Happy Homes
Dandapani Avenue Projects LLP · Sangareddy · RERA P01100006368
HAPPY HOMES is a residential apartment project in Isnapur Village, PATANCHERU Mandal, Sangareddy District, on a registered site of 3,365.30 sq. m. The registered promoter is Dandapani Avenue Projects LLP. The project comprises one building with 1 Stilt + 5 Upper Floors and 90 2BHK units, each with a filed saleable area of 102.19 sq. m. Its TG-RERA registration is P01100006368, and the proposed completion date is 30/04/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | HAPPY HOMES RERA record |
| Project type / registered portion | Residential apartment project; registered portion/phase is not separately named in the supplied record. RERA record RERA filing |
| TG-RERA registration | P01100006368; granted under section 5, issued 07/07/2023, valid through 31/12/2026. Registration validity is separate from the stated project completion deadline. RERA record |
| Registered promoter | Dandapani Avenue Projects LLP RERA record Corporate record |
| RERA status | Registration certificate supplied; the certificate states the period above and does not record an extension. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Isnapur Grampanchayat / Isnapur Village RERA record RERA filing |
| Mandal / district / PIN | PATANCHERU / Sangareddy / 502307 RERA record RERA filing |
| Project survey number(s) | Survey No. 206; the HMDA technical approval describes Survey No. 206 Part. No subdivision suffix is supplied. RERA record Land records |
| Registered site extent | 3,365.30 sq. m.; RERA land details show total area and net area as 3365.30 sq. m., with affected area 0. RERA filing Land records |
| Boundaries recorded in RERA | East: 40ft Road; West and North: Land of zahause Properties Pvt Ltd; South: Sold Land of Vendor. RERA filing |
| Additional cadastral context | The Bhu Bharati GIS record is for the whole Survey No. 206 and reports an extent of 86418.13 sq. m.; it is not the registered project-site extent. Cadastral map |
Development identity
| Item | Project record |
|---|---|
| Sanctioning / technical approval authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval letter identifies delegation to Isnapur Gram Panchayat for local building-plan sanction. Approvals record |
| Principal approval | 047705/SKP/R1/U6/HMDA/30072021, dated 22-12-2021. Approvals record |
| Approved building form | One residential building, 1 Stilt + 5 Upper Floors; no basement or podium level is stated in the supplied approval extraction. |
| Approved built-up area / height | Built up Area 8066.35; Height of the Building 14.95 (unit not stated in the extracted field). |
| Building / unit counts | One building and 90 residential units are recorded in the project information; the filed unit schedule lists 90 2BHK units. RERA filing RERA unit table RERA unit details |
| Parking levels / count | Stilt parking is identified in the approval conditions, but the supplied material does not establish a total sanctioned parking-space count or unit-wise allocation. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 90 units; filed saleable area 102.19 sq. m. per unit. RERA unit table RERA unit table RERA unit details |
| Booked / available | 0 booked; 90 available in the supplied TG-RERA portal reading. The record provides no as-of date, so counts are indicative. RERA unit table RERA unit details |
| Construction stage | Project status is recorded as New Project. No independently verified construction-progress percentage or site inspection evidence is supplied. RERA record RERA filing |
| Completion dates | RERA project information gives proposed completion 30/04/2027. The promoter’s Form B declaration undertakes completion by 18-01-2027. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the approval letter requires an occupancy certificate before occupation. |
2. The project story
- HAPPY HOMES is registered as a residential apartment project on Survey No. 206 (part), Isnapur Village, within Isnapur Grampanchayat, Patancheru Mandal, Sangareddy District. The registered project site is 3,365.30 sq. m. and the filed scheme is one building with 90 two-bedroom apartments. RERA record Land records RERA unit table
- HMDA’s technical approval describes a 1 Stilt + 5 Upper Floors residential building and records an approved built-up area of 8066.35. The project record lists all 90 units as available, but that portal reading has no as-of date. The supplied evidence does not establish current physical construction progress; “New Project” is the recorded status, not an independent site assessment. RERA filing RERA unit table
- The registration certificate remains valid through 31/12/2026; this is not the same as the completion deadline. The RERA project information states 30/04/2027, while the promoter’s Form B affidavit states 18-01-2027. No occupancy or completion certificate is included in the supplied documents. RERA record
3. Master plan, architecture & building design
- The filed development is a single residential building on the registered 3,365.30 sq. m. site. HMDA’s technical approval specifies 1 Stilt + 5 Upper Floors, built-up area 8066.35, and building height 14.95 (the extracted height field does not state a unit). The approval extraction does not provide a floor-by-floor apartment arrangement, footprint, flats per floor, lift or stair count, or a basement/podium configuration. Land records
