MACHARLA RESIDENCY is a residential apartment project in 34th ward & 35th ward, Karimnagar urban, Karimnagar. The registered promoter developing it is MACHARLA VENU. The project occupies 737.06 m² and comprises one Stilt + 5 residential building with 20 apartments: 10 2BHK and 10 3BHK. It is registered under TG-RERA number P02700002465, and the registration certificate states validity to 04/10/2024, unless extended by the Authority.

01What we found

Period endedTG-RERA registration ran to 4 Oct 2024 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameMACHARLA RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied records; the registration is for the project.
TG-RERA registrationP02700002465, granted under section 5; issued 11 January 2021.
Registration validityCertificate states valid from 11/01/2021 to 04/10/2024, unless extended by the Authority. The supplied certificate records no extension. Registration validity is distinct from the project’s completion deadline.
Registered promoterMACHARLA VENU (also rendered “Macharla Venu” on the certificate); proprietorship. RERA record RERA filing Corporate record
RERA status in supplied recordRegistration certificate supplied; validity end date has passed, and no extension is recorded in the supplied certificate. Current portal status is not established by the supplied record.

Land and geographic identity

ItemProject record
Locality / registered locationMAIN ROAD; certificate location: 34th ward & 35th ward, Karimnagar urban. The building-permit record identifies Sapthagiri Colony (Part)_W35. RERA record RERA filing
Revenue village34th ward & 35th ward (as recorded; a distinct revenue-village name is not disclosed). RERA record
Mandal / district / PINKarimnagar urban / Karimnagar / 505001. RERA record
Project survey number(s)Survey No. 1013. No subdivision is identified in the supplied project records. RERA filing Land records
Layout / subdivision identifierlrs139/35/2008/knr. Approvals record
Site areaTotal 737.06 m²; road-affected area 38 m²; net area 699.06 m² in the building-permit record.
RERA-filed site detailsTotal area 737.06 m², affected area 38 m², net area 699.06 m². RERA filing
BoundariesEast: HOUSE OF OTHERS; West: 50 FEET ROAD; North: HOUSE OF OTHERS; South: HOUSE OF OTHERS. RERA filing

Development identity

ItemProject record
Sanctioning authorityKarimnagar Municipal Corporation. Approvals record
Principal approvalBuilding Permit Order 3011/W35/2018/3749, dated 04 October, 2018. Approvals record
Approved built-up area2,107.05 m² upper-floor residential area; ground residential area is recorded as 0.00 m². The approved-plan record separately lists 453.63 m² stilt parking area.
Building count and configurationOne residential building; sanctioned configuration Stilt + 5. The plan extraction records height 14.95 m. RERA filing
Parking levelsStilt is identified for parking. No basement or podium parking is identified in the supplied approval extract.
Unit countRERA filing records 20 total units: 10 2BHK and 10 3BHK. The building-permit extraction separately records 6 upper-floor units; the supplied materials do not explain the scope of that permit count. RERA unit table

Offering and status

ItemProject record
RERA-filed configurations2BHK: 10 units; 3BHK: 10 units. RERA unit table RERA unit details
RERA-filed saleable areas2BHK: 38.12 m²; 3BHK: 56.72 m². RERA unit table RERA unit details
Booked / availablePortal-derived figures show 0 booked / 20 available (2BHK: 0 / 10; 3BHK: 0 / 10). The portal record has no as-of date, so these counts are indicative rather than current verified inventory. RERA unit table RERA unit details
Completion deadlineRegistration certificate validity ends 04/10/2024. The Form-B declaration records a 24-month completion undertaking, but does not establish a revised deadline in the supplied extraction.
Construction stageNo independently verified site progress or completion status is supplied. Document index
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project records. The building-permit order states that an occupancy certificate is required before occupation. Document index

2. The project story

MACHARLA RESIDENCY is registered as a residential apartment project on Survey No. 1013, in the recorded location of 34th ward & 35th ward, Karimnagar urban, Karimnagar. The building permit describes one Stilt + 5 residential building at Sapthagiri Colony (Part)_W35. The project’s RERA filing lists 20 apartments, split between 2BHK and 3BHK configurations. RERA record RERA filing RERA unit table

The records describe an approved development, not verified construction progress: no site-progress evidence, completion certificate or occupancy certificate is supplied. The RERA portal’s unit counts indicate all 20 apartments available and none booked, but the record has no as-of date. These are portal-recorded figures, not a current inventory confirmation. RERA unit table Document index

3. Master plan, architecture & building design

The building-permit extraction identifies one residential building with a Stilt + 5 configuration and a recorded height of 14.95 m. It lists upper-floor residential area of 2,107.05 m², ground residential area of 0.00 m², and stilt parking area of 453.63 m². The site is recorded as 737.06 m² total, including 38 m² road-affected area, with 699.06 m² net area. These are approval-record figures; the supplied material does not identify a separate FSI-counted area or carpet-area total.

The permit extraction records setbacks of 2.5 m at the front, rear and both sides, and refers to an 18M road. The supplied drawing-derived data does not establish building footprint, number of flats per floor, lifts, stairs, entrances, internal circulation or detailed open-space arrangement. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1001038.12 m²Not availableNot supplied
3BHK1001056.72 m²Not availableNot supplied

The unit counts, booking figures and saleable areas are from the TG-RERA filing; the booking record has no as-of date. RERA unit table RERA unit details

Two approved floor-plan drawings were processed, but no flat designs were measured for either configuration. Accordingly, no software-measured carpet area or room dimensions are available to report. Saleable area is the RERA-filed figure; it should not be treated as a measured carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

The building permit identifies 453.63 m² of stilt parking area and states that the approved stilt parking should be used exclusively for vehicle parking without partition walls or rolling shutters. It does not provide a car-space or two-wheeler-space count, visitor or accessible-space allocation, parking allotment details, or a documented unit-by-unit allocation. A distinct basement or podium parking level is not identified in the supplied approval extract.

