Prashamsa - I

MCOR PROJECTS LLP · Sangareddy · RERA P01100008923

PRASHAMSA - I is a residential apartment project in Ameenpur, AMEENPUR, Sangareddy. It is being developed by registered promoter MCOR PROJECTS LLP on a site of 960.24 sq. m, with one residential building comprising 1 stilt + 5 upper floors and 20 3BHK units. The TG-RERA registration number is P01100008923, and the proposed completion date is 27.08.2027.

More from Mcor Projects LLP · 6 projects →

01What we found

RegisteredTG-RERA - valid till 27 Aug 2027
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com

1. Project at a glance

Project identity

ItemProject record
Registered namePRASHAMSA - I RERA record
Project type / phaseResidential apartment project; registered phase/portion: PRASHAMSA - I. The RERA record identifies one building. RERA record RERA filing
TG-RERA registrationP01100008923 RERA record
Registration validity27 August 2024 to 27 August 2027, subject to any extension by the Authority. This is the registration period, not the building-permit validity or construction deadline. RERA record
Registered promoterMCOR PROJECTS LLP, an LLP. RERA record Corporate record
RERA statusRegistered project; the supplied certificate records the validity above.

Land and geographic identity

ItemProject record
LocalityAmeenpur / Ameenpur Municipality RERA record
Revenue villageAMEENAPUR (also rendered as Ameenpur in the plan and approval extracts) RERA record RERA filing
Mandal / district / PINAMEENPUR, Sangareddy, 502032 RERA record
Project survey number and subdivisionSurvey No. 139/PART; the plan identifies plots 4/A/PART (EAST PART), 4/A/PART (WEST PART) and 4/B/PART. RERA record RERA filing
Site extent960.24 sq. m total and net area; the RERA land record reports 960.24 sq. m. Land records
Boundaries in the RERA filingNorth: land in Sy. No. 139 part; South: 33 wide road; East: Plot No. 4/A/part; West: remaining land in Sy. No. 4/B and 4/B/part. RERA filing

Development identity

ItemProject record
Sanctioning authorityAmeenpur Municipality/Municipal Corporation; the filed plan identifies TS-DTCP and notes delegation to Ameenpur Municipality. RERA record
Principal building approval0089/BP/3121/2024, dated 27 August 2024. File No.: 001579/BP/DTCP/3121/0023/2024. Approvals record
Approved built-up area2,025.25 m² excluding parking; the plan also records 2,478.45 m² including parking and 2,490.70 m² as total BUA. These are distinct figures as stated in the plan.
Building count and floorsOne residential building: 1 stilt + 5 upper floors; building height 14.95 m. The approval’s floor schedule records five residential upper floors and one stilt parking floor. RERA filing
Parking shown in approval21 cars proposed; the plan records 453.20 m² parking area. The approval schedule lists 440.52 m² for stilt parking.
Unit count20 units in the filed RERA unit record and plan. RERA unit table

Offering and status

ItemProject record
RERA-filed configuration3BHK; 20 units. RERA unit table RERA unit details
RERA-filed saleable area77.76 m² per recorded 3BHK configuration. RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the portal record has no as-of date, so these counts are indicative. RERA unit table
Construction stageNo independently verified site progress or current construction stage is supplied. The project is registered as a new project; the building approval is not a completion or occupancy certificate. RERA record
Completion datesThe building approval states construction to be completed before 27 August 2027; Form B declares completion by 27.08.2027. These are completion commitments, separate from RERA registration validity.
OC / completion certificateNo completion or occupancy certificate is supplied; the building approval requires an application for an OC after completion and before occupation. The supplied approval extract marks completion as not certified.

2. The project story

PRASHAMSA - I is a registered residential apartment project on a 960.24 m² site in Ameenpur, Sangareddy district, identified in the RERA filing as Survey No. 139/PART. Its filed plan covers plots 4/A/PART (east and west parts) and 4/B/PART. The approved development is a single residential building with one stilt level and five upper floors, with 20 units recorded in the project materials. RERA record Land records

The RERA unit record lists 20 3BHK units and shows them as available, with no booked units in the portal snapshot; that record has no as-of date. The building approval and promoter’s Form B give a completion date of 27 August 2027. No current site-progress evidence or occupancy certificate is supplied, so completion and occupation should not be inferred from registration or sanction alone. RERA unit table RERA unit details

