S S Enclave

SRI VENKATESHWARA BUILDERS AND DEVELOPERS · Rangareddy · RERA P02400001388

S S ENCLAVE is a residential apartment project in HAYATHNAGAR, Hayathnagar Mandal, Ranga Reddy District, being developed by SRI VENKATESHWARA BUILDERS AND DEVELOPERS. The registered site is 671.33 sq. m, with one building of Stilt + 5 floors and 15 units: 5 2BHK and 10 3BHK. Its TG-RERA registration number is P02400001388, and its revised proposed completion date is 24/08/2024.

More from Sri Venkateshwara Builders And Developers · 5 projects →

01What we found

Period endedTG-RERA registration ran to 24 Aug 2024 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com

1. Project at a glance

Project identity

ItemRecord
Registered project nameS S ENCLAVE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name is stated. The registration record identifies Plot No. 111&112 SOUTH PART; the registered site comprises 671.33 sq. m in Survey No. 228/1. RERA filing
TG-RERA registrationP02400001388
Registration validity18/11/2019 to 24/08/2024; the supplied certificate states a four-year validity period unless extended by the Authority. No extension is recorded in the supplied evidence.
Registered promoterSRI VENKATESHWARA BUILDERS AND DEVELOPERS RERA record Corporate record
RERA statusThe project is recorded as On-Going Project. The registration validity end date is separate from the completion dates and from occupancy-certificate status. RERA record RERA filing

Land and geographic identity

ItemRecord
Locality / recorded site descriptionHAYATHNAGAR; the GHMC permit describes the site as BAGH HAYATH NAGAR. RERA record
Revenue villageHAYATHNAGAR in the RERA identity; Bagh Hayathnagar Village is used in the filed title material. RERA record RERA filing
Mandal / district / PINHayathnagar / Ranga Reddy / 501505 RERA record
Project survey number and subdivisionSurvey No. 228/1; no further subdivision number for the registered project site is stated. RERA filing
Registered site extent671.33 sq. m RERA filing
Total and net areaTotal Area: 671.33 sq. m; Net Area: 671.33 sq. m; area affected: 0 sq. m, as recorded in the RERA land details and GHMC permit. RERA filing
BoundariesEast: PLOT NO 110; West: ROAD; North: PLOT 112 NORTH PART; South: NEIGHBOURS LAND RERA filing

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit number / datePermit No. 2/C3/13958/2018, dated 27 August, 2018; file No. 2/C3/09435/2018 Approvals record
Approved built-up areaThe RERA project record gives Approved Built up Area: 1604.53 sq. m. The permit extraction also includes additional area figures, but does not identify them as the same measure; those figures are not substituted for the RERA-recorded approved built-up area here. RERA filing
Building configurationOne proposed residential building, Stilt + 5 floors; the permit states height 15 m. RERA filing
Tower / block count1 building / block RERA unit table
Parking levelStilt; the permit conditions refer to cellar and stilt parking, but the supplied record does not establish a cellar level for this project.
Unit count15 units in the RERA record; the permit condition says the sanctioned unit count must not be increased without GHMC approval, but the number sanctioned is not supplied in the extracted permit details. RERA unit table

Offering and status

ItemRecord
RERA-filed configurations2BHK: 5 units; 3BHK: 10 units RERA unit table
RERA-filed saleable areas2BHK: 106.18 sq. m; 3BHK: 116.63 sq. m RERA unit table
Booked / availablePortal figures show 0 booked and 5 available 2BHK units, and 0 booked and 10 available 3BHK units. The portal record supplies no as-of date, so counts are indicative. RERA unit table
Construction stageTG-RERA amenities/infrastructure records report varying progress for some items, including water supply 15%, sewerage 20%, and energy management 20%; other listed items show 0%. These are filed progress figures, not independent site verification. RERA amenities
Completion datesThe project record lists proposed and revised proposed completion as 24/08/2024. The Form B declaration states a completion undertaking of 30/06/2024. RERA record RERA filing
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation. Document index

2. The project story

S S ENCLAVE is registered as a residential apartment project on a 671.33 sq. m site identified as Survey No. 228/1, Plot No. 111&112 SOUTH PART, in Hayathnagar, Hayathnagar Mandal, Ranga Reddy District. The RERA and GHMC records describe one proposed residential building, with the GHMC permit specifying a stilt and five floors. RERA filing

The RERA unit schedule lists 15 apartments: five 2BHK and ten 3BHK. The available unit and booking figures are portal snapshots without an as-of date. RERA progress fields report partial progress for some infrastructure items, but the supplied materials do not establish independently inspected construction completion. The record gives a revised proposed completion date of 24/08/2024; no occupancy or completion certificate is supplied. RERA unit table RERA amenities RERA record Document index

