Lakshmi Nilayas
RAVIRAJ CONSTRUCTIONS · Suryapet · RERA P01900007293
LAKSHMI NILAYAS is a residential apartment project in Balajinagar, Kodad Mandal, Suryapet District. The registered promoter is Raviraj Constructions. The project covers 579.51 sq m and comprises one building with 1 stilt + 5 upper floors and 10 3BHK units. It is registered with TG-RERA under P01900007293, with proposed completion on 30/01/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Fact | Record |
|---|---|
| Registered project name | LAKSHMI NILAYAS |
| Project type / registered portion | Residential apartment project; phase or separately named registered portion is not disclosed. RERA record |
| TG-RERA registration | P01900007293; granted 24/11/2023, valid through 30/09/2026. The certificate records a two-year validity period and no extension. |
| Registered promoter | Raviraj Constructions (also shown in project records as RAVIRAJ CONSTRUCTIONS). RERA record |
| RERA status | Registered; the available certificate states validity through 30/09/2026. |
Land and geographic identity
| Fact | Record |
|---|---|
| Locality | Balajinagar; project record locality also states KODAD. RERA record |
| Revenue village | Kodad is named in title and land records; the RERA certificate identifies Balajinagar as the locality. Land records |
| Mandal / district / PIN | Kodad / Suryapet / 508206. RERA record |
| Project survey numbers and subdivisions | 837/2/1/2, 837/2/2, 837/2/3, 837/4/2/1, 837/4/2/2, 837/4/4/1, 837/4/4/2, 837/2/1/1/2, 837/4/1, 837/4/3. Land records |
| Registered site extent | 579.51 sq m total site area; the building approval records 577.58 sq m net area. Land records |
| Boundaries | East: Plot No. 20 and 19; west: 12-foot road; north: 12-foot road; south: Plot No. 11 and 18. RERA filing |
Development identity
| Fact | Record |
|---|---|
| Sanctioning authority | KODADA Municipality/Municipal Corporation. Approvals record |
| Principal building approval | 0017/BP/3046/2023, approved 01 October 2023; file no. 010520/BP/DTCP/3046/0029/2023. Approvals record |
| Approved built-up area | Residential 5 upper floors: 1,478.20 m²; stilt: 266.45 m². These are the areas stated in the sanctioned parameters. |
| Building count and configuration | One building, identified in the approval as Building A (P JNSI APT): 1 Stilt + 5 upper floors. Sanctioned height: 14.25 m. |
| Parking levels / provision | Stilt is identified as approved for parking; the approval conditions also refer to cellar and stilt parking, but the supplied sanctioned-parameters extract does not give a parking-space count or identify a cellar level. |
| Unit counts | The RERA filing records 10 proposed units; the sanctioned parameters supplied do not state an approved unit count. RERA unit table |
Offering and status
| Fact | Record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units. RERA unit table |
| RERA-filed saleable area | 148.64 m² per unit. RERA unit table |
| Booked / available | 0 booked and 10 available in the portal data; no as-of date is supplied, so these counts are indicative. RERA unit table |
| Construction stage | The supplied evidence does not establish current construction progress or independent site verification. The RERA filing describes the project as “New Project.” RERA record |
| Completion dates | The Form-B declaration undertakes completion by 30/09/2026; the RERA header gives proposed completion 30/01/2027. The building approval states construction to be completed before 01 October 2026. RERA record |
| Occupancy certificate (OC) | No OC is included in the supplied documents; the building approval requires an OC before occupation. The OC status is therefore not established by this evidence. |
The project story
LAKSHMI NILAYAS is registered with TG-RERA as a residential apartment project at Balajinagar, Kodad Mandal, Suryapet District. Its RERA land schedule identifies ten survey numbers or subdivisions, and the building approval identifies the same survey set. The sanctioned building is Building A, with a stilt and five upper floors. RERA record Land records
The RERA filing lists ten 3BHK units. The supplied portal snapshot shows none booked and ten available, but has no retrieval date and should be treated as indicative, not as a current sales statement. The evidence provided does not establish construction progress, completed portions, or independent verification of works on site. RERA unit table
The promoter’s Form-B declaration states a completion undertaking of 30/09/2026, while the project header records 30/01/2027 as the proposed completion date. The building approval separately states a completion deadline of 01 October 2026. Registration validity is a separate matter: the registration certificate runs through 30/09/2026 and records no extension. No occupancy certificate is supplied. RERA record
Master plan, architecture & building design
- The building permit approves one residential building, Building A (P JNSI APT), with 1 stilt + 5 upper floors and a stated height of 14.25 m. The sanctioned parameters list 1,478.20 m² for the five residential upper floors and 266.45 m² for the stilt. The approval records a site area of 579.51 m² and net area of 577.58 m².
