Vasanth Vihar
KR CONSTRUCTIONS · Rangareddy · RERA P02400008641
VASANTH VIHAR is a residential apartment project in Hyderguda, Rajendranagar mandal, Ranga Reddy district, developed by registered promoter KR CONSTRUCTIONS. The project has a total plot area of 340.01 sq. m and one building with 1 Stilt + 5 upper floors, comprising 10 2BHK apartments. Its TG-RERA registration number is P02400008641, and the promoter’s Form B undertaking states completion by 27/06/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | VASANTH VIHAR RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name or phase boundary is disclosed; the TG-RERA record identifies the project at the stated survey numbers. RERA record |
| TG-RERA registration | P02400008641 RERA record |
| Registration validity | 14 August 2024 to 27 June 2027, as recorded in the registration certificate. This is the registration-validity period, not a statement of OC status. RERA record |
| Registered promoter | KR CONSTRUCTIONS (also styled “Kr Constructions” in the certificate); partnership. RERA record Corporate record |
| RERA status | New Project RERA record |
| Registration capture | TG-RERA registration record captured 10 September 2026. Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Hyderguda RERA record RERA filing |
| Revenue village | Hyderguda RERA record |
| Mandal | Rajendranagar RERA record |
| District | Ranga Reddy RERA record |
| PIN | 500048 RERA record |
| Project survey numbers / subdivisions | 144/B/1 and 144/B/2 RERA record Land records |
| Registered site area | Total plot area 340.01 sq. m; net plot area 338.08 sq. m in the GHMC building-permit record. |
| RERA land record | Total area and net area each recorded as 340.01 sq. m in the RERA land details. RERA filing |
| Boundaries (RERA record) | East: neighbours’ land; West: 40 0 WIDE ROAD; North: Plot No. 6; South: 40 0 WIDE ROAD. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | 1935/GHMC/CHR/2024-BP, approved 28 June 2024 Approvals record |
| Associated file / plan references | File No. 005680/GHMC/2738/CHR2/2024-BP; plan reference 264/ENG/TP10/GHMC/2020-25; application TS/025837/2024. Approvals record |
| Approved built-up area | GHMC plan record states 893.50 sq. m excluding parking, 1072.20 sq. m including parking, and 1079.70 sq. m total proposed built-up area. These are the record’s separately labelled figures. |
| Building / tower count | One proposed residential building; the RERA record lists one building unit. RERA filing |
| Sanctioned floor configuration | 1 Stilt + 5 upper floors |
| Height and parking | Plan record states total height 20.35mt. and total parking area 178.70 sq. m; cellar 0. |
| Units | 10 units in the building-plan record and 10 units in the RERA unit record. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| Unit type | 2BHK apartments RERA unit table |
| RERA-filed saleable area | 102.66 sq. m per unit RERA unit table |
| Portal inventory | 10 total, 0 booked, 10 available; portal record has no stated as-of date, so counts are indicative. RERA unit table |
| Construction stage | No construction-progress percentage or independently verified site-stage record is supplied. Document index RERA amenities |
| Completion dates | Promoter’s Form B undertaking states 27/06/2027; the GHMC permit states construction to be completed before 28 June, 2027. The RERA certificate’s validity ends 27 June 2027. |
| Occupancy / completion certificate | No OC or completion certificate is included in the supplied project records. The GHMC permit states that an OC is compulsory before occupation. |
2. The project story
- VASANTH VIHAR is registered as a residential apartment project on Plot No. 7 in Hyderguda, Rajendranagar mandal, Ranga Reddy district, on survey numbers 144/B/1 and 144/B/2. The registered site is associated with a single proposed building, rather than a multi-tower or plotted development. RERA record RERA filing
- The sanctioned configuration is 1 Stilt + 5 upper floors, with 10 apartments. TG-RERA lists all 10 as 2BHK units and currently shows 0 booked and 10 available; that inventory is indicative because the portal data has no as-of date. RERA unit table
- The promoter’s Form B declares completion by 27/06/2027. The permit also specifies a construction completion deadline, while the RERA certificate separately records registration validity. No supplied evidence establishes the actual construction stage, completion of any portion, or issuance of an occupancy certificate.