3. Master plan, architecture & building design

  • The filed building plan describes one residential building on a 960.24 m² site. It records 2,025.25 m² proposed built-up area excluding parking, 2,478.45 m² including parking, and 2,490.70 m² total BUA. The plan also records 507.03 m² as vacant plot area. These are plan figures; no FSI-counted area is supplied.
  • The approved configuration is 1 stilt + 5 upper floors, with a stated height of 14.95 m. The approval schedule identifies five residential upper floors, no ground-floor residential area, one stilt parking floor and no cellar parking. The drawing extraction identifies a typical plan for floors 1, 3, 4 and 5 and a separate second-floor plan, but the supplied material does not establish a complete floor-by-floor unit distribution or flats per floor. Floor plans
  • The plan lists a 1.00 m wide green belt, a “Tot-lot” and a green strip among site features. It does not provide a supported description of lift count, stair count, internal circulation design or landscaped-area dimensions.

4. Homes, configurations & floor plans

The TG-RERA filing records 20 3BHK units, each with a saleable area of 77.76 m². It reports 0 booked and 20 available, but does not state the snapshot date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK2002077.76 m²75.7 m² (software-measured median; min/max both 75.7 m²)Not supplied

The carpet figure is software-measured from the filed floor-plan drawing, not a RERA-filed carpet-area disclosure. The drawing measurement reports two measured 3BHK designs. The plan identifies bedrooms, drawing room, dining, kitchen, toilets, balconies and a utility area; the supplied room measurements for one illustrated unit include a 1.5 m × 3.4 m utility and a 1.5 m × 1.92 m balcony. Balcony and utility areas are excluded from the stated drawing-based carpet measurement. Saleable area and carpet area are different measures; the supplied data does not provide a loading figure. Floor plans RERA unit details

The floor-plan measurements also identify 2BHK designs, with a software-measured carpet-area range of 49.3–67.7 m² (median 58.5 m²), but the supplied TG-RERA unit record does not list a 2BHK configuration or unit count. These drawing-based measurements should not be treated as a RERA-filed offering or unit inventory. Floor plans RERA unit details

5. Parking & vehicle circulation

  • The building plan records 21 cars proposed and a parking area of 453.20 m²; the building approval schedule lists 440.52 m² for the stilt parking floor. The approval identifies one stilt parking level and no cellar parking. No resident/visitor/accessibility-space breakdown, two-wheeler count, ramp or driveway details, EV charger count, or unit-wise parking allocation is supplied. A drawn or sanctioned parking provision does not by itself establish exclusive allocation to a buyer.
  • The approval requires the stilt parking area to be used for vehicle parking and not converted or misused. The plan also includes an EV-charging provision for parking areas, but the supplied documents do not establish installed chargers or their number.

6. Amenities, recreation & open spaces

The filed plan and RERA amenities record list the following provisions. A recorded “YES” or plan requirement is not evidence that an item has been completed or independently inspected. RERA amenities

Tot-lot
Description / sizePlan records “Tot-lot 0 m²”; separate plan condition requires it to be fenced and maintained as greenery before OC.
Declared progress / verified statusRERA amenities record shows Green Strip/TOT LOT/Park at 100%; independent completion verification not supplied. RERA amenities
Green strip / greenery
Description / sizePlan identifies a green strip and 1.00 m wide green belt; approval requires peripheral plantation and maintenance of greenery.
Declared progress / verified statusRERA amenities record shows Green Strip/TOT LOT/Park at 100%; independent verification not supplied. RERA amenities
Internal roads and footpaths
Description / sizeListed in RERA amenities record; no dimensions supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% recorded in the portal extract.
Community buildings
Description / sizeListed in RERA amenities record; no facility details supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% recorded.
Aggregate recreational open space
Description / sizeListed in RERA amenities record; no area supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% recorded.

