Narenn Primark Inspira
Primark Developers · Rangareddy · RERA P02400006151
NARENN PRIMARK INSPIRA is a residential apartment development in MADEENAGUDA, Serilingampally Mandal, Ranga Reddy District. The registered promoter is Primark Developers, recorded as a Partnership. The project has a registered site extent of 23,740.33 sq m and comprises four residential towers, A–D, with 17 upper floors, and 884 apartments: 206 2BHK units and 678 3BHK/3BK units; the permit also identifies a separate commercial clubhouse building with 9 upper floors. Its TG-RERA registration is P02400006151, and its proposed completion is 23/07/2029.
More from Primark Developers · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | NARENN PRIMARK INSPIRA RERA record |
| Project type | Residential apartment development RERA record |
| Phase / registered portion | A phase-specific designation is not disclosed in the available record. The registration identifies the project; the building permit names Towers A–D and a commercial clubhouse. RERA record |
| TG-RERA registration | P02400006151 |
| Registration status and validity | The certificate records registration under section 5, valid for five years from 24/04/2023 to 23/03/2029, unless extended. The certificate records no extension. Registration validity is distinct from the construction completion deadline. |
| Registered promoter | Primark Developers; entity type recorded as Partnership. RERA record Corporate record |
| Project stage / OC status | TG-RERA lists the project as “New Project.” The supplied records do not establish current construction completion or an occupancy certificate for any tower or the clubhouse. RERA record RERA amenities |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | MADEENAGUDA in the RERA project information and GHMC permit; the registration certificate also identifies Miyapur as locality. RERA record |
| Revenue village | Miyapur in the RERA project identity; MADEENAGUDA / Madeenaguda Revenue village in the building permit and title materials. RERA record Land records |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500049. RERA record |
| Project survey numbers and subdivisions | 206/1/AA, 206/2/E, 207A, 207/AA; the RERA header renders the final entries as “207A&207/AA.” RERA record Land records |
| Registered site extent | 23,740.33 sq m total and net area in the RERA land record and permit; the permit separately states plot area 28,935.24 sq m and road-affected area 3,324.58 sq m. Land records |
| Boundaries | North: 40 feet wide road; south: 80 feet wide road; east and west: neighbours’ land. RERA filing |
| Road / nala affected area | RERA land record: road-widening/FTL/nala-affected area 0 sq m. The GHMC permit separately records road-affected area as 3,324.58 sq m and nala-affected area as 0.0 sq m. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal approval | Revised Building Permit Order 0514/GHMC/SLP/2023-BP, approved 23 March 2023. File No. 001150/GHMC/0560/SLP1/2023-BP; application No. 1/HO/03666/2021. Approvals record |
| Approved development | Four residential towers, A–D, and a separate commercial clubhouse building. |
| Sanctioned floors | The permit’s summary describes Towers A–D as 17 upper floors with 2 cellars stated for Tower A; Form B describes the residential development as 2 Cellars + Stilt (Podium) + 17 Upper Floors across four blocks. Tower-level cellar/stilt particulars for every tower are not established by the supplied extraction. |
| Clubhouse floors | Commercial clubhouse: 9 upper floors. |
| Approved built-up area | The project information field records approved built-up area 135,801.08 sq m. The permit extraction also provides separate tower and clubhouse area entries; those are not substituted for the project-level figure here. RERA filing |
| Approved unit count | The project record states 884 total units across four buildings; the building permit condition says sanctioned unit numbers must not be increased without GHMC approval. RERA unit table |
| Parking provision | Permit records total parking area 56,348.4 sq m and requires approved cellar and stilt areas to be used exclusively for vehicle parking. A total count of parking spaces is not supplied. |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configurations | 2BHK: 206 units; 3BHK/3BK: 678 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 2BHK: 113.34 sq m; 3BHK/3BK: 151.5–167.87 sq m. RERA unit table RERA unit details |
| Portal booking / availability snapshot | 0 booked; 884 available in the supplied portal extract. It has no as-of date, so counts are indicative, not a current availability confirmation. RERA unit table |