3. Master plan, architecture & building design
- The filed GHMC permit and building-plan record describe a residential building on a plot recorded as 340.01 sq. m, with 338.08 sq. m net plot area in the permit. The plan identifies 1 Stilt + 5 upper floors, a total height of 20.35mt., and 10 sanctioned units.
- The plan extract lists 893.50 sq. m as proposed built-up area excluding parking, 1072.20 sq. m including parking, and 1079.70 sq. m as total proposed built-up area. These figures are retained under the labels supplied in the filed plan; they are not carpet or saleable-area figures.
- The permit identifies parking area of 178.70 sq. m, stilt parking area of 165.53, and cellar area 0. It also records road-affected area and nala-affected area as 0.0 and the plan extract lists a splay area of 1.93 and vacant plot area of 159.37.
- The available material does not provide a complete architectural description of the building’s footprint, flat count per floor, lift or stair arrangement, detailed circulation, or measured landscaping/open-space layout. The sanctioned records do identify a tot-lot and a requirement for greenery; these should not be read as evidence that they have been completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 102.66 sq. m | 65.0–75.1 sq. m; median 66.2 sq. m | 35% |
- RERA records the 2BHK saleable area as 102.66 sq. m per unit. The carpet-area range and median are software measurements from five flat designs in the approved floor-plan drawings, not RERA-filed disclosures; the measurement is flagged for review. The supplied drawing-based room extract for one flat identifies a living/kitchen, two bedrooms and two toilets. RERA unit table RERA unit details Floor plans
- Carpet area is a drawing-based measurement of the home’s internal area; saleable area is the RERA-filed figure and is not interchangeable with carpet area. The supplied records do not provide a separate balcony or utility-area measurement. RERA unit details Floor plans RERA unit table
5. Parking & vehicle circulation
- The sanctioned plan records 178.70 sq. m total parking area, 165.53 as stilt area, and 0 cellar area. The GHMC permit requires the stilt and any cellar approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters; it does not provide a parking-space count.
- The plan extract does not establish resident or visitor bay counts, accessible bays, parking allotment to particular units, ramp arrangements, or a spaces-per-home ratio. A separate vehicle-charging requirement appears in the plan material, but no evidence confirms that charging facilities have been installed.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot; no size supplied |
|---|---|
| Evidence source | GHMC permit and plan record |
| Declared progress / verified status | Sanction/condition record; no completion evidence supplied |
| Description / size | Peripheral greenery and tree planting required; no size supplied |
|---|---|
| Evidence source | GHMC permit |
| Declared progress / verified status | Required by permit; completion not verified |
| Description / size | Two rainwater-harvesting pits stated in the permit; the plan also refers to a percolation pit |
|---|---|
| Evidence source | GHMC permit and plan record |
| Declared progress / verified status | Provided for in approval record; progress not verified |
| Description / size | Within-premises provision |
|---|---|
| Evidence source | GHMC permit and plan record |
| Declared progress / verified status | Required/provided for in approval record; completion not verified |
| Description / size | RERA amenity list includes these categories; no size or facility detail supplied |
|---|---|
| Evidence source | RERA amenities record RERA amenities |
| Declared progress / verified status | Progress shown as 0%; not independently verified |
- The RERA amenity record also lists internal roads and footpaths, street lighting, water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, an electrical meter room/sub-station/receiving station, and aggregate recreational open space. It shows 0% progress for the listed amenities; this is a filed progress value, not independent site verification. RERA amenities
7. Utilities, building services & safety
- The project records list water supply, sewerage, storm-water drainage, rainwater harvesting, an electrical meter room/sub-station/receiving station, and solid-waste management. The building-plan record specifies a separate underground static water-storage tank of 25,000 lits. and a separate terrace tank of 25,000 lits for residential buildings. No supplied record confirms installation or operational status. RERA amenities
- The plan lists a generator and emergency lighting, hose reel, down corner, automatic sprinkler system, and fire-fighting installations. The GHMC permit states that fire and means-of-escape safety are the responsibility of the owner, builder/developer, architect and site engineer, and that an occupancy fire NOC is to be obtained before an occupancy certificate. The supplied evidence does not establish that these systems or clearances have been completed or obtained.