3. Master plan, architecture & building design

The GHMC building permit dated 27 August, 2018 sanctions a proposed residential building described as Stilt + 5, with a stated height of 15 m. The RERA record lists Approved Built up Area: 1604.53 sq. m. The permit extraction separately records 1,336.90 for residential upper floors and 241.81 for the stilt; these are permit-extracted components and are not relabelled as RERA approved built-up area. RERA filing

The registered site and net area are each 671.33 sq. m. The permit records road-affected area of 0, a tot-lot area of 0, 30 Trees, and Compound Wall 102.13 RM. It also specifies a periphery strip of greenery and tot-lot fencing/maintenance as conditions. The supplied drawing records do not establish a detailed building footprint, flats per floor, lift or stair arrangement, internal circulation, or a phase-wise plan. RERA filing Document index

The permit extraction contains other figures—Proposed Covered builtup area 93,583.00 and TOTAL: 599,937.00—whose intended measurement basis is not established by the supplied extraction. They are therefore not used as gross built-up, FSI-counted, saleable, or carpet area.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK505106.18 sq. mMedian 60.0 sq. m; measured range 55.4–65.1 sq. m44%
3BHK10010116.63 sq. mNot suppliedNot supplied

RERA saleable areas and unit counts are filing figures; the booking snapshot has no supplied as-of date. The 2BHK carpet measurements are software-measured from the floor-plan drawing, not RERA-filed measurements, and are flagged as needing review. The drawing-derived carpet area is distinct from saleable area, which includes the home’s share of common areas; the supplied evidence does not provide a separate balcony/utility area breakdown. RERA unit table Floor plans RERA unit details

The supplied measured 2BHK drawing sample covers 8 flat designs. One fifth-floor drawing panel identifies flat 03 and labels dining, drawing room, kitchen, two bedrooms, and two toilets. These are drawing-derived room labels and dimensions, not a complete RERA room schedule. No software-measured carpet area is supplied for the 3BHK configuration. RERA unit details Floor plans

5. Parking & vehicle circulation

The building permit provides for a stilt and states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking without partition walls or rolling shutters. The supplied project record does not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible spaces, parking allocation by unit, or whether a cellar is actually part of this building’s approved configuration. Document index

The RERA unit schedule marks both configurations as mortgaged, but this does not establish an individual parking allocation. No parking ratio, ramp arrangement, vehicle entry/exit plan, pedestrian separation, mechanical parking, or EV charging provision is supplied. RERA unit table

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green stripGHMC permit requires the tot-lot to be fenced and maintained as greenery; permit extraction records tot-lot area 0.Permit condition; RERA progress entry for Green Strip/TOT LOT/Park is 0%. Not independently verified complete. RERA amenities
Internal roads & footpathsNo dimensions or layout details supplied.RERA amenitiesRERA progress 0%. RERA amenities
Community buildingsNo facility or size details supplied.RERA amenitiesRERA progress 0%. RERA amenities
Recreational open spaceNo area or facility details supplied.RERA amenitiesRERA progress 0%. RERA amenities

No clubhouse, indoor recreation, sports facility, or other community amenity is established in the supplied RERA amenity records. No independent completion verification is supplied. RERA amenities Document index

7. Utilities, building services & safety

Water supply
Evidence in the supplied project recordRERA amenities record marks YES, with progress at 15%.
Status shownFiled availability/progress; not independently verified. RERA amenities
Sewerage / sewage treatment
Evidence in the supplied project recordRERA item Sewerage (Chamber, Lines, Septic Tank, STP) is marked YES at 20%.
Status shownFiled progress; no capacity or reuse details supplied. RERA amenities
Storm-water drainage
Evidence in the supplied project recordListed in RERA amenities.
Status shownProgress 0%. RERA amenities
Rainwater harvesting
Evidence in the supplied project recordMarked YES in the RERA amenities record; GHMC permit requires a rainwater-harvesting structure (percolation pit).
Status shownRERA progress 0%; permit condition, with no supplied completion verification. RERA amenities
Electrical / transformer
Evidence in the supplied project recordRERA record marks Electrical Meter Room, Sub-Station, Receiving Station: YES. GHMC permit requires space for a transformer.
Status shownRERA progress 0%; no transformer or substation capacity supplied. RERA amenities
Energy management
Evidence in the supplied project recordMarked YES in RERA amenities.
Status shownFiled progress 20%. RERA amenities
Waste
Evidence in the supplied project recordGHMC permit requires a garbage house within the premises. RERA solid-waste-management entry is listed.
Status shownRERA progress 0%; no waste-segregation details supplied. RERA amenities
Fire and life safety
Evidence in the supplied project recordGHMC permit assigns structural- and fire-safety responsibility to the owner, builder/developer, architect and structural engineer; RERA lists fire protection and fire-safety requirements.
Status shownRERA progress 0%; no system specifications or completed inspection evidence supplied. RERA amenities
Lifts / accessibility / security
Evidence in the supplied project recordNo lift capacity, accessible circulation, CCTV, access-control or security details are supplied.
Status shownNot disclosed in the supplied evidence. Document index