| Completion dates | GHMC permit: construction to be completed before 23 March 2029. Form B completion undertaking: 23-03-2029. The RERA header separately gives proposed completion 23/07/2029; the RERA certificate validity ends 23/03/2029. RERA record |
| Construction stage / OC | RERA progress extract reports internal roads and footpaths at 10% and water supply at 60%; the other listed infrastructure items are at 0%. These are filed progress figures, not independent site verification. No OC is evidenced for a tower or the clubhouse. RERA amenities |
2. The project story
NARENN PRIMARK INSPIRA is registered as a residential apartment project in the Madeenaguda/Miyapur area of Serilingampally Mandal, Ranga Reddy District. The site identity in the RERA record covers survey subdivisions 206/1/AA, 206/2/E, 207A and 207/AA. The GHMC permit identifies four residential towers, A–D, and a separate commercial clubhouse building. RERA record Land records
The RERA filing describes a multi-storey residential development with 884 apartments: 206 two-bedroom units and 678 three-bedroom units. The permit identifies two cellars and 17 upper floors in its tower summary, while the Form B declaration describes the overall residential arrangement as 2 cellars, stilt/podium and 17 upper floors. The permit also includes a nine-upper-floor commercial clubhouse. RERA unit table
The available progress record gives filed percentages for selected project infrastructure, not an independently inspected construction percentage for the towers. It does not establish which towers, if any, are complete or occupied, and no tower- or phase-specific occupancy certificate is included in the supplied evidence. RERA amenities Document index
3. Master plan, architecture & building design
The RERA land record states a site extent of 23,740.33 sq m. The GHMC permit lists plot area 28,935.24 sq m, road-affected area 3,324.58 sq m, nala-affected area 0.0 sq m, and net plot area 23,740.33 sq m. The RERA project information records approved built-up area of 135,801.08 sq m. These are distinct recorded measures and should not be treated as interchangeable. Land records RERA filing
The permit names residential Towers A, B, C and D and a commercial clubhouse. Its extracted tower figures are: Tower A, 32,878.64 sq m; Tower B, 32,872.53 sq m; Tower C, 32,874.60 sq m; Tower D, 32,878.64 sq m; and commercial clubhouse, 4,296.67 sq m. The permit describes 17 upper floors for each residential tower and nine upper floors for the clubhouse. It records Tower A with two cellars; Form B describes the residential buildings collectively as 2 cellars, stilt/podium and 17 upper floors.
The permit records a total parking area of 56,348.4 sq m and a tot-lot of 2,443.38 (unit not stated in the supplied extraction). It also lists six rainwater-harvesting pits. The supplied materials do not provide a complete drawing-derived account of floor-by-floor apartment arrangements, lifts, stairs, tower entries, internal circulation, landscaped open-space distribution or residential/common-area breakdown.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are shown below. A separate software measurement from the submitted plan records is available for 2BHK drawings; it is not a RERA-filed carpet-area disclosure. The drawing extraction also measures one 1BHK design, but 1BHK is not listed in the RERA unit schedule. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 206 | 0 | 206 | 113.34 sq m | Software-measured: 65.0–103.6 sq m; median 90.1 sq m across 64 measured designs | 20% supplied with drawing measurement |
| 3BHK / 3BK | 678 | 0 | 678 | 151.5–167.87 sq m | Not supplied | Not supplied |
The 2BHK drawing sample includes living/drawing, dining, two bedrooms, kitchen, toilets, balcony and utility. The plan extraction identifies a 2.00 m wide balcony in the described sample; balcony and utility areas are excluded from the software-measured carpet calculation. The software notes that its drawing-based measurements need review. Carpet area, balcony/utility space and saleable area are different measures; saleable area includes the home’s share of common areas, while the measured carpet figure is derived from drawing geometry. RERA unit details Floor plans
A single 1BHK drawing design is software-measured at 50.7 sq m (median and range), but the RERA filing does not list a 1BHK configuration or unit count. The portal’s booked/available figures have no supplied as-of date and should be confirmed before relying on them. RERA unit details Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC permit records 56,348.4 sq m of total parking area and states that cellar and stilt parking shown in the plan must be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit also requires safety measures during cellar excavation.
