LEGALAs DOYEN ASCENT - CONDOR B BLOCK is a residential apartment project in Serilingampally, Serilingampally Mandal, Ranga Reddy district, developed by the registered promoter DOYEN CONSTRUCTIONS PRIVATE LIMITED. The project covers 748.83 sq. m and comprises one building with 1 stilt + 5 upper floors and 10 3BHK apartments. It is registered under TG-RERA P02400008708, with a proposed completion date of 29 September 2027.

More from Doyen Constructions Pvt Ltd · 14 projects →

01What we found

RegisteredTG-RERA - valid till 29 May 2027
14documents on file - each fact links to its page
2court cases on this project's land (survey 79, 80, 81, 82, Serilingampally)
13items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

13 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldTG-RERA / project record
Registered project nameLEGALAs DOYEN ASCENT - CONDOR B BLOCK
Project typeResidential apartment project
Phase / registered portionCONDOR B BLOCK; the registration is for this named block.
TG-RERA registrationP02400008708
Registration validity28 August 2024 to 29 May 2027, unless extended by the Authority. This is the registration period, not the building-permit validity or the promised completion date.
Registered promoterDOYEN CONSTRUCTIONS PRIVATE LIMITED
RERA status in the recordNew Project; registered.
Completion undertakingThe promoter’s Form B states completion by 29 May 2027. The project header separately records a proposed completion date of 29 September 2027. These are dates recorded in different project fields; this Overview does not reconcile them.
Occupancy / completion certificateNot recorded as issued in the supplied material. The building permit requires an occupancy certificate before occupation.

RERA record RERA filing Approvals record

Land and geographic identity

FieldRegistered / filed identity
LocalitySerilingampally
Revenue villageSerilingampally; the permit describes “Serilingampally Village part.”
MandalSerilingampally
DistrictRanga Reddy
PIN500019
Project survey numbers79, 80, 81 and 82(P)
Plot identifiers recorded in the land detailsA32, A31, A63 and A64
Registered site extent748.83 sq. m
Total / net area in project land details748.83 sq. m total; 748.83 sq. m net.
Boundaries recorded in project land detailsEast and west: 40 feet wide roads; north: Survey No. 64 of Serilingampally Village; south: Survey No. 83 of Serilingampally Village.

RERA record RERA filing Land records

Development identity

FieldApproved / recorded detail
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Building permit1349/GHMC/SLP/2024-BP, dated 29 May 2024; file no. 002383/GHMC/1145/SLP2/2024-BP.
Approved built-up area1,887.55 sq. m, stated as excluding parking. The building-plan extraction separately records 2,265.05 sq. m including parking.
Building arrangementOne building / one block in the project record.
Sanctioned configuration1 stilt + 5 upper floors; the permit extraction records a building height of 14.95 m.
ParkingThe permit records 377.5 sq. m total parking area and 363.53 sq. m stack area; no total parking-space count is supplied.
Unit count10 units in the building-plan extraction; the project unit record also lists 10.
Permit scopePermit covers the 748.83 sq. m site and the survey numbers listed above. The permit says it does not confer ownership rights.

Approvals record RERA filing RERA unit table

Offering and status

FieldRecord
Configuration3BHK apartments
TG-RERA-listed units10
Booked / available0 booked and 10 available, as last read from the TG-RERA portal; the record does not provide an as-of date, so counts are indicative.
RERA-filed saleable area209.03 sq. m per unit.
Construction stageTG-RERA amenity/infrastructure progress entries are reported in the supplied record; no independently verified site inspection or consolidated construction-stage certification is provided here.
Original / revised completion dateThe supplied material includes the promoter’s Form B completion undertaking of 29 May 2027 and a project-header proposed completion date of 29 September 2027. No extension order is supplied.
Occupancy certificateNot recorded as issued; the permit requires an OC before occupation.

RERA unit table RERA unit details RERA amenities RERA record

The project story

This is the registered Condor B Block portion of a residential apartment development in Serilingampally, Ranga Reddy district. The filed project site is 748.83 sq. m and is identified as Survey Nos. 79, 80, 81 and 82(P), with plot identifiers A32, A31, A63 and A64. The site is recorded as bounded on its east and west by 40 feet wide roads, with Survey Nos. 64 and 83 to the north and south respectively. RERA record RERA filing Land records

GHMC’s building-permit record describes one residential building with a stilt and five upper floors, and the project filing lists ten 3BHK apartments. The permit records 1,887.55 sq. m of proposed built-up area excluding parking. The TG-RERA unit record lists all ten homes as available, but the portal count has no supplied as-of date. RERA unit table

