One East
S V CONSTRUCTIONS & DEVELOPERS · Rangareddy · RERA P02400010934
ONE EAST is a residential apartment project in HAYATHNAGAR, Hayathnagar Mandal, Ranga Reddy District, developed by registered promoter S V CONSTRUCTIONS & DEVELOPERS. The registered site extent is 17,302.54 sq. m, with seven residential blocks and one amenities block; the residential blocks have 2 common basements, a ground floor and 9 floors, and the project has 455 homes comprising 227 2BHK and 228 3BHK apartments. It is registered under TG-RERA number P02400010934, with proposed completion listed as 11/09/2031.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | ONE EAST RERA record |
| Project type | Residential apartment project; the filing identifies it as a new project. RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. The registration covers the project on Survey Nos. 356, 370 and 371. RERA record |
| TG-RERA registration | P02400010934; registered under section 5; certificate issued 22/06/2026. RERA record |
| Registration validity | 11/05/2026 to 11/05/2031 (five years), unless extended by the Authority. This is the registration period, not a statement that construction is complete. RERA record |
| Registered promoter | S V CONSTRUCTIONS & DEVELOPERS, represented by SANVI PROPERTIES INDIA PVT LTD REP BY SRI BANDARU AVENDER. RERA record |
| RERA status | Registered; the certificate records registration as not extended. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Locality: HAYATHNAGAR. Revenue village is recorded as Anmagal in the project identity and as ANMAGAL HAYATHNAGAR VILLAGE in filed project documents; other filed records use Amangal Village. RERA record RERA filing |
| Mandal | Hayathnagar (also rendered “Hayath Nagar” / “Hayathnagar Mandal” in approval records). RERA record |
| District / PIN | Ranga Reddy; PIN 501505. RERA record |
| Project survey numbers | Sy. Nos. 356, 370 and 371. The DAGPA also lists subdivisions 356/1, 370/1, 371/1, 356/2, 370/2 and 371/2. RERA record |
| Registered site extent | RERA and building-permit records state 17,302.54 sq. m. RERA record |
| Net / total area | Building-plan record: gross plot area 17,302.54 sq. m and net plot area 17,302.54 sq. m. |
| Boundaries | Project filing records east, west, north and south as “OTHERS LAND”; named adjoining properties are not disclosed in that field. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Building-permit document identifies Malkajgiri Municipal Corporation; the project filing also identifies GHMC as authority. RERA filing |
| Principal approval | Building Permit Order 3733/GHMC/SWBP/LBN1/2026, dated 11/05/2026. The filed plan also bears file number 003814/GHMC/01993/SWBP/LBN1/2025. Approvals record |
| Approved built-up area | 66,938.27 sq. m excluding parking; 88,930.71 sq. m including parking, as recorded in the plan extraction. These are distinct filed plan figures. |
| Buildings | Seven residential blocks—A, B, C, D, E, F and G—and one amenities block. |
| Sanctioned floor configuration | Residential blocks: 2 common basements + ground floor + 9 floors. Amenities block: common basements + ground floor + 4 floors. |
| Parking levels / provision | The building-permit extraction identifies 2 common basements and 21,992.44 sq. m total parking area; the plan extraction states 355 car parking spaces. |
| Units | Building-permit order: 455 dwelling units. RERA unit filing separately lists 455 saleable homes and 5 amenity rows (not homes for sale). RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Home types | 2BHK and 3BHK apartments. RERA unit table |
| RERA-filed saleable area | 2BHK: 100.4 sq. m; 3BHK: 178.56 sq. m. RERA unit table |
| Booked / available | Portal-derived filing counts: 0 booked / 227 available 2BHK and 0 booked / 228 available 3BHK. The portal record provides no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No construction-progress percentage or independently verified site stage is supplied in the reviewed record. The project is registered as a new project and the permit extraction says completion is not certified. RERA record |
| Completion dates | Promoter’s Form B undertaking states completion by 11/05/2031; the project header separately lists proposed completion as 11/09/2031. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is recorded in the supplied project documents; the building-permit extraction marks completion as not certified. No tower-wise OC status is provided. |
2. The project story
- ONE EAST is a proposed residential apartment development on the registered site in Anmagal / Anmagal Hayathnagar, Hayathnagar Mandal, Ranga Reddy District. The project record states a site extent of 17,302.54 sq. m. RERA record
- The sanctioned scheme comprises seven residential blocks and a separate amenities block. The residential blocks are approved with two common basement levels, a ground floor and nine upper floors; the amenities block is approved with common basements, a ground floor and four upper floors.