A parking-space count, resident or visitor allocation, accessible-space provision, mechanical-parking details, EV charging provision in the sanctioned project record, ramp arrangement and unit-specific parking allocation are not established by the supplied evidence. The permit’s parking-area figure does not by itself establish an exclusive parking right for an apartment buyer. Document index
6. Amenities, recreation & open spaces
The RERA progress record labels the following items “YES” and gives filed completion percentages. These are declared progress figures; the evidence does not independently verify delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Project internal circulation | RERA progress record | 10% filed; not independently verified |
| Water supply | Site water-supply infrastructure | RERA progress record | 60% filed; not independently verified |
| Sewerage, lines/chambers and STP | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Storm-water drains | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Green strip / tot-lot / park | Permit records a tot-lot of 2,443.38; unit is not stated | RERA progress record; GHMC permit | 0% filed for green strip/tot-lot/park; permit requires tot-lot to be fenced and maintained as greenery before OC |
| Street lighting | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Community buildings | Listed as a project infrastructure item | RERA progress record; GHMC permit | 0% filed; permit identifies a commercial clubhouse building |
| Sewage and sullage treatment/disposal | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Solid-waste management and disposal | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Water conservation / rainwater harvesting | Permit requires rainwater-harvesting structures and lists 6 pits | RERA progress record; GHMC permit | 0% filed in the progress record; completion not independently verified |
| Energy management | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Fire protection and fire-safety requirements | Listed as a project infrastructure item; permit requires compliance with Fire Services NOC conditions | RERA progress record; GHMC permit | 0% filed; completed status not established |
| Electrical meter room / substation / receiving station | Listed as a project infrastructure item; permit requires transformer space on site | RERA progress record; GHMC permit | 0% filed |
| Recreational open space | Aggregate area is listed, but no area figure is supplied | RERA progress record | 0% filed |
7. Utilities, building services & safety
The RERA progress record lists water supply, sewerage and STP, storm-water drains, solid-waste disposal, rainwater harvesting, energy management, fire protection, and electrical meter-room/substation/receiving-station works. It reports water supply at 60%, internal roads and footpaths at 10%, and the other listed infrastructure items at 0%. These are RERA-filed progress figures, not independent confirmation of completion or operational status. RERA amenities
The GHMC permit requires a rainwater-harvesting structure and lists six rainwater-harvesting pits, on-site transformer space and a garbage house. It also requires compliance with Fire Services and environmental-clearance conditions and requires services, utilities, storm-water disposal, sewerage, rainwater-harvesting pits and garbage disposal to follow the plans submitted to GHMC. The supplied evidence does not establish water sources or storage/treatment capacities, electrical backup, lift count or capacity, fire-system equipment, CCTV, access control, waste-segregation arrangements or accessible circulation.
