SRI MAHALAXMI TOWERS is a residential apartment project in Rangampally, Peddapalli mandal, Peddapalli district, developed by the registered promoter SRI VISHNU INFRASTRUCTURE & CONSTRUCTIONS. The project covers 2050.82 sq. m and comprises one building with 1 Stilt + 5 upper floors and 55 DOUBLE BED ROOM units, recorded as 2BHK, each with a RERA-filed saleable area of 64.83 sq. m. Its TG-RERA registration number is P02900004474, and the proposed completion date is 05/10/2027.

01What we found

RegisteredTG-RERA - valid till 5 Oct 2027
8documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered nameSRI MAHALAXMI TOWERS RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; the registration covers the project recorded as SRI MAHALAXMI TOWERS RERA record
TG-RERA registrationP02900004474 Approvals record
Registration validity02/05/2022 to 05/10/2027, unless extended by the Authority
Registered promoterSRI VISHNU INFRASTRUCTURE & CONSTRUCTIONS RERA record
RERA statusThe supplied certificate records a grant of registration; current status beyond the stated validity dates is not established by the supplied material

Land and geographic identity

ItemProject record
Locality / revenue villageRANGAMPALLY / Rangampally; the RERA certificate also gives locality as Peddapalli RERA filing
MandalPeddapalli in the project identity record; Sulthanabad is stated in the RERA certificate’s office-address fields RERA record
District / PINPeddapalli / 505172 RERA record RERA filing
Project survey numberSy. No. 295; no subdivision is disclosed RERA filing
Plot numbers77, 78, 79, 80, 81 and 82 RERA filing
Registered site extent2050.82 sq. m; total area and net area are each recorded as 2050.82 sq. m RERA filing
BoundariesEast: PLOT NO 83; West: PLOT NO 76; North: 9M ROAD; South: SURVEY NO 296 RERA filing

Development identity

ItemProject record
Sanctioning authorityPeddapally Municipality Approvals record
Building permit3014/W11/2021/1816, approved 05 October, 2021 Approvals record
Approved built-up area5,123 sq. m is recorded as approved built-up area; the permit extraction separately records 5,123.00 m² for residential upper floors and 1,150.23 m² for the stilt RERA filing
Building count and formOne building; sanctioned as 1 Stilt + 5 upper floors RERA filing
Height14.95 m in the building-permit extraction
ParkingStilt approved for parking; a separate sanctioned parking-space count is not supplied
Units55 units recorded in the RERA unit data; the building-permit extraction does not provide a separate sanctioned unit count RERA unit table

Offering and status

ItemProject record
RERA-filed configurationDOUBLE BED ROOM, recorded as 2BHK in the normalized unit data RERA unit table RERA unit details
RERA-filed saleable area64.83 sq. m per unit RERA unit table
Booked / available0 booked / 55 available in the portal data; no as-of date is supplied, so these counts are indicative RERA unit table
Construction stageNo site-verified construction progress or current completion stage is supplied. RERA amenity progress fields shown in the supplied record are 0% RERA amenities
Completion datesThe RERA registration certificate and Form B declaration state 05/10/2027; the building-permit extraction states completion required by 05 October, 2027
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied material; issuance status is not established Document index

2. The project story

SRI MAHALAXMI TOWERS is registered as a residential apartment project on Sy. No. 295, covering plot numbers 77–82 in the RERA project record. The registered site extent is 2050.82 sq. m. The building permit describes one residential building, with a stilt and five upper floors, intended for flats/apartments/tenements. RERA record RERA filing

The RERA unit data lists 55 two-bedroom units, each with a filed saleable area of 64.83 sq. m. The portal snapshot indicates all 55 as available and none booked, but it carries no as-of date. The available evidence does not establish how much construction has been completed on site, nor does it include an occupancy or completion certificate. The stated completion date is 05/10/2027; this is a deadline, not evidence of completion. RERA unit table

3. Master plan, architecture & building design

The building-permit record sanctions a single residential building, “Building - RAO (SUBODH),” with a height of 14.95 m and a configuration of 1 Stilt + 5 upper floors. The site area is 2050.82 m²; the permit records 0 m² as road-affected area and 2050.82 m² as net area. The extraction lists 5,123.00 m² for residential upper floors and 1,150.23 m² for the stilt, while the project record separately reports approved built-up area as 5,123 sq. m. These are retained as the respective filed figures; the supplied material does not reconcile their area definitions. RERA filing

The permit specifies six rainwater-harvesting structures and a tot-lot of 102.76 m². It also records “14% OPEN SPACE CONTRIBUTION 343,419.44”; the unit or basis for the latter figure is not specified in the extracted record. No drawing-derived evidence is supplied here for building footprint, flats per floor, lift and stair arrangement, detailed circulation, or residential/common-area breakdown.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK (filed as DOUBLE BED ROOM)5505564.83 sq. m63.0 sq. m software-measured median; measured range 63.0 sq. mNot supplied

The 2BHK carpet measurement is software-measured from approved floor-plan drawing doc. 210004, not a RERA-filed area, and is flagged for review. The drawing extraction shows a hall, living area, kitchen, two bedrooms, two toilets, a 1.20 m-wide balcony and a utility area; the balcony and utility are excluded from the measured carpet area. Dimensions and areas are drawing measurements, not RERA disclosures. Saleable area and carpet area are different measures: the supplied floor-plan note states that saleable area includes the home’s share of common areas, whereas the software-measured carpet area is taken from drawing geometry. No separate loading figure is supplied. RERA unit details Floor plans

Portal booking counts are indicative because their as-of date is not stated. Floor plans RERA unit table

5. Parking & vehicle circulation

The building permit identifies the stilt for parking and requires the approved parking areas to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a count of sanctioned bays, distinguish resident from visitor or accessible spaces, or specify a parking-allocation arrangement for individual units.

