Madinaguda
R S CONSTRUCTIONS · Rangareddy · RERA P02400000640
MADINAGUDA is a commercial project in RANGAREDDY, Ranga Reddy district; the mandal is not disclosed in the RERA land fields. The registered promoter is R S CONSTRUCTIONS. The project has a total area of 3299.38 sqmts, with 1 proposed building unit and 11 commercial shop units. It is registered under TG-RERA number P02400000640, with a proposed completion date of 31/12/2020.
More from R S Constructions · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | MADINAGUDA RERA record RERA filing |
| Project type | Commercial RERA filing RERA record |
| Phase / registered portion | Phase not identified; the RERA record describes one proposed building unit. RERA filing |
| TG-RERA registration | P02400000640 Approvals record |
| Registration validity | 22/04/2019 to 31/12/2020; the supplied certificate states a one-year validity period. Registration validity is distinct from the project’s completion date and occupancy certificate status. Approvals record |
| Registered promoter | R S CONSTRUCTIONS RERA record RERA filing |
| RERA status | Recorded as On-Going Project. RERA filing RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | The project record gives locality RANGAREDDY; the title report identifies Madinaguda Village. The RERA land fields do not disclose a village or mandal. RERA record RERA filing Land records |
| Mandal | Not disclosed in the RERA land fields. Land records |
| District | Ranga Reddy RERA record RERA filing |
| PIN | 500049 RERA record RERA filing |
| Survey number(s) / subdivision(s) | Survey No. 111; no subdivision is identified. RERA record RERA filing |
| Registered site extent | Title report describes 3944.60 SQ. YARDS under the development-rights entry. |
| RERA land areas | Total area 3299.38 sqmts; area affected in road widening/FTL of tanks/nala widening 307.58 sqmts; net area 2991.80 sqmts. RERA filing |
| Boundaries | East: DARGAH AND SY NO 111 PART; west: 60 FEET WIDE ROAD; north: HAFEEZPET VILLAGE BOUNDARY; south: 36 FEET WIDE PIPELINE ROAD. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | GHMC is listed as the authority in the RERA project information. RERA filing |
| Principal approval number / date | Not disclosed in the supplied readable project fields. The commencement-certificate upload is not legible enough to establish approval particulars. RERA filing |
| Approved built-up area | 7779.22 sqmts, recorded as approved built-up area in the project filing. RERA filing |
| Building count | RERA records 1 total building unit and 1 proposed building unit. RERA filing |
| Sanctioned floor configuration / parking levels | Not established by the readable supplied records. |
| RERA-declared commercial units | 11 shop units. RERA unit table RERA unit details |
| Sanctioned unit count | The RERA filing lists 11 shop units; a readable sanctioned plan establishing the sanctioned unit count was not supplied. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Unit type | Commercial shops; listed as SHOP NO 1, 101, 102, 2, 201, 202, 3, 301, 302, 401 and 402. RERA unit details |
| RERA-filed saleable area range | 488.67–1234.95 sqmts across the listed shop units. RERA unit table RERA unit details |
| Booked / available | 3 booked; 8 available in the TG-RERA portal data. The portal record supplied has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | An architect’s Form 1A states that construction work is completed in all aspects; this is a filed certificate, not an independent site inspection. |
| Original / revised completion date | 31/12/2020 / 31/12/2020. RERA record RERA filing |
| Occupancy certificate status | Form 1A records occupancy-certificate number t/czt/Lt7s3/2.020, with the date transcribed in the extraction as 22 Adober,2020. The certificate refers to the MADINAGUDA project; tower-specific scope is not separately stated. Approvals record |
2. The project story
MADINAGUDA is registered with TG-RERA as a commercial project under Survey No. 111 in Ranga Reddy district, with one building unit recorded and 11 shop units listed in the RERA filing. The registered site record provides a total area of 3299.38 sqmts and a net area of 2991.80 sqmts, and identifies road-widening/FTL/nala-widening affected area separately. RERA record RERA filing RERA filing RERA unit table
The RERA record gives 31/12/2020 as both the original and revised completion date. Separately, an architect’s Form 1A filed for the project certifies construction completion and records an occupancy-certificate number and date. The supplied evidence does not provide an independent site-status inspection or a more detailed breakdown of completion by floor or unit. RERA record RERA filing