8. Location, access & connectivity
The registered project location is in Miyapur / Madeenaguda, Serilingampally Mandal, Ranga Reddy District, PIN 500049. The permit records the site as MADEENAGUDA and identifies north and south boundaries as 40-foot and 80-foot wide roads respectively. It also lists road widths of 12 M and 18 mt.; a separate access-network description is not supplied here. RERA record RERA filing
The supplied location record gives HITEC City at 7.8 km. This is a supplied location-data distance; no travel time is established. Location record
9. Developer & development status
The registered promoter is Primark Developers, recorded as a partnership, with GSTIN 36AASFP3462D1Z2. The project filing gives the promoter address as Artham’s Arcade, Raghavendra Nagar, Madeenaguda, Serilingampally, Ranga Reddy, PIN 500049; the RERA certificate lists the promoter office PIN as 500084. The supplied data does not provide a verified official contact number or email address. Corporate record Parties record
GHMC’s permit describes the owners acting through a development-agreement-cum-GPA holder, M/s Primark Developers, represented by managing partner B. Samba Siva Rao. Form B is a promoter-signed declaration undertaking completion by 23-03-2029. The building permit also states construction is to be completed before 23 March 2029; the project header separately records proposed completion as 23/07/2029. No construction progress percentage for the buildings themselves or tower-specific OC status is established in the supplied evidence. RERA record
10. Approvals, official records & documents
| Identifier / date | P02400006151, issued 24/04/2023 |
|---|---|
| What it establishes | Form C registration of NARENN PRIMARK INSPIRA, valid to 23/03/2029 unless extended. |
| Identifier / date | 0514/GHMC/SLP/2023-BP, 23 March 2023 |
|---|---|
| What it establishes | Permit for residential Towers A–D and a commercial clubhouse at Madeenaguda; file No. 001150/GHMC/0560/SLP1/2023-BP. |
| Identifier / date | Application 1/HO/03666/2021; previous permit 1/C21/10364/2021, dated 16 December 2021 |
|---|---|
| What it establishes | Identifiers recorded in the revised permit. |
| Identifier / date | 24 March 2023 |
|---|---|
| What it establishes | Promoter declaration and completion undertaking to 23-03-2029. |
| Identifier / date | Title opinion dated 13 October 2022, document 312286; supporting title documents include 312260, 312275, 312281, 312294, 312296–312299, and 312695 |
|---|---|
| What it establishes | Title-search and supporting deed/development-agreement materials filed with the project. |
| Identifier / date | Encumbrance statement 133146979, document 315156; promoter disclosure document 448210 |
|---|---|
| What it establishes | Filed encumbrance-related records. |
| Identifier / date | Document 313357 |
|---|---|
| What it establishes | Listed as layout-plan material; the supplied record does not provide an extracted layout description. The same document ID is cited for software-measured floor-plan data. |
| Identifier / date | Permit requires commencement notice and an occupancy certificate before occupation |
|---|---|
| What it establishes | The supplied evidence does not include a separate issued commencement notice or an occupancy/completion certificate for any tower or the clubhouse. |
1. Project at a glance
Project identity
Registered project name: NARENN PRIMARK INSPIRA
Project type: Residential apartment development
Phase / registered portion: A phase-specific designation is not disclosed in the available record. The registration identifies the project; the building permit names Towers A–D and a commercial clubhouse.
TG-RERA registration: P02400006151
Registration status and validity: The certificate records registration under section 5, valid for five years from 24/04/2023 to 23/03/2029, unless extended. The certificate records no extension. Registration validity is distinct from the construction completion deadline.
Registered promoter: Primark Developers; entity type recorded as Partnership.
Project stage / OC status: TG-RERA lists the project as “New Project.” The supplied records do not establish current construction completion or an occupancy certificate for any tower or the clubhouse.
Land and geographic identity
Locality: MADEENAGUDA in the RERA project information and GHMC permit; the registration certificate also identifies Miyapur as locality.
Revenue village: Miyapur in the RERA project identity; MADEENAGUDA / Madeenaguda Revenue village in the building permit and title materials.
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500049.
Project survey numbers and subdivisions: 206/1/AA, 206/2/E, 207A, 207/AA; the RERA header renders the final entries as “207A&207/AA.”
Registered site extent: 23,740.33 sq m total and net area in the RERA land record and permit; the permit separately states plot area 28,935.24 sq m and road-affected area 3,324.58 sq m.
Boundaries: North: 40 feet wide road; south: 80 feet wide road; east and west: neighbours’ land.
Road / nala affected area: RERA land record: road-widening/FTL/nala-affected area 0 sq m. The GHMC permit separately records road-affected area as 3,324.58 sq m and nala-affected area as 0.0 sq m.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal approval: Revised Building Permit Order 0514/GHMC/SLP/2023-BP, approved 23 March 2023. File No. 001150/GHMC/0560/SLP1/2023-BP; application No. 1/HO/03666/2021.
Approved development: Four residential towers, A–D, and a separate commercial clubhouse building.
