Sign in

Megha Residency

MEGHA DEVELOPERS · Rangareddy · RERA P02400007935

Megha Residency is a residential apartment project in Sagar Complex, Saroornagar mandal, Ranga Reddy district. It is being developed by registered promoter MEGHA DEVELOPERS, a partnership, on a site of 417.69 sq.m. The project comprises one residential building, A (MEGHA DEVELOPERS), with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a RERA-filed saleable area of 140.46 sq.m. Its TG-RERA registration is P02400007935, and its proposed completion date is 24/04/2026.

More from Megha Developers · 13 projects →

01What we found

Period endedTG-RERA registration ran to 24 Apr 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameMegha Residency RERA record
Project type / phaseResidential apartment project; phase or separately registered portion not disclosed. RERA record
TG-RERA registrationP02400007935 RERA record
Registration validity23 March 2024 to 24 April 2026, as stated in the registration certificate. This is the registration-validity period, not an occupancy certificate. RERA record
Registered promoterMEGHA DEVELOPERS, a partnership. RERA record RERA filing Corporate record
RERA record statusListed as “New Project”; the record gives a proposed completion date of 24/04/2026. RERA record RERA filing

Land and geographic identity

FieldProject record
Locality / site descriptionSagar Complex; the filed building-permit and occupancy-certificate records describe the site as Sreepuram Colony of Karmanghat. RERA record RERA filing
Revenue villageKARMANGHAT (V) in the filed plan and permit records.
MandalSAROORNAGAR (M) in the filed plan and Saroornagar in the permit and occupancy-certificate records.
District / PINRanga Reddy; PIN 500079. RERA record RERA filing
Survey identitySy.No. 59/1, also identified in the filed plan and occupancy-certificate record as Old Sy.No. 59 PART. RERA filing
PlotPlot No. 504. RERA filing
Site extent417.69 sq.m (the RERA land record gives 417.69 sq.m total and net area; the permit record also gives 417.69 sq.m net plot area). RERA filing
Boundaries in RERA land recordNorth: Main Road; south, east and west: Others Land. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approval1007/GHMC/LBN/2023-BP, dated 24 April 2023. The filed building-permit order identifies file no. 000920/GHMC/0449/LBN2/2023-BP. Approvals record
Approved developmentOne residential building, A (MEGHA DEVELOPERS), sanctioned as 1 Stilt + 5 upper floors.
Approved built-up areaThe filed permit lists NET RESIDENTIAL BUA: 1152.05 sq.m and TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING: 1152.05 sq.m. It separately lists TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING: 1382.45 sq.m, PARKING AREA: 230.40 sq.m, and TOTAL BUA: 1384.76 sq.m.
Building heightThe filed permit lists Height of the Building 15.00 and Total height: 20.25mt.
Unit countsGHMC plan extraction: 10 units; the RERA filing lists 10 total units in one block. RERA filing RERA unit table
Parking provisionPermit extraction lists Total Parking Area 230.4 and NET RESI. PARKING: 230.40 sq.m; the same plan extraction lists PROPOSED NUMBER OF PARKINGS: 0. A sanctioned space count cannot be established from the available extract.

Offering and status

FieldProject record
Configuration3BHK apartments. RERA unit table RERA unit table
RERA-filed saleable area140.46 sq.m per 3BHK unit. RERA unit table RERA unit table
Booking snapshot10 total; 0 booked; 10 available as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table
RERA-declared completion date24/04/2026, stated in the project record and promoter’s Form B completion undertaking. RERA record
Occupancy-certificate recordA GHMC occupancy certificate, proceedings no. 000039/GHMC/00039/SWOC/LBN2/2025, approved 08/05/2025, covers the residential building at Plot No. 504, Sy.No. 59/1. Its extracted text states completion dated 05/04/2025 and that the building is fit for occupation. Approvals record
Certificate scope and progress distinctionThe certificate identifies Building A (MEGHA DEVELOPERS), 1 Stilt + 5 upper floors. It is an official certificate for the building; the RERA portal’s project-status field remains “New Project.” The filing does not provide independently verified current construction progress. RERA filing

2. The project story

  • Megha Residency is registered with TG-RERA as a residential apartment project at Plot No. 504, in Sy.No. 59/1 (also described in the filed plan as Old Sy.No. 59 PART), Karmanghat village, Saroornagar mandal, Ranga Reddy district. The project is recorded in the Sagar Complex locality, with the filed municipal records further describing the site as Sreepuram Colony of Karmanghat. RERA record RERA filing
  • The sanctioned scheme is a single residential building with stilt parking and five upper floors, containing 10 apartments. The RERA filing identifies the offered configuration as 3BHK. RERA unit table
  • The project’s RERA registration is recorded as valid through 24 April 2026, and its Form B completion undertaking gives the same date. These are distinct from the occupancy-certificate record described above.
  • A GHMC occupancy-certificate record is present for Building A and states that the building is fit for occupation, with completion dated 05/04/2025. This is a documentary status statement; no independent site inspection or current construction-progress measurement is supplied.