- The plan also includes EV charging infrastructure and broadband/digital-connectivity infrastructure. The permit requires a transformer space, a garbage house, and rainwater harvesting, and specifies safety distances from electrical lines. No lift capacity, accessibility arrangement, CCTV, access-control system, sewerage-treatment capacity, or backup-power capacity is supplied.
8. Location, access & connectivity
- The registered project location is Hyderguda village, Rajendranagar mandal, Ranga Reddy district, Telangana, PIN 500048. The GHMC plan identifies the site at Plot No. 7 and records road access on the west and south boundaries; the RERA boundary entries state 40 0 WIDE ROAD on both sides. RERA record RERA filing
- The supplied location record gives HITEC City — 9.9 km as a connectivity point. No measured public-transport distance, travel time, or further approach-road detail is available in the project-location evidence. Location record
9. Developer & development status
- The registered promoter is KR CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ABBFK5509N1Z1. The RERA record names Katamreddy Sadasiva Reddy as authorized signatory and Gogireddy Ravindra Reddy as partner. The registration certificate gives the promoter’s office location only as village/mandal/district Ranga Reddy, PIN 500048; a more specific registered-office address and official contact details are not supplied there. Corporate record Parties record
- The promoter’s Form B declares completion by 27/06/2027 and includes commitments concerning project funds and approvals. No construction-progress percentage or independent confirmation of completion is provided. The GHMC permit separately specifies completion before 28 June, 2027; registration validity is recorded separately through 27 June 2027. No occupancy certificate is present in the supplied records.
10. Approvals, official records & documents
| Record | Details |
|---|---|
| TG-RERA registration certificate | Form C certificate for VASANTH VIHAR, registration P02400008641; records the promoter, project location and registration conditions. |
| GHMC building permit | Permit 1935/GHMC/CHR/2024-BP, approved 28 June 2024; file No. 005680/GHMC/2738/CHR2/2024-BP. |
| Building-plan record | File No. 264/ENG/TP10/GHMC/2020-25; application TS/025837/2024; records the proposed residential building and plan parameters. |
| RERA promoter declaration | Form B affidavit-cum-declaration by KR CONSTRUCTIONS through Katamreddy Sadasiva Reddy, including the promoter’s completion undertaking and project-account declarations. |
| Occupancy / completion certificate | Not included in the supplied documents. The GHMC permit states that an OC is compulsory before occupation. |
The supplied approval documents include additional reference 364/MP2/HUDA/2003 and DRC No. 02534/TDR/2023. This overview does not assess the detailed sanction conditions or provide an independent verification of approval status beyond the records listed above.
1. Project at a glance
Project identity
Registered project name: VASANTH VIHAR
Project type: Residential apartment project
Phase / registered portion: No separate phase name or phase boundary is disclosed; the TG-RERA record identifies the project at the stated survey numbers.
TG-RERA registration: P02400008641
Registration validity: 14 August 2024 to 27 June 2027, as recorded in the registration certificate. This is the registration-validity period, not a statement of OC status.
Registered promoter: KR CONSTRUCTIONS (also styled “Kr Constructions” in the certificate); partnership.
RERA status: New Project
Registration capture: TG-RERA registration record captured 10 September 2026.
Land and geographic identity
Locality: Hyderguda
Revenue village: Hyderguda
Mandal: Rajendranagar
District: Ranga Reddy
PIN: 500048
Project survey numbers / subdivisions: 144/B/1 and 144/B/2
Registered site area: Total plot area 340.01 sq. m; net plot area 338.08 sq. m in the GHMC building-permit record.
RERA land record: Total area and net area each recorded as 340.01 sq. m in the RERA land details.
Boundaries (RERA record): East: neighbours’ land; West: 40 0 WIDE ROAD; North: Plot No. 6; South: 40 0 WIDE ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 1935/GHMC/CHR/2024-BP, approved 28 June 2024
Associated file / plan references: File No. 005680/GHMC/2738/CHR2/2024-BP; plan reference 264/ENG/TP10/GHMC/2020-25; application TS/025837/2024.
Approved built-up area: GHMC plan record states 893.50 sq. m excluding parking, 1072.20 sq. m including parking, and 1079.70 sq. m total proposed built-up area. These are the record’s separately labelled figures.
Building / tower count: One proposed residential building; the RERA record lists one building unit.