The RERA portal shows 3 of the 11 shops as booked and 8 as available, but supplies no “as of” date for those counts. They should therefore be treated as indicative portal figures, not a current inventory confirmation. RERA unit table RERA unit details
3. Master plan, architecture & building design
The RERA filing records a total site area of 3299.38 sqmts, a net area of 2991.80 sqmts, and 7779.22 sqmts of approved built-up area. These are separately recorded site and built-up figures; the supplied evidence does not provide a readable approved drawing or a floor-by-floor area schedule to explain the building configuration. RERA filing RERA filing
RERA records one building unit and one proposed building unit. The readable records do not establish the sanctioned floor arrangement, building footprint, height, parking levels, circulation, number of shops per floor, or common-area layout. The uploaded commencement-certificate document is too garbled to identify its approval particulars, and no readable floor-plan or layout drawing extraction was supplied. RERA filing
The title report states that construction permission was obtained for a commercial building, but the supplied extraction does not identify a plan approval number or provide the plans themselves.
4. Homes, configurations & floor plans
This is a commercial offering, not a residential apartment configuration. The RERA filing lists the following shop units and saleable areas. Booked and available counts have no supplied portal “as of” date and are indicative. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Commercial shops | 11 | 3 | 8 | 488.67–1234.95 sqmts across the individual units | Not available; none of the five drawing sheets was measured. | Not supplied |
The individual RERA-filed shop schedule is: SHOP NO 1 — 618.26 sqmts; SHOP NO 101 — 1234.95 sqmts; SHOP NO 102 — 548.68 sqmts; SHOP NO 2 — 668.34 sqmts; SHOP NO 201 — 1045.71 sqmts; SHOP NO 202 — 762.11 sqmts; SHOP NO 3 — 488.67 sqmts; SHOP NO 301 — 1045.71 sqmts; SHOP NO 302 — 762.08 sqmts; SHOP NO 401 — 1045.71 sqmts; and SHOP NO 402 — 762.08 sqmts. These are filed saleable areas, not measured carpet areas. RERA unit details
Five drawing sheets are listed, with zero measured and five scans pending. Consequently, no software-measured carpet areas or drawing-based shop layouts are available in the supplied evidence. Floor plans
5. Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, vehicle ramps, internal driveways, pedestrian separation, EV charging, or unit-specific parking allocations. The RERA land record reports a 780 sqmts mortgage area, but this does not establish a parking arrangement. RERA filing Land records
The RERA unit schedule marks SHOP NO 2, SHOP NO 201 and SHOP NO 202 as mortgaged; this is unit-status information and does not identify parking rights or allocation. RERA unit details
6. Amenities, recreation & open spaces
The supplied project amenities record is the available evidence for facilities. Percentages are recorded as portal-reported progress; they are not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | No size supplied | RERA amenities record | 100% recorded; not independently verified |
| Community Buildings | No further description or size supplied | RERA amenities record | 0% recorded |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenities record | 0% recorded |
No clubhouse, indoor recreation, sports, or other convenience/community facility is established by the supplied RERA project amenities record. Facilities listed in third-party marketing material are not used here as RERA-filed or delivered project amenities. RERA amenities Promoter website
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, sewage/sullage treatment and disposal, water conservation/rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station as available at 100%. These are portal-recorded declarations; the supplied material does not include supporting capacity details or independent verification of installation or operation. RERA amenities
| RERA-recorded information | Water Supply: YES; 100% |
|---|---|
| Limitation | Source, storage, treatment capacity and distribution details not supplied |
| RERA-recorded information | Sewerage (chamber, lines, septic tank, STP): YES; 100%. Treatment and disposal of sewage and sullage water: YES; 100% |
|---|---|
| Limitation | No capacity, reuse schedule or system drawings supplied |