- The permit identifies Plot Nos. 9, 10, 19/A and 20/A, and lists a layout permit number 0010/FTL/3046/2023, dated 06/07/2023. The available material does not provide a readable, approved layout drawing or sufficient plan-derived information to describe building footprint, flats per floor, lifts, stairs, entrances, circulation, landscaping/open-space dimensions, or internal road arrangement. The supplied sanctioned area figures are not identified as carpet area or saleable area and should not be treated as either.
- The approval lists 11 rainwater-harvesting structures and identifies space for a transformer and a garbage house. The tot-lot area is recorded as “NA.” The approval also requires periphery planting and maintenance of a greenery strip, and includes a condition that the tot-lot be fenced and maintained as greenery; no supplied measurement establishes the area or completed status of these items.
Homes, configurations & floor plans
The RERA filing records ten 3BHK units, each with a saleable area of 148.64 m². Software measurement of the approved floor-plan drawing for the 3BHK configuration gives a median carpet area of 112.1 m² (range 112.0–112.1 m²) across four measured designs. The drawing-based measurement is software-derived, is flagged for review, and is not a RERA disclosure. Saleable area and carpet area are distinct measures; the supplied data notes that saleable area includes the home’s share of common areas. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 148.64 m² | 112.0–112.1 m² (software-measured; four designs) | 25% |
The measured first-floor plan panel shows a hall, kitchen, three bedrooms, three toilets and balconies. The software-measured room areas for the illustrated unit include a hall of 33.83 m², a master bedroom of 17.78 m², and two other bedrooms of 14.96 m² and 15.51 m². The drawing labels a 1.60 m wide balcony and another balcony. These are drawing-based measurements and labels, not RERA-filed room specifications; verify them against the approved drawing. RERA unit details
Parking & vehicle circulation
The building approval identifies the stilt as approved for parking and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking. The supplied sanctioned-parameters extract does not state the number of parking spaces or confirm a cellar level; it also does not identify visitor, accessible, or two-wheeler spaces, ramps, EV-charging locations, or pedestrian-separated circulation. No unit-wise parking allocation or exclusive ownership arrangement is established by the supplied evidence.