Sanctioned floor configuration: 1 Stilt + 5 upper floors
Height and parking: Plan record states total height 20.35mt. and total parking area 178.70 sq. m; cellar 0.
Units: 10 units in the building-plan record and 10 units in the RERA unit record.
Offering and status
Unit type: 2BHK apartments
RERA-filed saleable area: 102.66 sq. m per unit
Portal inventory: 10 total, 0 booked, 10 available; portal record has no stated as-of date, so counts are indicative.
Construction stage: No construction-progress percentage or independently verified site-stage record is supplied.
Completion dates: Promoter’s Form B undertaking states 27/06/2027; the GHMC permit states construction to be completed before 28 June, 2027. The RERA certificate’s validity ends 27 June 2027.
Occupancy / completion certificate: No OC or completion certificate is included in the supplied project records. The GHMC permit states that an OC is compulsory before occupation.
2. The project story
- VASANTH VIHAR is registered as a residential apartment project on Plot No. 7 in Hyderguda, Rajendranagar mandal, Ranga Reddy district, on survey numbers 144/B/1 and 144/B/2. The registered site is associated with a single proposed building, rather than a multi-tower or plotted development.
- The sanctioned configuration is 1 Stilt + 5 upper floors, with 10 apartments. TG-RERA lists all 10 as 2BHK units and currently shows 0 booked and 10 available; that inventory is indicative because the portal data has no as-of date.
- The promoter’s Form B declares completion by 27/06/2027. The permit also specifies a construction completion deadline, while the RERA certificate separately records registration validity. No supplied evidence establishes the actual construction stage, completion of any portion, or issuance of an occupancy certificate.
3. Master plan, architecture & building design
- The filed GHMC permit and building-plan record describe a residential building on a plot recorded as 340.01 sq. m, with 338.08 sq. m net plot area in the permit. The plan identifies 1 Stilt + 5 upper floors, a total height of 20.35mt., and 10 sanctioned units.
- The plan extract lists 893.50 sq. m as proposed built-up area excluding parking, 1072.20 sq. m including parking, and 1079.70 sq. m as total proposed built-up area. These figures are retained under the labels supplied in the filed plan; they are not carpet or saleable-area figures.
- The permit identifies parking area of 178.70 sq. m, stilt parking area of 165.53, and cellar area 0. It also records road-affected area and nala-affected area as 0.0 and the plan extract lists a splay area of 1.93 and vacant plot area of 159.37.
- The available material does not provide a complete architectural description of the building’s footprint, flat count per floor, lift or stair arrangement, detailed circulation, or measured landscaping/open-space layout. The sanctioned records do identify a tot-lot and a requirement for greenery; these should not be read as evidence that they have been completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 102.66 sq. m | 65.0–75.1 sq. m; median 66.2 sq. m | 35% |
- RERA records the 2BHK saleable area as 102.66 sq. m per unit. The carpet-area range and median are software measurements from five flat designs in the approved floor-plan drawings, not RERA-filed disclosures; the measurement is flagged for review. The supplied drawing-based room extract for one flat identifies a living/kitchen, two bedrooms and two toilets.
- Carpet area is a drawing-based measurement of the home’s internal area; saleable area is the RERA-filed figure and is not interchangeable with carpet area. The supplied records do not provide a separate balcony or utility-area measurement.
5. Parking & vehicle circulation
- The sanctioned plan records 178.70 sq. m total parking area, 165.53 as stilt area, and 0 cellar area. The GHMC permit requires the stilt and any cellar approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters; it does not provide a parking-space count.
- The plan extract does not establish resident or visitor bay counts, accessible bays, parking allotment to particular units, ramp arrangements, or a spaces-per-home ratio. A separate vehicle-charging requirement appears in the plan material, but no evidence confirms that charging facilities have been installed.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | Tot-lot; no size supplied | GHMC permit and plan record | Sanction/condition record; no completion evidence supplied |
| Green strip / planting | Peripheral greenery and tree planting required; no size supplied | GHMC permit | Required by permit; completion not verified |
| Rainwater harvesting | Two rainwater-harvesting pits stated in the permit; the plan also refers to a percolation pit | GHMC permit and plan record | Provided for in approval record; progress not verified |
| Garbage house | Within-premises provision | GHMC permit and plan record | Required/provided for in approval record; completion not verified |
| Community buildings / recreational open space | RERA amenity list includes these categories; no size or facility detail supplied | RERA amenities record | Progress shown as 0%; not independently verified |
- The RERA amenity record also lists internal roads and footpaths, street lighting, water supply, sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, an electrical meter room/sub-station/receiving station, and aggregate recreational open space. It shows 0% progress for the listed amenities; this is a filed progress value, not independent site verification.