- The RERA record describes one building and 90 units, all filed as 2BHK. The supplied drawings do not support a measured floor-plan description: the drawing set records one drawing, with measurement pending and one scan awaiting processing. No software-measured carpet area or room dimensions are available. RERA filing RERA unit table Floor plans
- No project-specific internal-road, landscaped-area, open-space allocation or residential/common-area breakdown is established by the supplied drawing-derived data. The HMDA approval lists a gift deed for 520.23 Sq Mtrs for forming road area; this is an approval-recorded public-purpose road parcel, not a basis here to infer the project’s internal circulation plan.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 90 | 0 | 90 | 102.19 sq. m. | Not measured from the supplied drawings | Not supplied |
- The unit count, booking figures and saleable area are from the TG-RERA filing; booking figures have no supplied as-of date. The drawing-based measurement process has not produced a carpet-area figure for this project. RERA unit details RERA unit table Floor plans
- Saleable area and carpet area are different measures: the supplied project record reports saleable area, while no drawing-measured carpet area is available. No room dimensions, balcony or utility measurements, orientation, or typical floor arrangement are evidenced in the supplied material. RERA unit details Floor plans
5. Parking & vehicle circulation
- The HMDA technical approval identifies the stilt as a parking level and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied extraction does not state the number of car or two-wheeler spaces, visitor or accessible spaces, ramp arrangement, parking allocation by apartment, or any EV-charging provision. A unit-wise parking entitlement cannot be established from the available record.
6. Amenities, recreation & open spaces
| Description / size | No size or specification supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed as available “YES”; source/capacity not specified |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Chambers, lines, septic tank and STP are listed; no capacity or configuration supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed as available “YES”; no size/specification supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed; no area or detailed plan supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed; no quantity/specification supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed; no description or area supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed; no capacity or reuse details supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed; no system details supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed in the amenities record; the HMDA approval also requires a rainwater-harvesting structure (percolation pit) |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed with progress 0%; completion not independently verified |
| Description / size | Listed; no system or capacity supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed; no system details supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
| Description / size | Listed; no capacity supplied; HMDA approval requires transformer space |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed with progress 0%; completion not independently verified |
| Description / size | Aggregate area listed, but no area figure supplied |
|---|---|
| Evidence source | TG-RERA amenities record RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; not independently verified |
- The vendor data also lists a swimming pool, gym, children’s play area and clubhouse, among other facilities; these are vendor-listed amenities, not established by the supplied project-specific approval or verified as delivered. Promoter website
7. Utilities, building services & safety
- The TG-RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection, electrical meter-room/substation/receiving-station provision and solid-waste management. It gives no capacities, technical specifications or independent completion evidence; several listed items carry 0% progress in that record. RERA amenities
- HMDA’s technical approval requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house within the premises. It also states that an occupancy certificate is compulsory before occupation and that the building must be completed in accordance with the technically approved plans. These are approval conditions, not evidence that the installations or certificates have been completed or obtained.
- The supplied project-specific records do not establish lift numbers or capacities, backup-power arrangements, fire-system details, CCTV/security arrangements, accessibility features, or waste-segregation arrangements. The vendor lists power backup, fire safety, security, lift, waste management and CCTV, but these are vendor claims and are not independently verified in the supplied material. Promoter website
8. Location, access & connectivity
- The registered location is Isnapur Grampanchayat, Isnapur Village, PATANCHERU Mandal, Sangareddy District, Telangana 502307. The recorded eastern boundary is a 40ft Road; the other stated boundaries are land of Zahause Properties Pvt Ltd to the north and west, and sold land of vendor to the south. RERA record RERA filing RERA filing