- The building-permit order records 455 dwelling units, while the RERA unit schedule lists 227 2BHK and 228 3BHK homes. RERA unit table
- This is a registered project with a stated completion undertaking, not a completed or occupancy-certified development in the supplied records. No construction progress percentage, site inspection result or tower-by-tower construction status is available here.
3. Master plan, architecture & building design
- The filed building plan gives a gross and net plot area of 17,302.54 sq. m and proposed coverage of 6,356.04 sq. m (37%). It records 10,851.09 sq. m as vacant plot area. The plan states total proposed built-up area of 66,938.27 sq. m excluding parking and 88,930.71 sq. m including parking; these figures should not be treated as carpet or saleable area.
- The sanctioned arrangement is seven residential blocks, A–G, with two common basement levels, ground and nine upper floors, plus an amenities building with common basements, ground and four upper floors. The approval extraction gives a proposed building height of 29.7 m for residential buildings and 14.9 m for the amenities building.
- The plan extraction identifies a 2,226.29 sq. m tot-lot and 1,079.47 sq. m green strip. It also lists internal roads and footpaths, and an approach/service road requirement in the approval conditions. Detailed circulation drawings, block spacing, typical flats per floor, lift counts, staircase counts and a verified landscape plan are not fully provided in the supplied material. RERA amenities
4. Homes, configurations & floor plans
RERA’s unit schedule lists 227 2BHK and 228 3BHK apartments. Saleable areas below are the values filed with TG-RERA. Carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA disclosures; the measurement record says they need review against the drawing. Saleable area and measured carpet area are different bases, and the supplied record does not establish a verified unit-by-unit loading calculation. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 227 | 0 | 227 | 100.4 sq. m | 64.5–85.5 sq. m; median 74.4 sq. m (801 sq. ft) | 26% (software-measured) |
| 3BHK | 228 | 0 | 228 | 178.56 sq. m | 94.3–114.9 sq. m; median 104.5 sq. m (1,125 sq. ft) | 41% (software-measured) |
- The drawing review measured 108 flat designs for each configuration. One illustrated 2BHK plan includes living, dining, kitchen, bedrooms, toilets and a sit-out; one illustrated 3BHK plan includes bedrooms, toilets, a foyer, dining/kitchen and a utility area. These are drawing-based observations, not a guarantee that every apartment has the same arrangement or dimensions. Floor plans RERA unit details
- The RERA unit table also contains five “AMENITY” entries. They are not homes for sale and are excluded from the apartment count. RERA unit table
5. Parking & vehicle circulation
- The building-plan extraction records 355 car parking spaces and 21,992.44 sq. m total parking area. The sanctioned arrangement includes two common basement levels; the available records do not specify a separate resident/visitor split by space count, accessible-parking count, two-wheeler count, mechanical parking or a verified unit-wise parking allocation.
- The plan also records 2,092.62 sq. m visitor parking area. The approval conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use.
- The supplementary development agreement’s extracted allocation refers to parking of 80 sq. ft. for specified flat allocations, but the supplied summary does not establish a complete project-wide allotment schedule or exclusive ownership rights for any buyer. A drawn or stated parking provision alone does not establish a buyer’s particular parking entitlement.
