificate extraction describes the commercial building as one stilt floor and four upper floors, with building height 12.0 metres. The supplied evidence does not include readable floor-plan drawings from which to verify building arrangement, footprint, unit positions, circulation or room layout.
The occupancy record states 940.3 sq. metres total built-up area as per sanctioned plan and 963.852 sq. metres as per completion plan. These are certificate-reported built-up figures; they are distinct from the RERA project-field figure of 1,004.5 sq.mts approved built-up area. The certificate also records a deviated built-up area of 23.55. No FSI-counted area, carpet area or project-wide saleable built-up total is supplied.
The technical-clearance conditions call for a 1.0 m wide continuous green plantation strip in periphery on all sides and state that the parking area shown on the plan is to be used only for parking. The supplied extraction does not establish the strip’s delivered condition or provide a dimensioned site plan.
Homes, configurations & floor plans
The TG-RERA unit schedule lists four units under APARTMENT UNIT, with 0 booked and 4 available in the portal snapshot; its as-of date is not stated. The listed RERA saleable area is 200.9 sq.m per unit. No software-measured carpet area or loading figure is available: the supplied floor-plan record says the drawings have not been measured and two drawings remain pending scan review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Unspecified; filed as APARTMENT UNIT | 4 | 0 | 4 | 200.9 sq.m per unit | Not measured / not available | Not supplied |
The RERA saleable-area figure is the filed figure; no drawing-based carpet-area measurement is available to compare with it.
Parking & vehicle circulation
Stilt-floor parking is identified in the technical-clearance document, and the municipal occupancy record describes one stilt floor in the commercial building. The supplied records do not state the number or type of parking spaces, visitor or accessible provision, parking allocation to units, ramp arrangement, vehicle entries/exits, EV charging or pedestrian separation. The clearance states that the plan’s parking area is to be used only for parking.
Amenities, recreation & open spaces
The TG-RERA amenity record lists the following facilities and records 0% progress for each listed item. These percentages are portal-recorded declarations; no independent completion verification is supplied. “YES” appears for sewerage, storm-water drains and rainwater harvesting in the available field.
| Category | Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|---|
| Landscape / open space | Green Strip/TOT LOT/Park | Size not supplied | 0%; not independently verified | |
| Landscape / open space | Aggregate area of recreational Open Space | Area not supplied | 0%; not independently verified | |
| Convenience / community | Community Buildings | Details not supplied | 0%; not independently verified |
The technical-clearance conditions also refer to greenery and a 1.0 m wide continuous green plantation strip in periphery on all sides. The supplied evidence does not establish delivery or independent verification.
Utilities, building services & safety
The TG-RERA amenity record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, street lighting, and an electrical meter room/sub-station/receiving station. It records 0% progress for each listed item; sewerage, storm-water drains and rainwater harvesting are additionally marked “YES” in the available field. No capacities, system specifications or independent completion evidence are supplied.
The technical-clearance conditions refer to rainwater-harvesting structures, greenery and compliance with applicable environmental provisions. This records a condition, not proof that the relevant works were completed. The supplied evidence does not specify water sources or storage, sewage-treatment capacity or reuse, power backup, lift provision or capacity, fire-system details, waste segregation arrangements, security systems, or accessibility features.
Location, access & connectivity
The registered project location is Rangampalli, Peddapalli Mandal, Peddapalli District, PIN 505172, at Sy No: 24 and existing house numbers 2-8, 2-9 and 2-10. The project record identifies a 100 feet Road along the western boundary.
The supplied location data provides a cadastral parcel-centroid coordinate of 18.59932600593784, 79.37517249957149. It lists the nearest sampled Outer Ring Road interchange at approximately 143.4 km. No other approach-road, public-transport or landmark distances are supplied.
Developer & development status
The registered promoter is KAPIL FOODS AND STRUCTURES PRIVATE LIMITED, a company. The project record lists directors KRISHNA MOHAN UDUTHALA, SANJEEVA ALUVALA and SALUGARI THUKARAM, and authorized signatory VENU SANA.
The supplied registration certificate records the promoter office as Warangal Urban, PIN 506001, without a complete street address. The project profile lists a promoter address in Subedari, Peddapalli; the supplied evidence gives no official contact number, email or website.
The Form B declaration, signed by authorized signatory SANA VENU on 16/12/2018, states a completion undertaking of 31/03/2020. The municipal occupancy-certificate record describes the commercial building as completed on 05/07/2025 and certified fit for occupation under an occupancy certificate dated 19/07/2025. These records concern different milestones: the promoter’s declared deadline and the recorded completion/occupancy dates.
Approvals, official records & documents
| Identifier / date | P02900000582; issued 09/04/2019; valid through 31/03/2020 |
|---|---|
| Scope shown in supplied evidence | Form C registration for KAPIL BHAVAN - PEDDAPALLY. |
| Identifier / date | B.P.No.14/2017/W; 07-03-2018; file Lr.D.Dis.No.3610/2016/W |
|---|---|
| Scope shown in supplied evidence | Site at existing house numbers 2-8, 2-9 and 2-10, Rangampalli; clearance describes an apartment building and commercial complex. |
| Identifier / date | 3014/W5/2019/0977; the occupancy record lists 03/03/2021 |
|---|---|
| Scope shown in supplied evidence | Peddapally Municipality record for the Kapil Bhavan building. |
| Identifier / date | 003811/PEDD/00005/SWOC/2025; 19/07/2025; file 3014/W5/2019/0977 |
|---|---|
| Scope shown in supplied evidence | Peddapally Municipality certificate for the commercial building Kapil Bhavan, Survey No. 24; completion date recorded as 05/07/2025. The record states the building is fit for occupation. |
| Identifier / date | Form B; 16/12/2018 |
|---|---|
| Scope shown in supplied evidence | Authorized-signatory declaration including a completion undertaking of 31/03/2020. |
| Identifier / date | Document 20041 |
|---|---|
| Scope shown in supplied evidence | OCR is too garbled to identify the approval type, issuer, parties, site or plan details reliably. |
The occupancy-certificate extraction records total built-up area of 940.3 sq. metres as per sanctioned plan and 963.852 sq. metres as per completion plan, a deviated built-up area of 23.55, and remaining compounding fees of 59148.18 INR. These are certificate-recorded particulars; this overview does not assess their regulatory effect.
Frequently asked questions
Is KAPIL BHAVAN - PEDDAPALLY registered with Telangana RERA?
Yes. KAPIL BHAVAN - PEDDAPALLY is registered with the Telangana Real Estate Regulatory Authority as P02900000582; the registration status is New Project.
Who is the developer of KAPIL BHAVAN - PEDDAPALLY?
The promoter named in the RERA registration is KAPIL FOODS AND STRUCTURES PRIVATE LIMITED.
Where is KAPIL BHAVAN - PEDDAPALLY located?
KAPIL BHAVAN - PEDDAPALLY is in Sy No : 24, Rangampalli, Peddapalli, Telangana (505172).
When will KAPIL BHAVAN - PEDDAPALLY be completed?
The promoter's proposed date of completion filed with RERA is 31/03/2020. This is the promoter's declaration, not a guarantee.