Amenities, recreation & open spaces
| Facility | Tot-lot / greenery |
|---|---|
| Description / size | Tot-lot area recorded as “NA”; approval conditions require fencing and maintenance of the tot-lot as greenery, and periphery planting/green strip. |
| Declared progress / verified status | Approval condition; completion not established. |
| Facility | Landscaping and tree planting |
|---|---|
| Description / size | Listed as available in the RERA amenities record; approval also requires planting along the periphery and in front of the premises. |
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity record shows 0% progress; independent completion not established. |
| Facility | Garbage house |
|---|---|
| Description / size | Required within the premises by the building approval; also listed in the approval’s amenities/utilities. |
| Declared progress / verified status | Required/listed; completion not established. |
| Facility | Transformer space |
|---|---|
| Description / size | Space for a transformer is listed in the approval. |
| Declared progress / verified status | Required/listed; installation status not established. |
| Facility | Rainwater harvesting |
|---|---|
| Description / size | Approval specifies 11 rainwater-harvesting structures and a percolation pit. |
| Declared progress / verified status | Approved requirement; completion not established. |
The RERA amenities record also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, electrical meter/sub-station/receiving-station provision, recreational open space, and landscaping/tree planting. It gives 0% progress for the listed items; this record does not establish independent completion. RERA amenities
Utilities, building services & safety
- The RERA amenities record marks water supply, sewerage and rainwater harvesting as available, and marks an electrical meter room/sub-station/receiving station as available. The record gives 0% progress for these items and does not specify water source, storage or treatment capacity, sewerage treatment capacity, reuse, drainage design, electrical load, backup power or installed equipment. RERA amenities
- The building approval requires a rainwater-harvesting percolation pit, transformer space and a garbage house. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision; structural and fire-safety installations are assigned to the project’s responsible parties in the approval conditions. The evidence does not establish installed lift numbers or capacities, fire-system details, clearances, accessibility features, CCTV, access-control systems, or completed safety works.
- The approval additionally requires parking areas to provide EV-charging infrastructure under the cited requirements. This is an approval condition, not evidence that charging equipment has been installed. It requires an occupancy certificate before occupation and states that public water and electricity connections will be provided only on production of an occupancy certificate.
Location, access & connectivity
- The project’s registered locality is Balajinagar, Kodad Mandal, Suryapet District, Telangana, PIN 508206; the project record also uses KODAD. The title and land records identify the revenue village as Kodad. RERA record Land records
- The land schedule records 12-foot roads on the north and west boundaries; the east and south boundaries adjoin identified plots. The supplied location data gives an approximate distance of 146.6 km to the nearest sampled Outer Ring Road interchange. No other measured distance, public-transport information, landmark, or project-specific approach-road description is supplied. RERA filing Location record
Developer & development status
- The registered promoter is Raviraj Constructions, identified in the project record as a proprietorship. The project record names Pittala Jhansi as authorized signatory. The supplied promoter address is B, Yogananda Nagar, MS Manikanta Nagar, Balaji Nagar New Plotting Area Ward 16, Kodad, Suryapet, 508206; the RERA certificate separately records the promoter office as Huzurnagar-1, Huzurnagar Mandal, Suryapet, PIN 508204. Corporate record Parties record
- The RERA header describes the project as “New Project,” but the supplied evidence does not provide a dated construction-progress report or independently verified site status. The Form-B declaration undertakes completion by 30/09/2026; the project header states 30/01/2027 as proposed completion, and the building approval states a construction completion date before 01 October 2026. No OC is supplied, and no extension appears in the registration certificate. RERA record
Approvals, official records & documents
| Identifier / date | P01900007293, issued 24/11/2023; valid through 30/09/2026 |
|---|---|
| What the supplied record establishes | Registration of LAKSHMI NILAYAS to Raviraj Constructions; certificate records no extension. |
| Identifier / date | 0017/BP/3046/2023, 01 October 2023; file no. 010520/BP/DTCP/3046/0029/2023 |
|---|---|
| What the supplied record establishes | Municipal approval for Building A, 1 stilt + 5 upper floors, with conditions. |
| Identifier / date | 0010/FTL/3046/2023, dated 06/07/2023 |
|---|---|
| What the supplied record establishes | Listed among the building-approval document’s other numbers. |
| Identifier / date | Verified in 2023; date text is unclear |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, project funds, approvals and completion undertaking. |
| Identifier / date | Document 361691 |
|---|---|
| What the supplied record establishes | The supplied drawing-derived measurements cover two drawings; software measurement identifies four 3BHK designs and one 5BHK design. The 5BHK design is not listed in the RERA filing; it is not part of the RERA-filed unit-count table above. RERA unit details |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The building approval requires an OC before occupation; the supplied evidence does not establish that one has been issued. |
The building approval records a mortgage-related municipal condition and requires that the mortgaged built-up area be registered only after an occupancy certificate is produced. This overview reports the approval’s scope and does not determine title or the operation of that condition.