The supplied material establishes that a building permit was issued; it does not establish current physical completion, an independently inspected construction percentage, or an issued occupancy certificate. The permit requires an occupancy certificate before occupation. The promoter’s Form B contains a completion undertaking, while the project header records a separate proposed completion date; neither is evidence of completed construction. RERA record

Master plan, architecture & building design

Design / site itemEvidence in the supplied record
Site area748.83 sq. m plot area and 748.83 sq. m net plot area in the building-permit extraction. The project land details likewise record 748.83 sq. m total and net area.
Building count / useOne building, residential apartment use.
Floors and height1 stilt + 5 upper floors; permit extraction records a building height of 14.95 m.
Approved built-up area1,887.55 sq. m excluding parking; 2,265.05 sq. m including parking in the building-plan details. These are reported separately as recorded.
Parking area377.5 sq. m total parking area and 363.53 sq. m stack area are recorded in the permit extraction.
Open / vacant areaBuilding-plan details record 371.32 sq. m vacant plot area.
Site circulation / setbacksThe building-plan extraction records a 2.50 m wide passage. The permit extraction lists front, rear and side setbacks; the side II value is truncated in the supplied extraction.
Plot / unit organizationThe building-plan extraction records ten units. Floor-plan measurement data covers four measured 3BHK designs; it does not establish a different unit count.

RERA filing RERA unit table Floor plans

The supplied building-plan material does not provide a complete verified description of building footprint, floor-by-floor unit distribution, lifts or stairs, entrances and exits, internal road layout, or a phase-by-phase construction plan. It records a Tot Lot and other site provisions, but does not establish their current completion.

Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010209.03 sq. mSoftware-measured median 150.4 sq. m; range 149.8–150.7 sq. m28%

The 209.03 sq. m figure is the TG-RERA-filed saleable area. The carpet measurements are software-measured from the supplied building-plan drawings, not RERA disclosures; they are based on four measured designs and are noted as requiring review. The figures are different area measures and should not be treated as interchangeable. The project record does not supply a separate RERA-filed balcony or utility area. RERA unit table RERA unit details Floor plans

One measured typical-plan flat labels a children’s bedroom, guest room, master bedroom, living/dining area, kitchen, wash area, toilets, dress room, balcony and utility. Its drawing measurement records a 2.13 m wide balcony and a 4.03 sq. m utility area; the balcony and utility are excluded from the software-measured carpet area. These are drawing-based measurements, not independently verified dimensions of a specific offered unit. RERA unit details

Parking & vehicle circulation

GHMC’s permit extraction records 377.5 sq. m total parking area and 363.53 sq. m stack area. The building-plan record states that the stilt and any cellar approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied material does not provide a confirmed count of car or two-wheeler spaces, visitor or accessible parking, a parking-allocation schedule, or details of parking access ramps and internal vehicle circulation. A parking area shown or recorded in the plan does not by itself establish exclusive parking rights for a particular apartment.

Amenities, recreation & open spaces

The amenity record includes progress percentages for selected site works. These are recorded progress figures, not independent verification of completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSite infrastructure; size not suppliedTG-RERA amenity record80% recorded; not independently verified
Water supplySite utility; source and capacity not suppliedTG-RERA amenity record30% recorded; not independently verified
Sewerage (chambers, lines, septic tank, STP)Listed collectively; individual system details not suppliedTG-RERA amenity record70% recorded; not independently verified
Green strip / Tot Lot / parkPermit identifies a Tot Lot; no size suppliedTG-RERA amenity record and GHMC permit50% recorded; not independently verified
Street lightingSite infrastructure; quantity not suppliedTG-RERA amenity record80% recorded; not independently verified
Storm-water drainsSite infrastructure; system details not suppliedTG-RERA amenity record0% recorded
Rainwater harvestingPermit requires a rainwater-harvesting structure/percolation pit; amenity record lists water conservation and rainwater harvestingGHMC permit and TG-RERA amenity recordAmenity record shows 0%; permit does not establish completion
Community buildingsNo facility details suppliedTG-RERA amenity record0% recorded
Sewage/sullage treatment and disposalNo treatment or disposal detail supplied in this entryTG-RERA amenity record0% recorded
Solid-waste management and disposalNo system detail supplied in this entryTG-RERA amenity record0% recorded
Electrical meter room / sub-station / receiving stationSite provision listed; capacity not suppliedTG-RERA amenity record0% recorded
Recreational open spaceAggregate area not suppliedTG-RERA amenity record0% recorded

RERA amenities

The building-plan extraction also identifies a garbage house, fire sump, transformer space and Tot Lot. These are plan or permit provisions; the supplied record does not independently confirm they have been built or commissioned.