| RERA-recorded information | Storm Water Drains: 0%. Water Conservation, Rain water Harvesting: YES; 100% |
|---|---|
| Limitation | Design and capacity details not supplied |
| RERA-recorded information | Electrical Meter Room, Sub-Station, Receiving Station: YES; 100%. Energy management: YES; 100% |
|---|---|
| Limitation | Supply capacity and backup-power details not supplied |
| RERA-recorded information | Fire Protection And Fire Safety Requirements: YES; 100% |
|---|---|
| Limitation | The supplied evidence does not detail fire systems, escape stairs, access provisions or clearances |
| RERA-recorded information | Solid Waste Management And Disposal: 0% |
|---|---|
| Limitation | No further details supplied |
| RERA-recorded information | Not established in supplied project records |
|---|---|
| Limitation | Capacities, accessible circulation and security provisions not supplied |
RERA amenities
8. Location, access & connectivity
The RERA project record identifies locality RANGAREDDY, district Ranga Reddy, and PIN 500049. The title report identifies the land as being in Madinaguda Village, Survey No. 111; the RERA land fields do not disclose a mandal. The recorded boundaries include a 60 FEET WIDE ROAD to the west and a 36 FEET WIDE PIPELINE ROAD to the south. RERA record RERA filing RERA filing
A supplied cadastral-parcel centroid is 17.41528, 78.35459. The location data lists Financial District (Nanakramguda) — 1.2 km as a connectivity anchor. No travel time, route, public transport details or other measured distances are supplied. Location record
9. Developer & development status
The registered promoter is R S CONSTRUCTIONS, recorded as a Partnership. The listed partners are Anil Kumar Doulatram Raichandani, Raj Kumar Doulatram Raichandani and Kunal Raichandani; Anil Kumar Doulatram Raichandani is also listed as authorized signatory. RERA record RERA filing Parties record
The partnership documents include a Registrar of Firms acknowledgement for R S Constructions, No. 747 of 2012, and a Partnership cum Admission Deed dated 2 April 2018. These records concern the entity and do not establish land title.
The RERA record gives the proposed and revised completion date as 31/12/2020. The architect’s Form 1A states that the project’s construction is completed in all aspects and records an occupancy-certificate number and date; the supplied certificate does not give a separate floor-by-floor completion account. RERA record
10. Approvals, official records & documents
| Supplied evidence | Form C for MADINAGUDA, registration P02400000640, valid 22/04/2019 to 31/12/2020 |
|---|---|
| Scope / limitation | Certificate includes standard project conditions, including separate-account and conveyance requirements |
| Supplied evidence | GHMC is named as authority in the RERA project information RERA filing |
|---|---|
| Scope / limitation | A readable principal approval number and date are not supplied |
| Supplied evidence | RERA upload titled “Commencement Certificates for each building in each phase” |
|---|---|
| Scope / limitation | OCR is too garbled to identify issuing authority, land, approval particulars or terms |
| Supplied evidence | Form 1A for MADINAGUDA, developed by RS CONSTRUCTIONS |
|---|---|
| Scope / limitation | States construction is completed in all aspects; records occupancy-certificate number t/czt/Lt7s3/2.020 and date 22 Adober,2020 |
| Supplied evidence | Title report for Survey No. 111, Madinaguda Village |
|---|---|
| Scope / limitation | Contains the reported deed chain and development agreement; detailed title analysis belongs in Land & Title |
| Supplied evidence | Statement for Madeenaguda, Survey No. 111 and parts |
|---|---|
| Scope / limitation | Printed search period is 15‐10‐1980 to 0709‐ 2018; document numbers are stated as unconfirmed in the supplied record |
| Supplied evidence | Promoter affidavit concerning title basis, encumbrance declaration, completion undertaking and project-fund obligations |
|---|---|
| Scope / limitation | OCR does not identify the project registration number, selected title basis, completion period, date or place |
| Supplied evidence | RERA-form agreement naming M/s R.S. Constructions and reciting development rights for 32.60 Guntas in Survey No. 111, Madinaguda Village |
|---|---|
| Scope / limitation | Allottee and unit particulars are blank; it is a form, not a unit-specific executed agreement |
1. Project at a glance
Project identity
Registered project name: MADINAGUDA
Project type: Commercial
Phase / registered portion: Phase not identified; the RERA record describes one proposed building unit.