3. Master plan, architecture & building design

  • The filed GHMC building-permit material describes a single residential block, A (MEGHA DEVELOPERS), on a 417.69 sq.m site, with 1 Stilt + 5 upper floors. It records a proposed coverage area of 230.41 sq.m (55.16%) and vacant plot area of 187.28 sq.m. The permit extraction lists 1152.05 sq.m as net residential and proposed built-up area excluding parking, and separately records parking and total-area figures; these labels are reproduced as filed rather than treated as interchangeable area measures.
  • The plan extraction lists a building height of 15.00 MT and total height of 20.25mt. It also records one entry and one exit, each to have a minimum width of 4.5mts. and height clearance of 5mts. A lift and staircase are listed among the building provisions. Detailed floor-by-floor unit arrangements, number of flats per floor, lift capacity, footprint drawings, common-area dimensions and circulation plans are not available in the supplied extracted records.
  • The filed plan lists the following site provisions and conditions: rain-water harvesting, transformer space, a garbage house, parking, lift and staircase; it also requires tree planting and a green strip around the site and says the tot-lot is to be fenced and maintained as greenery. These are plan-filed requirements or provisions, not confirmation of delivery.

4. Homes, configurations & floor plans

The TG-RERA filing lists 10 3BHK units, with 0 booked and 10 available in the undated portal snapshot. The saleable area is the RERA-filed figure; the carpet-area figures below are software measurements from the approved floor-plan drawing, not RERA disclosures. The drawing-measurement record notes that review is needed. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010140.46 sq.m75.2–84.2 sq.m; median 79.5 sq.m43%
  • The drawing-derived median carpet measurement is also recorded as 856 sq.ft, with a measured range of 809–906 sq.ft across four measured flat designs. These are software-measured values, not RERA-filed areas, and should be checked against the drawing. The filed saleable area includes the home’s share of common areas and is not the same measurement as carpet area; balcony areas are excluded from the supplied drawing-based carpet calculation. Floor plans RERA unit details
  • For one second-floor plan example, flat 201, the extracted room schedule gives a living/dining area of 14.49 m², bedrooms of 12.22 m², 10.8 m² and 10.21 m², kitchen of 5.89 m², and two toilets of 3.02 m² and 3.47 m². The drawing also labels balconies, including a 1.22 M. WIDE BALC and a 1.20 M. WIDE BALC; the supplied measurement record excludes balconies from carpet area. RERA unit details

5. Parking & vehicle circulation

  • The GHMC plan extraction records 230.40 sq.m as parking area and net residential parking area. It separately records PROPOSED NUMBER OF PARKINGS: 0, so a count of sanctioned vehicle spaces cannot be established from the supplied extracts. The plan describes the stilt level and lists parking as a project provision; it also states that parking areas approved in the plan are to be used exclusively for vehicle parking.
  • The plan specifies one entry and one exit, with a minimum width of 4.5mts. and height clearance of 5mts. No supplied record establishes resident-versus-visitor allocation, accessible spaces, EV charging, parking allotments to individual units, or a legally documented exclusive parking right. A drawn or stated parking provision does not by itself establish ownership or allocation.

6. Amenities, recreation & open spaces

The RERA amenity record includes project-level infrastructure and service categories. The supplied progress percentages are 0 for the listed items; the record does not establish that any item is independently verified complete. RERA amenities

Green strip / tot lot / park
Description / sizeListed as available “YES” in the RERA amenity record; the plan requires a fenced, maintained tot-lot/greenery. No size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusRERA progress recorded as 0; no independent completion verification supplied.
Community buildings
Description / sizeListed in the RERA amenity record; no facility description or size supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0; completion not established.
Aggregate recreational open space
Description / sizeListed as available “YES”; no area supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0; completion not established.
Internal roads and footpaths
Description / sizeListed in the RERA amenity record; no dimensions supplied.
Evidence sourceRERA amenities
Declared progress / verified statusProgress recorded as 0; completion not established.