6. Amenities, recreation & open spaces
The RERA amenities schedule marks the following project infrastructure and facilities as available in the filing; each carries 0% progress in the supplied record. “Available” here is a filing status, not independent confirmation that an item has been completed or is operational. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed as available; building plan identifies a separate amenities block. | RERA amenities | 0% in RERA schedule; completion not independently verified |
| Green strip / tot-lot / park | Plan extraction records tot-lot 2,226.29 sq. m and green strip 1,079.47 sq. m. | 0% in RERA schedule; not independently verified complete | |
| Internal roads and footpaths | Listed in the RERA amenities schedule. | RERA amenities | 0%; not independently verified complete |
| Street lighting | Listed in the RERA amenities schedule. | RERA amenities | 0%; not independently verified complete |
| Water supply | Listed in the RERA amenities schedule. | RERA amenities | 0%; not independently verified complete |
| Sewerage / sewage treatment and disposal | Sewerage lines/chambers/septic tank/STP and treatment/disposal are listed in the RERA schedule. | RERA amenities | 0%; not independently verified complete |
| Storm-water drains | Listed in the RERA amenities schedule. | RERA amenities | 0%; not independently verified complete |
| Solid-waste management and disposal | Listed in the RERA amenities schedule; the plan conditions also require a garbage house within the premises. | RERA amenities | 0%; not independently verified complete |
| Water conservation / rainwater harvesting | RERA schedule lists water conservation and rainwater harvesting; plan extraction identifies 7 rainwater-harvesting pits. | RERA amenities | 0%; not independently verified complete |
| Energy management | Listed in the RERA amenities schedule. | RERA amenities | 0%; not independently verified complete |
| Fire protection and fire-safety requirements | Listed in the RERA amenities schedule. | RERA amenities | 0%; not independently verified complete |
| Electrical meter room / sub-station / receiving station | Listed in the RERA amenities schedule; plan conditions require transformer space. | RERA amenities | 0%; not independently verified complete |
| Recreational open space | RERA schedule lists aggregate recreational open space without a supplied area figure. | RERA amenities | 0%; not independently verified complete |
7. Utilities, building services & safety
- The RERA amenities schedule lists water supply, sewerage and sewage treatment/disposal, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. These are filed provisions; the schedule records 0% progress for each and does not establish their installation or operation. RERA amenities
- The building-permit records specify seven rainwater-harvesting pits, a transformer space and a garbage house. The commencement-permit conditions require a water-feasibility certificate from HMWS&SB before an occupancy certificate, an occupancy fire NOC for all blocks, and automatic sprinkler systems in cellar floors. The documents supplied do not establish that these certificates or systems have been completed.
- The approval conditions also require EV charging infrastructure in parking areas, dual-piping arrangements for the stated qualifying project category, and digital-connectivity infrastructure provisions. These are approval conditions, not evidence of installation. No water-storage capacity, STP capacity, generator capacity, lift count or lift capacity is provided in the reviewed records.