- A location record supplies a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda), 1.2 km as a connectivity anchor. The supplied data does not identify an approach route, public-transport service or measured route distance, so no travel time or broader connectivity claim is made. Location record
9. Developer & development status
- The registered promoter is Dandapani Avenue Projects LLP, an LLP, with GSTIN 36AAUFD4697C1ZZ. The RERA record names Kota Rajasekhar as authorized signatory. The listed promoter address is Raksha Pride Apartment, Thumkunta, Isnapur, Isnapur Grampanchayat, Patancheru, Sangareddy, 502307. Corporate record Parties record RERA filing
- The RERA project status is New Project; no independently verified construction-progress report is supplied. The project information gives proposed completion as 30/04/2027. In its Form B affidavit dated 28th March 2023, the promoter declared completion by 18-01-2027. The registration certificate is valid through 31/12/2026; no extension or occupancy/completion certificate is supplied. RERA filing
10. Approvals, official records & documents
| Supplied evidence | FORM ‘C’, registration P01100006368, issued 07/07/2023, valid through 31/12/2026 |
|---|---|
| Scope / note | HAPPY HOMES; Survey No. 206 |
| Supplied evidence | 047705/SKP/R1/U6/HMDA/30072021, dated 22-12-2021 |
|---|---|
| Scope / note | Residential building, Survey No. 206 Part, Isnapur Village; 1 Stilt + 5 Upper Floors |
| Supplied evidence | Mortgage Deed 41554/2021 dated 15.11.2021; Gift Deed 30893/2021 dated 17.08.2021 |
|---|---|
| Scope / note | Approval extraction records mortgage area of 979.91 Sq Mtrs and a 520.23 Sq Mtrs public-purpose road-area gift deed |
| Supplied evidence | Promoter affidavit dated 28th March 2023 |
|---|---|
| Scope / note | Includes promoter declarations on title basis, encumbrances, project account and completion undertaking |
| Supplied evidence | Advocate’s title report dated 02-03-2023 |
|---|---|
| Scope / note | Project land described as 4025 Sq. Yds (3365.30 Sq. Mtrs) in Sy. No. 206 (part), Isnapur Village |
| Supplied evidence | Statement 137892404, searched 01-01-1994 to 04-05-2023 |
|---|---|
| Scope / note | Project-filed encumbrance record; current status is not established by this historical search |
| Supplied evidence | Telangana-form template supplied |
|---|---|
| Scope / note | The supplied excerpt has no filled-in allottee, unit, price or schedules |
| Supplied evidence | Document 316524, titled as a site plan in the extraction |
|---|---|
| Scope / note | The extracted sheet describes Sy.No.-67/A, Bori Kalan HEC, and does not establish the HAPPY HOMES site; it is not relied on here as the project’s sanctioned plan |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | HMDA approval states an occupancy certificate is compulsory before occupation. |
- The HMDA approval requires local-authority building-plan sanction in conformity with the technically approved plans, and its conditions address construction, parking, road-area gift, mortgage area and occupancy. This overview records the supplied documents and does not determine whether every approval condition has been fulfilled.
1. Project at a glance
Project identity
Registered project name: HAPPY HOMES
Project type / registered portion: Residential apartment project; registered portion/phase is not separately named in the supplied record.
TG-RERA registration: P01100006368; granted under section 5, issued 07/07/2023, valid through 31/12/2026. Registration validity is separate from the stated project completion deadline.
Registered promoter: Dandapani Avenue Projects LLP
RERA status: Registration certificate supplied; the certificate states the period above and does not record an extension.
Land and geographic identity
Locality / revenue village: Isnapur Grampanchayat / Isnapur Village
Mandal / district / PIN: PATANCHERU / Sangareddy / 502307
Project survey number(s): Survey No. 206; the HMDA technical approval describes Survey No. 206 Part. No subdivision suffix is supplied.
Registered site extent: 3,365.30 sq. m.; RERA land details show total area and net area as 3365.30 sq. m., with affected area 0.
Boundaries recorded in RERA: East: 40ft Road; West and North: Land of zahause Properties Pvt Ltd; South: Sold Land of Vendor.
Additional cadastral context: The Bhu Bharati GIS record is for the whole Survey No. 206 and reports an extent of 86418.13 sq. m.; it is not the registered project-site extent.
Development identity
Sanctioning / technical approval authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval letter identifies delegation to Isnapur Gram Panchayat for local building-plan sanction.
Principal approval: 047705/SKP/R1/U6/HMDA/30072021, dated 22-12-2021.
Approved building form: One residential building, 1 Stilt + 5 Upper Floors; no basement or podium level is stated in the supplied approval extraction.
Approved built-up area / height: Built up Area 8066.35; Height of the Building 14.95 (unit not stated in the extracted field).
Building / unit counts: One building and 90 residential units are recorded in the project information; the filed unit schedule lists 90 2BHK units.
Parking levels / count: Stilt parking is identified in the approval conditions, but the supplied material does not establish a total sanctioned parking-space count or unit-wise allocation.
Offering and status
RERA-filed configuration: 2BHK, 90 units; filed saleable area 102.19 sq. m. per unit.
Booked / available: 0 booked; 90 available in the supplied TG-RERA portal reading. The record provides no as-of date, so counts are indicative.