Project at a glance
Project identity
Registered project name: LAKSHMI NILAYAS
Project type / registered portion: Residential apartment project; phase or separately named registered portion is not disclosed.
TG-RERA registration: P01900007293; granted 24/11/2023, valid through 30/09/2026. The certificate records a two-year validity period and no extension.
Registered promoter: Raviraj Constructions (also shown in project records as RAVIRAJ CONSTRUCTIONS).
RERA status: Registered; the available certificate states validity through 30/09/2026.
Land and geographic identity
Locality: Balajinagar; project record locality also states KODAD.
Revenue village: Kodad is named in title and land records; the RERA certificate identifies Balajinagar as the locality.
Mandal / district / PIN: Kodad / Suryapet / 508206.
Project survey numbers and subdivisions: 837/2/1/2, 837/2/2, 837/2/3, 837/4/2/1, 837/4/2/2, 837/4/4/1, 837/4/4/2, 837/2/1/1/2, 837/4/1, 837/4/3.
Registered site extent: 579.51 sq m total site area; the building approval records 577.58 sq m net area.
Boundaries: East: Plot No. 20 and 19; west: 12-foot road; north: 12-foot road; south: Plot No. 11 and 18.
Development identity
Sanctioning authority: KODADA Municipality/Municipal Corporation.
Principal building approval: 0017/BP/3046/2023, approved 01 October 2023; file no. 010520/BP/DTCP/3046/0029/2023.
Approved built-up area: Residential 5 upper floors: 1,478.20 m²; stilt: 266.45 m². These are the areas stated in the sanctioned parameters.
Building count and configuration: One building, identified in the approval as Building A (P JNSI APT): 1 Stilt + 5 upper floors. Sanctioned height: 14.25 m.
Parking levels / provision: Stilt is identified as approved for parking; the approval conditions also refer to cellar and stilt parking, but the supplied sanctioned-parameters extract does not give a parking-space count or identify a cellar level.
Unit counts: The RERA filing records 10 proposed units; the sanctioned parameters supplied do not state an approved unit count.
Offering and status
RERA-filed configuration: 3BHK, 10 units.
RERA-filed saleable area: 148.64 m² per unit.
Booked / available: 0 booked and 10 available in the portal data; no as-of date is supplied, so these counts are indicative.
Construction stage: The supplied evidence does not establish current construction progress or independent site verification. The RERA filing describes the project as “New Project.”
Completion dates: The Form-B declaration undertakes completion by 30/09/2026; the RERA header gives proposed completion 30/01/2027. The building approval states construction to be completed before 01 October 2026.
Occupancy certificate (OC): No OC is included in the supplied documents; the building approval requires an OC before occupation. The OC status is therefore not established by this evidence.
The project story
LAKSHMI NILAYAS is registered with TG-RERA as a residential apartment project at Balajinagar, Kodad Mandal, Suryapet District. Its RERA land schedule identifies ten survey numbers or subdivisions, and the building approval identifies the same survey set. The sanctioned building is Building A, with a stilt and five upper floors.
The RERA filing lists ten 3BHK units. The supplied portal snapshot shows none booked and ten available, but has no retrieval date and should be treated as indicative, not as a current sales statement. The evidence provided does not establish construction progress, completed portions, or independent verification of works on site.
The promoter’s Form-B declaration states a completion undertaking of 30/09/2026, while the project header records 30/01/2027 as the proposed completion date. The building approval separately states a completion deadline of 01 October 2026. Registration validity is a separate matter: the registration certificate runs through 30/09/2026 and records no extension. No occupancy certificate is supplied.
Master plan, architecture & building design
- The building permit approves one residential building, Building A (P JNSI APT), with 1 stilt + 5 upper floors and a stated height of 14.25 m. The sanctioned parameters list 1,478.20 m² for the five residential upper floors and 266.45 m² for the stilt. The approval records a site area of 579.51 m² and net area of 577.58 m².