TG-RERA registration: P02400000640
Registration validity: 22/04/2019 to 31/12/2020; the supplied certificate states a one-year validity period. Registration validity is distinct from the project’s completion date and occupancy certificate status.
Registered promoter: R S CONSTRUCTIONS
RERA status: Recorded as On-Going Project.
Land and geographic identity
Locality / revenue village: The project record gives locality RANGAREDDY; the title report identifies Madinaguda Village. The RERA land fields do not disclose a village or mandal.
Mandal: Not disclosed in the RERA land fields.
District: Ranga Reddy
PIN: 500049
Survey number(s) / subdivision(s): Survey No. 111; no subdivision is identified.
Registered site extent: Title report describes 3944.60 SQ. YARDS under the development-rights entry.
RERA land areas: Total area 3299.38 sqmts; area affected in road widening/FTL of tanks/nala widening 307.58 sqmts; net area 2991.80 sqmts.
Boundaries: East: DARGAH AND SY NO 111 PART; west: 60 FEET WIDE ROAD; north: HAFEEZPET VILLAGE BOUNDARY; south: 36 FEET WIDE PIPELINE ROAD.
Development identity
Sanctioning authority: GHMC is listed as the authority in the RERA project information.
Principal approval number / date: Not disclosed in the supplied readable project fields. The commencement-certificate upload is not legible enough to establish approval particulars.
Approved built-up area: 7779.22 sqmts, recorded as approved built-up area in the project filing.
Building count: RERA records 1 total building unit and 1 proposed building unit.
Sanctioned floor configuration / parking levels: Not established by the readable supplied records.
RERA-declared commercial units: 11 shop units.
Sanctioned unit count: The RERA filing lists 11 shop units; a readable sanctioned plan establishing the sanctioned unit count was not supplied.
Offering and status
Unit type: Commercial shops; listed as SHOP NO 1, 101, 102, 2, 201, 202, 3, 301, 302, 401 and 402.
RERA-filed saleable area range: 488.67–1234.95 sqmts across the listed shop units.
Booked / available: 3 booked; 8 available in the TG-RERA portal data. The portal record supplied has no as-of date, so these counts are indicative.
Construction stage: An architect’s Form 1A states that construction work is completed in all aspects; this is a filed certificate, not an independent site inspection.
Original / revised completion date: 31/12/2020 / 31/12/2020.
Occupancy certificate status: Form 1A records occupancy-certificate number t/czt/Lt7s3/2.020, with the date transcribed in the extraction as 22 Adober,2020. The certificate refers to the MADINAGUDA project; tower-specific scope is not separately stated.
2. The project story
MADINAGUDA is registered with TG-RERA as a commercial project under Survey No. 111 in Ranga Reddy district, with one building unit recorded and 11 shop units listed in the RERA filing. The registered site record provides a total area of 3299.38 sqmts and a net area of 2991.80 sqmts, and identifies road-widening/FTL/nala-widening affected area separately.
The RERA record gives 31/12/2020 as both the original and revised completion date. Separately, an architect’s Form 1A filed for the project certifies construction completion and records an occupancy-certificate number and date. The supplied evidence does not provide an independent site-status inspection or a more detailed breakdown of completion by floor or unit.
The RERA portal shows 3 of the 11 shops as booked and 8 as available, but supplies no “as of” date for those counts. They should therefore be treated as indicative portal figures, not a current inventory confirmation.
3. Master plan, architecture & building design
The RERA filing records a total site area of 3299.38 sqmts, a net area of 2991.80 sqmts, and 7779.22 sqmts of approved built-up area. These are separately recorded site and built-up figures; the supplied evidence does not provide a readable approved drawing or a floor-by-floor area schedule to explain the building configuration.
