Sign in

Manju Infra Avenues Rs 3

MANJU INFRA AVENUES · Rangareddy · RERA P02400008732

MANJU INFRA AVENUES RS 3 is a residential apartment project in Guttala Begumpet, Serilingampally mandal, Ranga Reddy district, developed by the registered promoter MANJU INFRA AVENUES. The project is on 418 sq. m of land and comprises one residential building with 1 stilt + 5 upper floors and 10 3BHK units. It is registered with TG-RERA under P02400008732, with proposed completion by 9 January 2027.

More from Manju Infra Avenues · 23 projects →

01What we found

RegisteredTG-RERA - valid till 9 Jan 2027
15documents on file - each fact links to its page
31court cases on this project's land (survey 33, 34, 35, 36, 37, 38 and 1 more, Guttala Begumpet)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.in

1. Project at a glance

Project identity

FieldRecord
Registered project nameMANJU INFRA AVENUES RS 3 RERA record
Project type / registered portionResidential apartment project; registered phase/portion is not separately named in the supplied record RERA record
TG-RERA registrationP02400008732 RERA record
Registration validity6 September 2024 to 9 January 2027, as stated in the certificate RERA record
Registered promoterMANJU INFRA AVENUES; entity type: partnership RERA filing Corporate record
RERA statusRegistered; the record labels the project “New Project.” A current completion certificate is also on file, described below. RERA record Approvals record

Land and geographic identity

FieldRecord
Locality / revenue villageGuttala Begumpet; village recorded as Guttala begumPet / GUTTALA BEGUMPET VILLAGE RERA record
Mandal / district / PINSerilingampally / Ranga Reddy / 500081 RERA record
Project survey numbers33, 34P, 35P, 36, 37, 38 & 39 RERA record Land records
Plot number146 RERA filing
Registered site extent418 sq. m; sanctioned net plot area also recorded as 418 sq. m
Area affected / net areaRoad-affected area 0.0 sq. m and nala-affected area 0.0 sq. m in the building-permit particulars; net plot area 418 sq. m
BoundariesEast: 30 WIDE ROAD; West: PLOT NO 177; North: PLOT NO 145; South: PLOT NO 147 RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Building permit5158/GHMC/SLP/2024-BP, dated 09 January 2024 Approvals record
Approved building configurationOne residential building: 1 Stilt + 5 upper floors; building height 14.9 m in the permit particulars
Approved built-up area1,153.15 sq. m excluding parking; 1,383.75 sq. m including parking in the plan particulars
Building count1
Parking provision in approval recordParking area 230.60 sq. m in the building-permit/plan particulars
Unit count10 units in the RERA filing and plan information RERA unit table

Offering and status

FieldRecord
RERA-filed configuration3BHK; 10 units RERA unit table
RERA-filed saleable area143.5 sq. m per unit RERA unit table
Booked / available0 booked / 10 available in the portal data; no as-of date is supplied, so these counts are indicative RERA unit table
Completion deadline9 January 2027 in the registration record and promoter Form B declaration RERA record
Occupancy certificateGHMC occupancy certificate recorded for the one residential building, dated 24 January 2026; the certificate identifies 1 stilt floor and 5 upper floors
Completion certificate particularsGHMC record gives completion date 04 December 2025 and states total built-up area of 1,207.4935 sq. m in the completion plan

Registration validity, the declared completion deadline, and the building’s occupancy-certificate status are separate records; the certificate and completion particulars above relate to the single building identified in the supplied project documents.

2. The project story

MANJU INFRA AVENUES RS 3 is recorded with TG-RERA as a residential apartment project on Plot 146 in Guttala Begumpet village, Serilingampally mandal, Ranga Reddy district. Its registered land identity lists survey numbers 33, 34P, 35P, 36, 37, 38 and 39. The GHMC building permit describes one building with stilt parking and five upper residential floors, while the project record lists ten 3BHK units. RERA record Land records RERA unit table

The project record includes a GHMC occupancy certificate for that one building, dated 24 January 2026. An architect’s Form–1A certificate also records completion of the registered project and identifies the occupancy certificate. These are document assertions on file; no independent site inspection or separate physical-progress verification is included in the supplied evidence.