Sanctioned floors: The permit’s summary describes Towers A–D as 17 upper floors with 2 cellars stated for Tower A; Form B describes the residential development as 2 Cellars + Stilt (Podium) + 17 Upper Floors across four blocks. Tower-level cellar/stilt particulars for every tower are not established by the supplied extraction.
Clubhouse floors: Commercial clubhouse: 9 upper floors.
Approved built-up area: The project information field records approved built-up area 135,801.08 sq m. The permit extraction also provides separate tower and clubhouse area entries; those are not substituted for the project-level figure here.
Approved unit count: The project record states 884 total units across four buildings; the building permit condition says sanctioned unit numbers must not be increased without GHMC approval.
Parking provision: Permit records total parking area 56,348.4 sq m and requires approved cellar and stilt areas to be used exclusively for vehicle parking. A total count of parking spaces is not supplied.
Offering and status
RERA-filed configurations: 2BHK: 206 units; 3BHK/3BK: 678 units.
RERA-filed saleable area: 2BHK: 113.34 sq m; 3BHK/3BK: 151.5–167.87 sq m.
Portal booking / availability snapshot: 0 booked; 884 available in the supplied portal extract. It has no as-of date, so counts are indicative, not a current availability confirmation.
Completion dates: GHMC permit: construction to be completed before 23 March 2029. Form B completion undertaking: 23-03-2029. The RERA header separately gives proposed completion 23/07/2029; the RERA certificate validity ends 23/03/2029.
Construction stage / OC: RERA progress extract reports internal roads and footpaths at 10% and water supply at 60%; the other listed infrastructure items are at 0%. These are filed progress figures, not independent site verification. No OC is evidenced for a tower or the clubhouse.
2. The project story
NARENN PRIMARK INSPIRA is registered as a residential apartment project in the Madeenaguda/Miyapur area of Serilingampally Mandal, Ranga Reddy District. The site identity in the RERA record covers survey subdivisions 206/1/AA, 206/2/E, 207A and 207/AA. The GHMC permit identifies four residential towers, A–D, and a separate commercial clubhouse building.
The RERA filing describes a multi-storey residential development with 884 apartments: 206 two-bedroom units and 678 three-bedroom units. The permit identifies two cellars and 17 upper floors in its tower summary, while the Form B declaration describes the overall residential arrangement as 2 cellars, stilt/podium and 17 upper floors. The permit also includes a nine-upper-floor commercial clubhouse.
The available progress record gives filed percentages for selected project infrastructure, not an independently inspected construction percentage for the towers. It does not establish which towers, if any, are complete or occupied, and no tower- or phase-specific occupancy certificate is included in the supplied evidence.
3. Master plan, architecture & building design
The RERA land record states a site extent of 23,740.33 sq m. The GHMC permit lists plot area 28,935.24 sq m, road-affected area 3,324.58 sq m, nala-affected area 0.0 sq m, and net plot area 23,740.33 sq m. The RERA project information records approved built-up area of 135,801.08 sq m. These are distinct recorded measures and should not be treated as interchangeable.
The permit names residential Towers A, B, C and D and a commercial clubhouse. Its extracted tower figures are: Tower A, 32,878.64 sq m; Tower B, 32,872.53 sq m; Tower C, 32,874.60 sq m; Tower D, 32,878.64 sq m; and commercial clubhouse, 4,296.67 sq m. The permit describes 17 upper floors for each residential tower and nine upper floors for the clubhouse. It records Tower A with two cellars; Form B describes the residential buildings collectively as 2 cellars, stilt/podium and 17 upper floors.
The permit records a total parking area of 56,348.4 sq m and a tot-lot of 2,443.38 (unit not stated in the supplied extraction). It also lists six rainwater-harvesting pits. The supplied materials do not provide a complete drawing-derived account of floor-by-floor apartment arrangements, lifts, stairs, tower entries, internal circulation, landscaped open-space distribution or residential/common-area breakdown.