Utilities, building services & safety

The permit material identifies a rainwater-harvesting percolation pit, transformer space, garbage house and fire sump. It requires an occupancy Fire NOC from the Director (EV&DM) before an occupancy certificate and states that fire-safety requirements are the responsibility of the owner, builder/developer and specified technical professionals. The document lists these as requirements or provisions, not completed or commissioned systems.

The TG-RERA amenity record shows water supply at 30%, sewerage at 70%, storm-water drains at 0%, rainwater harvesting at 0%, and fire protection/fire-safety requirements at 0%. The supplied data does not establish water sources or storage capacity, an operational STP or treated-water reuse, electrical supply or backup capacity, lift count or capacity, fire-system specifications, waste-segregation arrangements, CCTV/security systems, or accessible circulation. RERA amenities

Location, access & connectivity

The official project location is Serilingampally, Serilingampally Mandal, Ranga Reddy district, PIN 500019; the permit describes the site as in Serilingampally Village part. The supplied land record gives road boundaries on the east and west, each recorded as a 40 feet wide road. The GHMC permit extraction separately records an 18 m road width. RERA record RERA filing

The location data provides a cadastral parcel-centroid coordinate of 17.47767, 78.32550 and identifies the nearest sampled Outer Ring Road interchange at approximately 6.6 km. No additional verified public-transport, landmark, or measured-route distances are supplied here. Location record

Developer & development status

The registered legal promoter is DOYEN CONSTRUCTIONS PRIVATE LIMITED, a private limited company. The supplied corporate identifier is GSTIN 36AABCD2644M1ZK; the PAN is masked in the project data as xxxxxx644M. The listed promoter office address is DOYEN GALAXY, 8-3-993, 6th Floor, Srinagar Colony, Serilingampally, Serilingampally, Ranga Reddy, Telangana, PIN 500019. Corporate record Parties record RERA filing RERA filing

The project record names Prem Kumar Polavarapu as authorized signatory and Anish Polavarapu as director. The Form B affidavit is made by Prem Kumar Polavarapu as authorized signatory and declares a completion undertaking of 29 May 2027. No independent site verification of construction progress is provided. Parties record

Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400008708; valid 28 August 2024–29 May 2027
What it establishes in this OverviewRegistration of LEGALAs DOYEN ASCENT - CONDOR B BLOCK and the named promoter; the certificate is not a unit-specific sale agreement.
GHMC building permit order
Identifier / date1349/GHMC/SLP/2024-BP, 29 May 2024; file no. 002383/GHMC/1145/SLP2/2024-BP
What it establishes in this OverviewBuilding permit for a residential building on the recorded project site, with stated conditions. The permit says it does not confer ownership rights.
Building-plan document
Identifier / dateTG-RERA document 472360
What it establishes in this OverviewBuilding-plan details for the proposed apartment building, including the site, floor configuration, units and stated conditions. The supplied OCR does not show a populated approval number or approval date in this document.
Form B declaration
Identifier / dateTG-RERA document 472638
What it establishes in this OverviewPromoter declaration, including its completion undertaking and statements about land, project funds, audits and approvals.
Occupancy / completion certificate
Identifier / dateNot supplied as issued
What it establishes in this OverviewNo issued OC or completion certificate is established by the supplied records. The permit requires an OC before occupation.
Layout approval lookup
Identifier / dateNot established in the supplied extract
What it establishes in this OverviewThe supplied material does not provide an independently verified public layout-portal result for this project.

HMDA

Frequently asked questions

Is LEGALAs DOYEN ASCENT - CONDOR B BLOCK registered with Telangana RERA?

Yes. LEGALAs DOYEN ASCENT - CONDOR B BLOCK is registered with the Telangana Real Estate Regulatory Authority as P02400008708; the registration status is New Project.

Who is the developer of LEGALAs DOYEN ASCENT - CONDOR B BLOCK?

The promoter named in the RERA registration is DOYEN CONSTRUCTIONS PRIVATE LIMITED.

Where is LEGALAs DOYEN ASCENT - CONDOR B BLOCK located?

LEGALAs DOYEN ASCENT - CONDOR B BLOCK is in Serilingampally, Rangareddy, Telangana (500019).

When will LEGALAs DOYEN ASCENT - CONDOR B BLOCK be completed?

The promoter's proposed date of completion filed with RERA is 29/09/2027. This is the promoter's declaration, not a guarantee.