“Open Parking” and “Covered Parking” appear in vendor-supplied amenity information, but the supplied RERA and permit extracts do not establish counts, unit allocations, ramps, internal driveways, pedestrian separation or EV charging. Promoter website

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot102.76 m²; permit requires it to be fenced and maintained as greenery before occupancy certificationBuilding permitRequired by permit; no completion verification supplied
GreeneryTree planting along the site periphery and in front of the premises; peripheral greenery strip to be maintainedBuilding permitPermit condition; completion not verified
Internal roads and footpathsListed in RERA amenity dataRERA amenity data0% recorded RERA amenities
Community buildingsListed in RERA amenity dataRERA amenity data0% recorded RERA amenities
Aggregate recreational open spaceListed in RERA amenity dataRERA amenity data0% recorded RERA amenities
Open and covered parkingDescribed by vendor data; no sizes or quantities suppliedVendorNo RERA-declared completion status supplied Promoter website

The RERA amenity record also lists water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter/substation/receiving station. Except where a separate permit detail is noted above, the supplied record gives 0% progress for these items; it does not establish completed delivery. RERA amenities

7. Utilities, building services & safety

The RERA amenity data lists water supply and sewerage, including chambers, lines, septic tank and STP, as “YES”; it does not give capacities or establish completion. Storm-water drains, treatment and disposal of sewage and sullage, solid-waste management, energy management, and water conservation/rainwater harvesting are also listed, with 0% progress recorded in the supplied data. The building permit specifically requires six rainwater-harvesting structures. RERA amenities

Electrical meter room, sub-station and receiving station are listed as “YES” in the RERA amenity data, and the permit requires space for a transformer; no supply capacity or backup-power details are supplied. Fire protection and fire-safety requirements appear in the amenity data with 0% progress. No lift details, service-lift details, lift capacity, CCTV/access-control details, or accessibility features are supplied. The permit requires a garbage house within the premises and makes an occupancy certificate compulsory before occupation; these conditions do not establish that the facilities or certificate have been completed or obtained. RERA amenities

8. Location, access & connectivity

The project is identified in the RERA project record at Rangampally, Peddapalli mandal, Peddapalli district, PIN 505172. Its boundary description records a 9M ROAD on the north, plot 83 to the east, plot 76 to the west, and Survey No. 296 to the south. RERA record RERA filing RERA filing

The supplied location data places the cadastral parcel centroid at 18.59932600593784, 79.37517249957149. The nearest sampled Outer Ring Road interchange is recorded at approximately 143.4 km. No local public-transport, approach-road or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is SRI VISHNU INFRASTRUCTURE & CONSTRUCTIONS, recorded as a partnership. The supplied corporate identifier is GSTIN 36AEEFS4538M1ZJ. The promoter’s listed address is 4-12, Kodurupaka, Rangampally, Peddapalli, Telangana 505172. No official contact number, email address or website is established in the RERA identity data. RERA record Corporate record Parties record

The RERA registration certificate identifies the promoter and registration number P02900004474. Form B, signed by PONNAMANENI BALAJI RAO as promoter, declares a completion date of 05 October 2027 and states that 70% of amounts realised from allottees will be deposited in a separate scheduled-bank account for construction and land costs. These are promoter declarations in the filed document. No independent construction-progress measurement or occupancy status is supplied. RERA amenities

10. Approvals, official records & documents

RecordWhat the supplied record establishes
TG-RERA registration certificate, doc. REGCERT-32284Form C registration for SRI MAHALAXMI TOWERS, P02900004474, valid from 02/05/2022 to 05/10/2027 unless extended
Building Permit Order, doc. 212590Peddapally Municipality approval 3014/W11/2021/1816 dated 05 October, 2021; one building, 1 Stilt + 5 upper floors; conditional permission with completion required by 05 October, 2027
Form B declaration, doc. 212592Promoter declaration covering title, encumbrances, separate-account arrangements and the 05 October 2027 completion undertaking
Title report, doc. 210124Advocate’s title report concerning 2453 sq. yards in plot Nos. 77–82, Sy. No. 295, Rangampalli
Encumbrance statement, doc. 210088Statement concerning Rangampalle, principally Survey No. 295, for the stated search period 01-01-1983 to 01-12-2021
Floor-plan drawing, doc. 210004Drawing source used for software measurements of unit geometry; the supplied material does not include a separate plan approval identifier for this drawing
Occupancy / completion certificateNot supplied; issuance is not established Document index

The building permit requires a completion notice and occupancy certificate after construction and states that an occupancy certificate is compulsory before occupation. The document index supplied for this overview does not include an issued occupancy or completion certificate. Document index

Frequently asked questions

Is SRI MAHALAXMI TOWERS registered with Telangana RERA?

Yes. SRI MAHALAXMI TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02900004474; the registration status is New Project.

Who is the developer of SRI MAHALAXMI TOWERS?

The promoter named in the RERA registration is SRI VISHNU INFRASTRUCTURE & CONSTRUCTIONS.

Where is SRI MAHALAXMI TOWERS located?

SRI MAHALAXMI TOWERS is in RANGAMPALLY, Peddapalli, Telangana (505172).

When will SRI MAHALAXMI TOWERS be completed?

The promoter's proposed date of completion filed with RERA is 05/02/2028. This is the promoter's declaration, not a guarantee.