8. Location, access & connectivity
- The registered location is HAYATHNAGAR, Anmagal / Anmagal Hayathnagar Village, Hayathnagar Mandal, Ranga Reddy District, PIN 501505. The registered land identity is Survey Nos. 356, 370 and 371, with subdivisions 356/1, 370/1, 371/1, 356/2, 370/2 and 371/2 appearing in the filed DAGPA. RERA record
- The plan records surrounding road widths including 12.0 m, 9.0 m and 18 mt. roads, and includes an approach-road condition. The location data identifies the nearest sampled Outer Ring Road interchange at approximately 1.9 km; this is a supplied mapped distance, not a travel-time estimate. The reviewed data does not provide verified public-transport services or measured distances to other landmarks. Location record
9. Developer & development status
- The registered legal promoter is S V CONSTRUCTIONS & DEVELOPERS, identified in the project filing as a partnership. Its supplied GSTIN is 36AEVFS6312J1ZG. The filing names SANVI PROPERTIES INDIA PVT LTD REP BY SRI BANDARU AVENDER as authorized signatory; the project record lists the promoter address at Sanvi Towers, Swamy Ayyappa Co-op Society, Hayathnagar, Ranga Reddy, Telangana, PIN 501505. RERA filing Corporate record Parties record
- The registration certificate lists a promoter-office PIN of 500081, but does not provide a complete street address in that certificate field. The project record supplies the website svconstructionsndevelopers.com; no official project-specific contact details are provided in the reviewed data. Promoter website
- The promoter’s Form B affidavit, dated 01-06-2026, undertakes completion by 11/05/2031. The project header separately records proposed completion as 11/09/2031. The registration certificate is valid to 11/05/2031; registration validity, the completion undertaking and the header’s proposed completion date are separate record fields. No construction progress percentage or occupancy certification is supplied. RERA record
10. Approvals, official records & documents
| Record | What the supplied record establishes |
|---|---|
| TG-RERA registration certificate P02400010934 | Section 5 registration for ONE EAST; validity 11/05/2026–11/05/2031; certificate issued 22/06/2026. |
| Building Permit Order 3733/GHMC/SWBP/LBN1/2026 | Building-permit record dated 11/05/2026 for seven residential blocks and an amenities block on Survey Nos. 356, 370 and 371; records 455 dwelling units. |
| Filed building-permission plan; file 003814/GHMC/01993/SWBP/LBN1/2025 | Plan extraction gives site area, built-up areas, building configuration, parking and plan conditions. |
| Development Agreement-cum-General Power of Attorney 7117/2022 | Filed instrument records development rights over land in Survey Nos. 356, 370, 371 and listed subdivisions; it is a development instrument, not itself a conveyance of land title. |
| Revenue Department letter Lr.No E4/1792/2023, dated 03.05.2024 | Filed report concerning a building-permission NOC request for Survey Nos. 356, 370 and 371; it discusses nala/channel and buffer matters. |
| Form B promoter declaration | Promoter declaration dated 01-06-2026 concerning title, encumbrances, project-account obligations and completion undertaking. |
| Occupancy / completion certificates | No such certificate is included in the supplied project records; the building-permit extraction marks completion as not certified. |
| Other project-specific official records | A public-facing HMDA zoning sheet is identified for the area, but the sheet is image-only and the exact zone at the survey has not been read from it. The HMDA approved-layout lookup is reported unavailable through the public portal. HMDA |
1. Project at a glance
Project identity
Registered name: ONE EAST
Project type: Residential apartment project; the filing identifies it as a new project.
Phase / registered portion: No separate phase name is disclosed. The registration covers the project on Survey Nos. 356, 370 and 371.
TG-RERA registration: P02400010934; registered under section 5; certificate issued 22/06/2026.
Registration validity: 11/05/2026 to 11/05/2031 (five years), unless extended by the Authority. This is the registration period, not a statement that construction is complete.
Registered promoter: S V CONSTRUCTIONS & DEVELOPERS, represented by SANVI PROPERTIES INDIA PVT LTD REP BY SRI BANDARU AVENDER.
RERA status: Registered; the certificate records registration as not extended.
Land and geographic identity
Locality / revenue village: Locality: HAYATHNAGAR. Revenue village is recorded as Anmagal in the project identity and as ANMAGAL HAYATHNAGAR VILLAGE in filed project documents; other filed records use Amangal Village.
Mandal: Hayathnagar (also rendered “Hayath Nagar” / “Hayathnagar Mandal” in approval records).
District / PIN: Ranga Reddy; PIN 501505.
Project survey numbers: Sy. Nos. 356, 370 and 371. The DAGPA also lists subdivisions 356/1, 370/1, 371/1, 356/2, 370/2 and 371/2.
Registered site extent: RERA and building-permit records state 17,302.54 sq. m.
Net / total area: Building-plan record: gross plot area 17,302.54 sq. m and net plot area 17,302.54 sq. m.
Boundaries: Project filing records east, west, north and south as “OTHERS LAND”; named adjoining properties are not disclosed in that field.
Development identity
Sanctioning authority: Building-permit document identifies Malkajgiri Municipal Corporation; the project filing also identifies GHMC as authority.