4. Homes, configurations & floor plans
RERA-filed unit counts and saleable areas are shown below. A separate software measurement from the submitted plan records is available for 2BHK drawings; it is not a RERA-filed carpet-area disclosure. The drawing extraction also measures one 1BHK design, but 1BHK is not listed in the RERA unit schedule.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 206 | 0 | 206 | 113.34 sq m | Software-measured: 65.0–103.6 sq m; median 90.1 sq m across 64 measured designs | 20% supplied with drawing measurement |
| 3BHK / 3BK | 678 | 0 | 678 | 151.5–167.87 sq m | Not supplied | Not supplied |
The 2BHK drawing sample includes living/drawing, dining, two bedrooms, kitchen, toilets, balcony and utility. The plan extraction identifies a 2.00 m wide balcony in the described sample; balcony and utility areas are excluded from the software-measured carpet calculation. The software notes that its drawing-based measurements need review. Carpet area, balcony/utility space and saleable area are different measures; saleable area includes the home’s share of common areas, while the measured carpet figure is derived from drawing geometry.
A single 1BHK drawing design is software-measured at 50.7 sq m (median and range), but the RERA filing does not list a 1BHK configuration or unit count. The portal’s booked/available figures have no supplied as-of date and should be confirmed before relying on them.
5. Parking & vehicle circulation
The GHMC permit records 56,348.4 sq m of total parking area and states that cellar and stilt parking shown in the plan must be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit also requires safety measures during cellar excavation.
A parking-space count, resident or visitor allocation, accessible-space provision, mechanical-parking details, EV charging provision in the sanctioned project record, ramp arrangement and unit-specific parking allocation are not established by the supplied evidence. The permit’s parking-area figure does not by itself establish an exclusive parking right for an apartment buyer.
6. Amenities, recreation & open spaces
The RERA progress record labels the following items “YES” and gives filed completion percentages. These are declared progress figures; the evidence does not independently verify delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Project internal circulation | RERA progress record | 10% filed; not independently verified |
| Water supply | Site water-supply infrastructure | RERA progress record | 60% filed; not independently verified |
| Sewerage, lines/chambers and STP | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Storm-water drains | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Green strip / tot-lot / park | Permit records a tot-lot of 2,443.38; unit is not stated | RERA progress record; GHMC permit | 0% filed for green strip/tot-lot/park; permit requires tot-lot to be fenced and maintained as greenery before OC |
| Street lighting | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Community buildings | Listed as a project infrastructure item | RERA progress record; GHMC permit | 0% filed; permit identifies a commercial clubhouse building |
| Sewage and sullage treatment/disposal | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Solid-waste management and disposal | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Water conservation / rainwater harvesting | Permit requires rainwater-harvesting structures and lists 6 pits | RERA progress record; GHMC permit | 0% filed in the progress record; completion not independently verified |
| Energy management | Listed as a project infrastructure item | RERA progress record | 0% filed |
| Fire protection and fire-safety requirements | Listed as a project infrastructure item; permit requires compliance with Fire Services NOC conditions | RERA progress record; GHMC permit | 0% filed; completed status not established |
| Electrical meter room / substation / receiving station | Listed as a project infrastructure item; permit requires transformer space on site | RERA progress record; GHMC permit | 0% filed |
| Recreational open space | Aggregate area is listed, but no area figure is supplied | RERA progress record | 0% filed |
7. Utilities, building services & safety
The RERA progress record lists water supply, sewerage and STP, storm-water drains, solid-waste disposal, rainwater harvesting, energy management, fire protection, and electrical meter-room/substation/receiving-station works. It reports water supply at 60%, internal roads and footpaths at 10%, and the other listed infrastructure items at 0%. These are RERA-filed progress figures, not independent confirmation of completion or operational status.
The GHMC permit requires a rainwater-harvesting structure and lists six rainwater-harvesting pits, on-site transformer space and a garbage house. It also requires compliance with Fire Services and environmental-clearance conditions and requires services, utilities, storm-water disposal, sewerage, rainwater-harvesting pits and garbage disposal to follow the plans submitted to GHMC. The supplied evidence does not establish water sources or storage/treatment capacities, electrical backup, lift count or capacity, fire-system equipment, CCTV, access control, waste-segregation arrangements or accessible circulation.