7. Utilities, building services & safety
- The project records list water supply, sewerage, storm-water drainage, rainwater harvesting, an electrical meter room/sub-station/receiving station, and solid-waste management. The building-plan record specifies a separate underground static water-storage tank of 25,000 lits. and a separate terrace tank of 25,000 lits for residential buildings. No supplied record confirms installation or operational status.
- The plan lists a generator and emergency lighting, hose reel, down corner, automatic sprinkler system, and fire-fighting installations. The GHMC permit states that fire and means-of-escape safety are the responsibility of the owner, builder/developer, architect and site engineer, and that an occupancy fire NOC is to be obtained before an occupancy certificate. The supplied evidence does not establish that these systems or clearances have been completed or obtained.
- The plan also includes EV charging infrastructure and broadband/digital-connectivity infrastructure. The permit requires a transformer space, a garbage house, and rainwater harvesting, and specifies safety distances from electrical lines. No lift capacity, accessibility arrangement, CCTV, access-control system, sewerage-treatment capacity, or backup-power capacity is supplied.
8. Location, access & connectivity
- The registered project location is Hyderguda village, Rajendranagar mandal, Ranga Reddy district, Telangana, PIN 500048. The GHMC plan identifies the site at Plot No. 7 and records road access on the west and south boundaries; the RERA boundary entries state 40 0 WIDE ROAD on both sides.
- The supplied location record gives HITEC City — 9.9 km as a connectivity point. No measured public-transport distance, travel time, or further approach-road detail is available in the project-location evidence.
9. Developer & development status
- The registered promoter is KR CONSTRUCTIONS, recorded as a partnership, with GSTIN 36ABBFK5509N1Z1. The RERA record names Katamreddy Sadasiva Reddy as authorized signatory and Gogireddy Ravindra Reddy as partner. The registration certificate gives the promoter’s office location only as village/mandal/district Ranga Reddy, PIN 500048; a more specific registered-office address and official contact details are not supplied there.
- The promoter’s Form B declares completion by 27/06/2027 and includes commitments concerning project funds and approvals. No construction-progress percentage or independent confirmation of completion is provided. The GHMC permit separately specifies completion before 28 June, 2027; registration validity is recorded separately through 27 June 2027. No occupancy certificate is present in the supplied records.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C certificate for VASANTH VIHAR, registration P02400008641; records the promoter, project location and registration conditions.
GHMC building permit: Permit 1935/GHMC/CHR/2024-BP, approved 28 June 2024; file No. 005680/GHMC/2738/CHR2/2024-BP.
Building-plan record: File No. 264/ENG/TP10/GHMC/2020-25; application TS/025837/2024; records the proposed residential building and plan parameters.
RERA promoter declaration: Form B affidavit-cum-declaration by KR CONSTRUCTIONS through Katamreddy Sadasiva Reddy, including the promoter’s completion undertaking and project-account declarations.
Occupancy / completion certificate: Not included in the supplied documents. The GHMC permit states that an OC is compulsory before occupation.
The supplied approval documents include additional reference 364/MP2/HUDA/2003 and DRC No. 02534/TDR/2023. This overview does not assess the detailed sanction conditions or provide an independent verification of approval status beyond the records listed above.
Frequently asked questions
Is VASANTH VIHAR registered with Telangana RERA?
Yes. VASANTH VIHAR is registered with the Telangana Real Estate Regulatory Authority as P02400008641; the registration status is New Project.
Who is the developer of VASANTH VIHAR?
The promoter named in the RERA registration is KR CONSTRUCTIONS.
Where is VASANTH VIHAR located?
VASANTH VIHAR is in HYDERGUDA, Rajendranagar, Rangareddy, Telangana (500048).
When will VASANTH VIHAR be completed?
The promoter's proposed date of completion filed with RERA is 27/10/2027. This is the promoter's declaration, not a guarantee.
More projects in Hyderguda