Construction stage: Project status is recorded as New Project. No independently verified construction-progress percentage or site inspection evidence is supplied.
Completion dates: RERA project information gives proposed completion 30/04/2027. The promoter’s Form B declaration undertakes completion by 18-01-2027.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the approval letter requires an occupancy certificate before occupation.
2. The project story
- HAPPY HOMES is registered as a residential apartment project on Survey No. 206 (part), Isnapur Village, within Isnapur Grampanchayat, Patancheru Mandal, Sangareddy District. The registered project site is 3,365.30 sq. m. and the filed scheme is one building with 90 two-bedroom apartments.
- HMDA’s technical approval describes a 1 Stilt + 5 Upper Floors residential building and records an approved built-up area of 8066.35. The project record lists all 90 units as available, but that portal reading has no as-of date. The supplied evidence does not establish current physical construction progress; “New Project” is the recorded status, not an independent site assessment.
- The registration certificate remains valid through 31/12/2026; this is not the same as the completion deadline. The RERA project information states 30/04/2027, while the promoter’s Form B affidavit states 18-01-2027. No occupancy or completion certificate is included in the supplied documents.
3. Master plan, architecture & building design
- The filed development is a single residential building on the registered 3,365.30 sq. m. site. HMDA’s technical approval specifies 1 Stilt + 5 Upper Floors, built-up area 8066.35, and building height 14.95 (the extracted height field does not state a unit). The approval extraction does not provide a floor-by-floor apartment arrangement, footprint, flats per floor, lift or stair count, or a basement/podium configuration.
- The RERA record describes one building and 90 units, all filed as 2BHK. The supplied drawings do not support a measured floor-plan description: the drawing set records one drawing, with measurement pending and one scan awaiting processing. No software-measured carpet area or room dimensions are available.
- No project-specific internal-road, landscaped-area, open-space allocation or residential/common-area breakdown is established by the supplied drawing-derived data. The HMDA approval lists a gift deed for 520.23 Sq Mtrs for forming road area; this is an approval-recorded public-purpose road parcel, not a basis here to infer the project’s internal circulation plan.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 90 | 0 | 90 | 102.19 sq. m. | Not measured from the supplied drawings | Not supplied |
- The unit count, booking figures and saleable area are from the TG-RERA filing; booking figures have no supplied as-of date. The drawing-based measurement process has not produced a carpet-area figure for this project.
- Saleable area and carpet area are different measures: the supplied project record reports saleable area, while no drawing-measured carpet area is available. No room dimensions, balcony or utility measurements, orientation, or typical floor arrangement are evidenced in the supplied material.
5. Parking & vehicle circulation
- The HMDA technical approval identifies the stilt as a parking level and requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied extraction does not state the number of car or two-wheeler spaces, visitor or accessible spaces, ramp arrangement, parking allocation by apartment, or any EV-charging provision. A unit-wise parking entitlement cannot be established from the available record.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | No size or specification supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Water supply | Listed as available “YES”; source/capacity not specified | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Sewerage | Chambers, lines, septic tank and STP are listed; no capacity or configuration supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Storm-water drains | Listed as available “YES”; no size/specification supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Green strip / tot lot / park | Listed; no area or detailed plan supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Street lighting | Listed; no quantity/specification supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Community buildings | Listed; no description or area supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Sewage and sullage treatment/disposal | Listed; no capacity or reuse details supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Solid-waste management and disposal | Listed; no system details supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Water conservation / rainwater harvesting | Listed in the amenities record; the HMDA approval also requires a rainwater-harvesting structure (percolation pit) | Listed with progress 0%; completion not independently verified | |
| Energy management | Listed; no system or capacity supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Fire protection and safety | Listed; no system details supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
| Electrical meter room / substation / receiving station | Listed; no capacity supplied; HMDA approval requires transformer space | Listed with progress 0%; completion not independently verified | |
| Recreational open space | Aggregate area listed, but no area figure supplied | TG-RERA amenities record | Progress recorded as 0%; not independently verified |
- The vendor data also lists a swimming pool, gym, children’s play area and clubhouse, among other facilities; these are vendor-listed amenities, not established by the supplied project-specific approval or verified as delivered.
7. Utilities, building services & safety
- The TG-RERA amenities record lists water supply, sewerage, storm-water drains, rainwater harvesting, energy management, fire protection, electrical meter-room/substation/receiving-station provision and solid-waste management. It gives no capacities, technical specifications or independent completion evidence; several listed items carry 0% progress in that record.