Principal approval: Building Permit Order 3733/GHMC/SWBP/LBN1/2026, dated 11/05/2026. The filed plan also bears file number 003814/GHMC/01993/SWBP/LBN1/2025.
Approved built-up area: 66,938.27 sq. m excluding parking; 88,930.71 sq. m including parking, as recorded in the plan extraction. These are distinct filed plan figures.
Buildings: Seven residential blocks—A, B, C, D, E, F and G—and one amenities block.
Sanctioned floor configuration: Residential blocks: 2 common basements + ground floor + 9 floors. Amenities block: common basements + ground floor + 4 floors.
Parking levels / provision: The building-permit extraction identifies 2 common basements and 21,992.44 sq. m total parking area; the plan extraction states 355 car parking spaces.
Units: Building-permit order: 455 dwelling units. RERA unit filing separately lists 455 saleable homes and 5 amenity rows (not homes for sale).
Offering and status
Home types: 2BHK and 3BHK apartments.
RERA-filed saleable area: 2BHK: 100.4 sq. m; 3BHK: 178.56 sq. m.
Booked / available: Portal-derived filing counts: 0 booked / 227 available 2BHK and 0 booked / 228 available 3BHK. The portal record provides no as-of date, so these counts are indicative.
Construction stage: No construction-progress percentage or independently verified site stage is supplied in the reviewed record. The project is registered as a new project and the permit extraction says completion is not certified.
Completion dates: Promoter’s Form B undertaking states completion by 11/05/2031; the project header separately lists proposed completion as 11/09/2031.
Occupancy / completion certificate: No occupancy or completion certificate is recorded in the supplied project documents; the building-permit extraction marks completion as not certified. No tower-wise OC status is provided.
2. The project story
- ONE EAST is a proposed residential apartment development on the registered site in Anmagal / Anmagal Hayathnagar, Hayathnagar Mandal, Ranga Reddy District. The project record states a site extent of 17,302.54 sq. m.
- The sanctioned scheme comprises seven residential blocks and a separate amenities block. The residential blocks are approved with two common basement levels, a ground floor and nine upper floors; the amenities block is approved with common basements, a ground floor and four upper floors.
- The building-permit order records 455 dwelling units, while the RERA unit schedule lists 227 2BHK and 228 3BHK homes.
- This is a registered project with a stated completion undertaking, not a completed or occupancy-certified development in the supplied records. No construction progress percentage, site inspection result or tower-by-tower construction status is available here.
3. Master plan, architecture & building design
- The filed building plan gives a gross and net plot area of 17,302.54 sq. m and proposed coverage of 6,356.04 sq. m (37%). It records 10,851.09 sq. m as vacant plot area. The plan states total proposed built-up area of 66,938.27 sq. m excluding parking and 88,930.71 sq. m including parking; these figures should not be treated as carpet or saleable area.
- The sanctioned arrangement is seven residential blocks, A–G, with two common basement levels, ground and nine upper floors, plus an amenities building with common basements, ground and four upper floors. The approval extraction gives a proposed building height of 29.7 m for residential buildings and 14.9 m for the amenities building.
- The plan extraction identifies a 2,226.29 sq. m tot-lot and 1,079.47 sq. m green strip. It also lists internal roads and footpaths, and an approach/service road requirement in the approval conditions. Detailed circulation drawings, block spacing, typical flats per floor, lift counts, staircase counts and a verified landscape plan are not fully provided in the supplied material.