- The permit identifies Plot Nos. 9, 10, 19/A and 20/A, and lists a layout permit number 0010/FTL/3046/2023, dated 06/07/2023. The available material does not provide a readable, approved layout drawing or sufficient plan-derived information to describe building footprint, flats per floor, lifts, stairs, entrances, circulation, landscaping/open-space dimensions, or internal road arrangement. The supplied sanctioned area figures are not identified as carpet area or saleable area and should not be treated as either.
- The approval lists 11 rainwater-harvesting structures and identifies space for a transformer and a garbage house. The tot-lot area is recorded as “NA.” The approval also requires periphery planting and maintenance of a greenery strip, and includes a condition that the tot-lot be fenced and maintained as greenery; no supplied measurement establishes the area or completed status of these items.
Homes, configurations & floor plans
The RERA filing records ten 3BHK units, each with a saleable area of 148.64 m². Software measurement of the approved floor-plan drawing for the 3BHK configuration gives a median carpet area of 112.1 m² (range 112.0–112.1 m²) across four measured designs. The drawing-based measurement is software-derived, is flagged for review, and is not a RERA disclosure. Saleable area and carpet area are distinct measures; the supplied data notes that saleable area includes the home’s share of common areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 148.64 m² | 112.0–112.1 m² (software-measured; four designs) | 25% |
The measured first-floor plan panel shows a hall, kitchen, three bedrooms, three toilets and balconies. The software-measured room areas for the illustrated unit include a hall of 33.83 m², a master bedroom of 17.78 m², and two other bedrooms of 14.96 m² and 15.51 m². The drawing labels a 1.60 m wide balcony and another balcony. These are drawing-based measurements and labels, not RERA-filed room specifications; verify them against the approved drawing.
Parking & vehicle circulation
The building approval identifies the stilt as approved for parking and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking. The supplied sanctioned-parameters extract does not state the number of parking spaces or confirm a cellar level; it also does not identify visitor, accessible, or two-wheeler spaces, ramps, EV-charging locations, or pedestrian-separated circulation. No unit-wise parking allocation or exclusive ownership arrangement is established by the supplied evidence.
Amenities, recreation & open spaces
| Facility | Tot-lot / greenery |
|---|---|
| Description / size | Tot-lot area recorded as “NA”; approval conditions require fencing and maintenance of the tot-lot as greenery, and periphery planting/green strip. |
| Declared progress / verified status | Approval condition; completion not established. |
| Facility | Landscaping and tree planting |
|---|---|
| Description / size | Listed as available in the RERA amenities record; approval also requires planting along the periphery and in front of the premises. |
| Declared progress / verified status | RERA amenity record shows 0% progress; independent completion not established. |
| Facility | Garbage house |
|---|---|
| Description / size | Required within the premises by the building approval; also listed in the approval’s amenities/utilities. |
| Declared progress / verified status | Required/listed; completion not established. |
| Facility | Transformer space |
|---|---|
| Description / size | Space for a transformer is listed in the approval. |
| Declared progress / verified status | Required/listed; installation status not established. |
| Facility | Rainwater harvesting |
|---|---|
| Description / size | Approval specifies 11 rainwater-harvesting structures and a percolation pit. |
| Declared progress / verified status | Approved requirement; completion not established. |
The RERA amenities record also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, electrical meter/sub-station/receiving-station provision, recreational open space, and landscaping/tree planting. It gives 0% progress for the listed items; this record does not establish independent completion.
Utilities, building services & safety
- The RERA amenities record marks water supply, sewerage and rainwater harvesting as available, and marks an electrical meter room/sub-station/receiving station as available. The record gives 0% progress for these items and does not specify water source, storage or treatment capacity, sewerage treatment capacity, reuse, drainage design, electrical load, backup power or installed equipment.