The promoter’s website and third-party listing describe additional amenities, including a clubhouse, swimming pool, gym and children’s play area, but these are marketing/listing claims and are not established as sanctioned or delivered facilities by the supplied RERA amenity record. Promoter website

7. Utilities, building services & safety

  • The RERA amenity record marks water supply, sewerage, green strip/tot-lot/park, rain-water harvesting, electrical meter room/sub-station/receiving station, and aggregate recreational open space as “YES”; each corresponding progress entry supplied is 0. This records the filing status, not independently verified completion. RERA amenities
  • The GHMC plan specifies separate underground static water storage and terrace-tank capacities of 25,000 litres each for residential buildings, and lists 8 rain-water-harvesting pits. It also requires space for a transformer and a garbage house. The RERA amenity record lists storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management and fire protection/fire-safety requirements, but does not provide capacities or establish completion for those items. RERA amenities
  • The plan lists a lift and staircase. The supplied material does not establish lift capacity, backup-power capacity, a completed STP, water source or treatment capacity, CCTV coverage, accessibility features, or a completed fire-safety installation. The building-permit record assigns structural-safety and means-of-escape safety responsibilities to the owner, builder/developer, architect and site engineer and refers to fire-fighting installations and an occupancy Fire NOC.

8. Location, access & connectivity

  • The registered project location is Sagar Complex, Ranga Reddy district, PIN 500079. The filed GHMC plan identifies the site as Sreepuram Colony of Karmanghat village, Saroornagar mandal, and the land record gives the north boundary as Main Road. The permit extraction also records a road-width reference of 18 mt. RERA record RERA filing RERA filing
  • The supplied location record identifies Financial District (Nanakramguda), 1.2 km from the project parcel centroid. No other verified transport routes, public-transit distances or travel times are supplied. Location record

9. Developer & development status

  • The TG-RERA-registered promoter is MEGHA DEVELOPERS, recorded as a partnership with GSTIN 36ABFFM2622J1ZB. The project record lists NAGAMALLESWARA RAO DUSANAPUDI and SALAM SHAIK as authorised signatories. The promoter address recorded in the project data is Navya Lake View Apartments, Arunodaya Colony, Sreepuram Colony, Sagar Complex, Ranga Reddy, 500079. Corporate record Parties record RERA filing RERA filing
  • The project record gives a proposed completion date of 24/04/2026. The promoter’s Form B declaration also undertakes completion by that date. A GHMC occupancy-certificate record is present for Building A and describes the building as fit for occupation, with completion dated 05/04/2025; the supplied material does not include an independent site-progress assessment. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400007935; valid 23/03/2024–24/04/2026
What the supplied record establishesForm C certificate for Megha Residency and MEGHA DEVELOPERS; states registration conditions, including agreements for sale, conveyance and separate-account obligations.
GHMC building permit
Identifier / date1007/GHMC/LBN/2023-BP; 24 April 2023; file no. 000920/GHMC/0449/LBN2/2023-BP
What the supplied record establishesResidential building permission for one stilt plus five upper floors on a 417.69 sq.m plot.
Filed plan / approval material
Identifier / dateApplication no. TS/007118/2023; approved date 27-01-2023
What the supplied record establishesPlan extraction identifies Plot 504, Sy.No. 59/1 (Old Sy.No. 59 PART), Karmanghat village, and building/site parameters.
GHMC occupancy certificate
Identifier / dateProceedings no. 000039/GHMC/00039/SWOC/LBN2/2025; approved 08/05/2025
What the supplied record establishesCertificate record for Building A, Plot 504, Sy.No. 59/1; states the building is fit for occupation and records completion dated 05/04/2025.
Promoter Form B declaration
Identifier / dateFiled for Megha Residency
What the supplied record establishesPromoter declaration includes a completion undertaking of 24-04-2026 and statements concerning land, project accounts and approvals.
Unit plan and measurement source
Identifier / dateGHMC plan extraction, document 404280
What the supplied record establishesSource for the extracted 3BHK plan details; software-derived carpet measurements are not RERA-filed measurements. Floor plans

Frequently asked questions

Is Megha Residency registered with Telangana RERA?

Yes. Megha Residency is registered with the Telangana Real Estate Regulatory Authority as P02400007935; the registration status is New Project.

Who is the developer of Megha Residency?

The promoter named in the RERA registration is MEGHA DEVELOPERS.

Where is Megha Residency located?

Megha Residency is in Sagar Complex, Rangareddy, Telangana (500079).

When will Megha Residency be completed?

The promoter's proposed date of completion filed with RERA is 24/04/2026. This is the promoter's declaration, not a guarantee.

More projects in Rangareddy