3. Master plan, architecture & building design

The sanctioned plan information describes a single residential building on a 418.00 sq. m plot, with 1 stilt level and five upper floors. It records 1,153.15 sq. m as proposed built-up area excluding parking and 1,383.75 sq. m including parking. The building-permit particulars separately state residential upper-floor area of 1,153.15 sq. m and stilt area of 215.63 sq. m. These are approval-record areas, not carpet-area figures.

The plan records 187.37 sq. m of vacant plot area and a 230.60 sq. m parking area. It also shows one entry and one exit, each subject to stated minimum width and clearance, and identifies lift and staircase provisions. The supplied extracts do not establish the number of flats on each floor, lift capacity, landscaping area, or a detailed internal circulation arrangement.

The plan records a residential use and a single building; it does not provide a separate phase or tower layout. Its approval conditions include maintaining a tot-lot and peripheral greenery, and not adding units or floors without GHMC approval.

4. Homes, configurations & floor plans

The RERA filing lists ten 3BHK units, all shown as available in the supplied portal data; the portal record has no as-of date. RERA-filed saleable area is 143.5 sq. m per unit. Software measurement of the approved floor-plan drawings gives a median carpet area of 83.2 sq. m across six measured flat designs, with a measured range of 81.4–85.3 sq. m. The drawing-derived measurements are not RERA-filed areas and are identified as requiring review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010143.5 sq. mSoftware-measured median 83.2 sq. m; range 81.4–85.3 sq. m42%

The plan extract includes a fourth-floor flat drawing with three bedrooms, living/dining, kitchen, toilets, a balcony labelled 1.20 m wide, and a utility area. The listed room dimensions are drawing measurements for one flat design, not a statement that every unit has identical dimensions. RERA unit details

Carpet area refers to usable internal floor area; balcony and utility areas are identified separately in the drawing measurement. Saleable area is the RERA-filed figure and is not interchangeable with the drawing-measured carpet area. The supplied material does not give a RERA-filed carpet area or a unit-specific loading schedule. RERA unit details Floor plans RERA unit table

5. Parking & vehicle circulation

The building-permit and plan particulars record 230.60 sq. m of parking area and describe parking at the stilt level. The permit conditions say the approved stilt and cellar parking, where shown in the plan, must be used for vehicle parking and not converted to another use. The supplied plan extract does not establish a car-space or two-wheeler-space count, visitor or accessible-space allocation, or unit-by-unit parking allotments.

The approval plan identifies one entry and one exit and specifies minimum widths and height clearance for access. No project-specific EV charging installation or completed parking allocation is verified in the supplied record.

6. Amenities, recreation & open spaces

The approval and RERA amenity records identify the following. “YES” or a listed item indicates a filed or approval-record provision, not independent confirmation that it is complete or operational.

Tot-lot / green strip
Description / sizeTot-lot; no size supplied
Evidence sourceRERA amenities
Declared progress / verified statusIncluded in approval conditions; RERA amenity progress is recorded as 0%
Peripheral greenery / planting
Description / sizePeripheral greenery and avenue planting required; no area supplied
Declared progress / verified statusApproval condition; completion not independently verified
Rainwater harvesting
Description / size1 pit in the sanctioned plan
Evidence sourceRERA amenities
Declared progress / verified statusCompletion certificate extract records one pit in the completion plan; independent site verification not supplied
Community buildings / recreational open space
Description / sizeListed in the RERA amenity schedule without dimensions
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity progress recorded as 0%; no size or completion evidence supplied
Indoor, sports or clubhouse facilities
Description / sizeNo project-specific sanctioned or RERA-filed facility details supplied
Evidence sourceRERA amenities Promoter website
Declared progress / verified statusThird-party vendor claims are not treated here as confirmed project facilities

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, sewerage, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station as available. Its progress fields are recorded as 0% for the listed amenities; the evidence does not independently verify operational status or provide capacities. RERA amenities

The building-plan information identifies a distribution transformer, lift, staircase and garbage house. The building permit requires a rainwater-harvesting structure, transformer space and an on-site garbage house. The plan also records separate underground and terrace water-storage tanks, each with a stated capacity of 25,000 litres. The supplied evidence does not specify water source, treatment capacity, STP capacity, backup-power capacity, lift capacity, CCTV installation status, or accessibility features.