No clubhouse or indoor-facility schedule is supplied. Sports and recreational facilities are mentioned in vendor-provided material, not established as a RERA-filed or sanctioned facility in the supplied project documents. Promoter website

7. Utilities, building services & safety

Water
Evidence in project recordWater supply is marked “YES” and 100% in the RERA amenities extract. The plan identifies a sump and dual-piping-system condition.
Status / limitationNo source, storage capacity, treatment details or independent completion verification supplied. RERA amenities
Sewerage and drainage
Evidence in project recordThe plan lists an STP; the RERA amenities extract marks sewerage (chamber, lines, septic tank, STP) “YES” and 100%. Storm-water drains are listed separately.
Status / limitationSTP capacity and storm-water progress are not supplied; the amenities record shows storm-water drains at 0%. RERA amenities
Rainwater harvesting
Evidence in project recordPlan lists rainwater harvesting; approval requires a rainwater-harvesting structure/percolation pit and records four RWHPs.
Status / limitationA plan/approval requirement, not evidence of installed or functioning systems.
Electrical
Evidence in project recordPlan lists a distribution transformer; approval requires space for a transformer. The amenities record marks electrical meter room/sub-station/receiving station “YES” and 100%.
Status / limitationCapacity and completed installation status are not supplied. RERA amenities
Lifts and accessibility
Evidence in project recordApproval conditions refer to lifts and services under qualified technical supervision.
Status / limitationLift count, capacity, service lift and accessible circulation details are not supplied.
Fire and life safety
Evidence in project recordThe approval places responsibility for fire-safety requirements and necessary firefighting installations on the project parties; the amenities record lists fire protection and fire-safety requirements.
Status / limitationNo system specifications, capacity, clearance or completion evidence supplied. The approval condition is not itself proof of compliance. RERA amenities
Waste
Evidence in project recordApproval requires a garbage house within the premises; the RERA amenities record lists solid-waste management and disposal.
Status / limitationNo segregation or disposal-system specifications supplied; the portal extract records 0% for solid-waste management. RERA amenities
Security and backup power
Evidence in project recordNo project-filed specifications supplied.
Status / limitationNot established by the supplied records.

8. Location, access & connectivity

The registered project location is AMEENAPUR, AMEENPUR, Sangareddy, 502032, with the filed site in Survey No. 139/PART. The RERA record and approval identify Ameenpur/Ameenpur Municipality. RERA record

The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 7.8 km from the cadastral parcel centroid. This is a software-derived proximity measure, not a travel-time estimate. No verified public-transport route or additional measured road distances are supplied in the project location data. Location record Cadastral map

9. Developer & development status

  • The registered promoter is MCOR PROJECTS LLP, an LLP, with GSTIN 36ABSFM8392G1ZI. The project record names Rajendranath Vadala as authorized signatory and Manjunath Reddy Aadika as partner. The promoter address shown in the project record is Rajendranath Vadala, SSPRIYA Estates, Sy. No. 139/PART, Ameenpur, Ameenpur, Sangareddy, 502032. Corporate record Parties record RERA filing RERA filing
  • The promoter’s Form B, dated 12 September 2024, declares completion by 27.08.2027 and includes declarations concerning title, encumbrances, separate-account arrangements and pending approvals. These are promoter declarations, not independent verification of current site progress or completion.
  • The supplied records identify one building and one registered phase/portion, with no phase-wise construction status or independently confirmed progress supplied. No OC is provided. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Reference and scopePRASHAMSA - I; P01100008923; validity 27/08/2024–27/08/2027.
Building approval
Reference and scopeAmeenpur Municipality/Municipal Corporation; approval 0089/BP/3121/2024, dated 27 August 2024; file No. 001579/BP/DTCP/3121/0023/2024; Survey No. 139/Part; one stilt plus five upper floors.
Building-plan drawing
Reference and scope“Layout Plan Details - Building Plan Details”; identifies Survey No. 139/Part and the three plot portions, the building configuration and plan parameters.
Form B promoter declaration
Reference and scopeMCOR PROJECTS LLP; dated 12 September 2024; includes declared completion date of 27.08.2027.
Completion / occupancy record
Reference and scopeNo completion certificate or occupancy certificate supplied. The building approval requires an OC before occupation.

The supplied plan and approval documents contain construction and service conditions; this overview does not reproduce their full conditions. No current independent construction inspection, completion certificate or OC is included in the supplied evidence.

Frequently asked questions

Is PRASHAMSA - I registered with Telangana RERA?

Yes. PRASHAMSA - I is registered with the Telangana Real Estate Regulatory Authority as P01100008923; the registration status is New Project.

Who is the developer of PRASHAMSA - I?

The promoter named in the RERA registration is MCOR PROJECTS LLP.

Where is PRASHAMSA - I located?

PRASHAMSA - I is in AMEENPUR, AMEENAPUR, Sangareddy, Telangana (502032).

When will PRASHAMSA - I be completed?

The promoter's proposed date of completion filed with RERA is 27/12/2027. This is the promoter's declaration, not a guarantee.