8. Location, access & connectivity
The registered project location is in Miyapur / Madeenaguda, Serilingampally Mandal, Ranga Reddy District, PIN 500049. The permit records the site as MADEENAGUDA and identifies north and south boundaries as 40-foot and 80-foot wide roads respectively. It also lists road widths of 12 M and 18 mt.; a separate access-network description is not supplied here.
The supplied location record gives HITEC City at 7.8 km. This is a supplied location-data distance; no travel time is established.
9. Developer & development status
The registered promoter is Primark Developers, recorded as a partnership, with GSTIN 36AASFP3462D1Z2. The project filing gives the promoter address as Artham’s Arcade, Raghavendra Nagar, Madeenaguda, Serilingampally, Ranga Reddy, PIN 500049; the RERA certificate lists the promoter office PIN as 500084. The supplied data does not provide a verified official contact number or email address.
GHMC’s permit describes the owners acting through a development-agreement-cum-GPA holder, M/s Primark Developers, represented by managing partner B. Samba Siva Rao. Form B is a promoter-signed declaration undertaking completion by 23-03-2029. The building permit also states construction is to be completed before 23 March 2029; the project header separately records proposed completion as 23/07/2029. No construction progress percentage for the buildings themselves or tower-specific OC status is established in the supplied evidence.
10. Approvals, official records & documents
| Identifier / date | P02400006151, issued 24/04/2023 |
|---|---|
| What it establishes | Form C registration of NARENN PRIMARK INSPIRA, valid to 23/03/2029 unless extended. |
| Identifier / date | 0514/GHMC/SLP/2023-BP, 23 March 2023 |
|---|---|
| What it establishes | Permit for residential Towers A–D and a commercial clubhouse at Madeenaguda; file No. 001150/GHMC/0560/SLP1/2023-BP. |
| Identifier / date | Application 1/HO/03666/2021; previous permit 1/C21/10364/2021, dated 16 December 2021 |
|---|---|
| What it establishes | Identifiers recorded in the revised permit. |
| Identifier / date | 24 March 2023 |
|---|---|
| What it establishes | Promoter declaration and completion undertaking to 23-03-2029. |
| Identifier / date | Title opinion dated 13 October 2022, document 312286; supporting title documents include 312260, 312275, 312281, 312294, 312296–312299, and 312695 |
|---|---|
| What it establishes | Title-search and supporting deed/development-agreement materials filed with the project. |
| Identifier / date | Encumbrance statement 133146979, document 315156; promoter disclosure document 448210 |
|---|---|
| What it establishes | Filed encumbrance-related records. |
| Identifier / date | Document 313357 |
|---|---|
| What it establishes | Listed as layout-plan material; the supplied record does not provide an extracted layout description. The same document ID is cited for software-measured floor-plan data. |
| Identifier / date | Permit requires commencement notice and an occupancy certificate before occupation |
|---|---|
| What it establishes | The supplied evidence does not include a separate issued commencement notice or an occupancy/completion certificate for any tower or the clubhouse. |
Frequently asked questions
Is NARENN PRIMARK INSPIRA registered with Telangana RERA?
Yes. NARENN PRIMARK INSPIRA is registered with the Telangana Real Estate Regulatory Authority as P02400006151; the registration status is New Project.
Who is the developer of NARENN PRIMARK INSPIRA?
The promoter named in the RERA registration is Primark Developers.
Where is NARENN PRIMARK INSPIRA located?
NARENN PRIMARK INSPIRA is in MADEENAGUDA, Miyapur, Serilingampally, Rangareddy, Telangana (500049).
When will NARENN PRIMARK INSPIRA be completed?
The promoter's proposed date of completion filed with RERA is 23/07/2029. This is the promoter's declaration, not a guarantee.
More projects in Miyapur