8. Location, access & connectivity

The registered project location is HAYATHNAGAR, Hayathnagar Mandal, Ranga Reddy District, PIN 501505. The GHMC permit describes the site as BAGH HAYATH NAGAR, Survey No. 228/1. The registered site boundaries identify a road on the west, but no road name or width in the project location record is supplied. RERA record RERA filing

A location dataset places the cadastral parcel centroid at 17.326701352226372, 78.61866284487061 and lists the nearest sampled Outer Ring Road interchange at approximately 0.8 km. The supplied record does not identify the interchange by name or provide other independently measured access distances. Location record Cadastral map

9. Developer & development status

The registered promoter is SRI VENKATESHWARA BUILDERS AND DEVELOPERS, recorded as a Partnership. The registered office address shown in the project record is 1st FLOOR, SHOP NO 5 & 6, LECTURERS COLONY, BAGH HAYATH NAGAR, HAYATH NAGAR, Hayathnagar, Ranga Reddy, 501505. The RERA record identifies VENU GOPAL REDDY EDULAKANTI as authorized signatory. No corporate identifier or official contact details beyond the supplied address are established here. Corporate record Parties record

The RERA amenity schedule reports partial progress for water supply, sewerage and energy management and zero progress for the other listed items. These are promoter-filed progress figures, not an independent site inspection. The registration certificate is valid through 24/08/2024 unless extended; no extension is recorded in the supplied certificate. The RERA record’s proposed and revised completion dates are 24/08/2024, while the Form B declaration gives a completion undertaking of 30/06/2024. No occupancy or completion certificate is supplied. RERA amenities RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400001388, issued 18/11/2019; valid to 24/08/2024 unless extended
Supplied evidence and scopeForm C registration for S S ENCLAVE, identifying Survey No. 228/1 and the Hayathnagar site. No extension is recorded in this certificate.
GHMC building permit
Identifier / datePermit No. 2/C3/13958/2018; file No. 2/C3/09435/2018; dated 27 August, 2018
Supplied evidence and scopeBuilding Permit Order for the proposed residential building at Survey No. 228/1, Stilt + 5. The permit requires an occupancy certificate before occupation and states that the permission does not confer ownership rights.
Layout / subdivision reference
Identifier / date78878/07/11/2014
Supplied evidence and scopeAppears as a layout / Sub Divn. No. in the GHMC permit extraction; no separate layout approval document is supplied.
Form B promoter declaration
Identifier / dateDated 11TH day ofJANUARY 2018
Supplied evidence and scopePromoter affidavit including a stated title basis, an assertion that land is free from encumbrances, fund-handling and audit undertakings, and a completion undertaking of 30/06/2024.
Title report
Identifier / dateDoc. 42166
Supplied evidence and scopeLegal opinion dated 05-03-2019 concerning Plot No. 111 and the south part of Plot No. 112 in Survey No. 228/1.
Development agreement cum GPA
Identifier / dateDoc. 17724; registered document 5682/2018, dated 18 August 2018
Supplied evidence and scopeFiled document concerning development rights over the site; the extracted document describes owner/developer apartment shares.
Occupancy / completion certificate
Identifier / dateNot supplied
Supplied evidence and scopeNo certificate is present in the supplied project documents. Document index
Layout-plan document
Identifier / dateDoc. 17725
Supplied evidence and scopeListed as the layout plan / layout approval document, but extraction is unavailable; supplied drawing measurement data from this document relates to floor-plan drawings.

Frequently asked questions

Is S S ENCLAVE registered with Telangana RERA?

Yes. S S ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02400001388; the registration status is On-Going Project.

Who is the developer of S S ENCLAVE?

The promoter named in the RERA registration is SRI VENKATESHWARA BUILDERS AND DEVELOPERS.

Where is S S ENCLAVE located?

S S ENCLAVE is in HAYATH NAGAR, HAYATHNAGAR, Rangareddy, Telangana (501505).

When will S S ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 24/08/2024. This is the promoter's declaration, not a guarantee.

More projects in Hayathnagar