The RERA filing marks the listed 2BHK and 3BHK units as mortgaged in the unit-level rows; this does not establish parking allocation or exclusive parking rights. RERA unit table

6. Amenities, recreation & open spaces

The RERA amenity record lists the following project facilities and infrastructure. Its progress figures are recorded as 0 where supplied; “available: YES” is a filing entry, not independent verification of delivery. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green strip / tot lot / parkSize not statedRERA amenity record; building-permit conditions RERA amenitiesRERA record says available: YES; progress 0. No independent completion verification supplied.
Community buildingsNo size or details statedRERA amenity record RERA amenitiesProgress 0; no independent completion verification supplied.
Aggregate recreational open spaceArea not statedRERA amenity record RERA amenitiesProgress 0; no independent completion verification supplied.

No RERA-filed clubhouse, indoor recreation or sports facility details are established by the supplied amenity record. RERA amenities

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, rainwater harvesting and the electrical meter room/sub-station/receiving station as “YES”; it records progress as 0 for the listed infrastructure items. It does not give water sources, treatment or sewerage capacity, or the design and operating status of these services. RERA amenities

The building permit calls for a 25,000 L underground static water storage tank and a separate 25,000 L terrace tank for residential buildings. It also calls for a rainwater-harvesting structure, transformer space, a garbage house within the premises, and tree planting around the site. The permit extraction lists 7 rainwater-harvesting pits (RWHPs). These are approval conditions or recorded provisions, not proof of completed installation.

Fire protection and fire-safety requirements appear in the RERA amenity list with progress 0; no system specifications or independent clearance are supplied. The supplied records do not establish lifts, backup power, CCTV, access control, waste segregation, accessible circulation, or completed safety systems. RERA amenities Document index

8. Location, access & connectivity

The registered location is 34th ward & 35th ward, Karimnagar urban, Karimnagar, Telangana, PIN 505001; the RERA header also records locality as MAIN ROAD. The building-permit extraction describes the site as Sapthagiri Colony (Part)_W35. The RERA-filed west boundary is a 50 FEET ROAD. RERA record RERA filing

The supplied location data provides an approximate sampled Outer Ring Road interchange distance of 112.9 km. The dataset geocode is labelled “Urban Health centre,Karimnagar, SH11, Karimnagar, Karimnagar mandal, Karimnagar, Telangana, 505001, India”; it is a location reference, not a verified project entrance or measured route. No project-specific public-transport or landmark distances are established by the RERA record. Location record

9. Developer & development status

The registered promoter is MACHARLA VENU, identified in the RERA filing as a proprietorship. The promoter address recorded in the filing is SHESHADRI RESIDENCY, SAPTHAGIRI COLONY, SAPTHAGIRI COLONY, MAIN ROAD, Karimnagar urban, Karimnagar, 505001. No official phone number, email address or website is supplied. Parties record RERA filing

The Form-B declaration dated 10 January 2019 records a 24-month completion undertaking and statements concerning project title, accounts, approvals and allottee treatment. These are promoter declarations, not independent verification of title, funding or completion. The supplied registration certificate gives validity through 04/10/2024 and records no extension. No construction-progress verification or occupancy/completion certificate is supplied. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02700002465, issued 11/01/2021
Scope and evidenceForm C records registration of MACHARLA RESIDENCY for Survey No. 1013 and validity to 04/10/2024, unless extended.
Building Permit Order
Identifier / date3011/W35/2018/3749, 04 October, 2018
Scope and evidenceKarimnagar Municipal Corporation; sanctions a Stilt + 5 residential building and sets out site and building conditions.
RERA Form-B declaration
Identifier / date10 January 2019
Scope and evidencePromoter declaration concerning title, encumbrances, project funds, approvals and a 24-month completion undertaking.
Title-report documents
Identifier / dateDocument IDs 25920, 66704, 66705
Scope and evidenceTitle scrutiny report and copies/extracts of the claimed 2008 gift settlement deed.
Encumbrance documents
Identifier / dateDocument IDs 25742, 66675
Scope and evidenceEncumbrance statements are included in the project file.
Occupancy / completion certificate
Identifier / dateNot supplied
Scope and evidenceThe building-permit order requires an occupancy certificate before occupation; no certificate is included in the supplied documents. Document index
Building-plan drawing record
Identifier / dateDocument ID 25743
Scope and evidenceListed as a building-floor-plan/layout-plan document, but the supplied record does not provide an extracted plan description.

Frequently asked questions

Is MACHARLA RESIDENCY registered with Telangana RERA?

Yes. MACHARLA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02700002465; the registration status is New Project.

Who is the developer of MACHARLA RESIDENCY?

The promoter named in the RERA registration is MACHARLA VENU.

Where is MACHARLA RESIDENCY located?

MACHARLA RESIDENCY is in MAIN ROAD, 34th ward & 35th ward, Karimnagar urban, Karimnagar, Telangana (505001).

When will MACHARLA RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 04/10/2024. This is the promoter's declaration, not a guarantee.