RERA records one building unit and one proposed building unit. The readable records do not establish the sanctioned floor arrangement, building footprint, height, parking levels, circulation, number of shops per floor, or common-area layout. The uploaded commencement-certificate document is too garbled to identify its approval particulars, and no readable floor-plan or layout drawing extraction was supplied.
The title report states that construction permission was obtained for a commercial building, but the supplied extraction does not identify a plan approval number or provide the plans themselves.
4. Homes, configurations & floor plans
This is a commercial offering, not a residential apartment configuration. The RERA filing lists the following shop units and saleable areas. Booked and available counts have no supplied portal “as of” date and are indicative.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Commercial shops | 11 | 3 | 8 | 488.67–1234.95 sqmts across the individual units | Not available; none of the five drawing sheets was measured. | Not supplied |
The individual RERA-filed shop schedule is: SHOP NO 1 — 618.26 sqmts; SHOP NO 101 — 1234.95 sqmts; SHOP NO 102 — 548.68 sqmts; SHOP NO 2 — 668.34 sqmts; SHOP NO 201 — 1045.71 sqmts; SHOP NO 202 — 762.11 sqmts; SHOP NO 3 — 488.67 sqmts; SHOP NO 301 — 1045.71 sqmts; SHOP NO 302 — 762.08 sqmts; SHOP NO 401 — 1045.71 sqmts; and SHOP NO 402 — 762.08 sqmts. These are filed saleable areas, not measured carpet areas.
Five drawing sheets are listed, with zero measured and five scans pending. Consequently, no software-measured carpet areas or drawing-based shop layouts are available in the supplied evidence.
5. Parking & vehicle circulation
The supplied records do not establish a sanctioned parking count, visitor or accessible parking provision, parking levels, vehicle ramps, internal driveways, pedestrian separation, EV charging, or unit-specific parking allocations. The RERA land record reports a 780 sqmts mortgage area, but this does not establish a parking arrangement.
The RERA unit schedule marks SHOP NO 2, SHOP NO 201 and SHOP NO 202 as mortgaged; this is unit-status information and does not identify parking rights or allocation.
6. Amenities, recreation & open spaces
The supplied project amenities record is the available evidence for facilities. Percentages are recorded as portal-reported progress; they are not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green Strip/TOT LOT/Park | No size supplied | RERA amenities record | 100% recorded; not independently verified |
| Community Buildings | No further description or size supplied | RERA amenities record | 0% recorded |
| Aggregate area of recreational Open Space | Area not supplied | RERA amenities record | 0% recorded |
No clubhouse, indoor recreation, sports, or other convenience/community facility is established by the supplied RERA project amenities record. Facilities listed in third-party marketing material are not used here as RERA-filed or delivered project amenities.
7. Utilities, building services & safety
The RERA amenities record marks water supply, sewerage, sewage/sullage treatment and disposal, water conservation/rainwater harvesting, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station as available at 100%. These are portal-recorded declarations; the supplied material does not include supporting capacity details or independent verification of installation or operation.
| RERA-recorded information | Water Supply: YES; 100% |
|---|---|
| Limitation | Source, storage, treatment capacity and distribution details not supplied |
| RERA-recorded information | Sewerage (chamber, lines, septic tank, STP): YES; 100%. Treatment and disposal of sewage and sullage water: YES; 100% |
|---|---|
| Limitation | No capacity, reuse schedule or system drawings supplied |
| RERA-recorded information | Storm Water Drains: 0%. Water Conservation, Rain water Harvesting: YES; 100% |
|---|---|
| Limitation | Design and capacity details not supplied |
| RERA-recorded information | Electrical Meter Room, Sub-Station, Receiving Station: YES; 100%. Energy management: YES; 100% |
|---|---|
| Limitation | Supply capacity and backup-power details not supplied |
| RERA-recorded information | Fire Protection And Fire Safety Requirements: YES; 100% |
|---|---|
| Limitation | The supplied evidence does not detail fire systems, escape stairs, access provisions or clearances |
| RERA-recorded information | Solid Waste Management And Disposal: 0% |
|---|---|
| Limitation | No further details supplied |
| RERA-recorded information | Not established in supplied project records |
|---|---|
| Limitation | Capacities, accessible circulation and security provisions not supplied |
8. Location, access & connectivity
The RERA project record identifies locality RANGAREDDY, district Ranga Reddy, and PIN 500049. The title report identifies the land as being in Madinaguda Village, Survey No. 111; the RERA land fields do not disclose a mandal. The recorded boundaries include a 60 FEET WIDE ROAD to the west and a 36 FEET WIDE PIPELINE ROAD to the south.