- HMDA’s technical approval requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house within the premises. It also states that an occupancy certificate is compulsory before occupation and that the building must be completed in accordance with the technically approved plans. These are approval conditions, not evidence that the installations or certificates have been completed or obtained.
- The supplied project-specific records do not establish lift numbers or capacities, backup-power arrangements, fire-system details, CCTV/security arrangements, accessibility features, or waste-segregation arrangements. The vendor lists power backup, fire safety, security, lift, waste management and CCTV, but these are vendor claims and are not independently verified in the supplied material.
8. Location, access & connectivity
- The registered location is Isnapur Grampanchayat, Isnapur Village, PATANCHERU Mandal, Sangareddy District, Telangana 502307. The recorded eastern boundary is a 40ft Road; the other stated boundaries are land of Zahause Properties Pvt Ltd to the north and west, and sold land of vendor to the south.
- A location record supplies a cadastral parcel centroid at 17.41528, 78.35459 and lists Financial District (Nanakramguda), 1.2 km as a connectivity anchor. The supplied data does not identify an approach route, public-transport service or measured route distance, so no travel time or broader connectivity claim is made.
9. Developer & development status
- The registered promoter is Dandapani Avenue Projects LLP, an LLP, with GSTIN 36AAUFD4697C1ZZ. The RERA record names Kota Rajasekhar as authorized signatory. The listed promoter address is Raksha Pride Apartment, Thumkunta, Isnapur, Isnapur Grampanchayat, Patancheru, Sangareddy, 502307.
- The RERA project status is New Project; no independently verified construction-progress report is supplied. The project information gives proposed completion as 30/04/2027. In its Form B affidavit dated 28th March 2023, the promoter declared completion by 18-01-2027. The registration certificate is valid through 31/12/2026; no extension or occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Supplied evidence | FORM ‘C’, registration P01100006368, issued 07/07/2023, valid through 31/12/2026 |
|---|---|
| Scope / note | HAPPY HOMES; Survey No. 206 |
| Supplied evidence | 047705/SKP/R1/U6/HMDA/30072021, dated 22-12-2021 |
|---|---|
| Scope / note | Residential building, Survey No. 206 Part, Isnapur Village; 1 Stilt + 5 Upper Floors |
| Supplied evidence | Mortgage Deed 41554/2021 dated 15.11.2021; Gift Deed 30893/2021 dated 17.08.2021 |
|---|---|
| Scope / note | Approval extraction records mortgage area of 979.91 Sq Mtrs and a 520.23 Sq Mtrs public-purpose road-area gift deed |
| Supplied evidence | Promoter affidavit dated 28th March 2023 |
|---|---|
| Scope / note | Includes promoter declarations on title basis, encumbrances, project account and completion undertaking |
| Supplied evidence | Advocate’s title report dated 02-03-2023 |
|---|---|
| Scope / note | Project land described as 4025 Sq. Yds (3365.30 Sq. Mtrs) in Sy. No. 206 (part), Isnapur Village |
| Supplied evidence | Statement 137892404, searched 01-01-1994 to 04-05-2023 |
|---|---|
| Scope / note | Project-filed encumbrance record; current status is not established by this historical search |
| Supplied evidence | Telangana-form template supplied |
|---|---|
| Scope / note | The supplied excerpt has no filled-in allottee, unit, price or schedules |
| Supplied evidence | Document 316524, titled as a site plan in the extraction |
|---|---|
| Scope / note | The extracted sheet describes Sy.No.-67/A, Bori Kalan HEC, and does not establish the HAPPY HOMES site; it is not relied on here as the project’s sanctioned plan |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | HMDA approval states an occupancy certificate is compulsory before occupation. |
- The HMDA approval requires local-authority building-plan sanction in conformity with the technically approved plans, and its conditions address construction, parking, road-area gift, mortgage area and occupancy. This overview records the supplied documents and does not determine whether every approval condition has been fulfilled.
Frequently asked questions
Is HAPPY HOMES registered with Telangana RERA?
Yes. HAPPY HOMES is registered with the Telangana Real Estate Regulatory Authority as P01100006368; the registration status is New Project.
Who is the developer of HAPPY HOMES?
The promoter named in the RERA registration is Dandapani Avenue Projects LLP.
Where is HAPPY HOMES located?
HAPPY HOMES is in Isnapur Grampanchayat, PATANCHERU, Sangareddy, Telangana (502307).
When will HAPPY HOMES be completed?
The promoter's proposed date of completion filed with RERA is 30/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Isnapur