- The building approval requires a rainwater-harvesting percolation pit, transformer space and a garbage house. It also states that sanitation, plumbing, fire-safety requirements, lifts and electrical installations are to be executed under qualified technical supervision; structural and fire-safety installations are assigned to the project’s responsible parties in the approval conditions. The evidence does not establish installed lift numbers or capacities, fire-system details, clearances, accessibility features, CCTV, access-control systems, or completed safety works.
- The approval additionally requires parking areas to provide EV-charging infrastructure under the cited requirements. This is an approval condition, not evidence that charging equipment has been installed. It requires an occupancy certificate before occupation and states that public water and electricity connections will be provided only on production of an occupancy certificate.
Location, access & connectivity
- The project’s registered locality is Balajinagar, Kodad Mandal, Suryapet District, Telangana, PIN 508206; the project record also uses KODAD. The title and land records identify the revenue village as Kodad.
- The land schedule records 12-foot roads on the north and west boundaries; the east and south boundaries adjoin identified plots. The supplied location data gives an approximate distance of 146.6 km to the nearest sampled Outer Ring Road interchange. No other measured distance, public-transport information, landmark, or project-specific approach-road description is supplied.
Developer & development status
- The registered promoter is Raviraj Constructions, identified in the project record as a proprietorship. The project record names Pittala Jhansi as authorized signatory. The supplied promoter address is B, Yogananda Nagar, MS Manikanta Nagar, Balaji Nagar New Plotting Area Ward 16, Kodad, Suryapet, 508206; the RERA certificate separately records the promoter office as Huzurnagar-1, Huzurnagar Mandal, Suryapet, PIN 508204.
- The RERA header describes the project as “New Project,” but the supplied evidence does not provide a dated construction-progress report or independently verified site status. The Form-B declaration undertakes completion by 30/09/2026; the project header states 30/01/2027 as proposed completion, and the building approval states a construction completion date before 01 October 2026. No OC is supplied, and no extension appears in the registration certificate.
Approvals, official records & documents
| Identifier / date | P01900007293, issued 24/11/2023; valid through 30/09/2026 |
|---|---|
| What the supplied record establishes | Registration of LAKSHMI NILAYAS to Raviraj Constructions; certificate records no extension. |
| Identifier / date | 0017/BP/3046/2023, 01 October 2023; file no. 010520/BP/DTCP/3046/0029/2023 |
|---|---|
| What the supplied record establishes | Municipal approval for Building A, 1 stilt + 5 upper floors, with conditions. |
| Identifier / date | 0010/FTL/3046/2023, dated 06/07/2023 |
|---|---|
| What the supplied record establishes | Listed among the building-approval document’s other numbers. |
| Identifier / date | Verified in 2023; date text is unclear |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, project funds, approvals and completion undertaking. |
| Identifier / date | Document 361691 |
|---|---|
| What the supplied record establishes | The supplied drawing-derived measurements cover two drawings; software measurement identifies four 3BHK designs and one 5BHK design. The 5BHK design is not listed in the RERA filing; it is not part of the RERA-filed unit-count table above. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The building approval requires an OC before occupation; the supplied evidence does not establish that one has been issued. |
The building approval records a mortgage-related municipal condition and requires that the mortgaged built-up area be registered only after an occupancy certificate is produced. This overview reports the approval’s scope and does not determine title or the operation of that condition.
Frequently asked questions
Is LAKSHMI NILAYAS registered with Telangana RERA?
Yes. LAKSHMI NILAYAS is registered with the Telangana Real Estate Regulatory Authority as P01900007293; the registration status is New Project.
Who is the developer of LAKSHMI NILAYAS?
The promoter named in the RERA registration is RAVIRAJ CONSTRUCTIONS.
Where is LAKSHMI NILAYAS located?
LAKSHMI NILAYAS is in KODAD, Balajinagar, Suryapet, Telangana (508206).
When will LAKSHMI NILAYAS be completed?
The promoter's proposed date of completion filed with RERA is 30/01/2027. This is the promoter's declaration, not a guarantee.