A supplied cadastral-parcel centroid is 17.41528, 78.35459. The location data lists Financial District (Nanakramguda) — 1.2 km as a connectivity anchor. No travel time, route, public transport details or other measured distances are supplied.
9. Developer & development status
The registered promoter is R S CONSTRUCTIONS, recorded as a Partnership. The listed partners are Anil Kumar Doulatram Raichandani, Raj Kumar Doulatram Raichandani and Kunal Raichandani; Anil Kumar Doulatram Raichandani is also listed as authorized signatory.
The partnership documents include a Registrar of Firms acknowledgement for R S Constructions, No. 747 of 2012, and a Partnership cum Admission Deed dated 2 April 2018. These records concern the entity and do not establish land title.
The RERA record gives the proposed and revised completion date as 31/12/2020. The architect’s Form 1A states that the project’s construction is completed in all aspects and records an occupancy-certificate number and date; the supplied certificate does not give a separate floor-by-floor completion account.
10. Approvals, official records & documents
| Supplied evidence | Form C for MADINAGUDA, registration P02400000640, valid 22/04/2019 to 31/12/2020 |
|---|---|
| Scope / limitation | Certificate includes standard project conditions, including separate-account and conveyance requirements |
| Supplied evidence | GHMC is named as authority in the RERA project information |
|---|---|
| Scope / limitation | A readable principal approval number and date are not supplied |
| Supplied evidence | RERA upload titled “Commencement Certificates for each building in each phase” |
|---|---|
| Scope / limitation | OCR is too garbled to identify issuing authority, land, approval particulars or terms |
| Supplied evidence | Form 1A for MADINAGUDA, developed by RS CONSTRUCTIONS |
|---|---|
| Scope / limitation | States construction is completed in all aspects; records occupancy-certificate number t/czt/Lt7s3/2.020 and date 22 Adober,2020 |
| Supplied evidence | Title report for Survey No. 111, Madinaguda Village |
|---|---|
| Scope / limitation | Contains the reported deed chain and development agreement; detailed title analysis belongs in Land & Title |
| Supplied evidence | Statement for Madeenaguda, Survey No. 111 and parts |
|---|---|
| Scope / limitation | Printed search period is 15‐10‐1980 to 0709‐ 2018; document numbers are stated as unconfirmed in the supplied record |
| Supplied evidence | Promoter affidavit concerning title basis, encumbrance declaration, completion undertaking and project-fund obligations |
|---|---|
| Scope / limitation | OCR does not identify the project registration number, selected title basis, completion period, date or place |
| Supplied evidence | RERA-form agreement naming M/s R.S. Constructions and reciting development rights for 32.60 Guntas in Survey No. 111, Madinaguda Village |
|---|---|
| Scope / limitation | Allottee and unit particulars are blank; it is a form, not a unit-specific executed agreement |
Frequently asked questions
Is MADINAGUDA registered with Telangana RERA?
Yes. MADINAGUDA is registered with the Telangana Real Estate Regulatory Authority as P02400000640; the registration status is On-Going Project.
Who is the developer of MADINAGUDA?
The promoter named in the RERA registration is R S CONSTRUCTIONS.
Where is MADINAGUDA located?
MADINAGUDA is in RANGAREDDY, Telangana (500049).
When will MADINAGUDA be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2020. This is the promoter's declaration, not a guarantee.