4. Homes, configurations & floor plans
RERA’s unit schedule lists 227 2BHK and 228 3BHK apartments. Saleable areas below are the values filed with TG-RERA. Carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA disclosures; the measurement record says they need review against the drawing. Saleable area and measured carpet area are different bases, and the supplied record does not establish a verified unit-by-unit loading calculation.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 227 | 0 | 227 | 100.4 sq. m | 64.5–85.5 sq. m; median 74.4 sq. m (801 sq. ft) | 26% (software-measured) |
| 3BHK | 228 | 0 | 228 | 178.56 sq. m | 94.3–114.9 sq. m; median 104.5 sq. m (1,125 sq. ft) | 41% (software-measured) |
- The drawing review measured 108 flat designs for each configuration. One illustrated 2BHK plan includes living, dining, kitchen, bedrooms, toilets and a sit-out; one illustrated 3BHK plan includes bedrooms, toilets, a foyer, dining/kitchen and a utility area. These are drawing-based observations, not a guarantee that every apartment has the same arrangement or dimensions.
- The RERA unit table also contains five “AMENITY” entries. They are not homes for sale and are excluded from the apartment count.
5. Parking & vehicle circulation
- The building-plan extraction records 355 car parking spaces and 21,992.44 sq. m total parking area. The sanctioned arrangement includes two common basement levels; the available records do not specify a separate resident/visitor split by space count, accessible-parking count, two-wheeler count, mechanical parking or a verified unit-wise parking allocation.
- The plan also records 2,092.62 sq. m visitor parking area. The approval conditions state that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use.
- The supplementary development agreement’s extracted allocation refers to parking of 80 sq. ft. for specified flat allocations, but the supplied summary does not establish a complete project-wide allotment schedule or exclusive ownership rights for any buyer. A drawn or stated parking provision alone does not establish a buyer’s particular parking entitlement.
6. Amenities, recreation & open spaces
The RERA amenities schedule marks the following project infrastructure and facilities as available in the filing; each carries 0% progress in the supplied record. “Available” here is a filing status, not independent confirmation that an item has been completed or is operational.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | Listed as available; building plan identifies a separate amenities block. | 0% in RERA schedule; completion not independently verified | |
| Green strip / tot-lot / park | Plan extraction records tot-lot 2,226.29 sq. m and green strip 1,079.47 sq. m. | 0% in RERA schedule; not independently verified complete | |
| Internal roads and footpaths | Listed in the RERA amenities schedule. | 0%; not independently verified complete | |
| Street lighting | Listed in the RERA amenities schedule. | 0%; not independently verified complete | |
| Water supply | Listed in the RERA amenities schedule. | 0%; not independently verified complete | |
| Sewerage / sewage treatment and disposal | Sewerage lines/chambers/septic tank/STP and treatment/disposal are listed in the RERA schedule. | 0%; not independently verified complete | |
| Storm-water drains | Listed in the RERA amenities schedule. | 0%; not independently verified complete | |
| Solid-waste management and disposal | Listed in the RERA amenities schedule; the plan conditions also require a garbage house within the premises. | 0%; not independently verified complete | |
| Water conservation / rainwater harvesting | RERA schedule lists water conservation and rainwater harvesting; plan extraction identifies 7 rainwater-harvesting pits. | 0%; not independently verified complete | |
| Energy management | Listed in the RERA amenities schedule. | 0%; not independently verified complete | |
| Fire protection and fire-safety requirements | Listed in the RERA amenities schedule. | 0%; not independently verified complete | |
| Electrical meter room / sub-station / receiving station | Listed in the RERA amenities schedule; plan conditions require transformer space. | 0%; not independently verified complete | |
| Recreational open space | RERA schedule lists aggregate recreational open space without a supplied area figure. | 0%; not independently verified complete |
7. Utilities, building services & safety
- The RERA amenities schedule lists water supply, sewerage and sewage treatment/disposal, storm-water drains, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. These are filed provisions; the schedule records 0% progress for each and does not establish their installation or operation.
- The building-permit records specify seven rainwater-harvesting pits, a transformer space and a garbage house. The commencement-permit conditions require a water-feasibility certificate from HMWS&SB before an occupancy certificate, an occupancy fire NOC for all blocks, and automatic sprinkler systems in cellar floors. The documents supplied do not establish that these certificates or systems have been completed.