The approval record requires fire-related clearance, including a Fire NOC before issue of the occupancy certificate, and requires fire-safety installations under the stated building conditions. The supplied occupancy certificate is on file, but the underlying Fire NOC is not separately identified in the provided documents. This overview does not treat plan illustrations or amenity entries as independent proof of statutory compliance.

8. Location, access & connectivity

The registered site is at Plot 146, Guttala Begumpet village, Serilingampally mandal, Ranga Reddy district, PIN 500081, on survey numbers 33, 34P, 35P, 36, 37, 38 and 39. The supplied land record gives the site boundaries as a 30-wide road to the east, Plot 177 to the west, Plot 145 to the north and Plot 147 to the south. The project record identifies HITEC City at a distance of 2.3 km. RERA filing Location record

The supplied material does not provide verified public-transport details or additional measured distances to landmarks. No travel-time claim is included.

9. Developer & development status

The registered promoter is MANJU INFRA AVENUES, recorded as a partnership, with GSTIN 36AAWFM4454C1Z1. The supplied promoter record gives the address as Srikrishna Devaraya Nagar, Guttala Begumpet, Serilingampally, Ranga Reddy, 500081. It identifies PRADEEP P as authorised signatory and PRAVEEN P, SUNDARI P, MANASA P and SESHIAH P as partners. Corporate record Parties record

The promoter’s Form B declaration states a completion deadline of 09-01-2027 and undertakings concerning project funds, approvals and allottee treatment. The project file also contains the GHMC occupancy certificate and an architect’s completion certificate for the single building. These are promoter-filed and authority-issued records respectively; the supplied evidence does not include an independent site-progress assessment.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400008732; valid 06/09/2024–09/01/2027
Scope and evidenceMANJU INFRA AVENUES RS 3; Form C certificate
GHMC building permit
Identifier / date5158/GHMC/SLP/2024-BP; 09 January 2024
Scope and evidenceOne residential building, 1 Stilt + 5 upper floors; surveys 33, 34P, 35P, 36, 37, 38 and 39
Building plan
Identifier / datePlan for Plot 146; 418.00 sq. m
Scope and evidenceRecords one building, ten units, floor configuration, built-up areas, parking area and building services
GHMC occupancy certificate
Identifier / date011648/GHMC/05207/SWOC/SLP2/2025; dated 24/01/2026
Scope and evidenceCertificate extract identifies the residential building as 1 stilt floor and 5 upper floors
Architect’s completion certificate
Identifier / date011648/GHMC/05207/SWO C/SLP2/2025; 24/01/2026
Scope and evidenceForm–1A certificate for MANJU INFRA AVENUES RS 3 and registration P02400008732
Form B declaration
Identifier / dateDeadline stated as 09-01-2027
Scope and evidencePromoter declaration; OCR does not supply a declaration date or place

The supplied document set includes the building permit, plan, occupancy certificate, architect’s completion certificate, RERA certificate and Form B declaration. The overview does not assess the complete sanction-condition record or legal effect of the filed documents. Document index

Frequently asked questions

Is MANJU INFRA AVENUES RS 3 registered with Telangana RERA?

Yes. MANJU INFRA AVENUES RS 3 is registered with the Telangana Real Estate Regulatory Authority as P02400008732; the registration status is New Project.

Who is the developer of MANJU INFRA AVENUES RS 3?

The promoter named in the RERA registration is MANJU INFRA AVENUES.

Where is MANJU INFRA AVENUES RS 3 located?

MANJU INFRA AVENUES RS 3 is in GUTTALA BEGUMPET VILLAGE, Guttala begumPet, Serilingampally, Rangareddy, Telangana (500081).

When will MANJU INFRA AVENUES RS 3 be completed?

The promoter's proposed date of completion filed with RERA is 09/01/2027. This is the promoter's declaration, not a guarantee.

More projects in Guttala Begumpet