- The approval conditions also require EV charging infrastructure in parking areas, dual-piping arrangements for the stated qualifying project category, and digital-connectivity infrastructure provisions. These are approval conditions, not evidence of installation. No water-storage capacity, STP capacity, generator capacity, lift count or lift capacity is provided in the reviewed records.
8. Location, access & connectivity
- The registered location is HAYATHNAGAR, Anmagal / Anmagal Hayathnagar Village, Hayathnagar Mandal, Ranga Reddy District, PIN 501505. The registered land identity is Survey Nos. 356, 370 and 371, with subdivisions 356/1, 370/1, 371/1, 356/2, 370/2 and 371/2 appearing in the filed DAGPA.
- The plan records surrounding road widths including 12.0 m, 9.0 m and 18 mt. roads, and includes an approach-road condition. The location data identifies the nearest sampled Outer Ring Road interchange at approximately 1.9 km; this is a supplied mapped distance, not a travel-time estimate. The reviewed data does not provide verified public-transport services or measured distances to other landmarks.
9. Developer & development status
- The registered legal promoter is S V CONSTRUCTIONS & DEVELOPERS, identified in the project filing as a partnership. Its supplied GSTIN is 36AEVFS6312J1ZG. The filing names SANVI PROPERTIES INDIA PVT LTD REP BY SRI BANDARU AVENDER as authorized signatory; the project record lists the promoter address at Sanvi Towers, Swamy Ayyappa Co-op Society, Hayathnagar, Ranga Reddy, Telangana, PIN 501505.
- The registration certificate lists a promoter-office PIN of 500081, but does not provide a complete street address in that certificate field. The project record supplies the website svconstructionsndevelopers.com; no official project-specific contact details are provided in the reviewed data.
- The promoter’s Form B affidavit, dated 01-06-2026, undertakes completion by 11/05/2031. The project header separately records proposed completion as 11/09/2031. The registration certificate is valid to 11/05/2031; registration validity, the completion undertaking and the header’s proposed completion date are separate record fields. No construction progress percentage or occupancy certification is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate P02400010934: Section 5 registration for ONE EAST; validity 11/05/2026–11/05/2031; certificate issued 22/06/2026.
Building Permit Order 3733/GHMC/SWBP/LBN1/2026: Building-permit record dated 11/05/2026 for seven residential blocks and an amenities block on Survey Nos. 356, 370 and 371; records 455 dwelling units.
Filed building-permission plan; file 003814/GHMC/01993/SWBP/LBN1/2025: Plan extraction gives site area, built-up areas, building configuration, parking and plan conditions.
Development Agreement-cum-General Power of Attorney 7117/2022: Filed instrument records development rights over land in Survey Nos. 356, 370, 371 and listed subdivisions; it is a development instrument, not itself a conveyance of land title.
Revenue Department letter Lr.No E4/1792/2023, dated 03.05.2024: Filed report concerning a building-permission NOC request for Survey Nos. 356, 370 and 371; it discusses nala/channel and buffer matters.
Form B promoter declaration: Promoter declaration dated 01-06-2026 concerning title, encumbrances, project-account obligations and completion undertaking.
Occupancy / completion certificates: No such certificate is included in the supplied project records; the building-permit extraction marks completion as not certified.
Other project-specific official records: A public-facing HMDA zoning sheet is identified for the area, but the sheet is image-only and the exact zone at the survey has not been read from it. The HMDA approved-layout lookup is reported unavailable through the public portal.
Frequently asked questions
Is ONE EAST registered with Telangana RERA?
Yes. ONE EAST is registered with the Telangana Real Estate Regulatory Authority as P02400010934; the registration status is New Project.
Who is the developer of ONE EAST?
The promoter named in the RERA registration is S V CONSTRUCTIONS & DEVELOPERS.
Where is ONE EAST located?
ONE EAST is in HAYATHNAGAR, Anmagal, Rangareddy, Telangana (501505).
When will ONE EAST be completed?
The promoter's proposed date of completion filed with RERA is 11/09/2031. This is the promoter's declaration, not a guarantee.